NEOM QUALITY MANAGEMENT

SYSTEM
NESMA
Inspection and Test Plan for Fire Protection PMC OXGAON
NOVEC System VILLAGE
COMPANY
LIMITED
Main
Contractor
Tamimi Global Co.
Contract Rev
Project 20,000 PERSON NRC OXAGON PLOT D ITP No: TPE-MEC-ITP-000000 No:
01 DATE
# No.
Controllin
g Acceptance Level of Participation Points
S.N Activity Phase Inspection / Test Method Document/ Remark
Criteria NEOM
O CONTRACTO PMC(SAJ)
Reference Project
R
Standard Monitor

1 Document Review
Review of shop drawings NEOM Specs Section 212200
with reference to IFC S
1.1 drawings Approved R/H R
drawings

DESIGN / NEOM Specs Section 212200


1.2 ENGINEERING Review of prequalification S
PHASE documents Approved R/H R
submittal

Review of material, Approved


procedures NEOM Specs Section 212200
1.3 submittal R/H R S
procedures

2 Receiving Inspection
Visual inspection for Approved material
submittal Project Approved material MIR / DELIVERY NOTE / MAT
damage, deformity and
Specific 212200 submittal Project S
2.1 Correct label. Specific 212000 H W APPROVAL / MATERIAL
PROCUREMENT CHECKLIST
PHASE
2.2 Material receiving NEOM Specs Section 212200 Approved material
Inspection of Clean submittal Project H W S
agent Fire Extinguishing Specific 212000
system

3 INSTALLATION NOVEC SYSTEM


Pipe, fittings & supports
Drawings / Project SPEC As per approved WIR / MIR APPROVAL DRAWINGS
CONSTRUCTION Installation drawing & method H H S
212200 MECH-TIC1.1
PHASE of statement
NEOM QUALITY MANAGEMENT
SYSTEM
NESMA
Inspection and Test Plan for Fire Protection PMC OXGAON
NOVEC System VILLAGE
COMPANY
LIMITED
Main
Contractor
Tamimi Global Co.
Contract Rev
Project 20,000 PERSON NRC OXAGON PLOT D ITP No: TPE-MEC-ITP-000000 No:
01 DATE
# No.
Controllin
g Acceptance Level of Participation Points
S.N Activity Phase Inspection / Test Method Document/ Remar
Criteria NEOM
O Reference CONTRACTO PMC(SAJ) k
Project
Standard R
Monitor
Installation of FM 200, MOS for Firefighting system
As per approved
NOVEC 1230, CEA-410, Installation, testing and drawing & method of H H S WIR / MIR APPROVAL DRAWINGS
INERGEN SYSTEM, Commissioning statement MECH-TIC1.1
3.1 Container & accessories NEOM Specs Section 212200

3.2 WIR / MIR APPROVAL / DRAWINGS /


Nozzle installation Drawings / Project SPEC
212200 As per approved S MECH-TIC1.1
drawing & method of
statement H W

Above ground piping painting Project Specific


& touch-up 210500 Page 12 As per Approved
of14 S
method of statement WIR / MIR APPROVAL / DRAWINGS /
3.3 H W MECH-TIC1.1

4 TESTING AND COMMISSIONING


4.1 Pneumatic testing of MOS for Fire Fighting As per Approved WIR / MIR APPROVAL / DRAWINGS /
Piping Installation NEOM Specs method of statement MECH-TIC1.1
Section 212200
Approved Shop Drawing/ H H S
NFPA 2001

4.2 Room integrity test As per Approved WIR / MIR APPROVAL / DRAWINGS /
Project SPEC 212200 method of statement
Integration of Novec to the Fire H H S MECH-TIC1.1
Station BMS.
MOS for Fire Fighting As per Approved WIR / MIR APPROVAL / DRAWINGS /
Testing commissioning Installation, method of statement H H S MECH-TIC1.1
Testing, and
Commissioning
NEOM Specs 212200 part
3.9 & NFPA 2001
NEOM QUALITY MANAGEMENT
SYSTEM
NESMA
Inspection and Test Plan for Fire Protection PMC OXGAON
NOVEC System VILLAGE
COMPANY
LIMITED
Main
Contractor
Tamimi Global Co.
Contract Rev
Project 20,000 PERSON NRC OXAGON PLOT D ITP No: TPE-MEC-ITP-000000 No:
01 DATE
# No.
Controllin
g Acceptance Level of Participation Points
S.NO Activity Phase Inspection / Test Method Document/ Remar
Criteria NEOM
CONTRACTO PMC(SAJ) k
Reference Project
R
Standard Monitor
GENERAL NOTES:
1) The first (3) of each inspection or testing activity listed requires 100% participation of client site inspection personnel. After
this period,client inspection may adjust the level of client participation based on the contractor's performance.
2) Hold: The QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be
carried outwithout the QA/QC Team/Client representative in attendance.
3) Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
4) Witness: The QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client
representative
doesn’t come on time for inspection, the activity can proceed.
5) Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check
selection.
6) Once Neom has issued an acceptance of ITP, CONTRACTOR shall not deviate from the requirements in it, unless prior
written from NEOM. The acceptance of this ITP shall not release CONTRACTOR from any other obligations in Schedule”
Q”, or any other contractualobligation.
Hold point for NEOM/ EPM / QC
H inspection/test R Review of Documents S Surveillance

