Berikut Data ekonomi awal untuk cebakan KS Creek adalah:

KS Creek - Preliminary Economic Parameters ($US)


Mining Cost Per Tonne Total Material $ 0.55
Milling Cost Per Tonne Ore $ 2.10
General and Administrative (G&A) Per Tonne Ore $ 0.75
Mill Recovery of Copper 92%
Mill Recovery of Gold 80 %
Smelting, Freight , Refining (SFR) Per Pound Payable
$ 0.345
Copper
Smelter Payable (Recovery) of Copper 96.15%
Smelter Payable of Gold 98%
Copper Price Per Pound $ 1.00
Gold Price Per Tr Oz and (Per Gram) $ 375 ($ 12.06)
Breakeven Cutoff Grade for Copper
Internal Cutoff Grade for Copper
Copper Equivalent = Total Copper + .......... x Gold

KS Creek - Summary of Smelting, Refining, and Freight Charges


Copper Concentrate Grade 26%
Smelting Payable of Copper (Deduct 1% of Conc. Grade) 96.15%
Payable Pounds of Copper Per Tonne Concentrate 551.15
Smelting Cost Per Tonne Concentrate $ 100
Transportation Cost Per Tonne Concentrate $ 35
Refining Per Pound Finished Copper $ 0.10

Besarnya break even cut-off grade (BECoG) dan break even stripping ratio (BESR) yang
akan digunakan dalam kegiatan perencanaan tambang dari data di atas diatas yaitu:
BECoG dan ICoG

Nilai BECoG dan ICoG untuk tembaga


Nilai faktor diabaikan dan satuan massa dari tiap variabel yaitu per ton yaitu:
PT. MANDAR NATURAL RESOURCE, Tbk
Head Office: Jl. Poros Malino, Gedung Departemen Teknik
Pertambangan LT2, Kabupaten Gowa, Indonesia
Website: www-MNRmine.com Email:
info.MNRMine@gmail.com
Contact Number: 021-8756474

a. Menghitung nilai BECoG

𝑂𝑛𝑔𝑘𝑜𝑠 (𝑚𝑖𝑛𝑒 + 𝑚𝑖𝑙𝑙 + 𝐺&𝐴)


𝐵𝐸𝐶𝑜𝐺 =
(ℎ𝑎𝑟𝑔𝑎 𝑗𝑢𝑎𝑙 − 𝑆𝑅𝐹) × 𝑚𝑖𝑙𝑙 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑠𝑚𝑒𝑙𝑡𝑒𝑟 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑓𝑎𝑘𝑡𝑜𝑟
0.55 + 2.1 + 0.75
𝐵𝐸𝐶𝑜𝐺 =
(2204.6 − 760.6) × 0.92 × 0.9615
𝐵𝐸𝐶𝑜𝐺 = 0.0026 = 0.26 %

b. Menghitung nilai ICoG

𝑂𝑛𝑔𝑘𝑜𝑠 (𝑚𝑖𝑙𝑙 + 𝐺&𝐴)


𝐼𝐶𝑜𝐺 =
(ℎ𝑎𝑟𝑔𝑎 𝑗𝑢𝑎𝑙 − 𝑆𝑅𝐹) × 𝑚𝑖𝑙𝑙 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑠𝑚𝑒𝑙𝑡𝑒𝑟 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑓𝑎𝑘𝑡𝑜𝑟
2.1 + 0.75
𝐼𝐶𝑜𝐺 =
(2204.6 − 760.6) × 0.92 × 0.9615
𝐼𝐶𝑜𝐺 = 0.0022 = 0.22 %

Nilai BECoG dan ICoG untuk emas

a. Menghitung nilai BECoG:

𝑂𝑛𝑔𝑘𝑜𝑠 (𝑚𝑖𝑛𝑒 + 𝑚𝑖𝑙𝑙 + 𝐺&𝐴)


𝐵𝐸𝐶𝑜𝐺 =
(ℎ𝑎𝑟𝑔𝑎 𝑗𝑢𝑎𝑙 − 𝑆𝑅𝐹) × 𝑚𝑖𝑙𝑙 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑠𝑚𝑒𝑙𝑡𝑒𝑟 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑓𝑎𝑘𝑡𝑜𝑟
0.55 + 2.1 + 0.75
𝐵𝐸𝐶𝑜𝐺 =
(12.06 − 0.81) × 0.8 × 0.98
𝐵𝐸𝐶𝑜𝐺 = 0.38 %

b. Menghitung nilai ICoG

𝑂𝑛𝑔𝑘𝑜𝑠 (𝑚𝑖𝑙𝑙 + 𝐺&𝐴)


𝐼𝐶𝑜𝐺 =
(ℎ𝑎𝑟𝑔𝑎 𝑗𝑢𝑎𝑙 − 𝑆𝑅𝐹) × 𝑚𝑖𝑙𝑙 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑠𝑚𝑒𝑙𝑡𝑒𝑟 𝑟𝑒𝑐𝑜𝑣𝑒𝑟𝑦 × 𝑓𝑎𝑘𝑡𝑜𝑟
PT. MANDAR NATURAL RESOURCE, Tbk
Head Office: Jl. Poros Malino, Gedung Departemen Teknik
Pertambangan LT2, Kabupaten Gowa, Indonesia
Website: www-MNRmine.com Email:
info.MNRMine@gmail.com
Contact Number: 021-8756474

2.1 + 0.75
𝐼𝐶𝑜𝐺 =
(12.06 − 0.81) × 0.8 × 0.98
𝐼𝐶𝑜𝐺 = 0.32 %

Copper Equivalent
Diketahui nilai NSR = 0.74, maka copper equivalent:

𝐶𝑜𝑝𝑝𝑒𝑟 𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 = 𝑡𝑜𝑡𝑎𝑙 𝑐𝑜𝑝𝑝𝑒𝑟 + 𝑁𝑆𝑅 × 𝑡𝑜𝑡𝑎𝑙 𝑔𝑜𝑙𝑑


𝐶𝑜𝑝𝑝𝑒𝑟 𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 = 0.92 + 0.74 × 0.8
𝐶𝑜𝑝𝑝𝑒𝑟 𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 = 1.512 %

BESR
Dengan ongkos pengupasan waste sama dengan ongkos penambangan per ton total material
yakni $0,55, maka BESR dapat dihitung sebagai berikut:

(𝑝𝑒𝑛𝑑𝑎𝑝𝑎𝑡𝑎𝑛 − 𝑜𝑛𝑔𝑘𝑜𝑠 𝑝𝑒𝑛𝑎𝑚𝑏𝑎𝑛𝑔𝑎𝑛 𝑑𝑎𝑛 𝑝𝑒𝑛𝑔𝑜𝑙𝑎ℎ𝑎𝑛)⁄𝑡𝑜𝑛 𝑏𝑖𝑗𝑖ℎ


𝐵𝐸𝑆𝑅 =
𝑜𝑛𝑔𝑘𝑜𝑠 𝑝𝑒𝑛𝑔𝑢𝑝𝑎𝑠𝑎𝑛 𝑤𝑎𝑠𝑡𝑒
(𝑡𝑒𝑚𝑏𝑎𝑔𝑎 + 𝑒𝑚𝑎𝑠) − 2,65
𝐵𝐸𝑆𝑅 =
𝑜𝑛𝑔𝑘𝑜𝑠 𝑝𝑒𝑛𝑔𝑢𝑝𝑎𝑠𝑎𝑛 𝑤𝑎𝑠𝑡𝑒
(11.587998 + 8,82) − 2,65
𝐵𝐸𝑆𝑅 =
0,55
17,75
𝐵𝐸𝑆𝑅 =
0,55
𝐵𝐸𝑆𝑅 = 32,27

Jadi, berdasarkan perhitungan di atas, BESR yang diperoleh yaitu $32,27.