W Witness Inspection / Test RH Review And Approval Of Documents I 100% Contractor Inspection
DOCUMENT CODE: NEOM-NEN-
REVISION CODE: 01.00
SOP-
008_FRM11
©NEOM [2021]. All rights
reserved
INSPECTION CHECKLIST TIC NUMBER Date: WIR NUMBER
Inspection and Test Plan for Fire Protection MECH-TIC-1.3
NOVEC System Rev:

PROJECT TITLE CONTRACT CONTRACTOR


20,000 PERSON NRC Oxagon Plot D NUMBER TAMIMI GLOBAL COMPANY
ITEM
No. ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A Remarks
1 Material Receiving / Preservation & Handling
1.1 Delivered material are approved and free of damage.
As per approved
Handle and store all piping material so not to expose direct to sun light and material submittal
1.2
damage by excessively high temperatures.
1.3 Follow manufacturer recommendations of the supplier of the products.
2 Installation of Fire fighting system
2.1 The sizes of the pipe used are as per approved shop drawings.
2.2 Size of fittings used is correct?
2.3 Setting out and location of pipes and devices are as per approved shop drawings.
2.4 The sizes of the pipe used are as per approved shop drawings.
2.5 Size of fittings used is correct? Manufacturer
recommendation /
2.6 Workmanship of pipe/valve installation, alignment, plumb is acceptable. approved drawing /
2.7 NOVEC cylinder installed and supported properly As per IFC drawing
& NEOM SPECS
2.8 Location of cylinder is as per approved drawings SECTION 212200
2.9 Pressure gauges and pressure switch installed
2.9.1 Fire Sprinkler nozzle installed
2.9.2 Fire Extinguisher Installed
2.93 Identification and labelling of pipes and valves done
3 PIPING PNEUMATIC TEST RECORD
3.1 Installation inspection is accepted and signed off.
3.2 Check for piping connection leaks.
3.3 Pneumatic test record: As per method of
statement & Project
3.4 Test Pressure at 1.5 x Working Pressure Working Pressure: Test Pressure: Specific SECTION
3.5 212200 PART 3.7
Min. of 2 Hours
3.5 No Leaks found/ No Pressure drop

3.6 The final pressure is acceptable

3.7 The test found satisfactory and Acceptable (No leak Found)

3.8 Piping is ready for closure

3.9 Piping system is ready for pre commissioning


Testing & Commissioning
4
Integrity testing of FM 200, NOVIC 1230 is
4.1
performed as per NFPA 2001 Annex C
4.2 Make Sure the Solenoid Valve Is Disconnected from The Cylinders

Verify That the System Is in Normal Mode and Check the Control Panel Display
4.3
and Indicators in The Front of The
Panel SECTION
1st Stage Activate One Detector in A Protected Hazard Area and Please Check 212200 & NFPA 2001
4.4 the Following

4.5 Alarm Bell Inside the Rooms Will Activate.

Outdoor Horn/Strobe Will Activate.


4.6 The Control Panel Send Activation Signal to The Existing Fire Alarm Panel
2nd Stage Activate Other Detector in The Same Protected Hazard and Please
4.7 Check the Following
Releasing Time Delay (30 Seconds Recommended) Will Start Down Counting
4.8
(Abort Switch Can Be
Operated During This Time Delay)
Signal will be Released to Operate HVAC Shut Down, Dampers Closing if
4.9 required
REMARKS: -

Contractor / third party Client


Construction Representative
Name, Work is Completed and Ready for
Inspection
Initials,Date:

QC Client Representative
Inspector
Performed Inspection
Name, Initials Work/Rework May Proceed T&I Witnessed
andDate: QC Record Reviewed
Name, Work Verified
QC Supervisor / Manager
Initialsand
Name, Sign Date:
andDate: