Sei sulla pagina 1di 44

45

thh

1969 - 2014
4

gruppo
g
gr

NEL CUORE
DI OGNI GRANDE
OPERA

IN THE HEART OF
EVERY GREAT
WORK
Generale SICE - Info SICE

CONTATTI - CONTACTS
sice@siceimpianti.com

Presidente - President
Dott. Ing. Vito Villari
vitovillari@siceimpianti.com

Amministratore Delegato - C.E.O.


Dott. Ing. Alberto Villari
albertovillari@siceimpianti.com

Direttore amministrativo qualità ISO e SOA


C.F.O. Director Quality ISO e SOA
Dott. Arch. Emanuela Villari
emanuelavillari@siceimpianti.com
amministrazione@siceimpianti.com

Direttore Tecnico - Technical Director


Per. Ind. Andrea Noventa
andreanoventa@siceimpianti.com

Ufficio Commerciale - Commercial Director


Per. Ind. Igor Pallado
igorpallado@siceimpianti.com
commerciale@siceimpianti.com

Ufficio Lavori, Sicurezza e RSPP - Work’s Office, H&S Manager


Dott. Ing. Pauline Consoli
paulineconsoli@siceimpianti.com

Divisione Impianti Elettrici - Electrical Planning Coordinator


Per. Ind. Marco Varotto
marcovarotto@siceimpianti.com
elettrico@siceimpianti.com

Divisione Impianti Meccanici - Mechanical Planning Coordinator


Dott. Ing. Roberto Maggiolo
robertomaggiolo@siceimpianti.com
termotecnico@siceimpianti.com

Ufficio Gare e Preventivi - Quotes/Estimates Office


preventivi@siceimpianti.com

Ufficio Acquisti - Purchase Office


acquisti@siceimpianti.com

Ufficio CAD - CAD Office


cad@siceimpianti.com
Fondata nel 1969, Sice nasce dal desiderio di un gruppo
di imprenditori veneti di dare vita ad una realtà nuova
COMPANY PROFILE che, sulla scorta del modello produttivo del nordest,
riuscisse ad imporsi prima a livello regionale, e poi
nazionale nell’ambito della progettazione e della
realizzazione di impianti elettrici.

Riuscita nel giro di un ventennio a guadagnare una


posizione di rispetto in tale settore con realizzazioni
Sice srl gruppo leader nella progettazione, significative a livello nazionale e internazionale, sia nel
installazione e manutenzione di impianti elettrici, pubblico che nel privato (ospedali, sedi centrali di
banche, aree e centri commerciali, in Italia, Algeria,
meccanici e speciali in Italia e nel mondo. Arabia Saudita, Turchia e Croazia), Sice crea una
Fondata nel 1969, Sice nasce dal desiderio di un divisione specializzata nella progettazione e installa-
gruppo di imprenditori veneti di dare vita ad una zione di impianti meccanici (termoidraulici, antincendio
realtà nuova, che, sulla scorta del modello e di condizionamento), presentandosi così sul mercato
come una delle prime realtà capaci di offrire al Cliente
produttivo del nordest, riuscisse ad imporsi prima una competenza ed un servizio completi.
a livello regionale, e poi nazionale nell’ambito
della progettazione e della realizzazione L’ultimo decennio l’ha vista sempre più protagonista
di impianti elettrici. anche in tale ambito ed oggi essa risulta leader sul
panorama nazionale nella realizzazione di impianti
elettrici e meccanici, con un fatturato annuo di circa 10
milioni di euro, suddiviso in percentuali quasi uguali tra
i due settori.
Sice srl is leader-group in engineering,
building and service of electrical, L’impresa ha ottenuto inoltre la certificazione di qualità
mechanical and networking systems. UNI EN ISO 9001:2008 (n° 510 del 13/02/2012) e l’attesta-
zione SOA La Soatech srl (n.15569/17/00 del 05/04/2013)
Founded in 1969, Sice was born from the per le categorie OG1, OG10, OG11, OS3, OS30, OS28 e
desire of a group of Venetian entrepreneurs to OG9, fino al VI livello (vedi certificati), per complessivi
realize a new reality, which, on the basis of the circa 30 milioni di euro.
production model of the Northeast, was able to
impose as leader of design and installation of
Founded in 1969, Sice was born by the dream of a group
electrical equipment, first at the regional of local managers, to start up a new company that, in
level and then nationally. the “nord-east” way of making business, wiel improve
new realization of electrical equipments, by the time in
the regional market and then in all the country side.

In the last 20 years, Sice became a leader in the market


of electrical plants, developing business activities
abroad, building all plants in hospital areas, bank’s
headquarters, trading areas in Italy, Algeria, Saudi
Arabia, Turkey and Croatia. In the same time, completing
the offer, Sice build a new business unit of mechanical
plants and the project unit, giving to the holders a full
solution for all technological systems.

In the last ten years Sice increases business up to 10 mln


€ shared in the two division of electrical and mechanical
Presidente systems.
President
Dott. Ing. Vito Villari Sice is UNI EN ISO 9001:2008 certified and SOA certified
for categories OG1, OG10, OG11, OS3, OS30, OS28 e
OG9, to the VI° level. (30 mln).
DIVISIONI
INDICE - INDEX

DIVISIONS pag. 3

PROGETTI
PROJECTS pag. 9

ELENCO REFERENZE LAVORI


LIST OF WORK REFERENCES pag. 29

CERTIFICAZIONI
CERTIFICATIONS pag. 40
Sice s.r.l. ha al suo organico oltre 40 addetti, una divisione
specializzata nella progettazione e realizzazione degli impianti
elettrici e affini, una divisione specializzata in quelli meccanici
(termoidraulici, idricosanitari, antincendio,di condizionamento, etc),
una addetta alla realizzazione di tutti gli impianti speciali e
di sicurezza quali antintrusione, TVCC, controllo accessi, cablaggio
strutturato, diffusione sonora, supervisione e termoregolazione,
DIVISIONI
una divisione esperta nella realizzazione degli impianti a fonti
rinnovabili quali fotovoltaico, eolico, biomasse, biogas, etc.
DIVISIONS
Sice has a staff of more than 40 employees, a division specialized in
design and realization of electrical installations, a division specialized
in mechanical installations (thermohydraulic, hydrosanitary,
fire protection, air conditioning, etc.), another one is assigned at the
realization of all the special and security systems such as intrusion
detection, CCTV, access control, structured wiring, sound system,
supervision and thermoregulation and a division expert in the
production of renewable energy systems such as solar,
wind, biomass, biogas, etc.
Sice ha assunto una posizione di rilievo nella progettazione,
DIVISIONE PROGETTAZIONE installazione e manutenzione di impianti elettrici,
meccanici e speciali.
DESIGN DIVISION La divisione di progettazione e sviluppo è costituita da
un pool di ingegneri, periti, architetti (iscritti all’Albo
professionale di riferimento) e con esperienze professio-
nalità ad oggi ultra quarantennali.
È in grado di accompagnare il Cliente dallo studio di
fattibilità fino alla progettazione esecutiva e costruttiva,
Sice ha un ufficio tecnico interno composto da oltre che nell’analisi dettagliata e nella traduzione in
professionisti di lunga esperienza dedicato solo alla “cantierabili” di progetti realizzati per Committenti
terzi.
progettazione preliminare, definitiva, esecutiva e
costruttiva relativa a tutta l’intera gamma di Settori Principali
impianti che realizza (impianti elettrici,
termotecnici, condizionamento, antincendio, • impianti di spegnimento antincendio sprinkler e a gas inerte
• impianti idricosanitari e scarichi
idrotermosanitari, trattamento aria e speciali). • impianti elettrici civili, industriali, terziari, direzionali,
commerciali, di produzione e dispaccio di energia elettrica
• reti di distribuzione in AT, MT e BT
• impianti di trasformazione di potenza
• impianti di diffusione sonora, impianti TVCC
• impianti antintrusione, controllo accessi, varchi e presenze
• impianti multimediali e audiovisivi
• reti e sistemi di cablaggio strutturato e telefonici
Sice has a technical department, • impianti di rilevazione fumi e spegnimento incendi
consists of experienced professionals, • impianti TV e satellitari
dedicated to preliminary, definitive and executive • impianti fotovoltaici, solari termici, eolici, centrali a
biodigestione e a biomasse, geotermici
design and construction on the entire range of • impianti di building automation, termoregolazione,
plant which Sice realizes (electrical, supervisione e domotica
heat engineering, air conditioning,
fire protection, plumbing, HVAC and special).
Sice has reached a successful position in design,
setting-up and maintenance of electrical and mechanical
plants.
Project division is a pool of engineers, technician and
architects (booked on the respective professional
register), with over forty years of experience.
This team suggests the customer by the featuring of a
new project to the realization of a solution “all inclusive”.

Main Applications

• Fire prevention systems


• Hydraulic plants

1
• Electrical plants including industrial, offices, trading centers,
• Power production and distribution
• HV, MV and LV networks
• Audio diffusion systems, TVCC
• Access control, security and checking systems
• Multimedia control
• LAN e WAN solutions
• TV set and satellite broadcast
• Solar systems, wind-based systems, ecological systems
• Building automation, clima settings and control

4
Sice è stata una delle prime realtà a livello nazionale a
DIVISIONE IMPIANTI ELETTRICI specializzarsi nella progettazione, installazione e
manutenzione di impianti elettrici, maturando
ELECTRICAL PLANTS DIVISION un’ esperienza e una professionalità ad oggi
ultraquarantennali.

Lo staff di Sice è in grado di gestire e risolvere ogni


problematica in quest’ambito, intervenendo su immobili
con ogni destinazione d’uso e potendo soddisfare le
Progettazione, installazione, supervisione e specifiche esigenze del Cliente in piena armonia con le
controllo quadri elettrici di media e bassa tensione, normative vigenti.
cabine, impianti di trasformazione e di potenza, Settori principali
centrali elettriche e cogenerative.
• Ospedali
• Banche e istituti assicurativi
• Terziario e direzionale
• Centri e parchi commerciali
• Scuole e istituti universitari
• Industriale
• Illuminazione pubblica
• Aree sportive e culturali

Design, installation, supervision and


control switchboards of medium and low voltage,
cabins, processing plants and power plants, power
plants and cogeneration.

Sice was one of the first companies specialized in


engineering, installation and maintenance of electrical
system, having experience from 1969.

Staff is full-skilled to solve every problem, for every type


of plant, according to the customer’s requirements.

Main Applications

• Hospital areas
• Banks and insurances
• Offices and retail areas
• Trading areas

2
• Schools and universities
• Industrial areas
• Public lighting
• Social and sport areas

5
Sice copre tutti i settori nella progettazione,
DIVISIONE IMPIANTI MECCANICI realizzazione e manutenzione di impianti meccanici.

MECHANICAL PLANTS DIVISION In particolare opera su:

• Impianti termoidraulici (idrico-sanitario, scarichi, etc)


• Condizionamento e trattamento dell’aria
• Antincendio (Sprinkler, idranti, gas inerte, etc)
• Termoregolazione, gestione e supervisione
Installazione e supervisione impianti di
climatizzazione, riscaldamento e condizionamento, L’esperienza maturata in questo settore consente a Sice
di affrontare ogni problematica fornendo al Cliente la
termoregolazione, impianti areaulici, antincendio, migliore soluzione possibile, in piena armonia con le
idrico-sanitari, a gas inerte normative vigenti.

Settori Principali

• Ospedali
• Banche e istituti assicurativi
• Terziario e direzionale
• Centri e parchi commerciali
• Scuole e istituti universitari
• Industriale
• Aree sportive e culturali
Installation and supervision of air conditioning
systems heating and air conditioning,
temperature control systems, air treatment,
fire protection, waterworks, plumbing, hvac

Sice is leader in the engineering, installation and


maintenance of mechanical systems in particular:

• Water plants
• Air-conditioning and air-treatment
• Fire prevention and protection
• Clima management and supervision
• Waterworks and plumbing

The remarkable experience gives to Sice all the


knowledge to solve every customer’s problem by the
best possible solution, according to the law.

3
Main Applications

• Hospital areas
• Banks and insurances
• Offices and retail areas
• Trading areas
• Schools and universities
• Industrial areas
• Social and sport areas

6
Per fornire al Cliente un servizio e una competenza
DIVISIONE SISTEMI E globali sull’opera o sull’intervento, Sice può contare su
uno specifico settore che progetta, realizza e manutiene
TECNOLOGIE INNOVATIVE tutti gli impianti “speciali” per la gestione intelligente
del “building” secondo le specifiche esigenze del Cliente.
INNOVATIVE SYSTEMS DIVISION
Sice interviene su:
• sistemi di supervisione, domotica, building automation
e regolazione
Sistemi e tecnologie innovative: • impianti di cablaggio strutturato (parte passiva e
attiva) chiavi in mano
cablaggio strutturato, telefonia, • impianti di antintrusione e di sicurezza
TVCC, antintrusione, controllo accessi e • impianti tvcc e videocitofonici
presenze, diffusione sonora, rilevazione fumi, • impianti di sonorizzazione e diffusione sonora
TV-SAT, building automation, fotovoltaico, • impianti di rilevazione fumi e incendio
• sistemi e impianti audiovisivi, TV, satellitari e di
solare termico, biomasse videoconferenza
• impianti controllo accessi, varchi e presenze

L’attenzione di Sice è da sempre inoltre rivolta verso le


nuove tecnologie e le fonti energetiche alternative e
rinnovabili. Per questo è stata costituita una divisione
all’avanguardia nella realizzazione e gestione di:
• impianti fotovoltaici
• impianti a collettori solari termici
Innovative systems and technologies: • impianti eolici
structured cabling, telephony, • impianti e sistemi geotermici
• sistemi e gruppi di assorbimento, impianti a biomasse
CCTV, antitheft, access control and e biodigestione
attendance, sound systems, smoke detection, In tutti questi settori Sice è partner certificato dei
TV-SAT, building automation, photovoltaics, principali costruttori mondiali e, in virtù di questo, è in
solar thermal, biomass grado di fornire al Cliente ogni forma di garanzia sull’opera.

To full-care every project directly, overviewing the


develop of the construction, Sice is able to manage every
step, including all the advanced plants like:
• building automation
• LAN systems
• antitheft and control systems
• TVCC and video systems
• audio and conference rooms
• fire prevention systems
• access control and authorizations
Main Applications

4
Sice is every time up-to-date to the last
technology and alternative power source.
So a specific unit is able to project:
• photovoltaics systems
• solar thermal systems
• wind systems
• geothermical systems
• thermovalorization
Sice is partner of the major manufacturers in the world.

7
HYPO ALPE ADRIA BANK s.p.a.
INDICE PROGETTI - PROJECTS INDEX

pag. 10
VENETO BANCA s.c.ar.l. pag. 11
PAM-PANORAMA s.p.a. pag. 12
GRUPPO POLICENTRO s.p.a. pag. 13
AZIENDA SANITARIA EMILIA ROMAGNA pag. 14
AGENZIA DELLE ENTRATE E DEL TERRITORIO pag. 15
FINBENI HOLDING s.r.l. pag. 16
F.LLI LANDO s.p.a. pag. 17
IMPIANTI FOTOVOLTAICI NOVA COOP s.c.ar.l. PIEMONTE pag. 18
SHOPPING TEN pag. 19
UNIVERSITA’ DEGLI STUDI DI PADOVA pag. 20
FRIULAIR s.r.l. pag. 21
DUSSMANN SERVICE s.r.l. pag. 22
MARINA VERDE s.r.l. pag. 23
BROSS - REDAIS s.r.l. pag. 24
INTERPORTO DI PADOVA s.p.a. pag. 25
TENUTA DI CASTEFALFI s.p.a. pag. 26
SERENISSIMA RISTORAZIONE s.p.a. pag. 27
L’intero staff di Sice opera con la consapevolezza
che un solo fatto conta più di mille parole.
Nelle pagine che seguono si possono scorrere una
PROGETTI
lista delle referenze dedicate ad alcuni tra gli ultimi
cantieri più significativi da noi realizzati. PROJECTS
The entire staff of Sice works with the
knowledge that one only fact counts more than a
thousand words.
In the following pages you can scroll through a list
of references dedicated to some of the most
significant recent construction realized by us.
La nuova sede della Hypo Alpe Adria Bank a Tavagnacco
(UD) è un progetto ambizioso, che stupisce già per
HYPO ALPE ADRIA BANK s.p.a. l’originale struttura pensata dall’architetto californiano
Thom Mayne. Il progetto è articolato in un edificio
direzionale di 8 piani (oltre 12.000 mq) che troneggia
inclinato di ca 14° sulla verticale, un avveneristico
auditorium con copertura a vela (ca 1.000 mq),
Sede centrale Italia - Tavagnacco (Udine) una filiale operativa, un complesso adibito ad archivi (di
Servizi: impianti elettrici, speciali e meccanici ca 1.500 mq) con uno sviluppo lineare di oltre 100 metri
e l’asilo, per un investimento globale di 36 milioni di
Anno: 2005 - 2006 euro.
Importo Lavori: € 5.027.128,00 Gli impianti sono stati progettati dallo Studio IN.AR.CO.
di Udine (per un appalto di oltre 5 milioni di euro) e la
realizzazione ha impegnato SICE per 14 mesi,
con l’impiego di oltre 40 maestranze.
A conclusione dei lavori, gli impianti risultano raffinati
Headquarter Italy – Tavagnacco (Udine) almeno quanto le strutture e i numeri restituiscono una
Services: electrical, mechanical and special plants fotografia chiara del valore del lavoro.
Years: 2005-2006
Amount of work: € 5.027.128,00 I Numeri del progetto

• oltre 7.000 mq di soffitti radianti alimentati da


16 distinte linee di tubazioni dorsali per un totale di
ca 44.000 kg
• 1.300 infissi e tende motorizzati gestiti da un
complesso impianto di building automation con
trasduttori atmosferici
• 1,6 MVA di potenza elettrica complessiva installata
• oltre 50 quadri elettrici di bassa tensione
• oltre 8.000 mt di canalizzazioni portacavi
• 720 kVA di gruppo di autoproduzione elettrodiesel
• oltre 1.600 mq complessivi (tra due CED e archivi)
protetti da impianti di spegnimento a gas inerte
• 8 linee ridondanti di blindosbarre da 250A a servizio
delle utenze ai piani
• 800 torrette portaprese da incasso su pavimento
flottante per postazioni di lavoro
• 500 kVA complessivi sotto continuità assoluta
• oltre 4.500 mq di canalizzazioni di mandata e quasi
30.000 Kg di ripresa per un sofisticato impianto
aeraulico che gestisce 16 aree indipendenti

A very particular project for the new headquarter of


Hypo Alpe Adria Bank in Tavagnacco (UD), the original
architecture, planned by the famous Californian
architect Thom Mayne consisting of a directional
building (more than12.000sqm) of 8 floors tilted of 14°,
a new auditorium with sail cover (of ca 1.000sqm),
a bank office, and a nursery school.

Numbers Of The Project

• More than 7.000 sqm of radiant celling panels


powered by 16 lines for a total of 44.000 kg
• 1.300 motorized windows and curtains placed under
a building automation control
• 1,6MVA of total electrical power
• Over 50 power panels under low voltage
• 720kVA of power backup systems
• More than 1600sqm of CED and archives protected by
fire guard systems
• 800 work-places
• 500 kVA under UPS
• An up-to-date system of climatization with 16
independent areas.
• More than 4.500sqm of supply ducts and more than
30.000 kg of return air ducts.

A project and a work where Sice was a SINGLE PARTNER


by his total quality in building and maintenance of
systems

10
La sede centrale di Veneto Banca a Montebelluna (TV) si
sviluppa su una superficie complessiva di circa 17.000 mq.
VENETO BANCA s.c.ar.l. E’ composta da un edificio direzionale principale di 4
piani (2.100 mq ciascuno) con annesso auditorium semi-
circolare da 350 posti, da un edificio mensa di ca 1.000
mq, da un ulteriore edificio adibito ad archivi e locali
tecnologici per ca 3.500 mq.
Sede centrale Italia - Montebelluna (Treviso) Gli impianti, progettati dallo Studio TiFS di Padova, sono
Servizi: impianti elettrici, speciali e meccanici molto sofisticati sotto il profilo del building automation,
che prevede la supervisione computerizzata in tempo
Anno: 2002-2005 reale di tutti gli apparati (impianti elettrici, illuminazione
Importo lavori: € 6.133.482,44 con reattori digitali dimmerabili DALI, rilevazione fumi,
TVCC, controllo accessi, antintrusione, termoregolazione
etc); l’opera risulta complessa anche in termini meccanici,
prevedendo l’attivazione di 3 gruppi termofrigoriferi
che scambiano calore con acqua di falda prelevata
Headquarter – Montebelluna (Treviso) mediante 2 pozzi a 110 mt di profondita con pompe da
Services: electrical, mechanical and special plants 100 mc/h. L’intervento di SICE si è sviluppato complessi-
vamente in 26 mesi di lavoro, con l’impiego di 40
Years: 2002-2005 maestranze di cantiere. L’importo della commessa per gli
Amount of work: € 6.133.482,44 impianti supera i 6 milioni di euro.
I numeri del progetto
• 16 Centrali di Trattamento Aria
• 3 gruppi frigoriferi condensati ad acqua con compressori
a vite ciascuno da 358 kWf
• 300 ventilconvettori a quattro tubi, oltre 60.000 kg di
tubazioni idrauliche in acciaio nero, ca 10.000 Kg di
tubazioni idrauliche in acciaio zincato, oltre 50 quadri
elettrici di bassa tensione
• oltre 6.000 mt di canalizzazioni portacavi,
ca 7.000 mt di cavidotti esterni
• impianto di cablaggio strutturato con 16 rack per un
tot di ca 3.000 prese in campo RJ45, oltre 180 km di
cavo AWG24 cat.7 SFTP e 400 fibre ottiche multimodali
per un tot di 4.000 mt di cavo a 12 fibre ottiche
• oltre 300 rilevatori antintrusione
• ca 50 telecamere fisse con 9 monitor e 4 registratori
digitali connessi via rete ethernet
• oltre 80 diffusori acustici, ca 1.000 punti di gestione
dell’impianto di supervisione
• ca 30 centrali di rilevazione fumi ad aspirazione,
oltre 600 punti rilevazione di fumo

The new headquarter of Veneto Banca is about 17.000


sqm with a main building of 4 floors of 2.100sqm each
one, a semi-circular auditorium of 350 seats and a service
area of 1.000 sqm and CED build of 3.500sqm

The plants, projected by TIFS – Padova, are very


particular, including building automation, lighting, full
control checking and many others. Air conditioning and
air treatment include 3 power settings coolers with
geothermal system of 110m of depth.

This project needed over 26 months and over 40


full-time workers.

Numbers Of The Project

• 16 air handling units


• 3 coolers of 358 KWf
• 300 fan coils, 60.000kg of each one steel
10.000 kg of galvanized steel pipelines
• Over 6.000 mt of cable trays and 7.000 mt outdoor
lines
• LAN system with over 3.000 RJ45 outlet, over 300 km
of AWG 24 cat. 7 SFTP, cables and 400 fiber optics network
• Over 300 anti-theft sensors
• 50 cam with 9 monitors and 4 recorders
• Over 80 speakers
• 1.000 control monitoring system points
• 30 fire-alarm systems with 600 points of reveal

11
La realizzazione del centro commerciale di Ariccia
rappresenta un progetto importante e al tempo stesso
PAM-PANORAMA s.p.a. una sfida significativa, per l’impegno tecnico e operativo
richiesto.
SICE è stata scelta come partner unico in nome della
fiducia della garanzia di qualità legata ad un marchio
consolidato.
Centro Commerciale Ariccia (Roma) L’intervento di SICE – che ha messo a disposizione le
Servizi: impianti elettrici, speciali e meccanici proprie competenze per affinare le soluzioni tecniche
proposte nel progetto – si è dimostrato competitivo ed
Anno: 2006 è stato ancora una volta importante per la visione
Importo lavori: € 2.940.000,00 integrata del lavoro.

I numeri del progetto

• ca 25 milioni di euro di investimento globale


Trading Center Ariccia (Rome) • ca 3 milioni di euro di appalto per le opere
Services: electrical, mechanical and special plants impiantistiche elettriche e meccaniche
• 40 persone in cantiere per 6 mesi
Year: 2006 • 13.000 mq di aree coperte di cui 6.000 mq di sala
Amount of work: € 2.940.000,00 vendita, 1.000 mq di sala lavorazioni, 1.500 mq di
negozi di terzi, 1.000 mq di uffici, 2.000 mq di locali
tecnici, 1.500 mq di magazzino di stoccaggio merci,
30.000 mq complessivi di parcheggi
• 2,5 MVA di potenza elettrica complessiva installata
• 800 kVA da gruppo di autoproduzione elettrica diesel
• 15 quadri elettrici di bassa tensione
• 15.000 mt di canalizzazioni e portacavi
• impianto di cablaggio strutturato con 8 rack per 500
prese cat. 5e e 100 attestazioni di fibra ottica
• 300 punti ottici, termici e lineari per impianto di
rivelazione fumo
• 200 punti in campo, costituiti da sensori a infrarossi e
doppia tecnologia, per impianto antintrusione
• impianto di gestione (building managment system)
con 600 punti controllati
• ca 40.000 kg di canalizzazioni aerauliche
• ca 15.000 kg di tubazioni idrauliche a servizio degli
impianti di condizionamento
• ca 20.000 kg di tubazione a servizio dell’impianto
Sprinkler per 1.200 testine in campo totali

Building of this trade center represents a very important


project and a real challenge for the effort submitted.
SICE has been chosen by PAM as the sole partner trusting
in his quality and capabilities.
The internal planning division help, was only one of the
branch who support the engineers pool to find the best
solution for the best plans inside this center: a very
important field to an integrated overview on all the
process.

Numbers Of The Project

• Approximately 25.000.000 euro of global investment


• Approximately 3.000.000 euro of plants investment
• 40 workers engaged
• 13.000sqm of covered areas, 6.000sqm of sales room,
1.000sqm processing room, 1.500sqm of shops,
1.000sqm for offices, 2.000 of technical rooms,
1.500 for docks and 30.000sqm for parking
• 2,5 MVA of total power
• 800 kVa of backup power
• 15 power panels
• 15.000 m of cable trays
• LAN system with 8 rack, 500 outlet cat.5e and 100
fiber optic lines
• 300 optical, thermal and linear fire alarm points
• 200 points for anti-theft system
• 600 points for building management
• About 40.000kg of ducting
• About 15.000kg of hydraulic circuit (air-treatment)
• About 20.000kg of sprinkler system pipes
(1.200 points)

12
L’esperienza ultraquarantennale nella costruzione di
impianti per la Grande Distribuzione Organizzata
GRUPPO POLICENTRO s.p.a. (centri commerciali, ipermercati), con oltre 70 realizzazioni
in tutta Italia, ha indotto il Gruppo Policentro SpA a
scegliere SICE come appaltatore unico di quello ad oggi
è il suo progetto più importante: il centro commerciale
Tower Center di Rijeka (HR), che si affaccia sulle isole di
Tower center – Rijeka (Croazia) Krk e Cres.
Servizi: impianti elettrici, speciali e meccanici SICE è partner di Policentro dal 1994 e questo proficuo
legame ha portato a collaborazioni in tutta Italia, tra le
Anno: 2005-2006 quali vale la pena di citare i centri commerciali La Grande
Importo lavori: € 14.130.000,00 Mela a Sona (VR), Torri d’Europa a Trieste, Piazzagrande
a Piove di Sacco (PD) e Piazza Umbra a Trevi (PG).
Le cifre del Tower Center sono notevoli, anche per
questo è forse il progetto che testimonia al meglio la
capacità di SICE nell’operare in Italia e all’estero,
Tower center – Rijeka (Croatia) garantendo al cliente totale affidabilità e un servizio di
Services: electrical, mechanical and special plants alta specializzazione.
Year: 2005-2006 I numeri del progetto
Amount of work: € 14.130.000,00
• ca 100 milioni di € di investimento globale
• 70 maestranze di cantiere
• ca 150.000 mq di aree coperte, comprendenti anche
un multisala cinematografica da 1700 posti,
una sala giochi, una palestra, un ipermercato di
ca 10.000 mq
• 1.877 posti auto
• oltre 180 negozi
• oltre 11 MVA di potenza elettrica complessiva
installata suddivisa in 5 cabine distinte e
12 trasformatori di potenza
• ca 1,7 MVA totali da gruppi di autoproduzione
elettrodiesel
• oltre 350.000 Kg di canalizzazioni aerauliche
• oltre 50.000 Kg di tubazioni idrauliche a servizio
degli impianti di condizionamento
• oltre 250.000 Kg di tubazioni a servizio dell’impianto
sprinkler per ca 9.000 testine totali in campo
• impianti speciali: TVCC, antintrusione,
diffusione sonora, rivelazione fumi

Policentro S.P.A. required Sice as sole contractor of his


best plan: “Tower Center“ the new trade center of
Rijeka (HR), a building area over the town and his islands
of Krk and Cres
Since 1994 SICE is a friendly partner of Policentro,
and this relationship has led to a lot of realizations:
• La Grande Mela of Sona (VR);
• Torri d’Europa of Trieste (TS);
• Piazzagrande of Piove di Sacco (PD);
• Piazza Umbra of Trevi (PG).

Numbers Of The Project

• Approximately 100 millions of euros of total


investment
• More than 140.000sqm of covered areas,
a 1700 seats multiplex cinema, games area,
fitness center and a 10.000sqm superstore
• 1877 parking spaces
• More than 180 shops
• 70 workers
• Over 11MVA of total electrical power
• Approximately 1,7MVA of electro diesel power’s backup
• More than 350,000 kg of ducting
• More than 50,000 kg of hydraulic piping for
air conditioning systems
• More than 250,000 kg of piping for fire
protection system
• CCTV, anti-theft, audio, fire alarm

13
Il nuovo blocco dell’Ospedale di Budrio (BO), di proprietà
AZIENDA SANITARIA della ASL Emilia Romagna, consta di quattro piani (di cui
tre totalmente fuori terra) per una superficie coperta
EMILIA ROMAGNA complessiva di ca 5.000 mq e di una nuova camera
mortuaria (Morgue) da ca 300 mq. Ogni piano è costituito
da due ali diametralmente opposte e da un corpo
centrale che accoglie lo sbarco per ascensori e
Ospedale – Budrio (Bologna) montalettighe e i vani scale.
Servizi: impianti elettrici, speciali e meccanici Il complesso comprende un reparto radiologico al piano
seminterrato con 5 sale RX, 8 studi medici e 4 ambulatori
Anno: 2006-2007 ecografia e mammografia; 38 stanze di degenza ai piani
Importo lavori: € 2.550.000,00 primo e secondo; 4 ambulatori medici per terapia
intensiva, il pronto soccorso nell’ala Est del piano terra
(ca 600 mq) e nell’ala Ovest l’ingresso principale (ca 380
mq) con reception e bar interno; i locali tecnici sono
distribuiti tra il seminterrato (centrale tecnologica e di
Budrio Hospital (Bologna) pompaggio in copertura) e l’interrato (centrale gruppi
Services: electrical, mechanical and special plants antincendio, con vasca da ca 130 mc).
Years: 2006-2008 I numeri del progetto
Amount of work: € 2.550.000,00
• 66 quadri elettrici e centralini di bassa tensione
• Oltre 2.500 mt di canalina portacavi in acciaio zincato
• Oltre 25.000 mt di linee energia in cavo FG7OM1 0,6/1 kV
• Oltre 3.000 mt di cavo coassiale TV-SAT con 50 prese
TV-SAT miscelate in campo
• Un sofisticato impianto di termoregolazione e
building automation Siemens che gestisce e comanda
oltre 1.000 punti logici in campo
• Ca 1.000 corpi illuminanti per illuminazione normale
e oltre 300 plafoniere per illuminazione di emergenza
gestite da impianto di diagnosi e telecontrocco
centralizzato
• Gruppo statico di continuità assoluta UPS da 60 kVA
• Un sofisticato impianto di rilevazione e segnalazione
incendi digitale interattivo Siemens Sinteso con oltre
600 punti in campo
• Impianto di videochiamata infermiera ABB Clinos Phon
per 38 degenze, 19 WC assistiti, 3 capo sala 17
ambulatori e studi medici
• Impianto di diffusione sonora conforme a norma
EN60849 con 60 diffusori acustici in campo da incasso
con fondello in acciaio e morse o in ceramica conforme
alle British Standard BS5839 part 8

The new branch of Budrio Hospital is a 4 floors


(3 above) building for a total of about 5.000sqm and a
Morgue of 300sqm
Each floor is set with two areas and a common area
which houses the landing for elevators, stretcher lifts
and stairwells. The building contains 5 RX room, 8 main
rooms and 4 ambulatories, 38 hospital rooms,
4 emergency rooms and the first aid area and the
entrance to the hospital with reception and bar.
Technical rooms are in the basement with the
fire-fighting units, with a water sypply of approx 130
cubic meter..

Numbers Of The Project

• 66 electrical panel
• More than 2.500m of cable-trays
• More than 25.000m of power lines
• More than 3.000m of TV SAT system
• Siemens systems for building automation
(over 1.000 points)
• Over 1.000 lighting systems and 300 full logic
emergency light system
• UPS for 60kVA
• Siemens SINTESO fire detection system with more
than 600 points
• Videocall system ABB CLinos for 38 bedrooms,
19 WC, 3 nurse and 17 other rooms
• Audio system according to EN60849 and
BS5839 part B law.

14
Nella realizzazione di edifici adibiti ad uso terziario
AGENZIA DELLE ENTRATE direzionale, SICE ha maturato una vasta esperienza.
Negli ultimi anni, solo a Padova, per l’impresa SVEC SpA
E DEL TERRITORIO ha realizzato la nuova sede provinciale dell’INAIL e la
nuova sede della facoltà di Economia dell’Università
degli Studi di Padova. Il proficuo legame di collaborazione
ha portato a questo nuovo progetto che, per dimensioni
Sede centrale (Padova) e complessità, rappresenta una sfida impegnativa per
Servizi: impianti elettrici e speciali SICE.
La qualità del lavoro e l’attenzione ad ogni particolare
Anno: 2006 ha consentito di realizzare compiutamente e correttamente
Importo lavori: € 768.604,54 il progetto.

I numeri del progetto

• Tre blocchi di edifici attigui per oltre 8.000 mq


Headquarter (Padova) complessivi adibiti ad uffici e ca 2.000 mq di
Services: electrical and special plants autorimesse interrate
• N° 3 cabine per un totale di 1 MVA ca di potenza
Years: 2006 elettrica complessiva installata.
Amount of work: € 768.604,54 • oltre 1.500 apparecchi di illuminazione
• oltre 240 apparecchi di illuminazione di sicurezza
• Quasi 400 posti di lavoro previsti
• N° 3 impianti di rilevazione fumi per un totale di ca
700 punti in campo
• Impianti di richiesta udienza
• N° 3 impianti autonomi TV e Satellitari
• Ca 30 quadri elettrici di bassa tensione
complessivamente installati
• Oltre 4.000 mt di canalizzazioni portacavi
• N° 2 impianti di spegnimento ad aerosol autonomi a
servizio degli archivi

SICE has gained particular experience in the construction


of buildings for commercial and directional use.
In recent years, only in Padua, for SVEC SpA enterprise,
SICE has implemented new INAIL provincial headquarters
and the new headquarters of the Faculty of Economics
of Padua University. The fruitful relationship of cooperation
has led to this new project, which represents a challenge
for SICE for its size and complexity
The quality of work and the attention to every detail has
allowed us to fully and properly implement the project.

Numbers Of The Project

• 3 blocks of adjacent buildings over 8,000 square


meters used for offices and about 2,000 square meters
of underground garages
• 3 electrical sub-station of 1MVA
• More than 1500 lighting fixtures
• More than 240 safety lighting fixtures
• Nearly 400 workplaces
• 3 smoke detection systems for a total of 700 points
• 3 independent TV and satellite systems
• More than 4000 m of cable support
• 2 aerosol fire control systems

15
Il Centro Commerciale Iperlando di Conselve, che sorge
in corrispondenza della statale Monselice mare,
FINBENI HOLDING s.r.l. rappresenta il primo vero grande Centro Commerciale
del gruppo IPERLANDO S.p.A.Consta di ca. 33.000 mq.
coperti totali su unico piano con un Ipermercato LANDO
S.p.A. da ca. 7.900 mq., gallerie per tot. 3.000 mq. e tot.
20.000 mq. di negozi di cui N. 8 grandi o medie
Centro Commerciale IPERLANDO superfici.
di Conselve (PD)
SICE s.r.l. è stata scelta come partner impiantistico unico
Servizi: impianti elettrici, speciali e meccanici sia elettrico che meccanico, e ha messo ancora una volta
Anno: 2008-2009 le sue competenze e la sua struttura a servizio del
Importo Lavori: € 6.000.000,00 Cliente.

I numeri del progetto


Mall IPERLANDO of Conselve (PD) • Ca. 40 milioni di Euro di investimento globale
Services: electrical, mechanical and special plants • Oltre 40 maestranze di cantiere medie
• 33.000 mq. di totale superficie coperta
Years: 2008-2009 • 7.900 mq. di Ipermercato di cui 4.900 mq. di area vendita
Amount of work: € 6,000,000.00 • 3.000 mq. di gallerie coperte e spazi comuni
• 20.000 mq. per negozi e N. 1.300 posti auto scoperti
• Oltre N. 3.385 testine impianto sprinklers
• 4,3 MVA di potenza elettrica complessiva installata
• 850 kVA autoprodotti da gruppi elettrogeni diesel
• Oltre 91.000 Kg. di canalizzazioni aerauliche

Iperlando Conselve Shopping Center, located along the


highway Monselice-Mare, is the first real big shopping
center realized by IPERLANDO SpA group. It consists of
approx. 33,000 sqm of covered area totally on one level
with a Hypermarket LANDO SpA of approx. 7,900 sqm,
arcade for tot. 3,000 sqm and tot. 20,000 sqm of shops
including 8 large or medium-sized areas.

SICE s.r.l was chosen as the sole partner for the


installation of electrical and mechanical systems, and has
once again brought its expertise and its structure to
service the customer.

Numbers Of The Project

• Approximately € 40 million global investment


• More than 40 construction site workers
• 33,000 sqm of covered area
• 7,900 sqm Hypermarket including 4,900 sqm of sales area
• 3,000 sqm of covered arcades and public areas
• 20,000 sqm of shops and 1,300 parking places
• More than 3,385 nozzles of sprinklers system
• 4.3 MVA of total electric power installed
• 850 kVA self-produced by diesel generators
• More than 91,000 kg of ducting

16
Il Centro Commerciale Iperlando di Cittadella (PD)
rappresenta il secondo grande complesso commerciale
F.LLI LANDO s.p.a. realizzato dal Gruppo Iperlando S.p.A.
Il progetto è nato nel lontano 1999 ma per oltre 10 anni
è rimasto sospeso a causa di ritardi e problematiche
amministrative e burocratiche.
Il complesso consta di un piano interrato adibito ad
Centro Commerciale IPERLANDO autorimessa da tot. 29.000 mq., di un Ipermercato da
di Cittadella (PD) 8.000 mq., di cui 5.100 mq. di area vendita, da un
multisala cinematografico con N. 2 sale per tot. N. 400
Servizi: impianti elettrici, speciali e meccanici posti a sedere.
Anno: 2012-2013 SICE s.r.l. è stata scelta come partner impiantistico unico
Importo Lavori: € 6.000.000,00 e ha realizzato l’opera inaugurandola il 06/11/2013.

I Numeri del progetto


Mall IPERLANDO of Cittadella (PD)
Services: electrical, mechanical and special plants • Ca. 50 milioni di Euro di investimento globale
• Ca. 50.000 mq. di totale aree coperte di cui 29.000 mq.
Year: 2012-2013 di autorimesse interrate
Amount of work: € 6,000,000.00 • N. 1 multisala cinematografico da N. 2 sale per tot. N.
400 posti a sedere
• N. 897 posti auto complessivi interrati
• Oltre 3.000 testine sprinklers complessive
• 2,5 MVA di potenza elettrica complessiva installata
• 850 kVA autoprodotti da gruppi elettrogeni diesel

The Shopping Center Iperlando of Cittadella (PD) is the


second largest shopping complex built by Iperlando SpA
Group.
The project was started back in 1999 but for over 10
years has been suspended due to administrative and
bureaucratic delays and problems.
The complex consists of 29,000 square meters garage in
the basement, an Hypermarket of 8,000 sqm, including
5,100 sqm of sales area, a multiplex cinema with 2 rooms
for a total of 400 seats.
SICE s.r.l was chosen as the sole partner for the construction
of facilities and completed the work inaugurating the
06/11/2013.

Numbers Of The Project

• Approximately 50 million Euro global investment


• Approximately 50,000 sqm of total covered areas
including 29,000 sqm of underground garages
• 1 multiplex cinema with 2 rooms for a total of
400 seats
• A total of 897 parking spaces underground
• More than 3,000 nozzles of sprinklers system
• 2.5 MVA of total electric power installed
• 850 kVA self-produced by diesel generatorsA project
and a work where Sice was a SINGLE PARTNER by his
total quality in building and maintenance of systems

17
SICE s.r.l. ha realizzato per la NOVA COOP s.c.ar.l. del
IMPIANTI FOTOVOLTAICI Piemonte nel 2013 N. 5 impianti fotovoltaici su
altrettanti ipermercati (Borgosesia, Santhià, Tradate,
NOVA COOP s.c.ar.l. PIEMONTE Novara, Pinasca) per tot. 635 kWp, con un importo lavori
complessivo di Euro 863.000. Tutti questi impianti sono
stati realizzati con pannelli policristallini o monocristallini
da 250 Wp di produzione EU e con certificato in Classe
Servizi: N. 5 impianti fotovoltaici ed elettrici di Reazione al Fuoco 1 con inverters trifasi del tipo
Anno: 2013 “distribuito” stagno (tipo Power One Aurora Trio) e con
strutture autoportanti in alluminio non perforanti
Importo Lavori: € 863.000,00 zavorrate. Tutti gli impianti sono ricaduti negli incentivi
del V° Conto Energia.

I Numeri del progetto

• 635.000 Wp complessivi installati


Photovoltaic plants - Coop Piemonte s.c.ar.l. • N. 2.540 pannelli poli/mono-cristallini 250 Wp EU con
Services: n. 5 photovoltaic and electrical plants Classe di Reazione al Fuoco 1 per VVF
• N. 22 inverters Power One Aurora Trio 27,6 kW con
Year: 2013 Datalogger RS485 e Supervisione
Amount of work: € 863,000.00 • Strutture autoportanti non perforanti zavorrate in
profili di alluminio
• Oltre N. 5.000 zavorre da 60 Kg. cad. in c.a. vibrato
• Oltre 730.000 kWh complessivi attesi annui di energia
autoprodotta
• Oltre 130.000 Euro complessivi attesi di risparmio in
bolletta annuo
• Oltre 510 tonnellate di CO2 evitate annue

In 2013 SICE s.r.l has realized for the NOVA COOP s.c.ar.l.
5 photovoltaic systems on many hypermarkets
(Borgosesia, Santhià, Tradate, Novara, Pinasca) for a total
of 635 kWp, with a total contract amount of Euro
863,000. All of these plants have been realized with
polycrystalline or monocrystalline 250 Wp of EU
production and certified in Class 1 Fire Resistance with
three-phase watertight “distributed” inverters (type
Power One Aurora Trio) and with self-supporting in non
penetrating ballasted aluminum structures.

Numbers Of The Project

• 635,000 Wp total installed


• 2,540 poly / mono-crystalline 250 Wp panels EU with
Class 1 Fire Reaction
• 22 Power One Aurora Trio 27.6 kW Inverters
Datalogger with RS485 and Supervision
• Self-supporting structures in non-penetrating
ballasted aluminum profiles
• More than 5,000 vibrated concrete weights of 60 kg
each
• More than 730,000 kWh total expected annual energy
self-produced
• More than 130,000 Euro of the total expected annual
savings
• More than 510 tons of CO2 avoided per year

18
Il Centro Commerciale Shopping Ten sorge a Tencarola
nei pressi di Selvazzano (PD) ed è costituito da una
SHOPPING TEN superficie coperta di tot. 10.470 mq. di cui 4.700 mq. di
autorimessa interrata, 2.700 mq. di Ipermercato
ASPIAG- DESPAR., 1.400 mq. di negozi, zone comuni e
gallerie del Centro Commerciale e da un piano 1° adibito
a palestra Happy Fit da 1.670 mq.
Centro Commerciale Shopping Ten SICE è stata scelta come partner impiantistico unico ed
di Tencarola (PD) ha realizzato i lavori in meno di 8 mesi con una media di
20 maestranze.
Servizi: impianti elettrici, speciali e meccanici
Anno: 2010-2011 I Numeri del progetto
Importo Lavori: € 1.750.000,00
• Ca. 10 milioni di Euro di investimento globale
• Tot. 10.470 mq. di superficie totale coperta
• Tot. 4.700 mq. di autorimessa interrata con
Shopping Ten Mall – Tencarola (PD) N. 144 posti auto
Services: electrical, mechanical and special plants • Tot. 2.700 mq. di Ipermercato Aspiag-Despar
• Tot. 1.670 mq. di palestra Happy Fit al piano 1°
Years: 2010-2011 • 1.727 testine sprinklers totali
Amount of work: € 1,750,000.00

The Shopping Ten Mall is located near Tencarola


Selvazzano (PD) and consists of a 10,470 sqm area
including a 4,700 sqm underground garage, a 2,700 sqm
ASPIAG-DESPAR Hypermarket , 1,400 square meters of
shops, arcades and public areas of the shopping center
and a 1,670 sqm 1st floor used as a Happy Fit gym.
SICE has been chosen as the sole partner plant and has
carried out the work in less than 8 months with an
average of 20 workers.

Numbers Of The Project

• Approximately 10 million global investment


• Total 10,470 sqm of the total area covered
• Total 4,700 sqm. of underground garage with
N. 144 parking spaces
• Total 2,700 sqm Hypermarket of Aspiag-Despar
• Total 1,670 sqm Happy Fit gym on the 1st floor
• 1,727 nozzles for sprinklers system

19
L’edificio della facoltà di Biologia e Biomedicina
UNIVERSITÀ DEGLI STUDI dell’Università degli Studi di Padova, ideato dal famoso
architetto Mario Botta di Lugano, stupisce sia per la
DI PADOVA bellezza delle forme ispirate dallo sbocciare di un fiore,
sia per le monumentali dimensioni e sviluppo esterni e
interni. Consta infatti di tot. 15.000 mq. complessivi su
N. 5 piani adibiti ad aule per un tot. di oltre N. 1.500
Nuova Facoltà di Biologia e Biomedicina posti, laboratori, uffici, autorimessa, spazi comuni, etc.
Servizi: impianti elettrici e speciali
SICE è stata scelta come impiantista elettrico specializzato
Anno: 2011-2013 ed ha eseguito anche tutti i molteplici e complessi
Importo Lavori: € 1.698.750,00 impianti speciali a servizio dell’intero fabbricato
(rilevazione fumi e gas, diffusione sonora, trasmissione
dati / cablaggio strutturato, etc.).

New Biology and Biomedicine Faculty - Padova I Numeri del progetto


Services: electrical and special systems plants
• Oltre 30 milioni di investimento globale
Year: 2011-2013 • 15.000 mq. di superficie coperta globale
Amount of work: € 1,698,750.00 • N. 17 aule con oltre N. 1.500 posti a sedere
• N. 21 laboratori didattici e di ricerca
• 2,5 MVA di potenza elettrica complessiva installata
• Oltre N. 2.500 apparecchi illuminanti
• N. 1 gruppo elettrogeno da 650 kVA

The building of Biology and Biomedicine Faculty of


Padua University , designed by the famous Lugano
architect Mario Botta, surprising both for the beauty of
forms inspired by the blossoming of a flower, and for the
monumental size and external and internal development.
In fact consists of 15,000 square meters divided into 5
floors used as classrooms with more than 1,500 seats,
laboratories, offices, garage, common areas, and so on.
SICE has been chosen as specialized electrical plant
engineer and also performed all the multiple and
complex special equipment to service the entire building
(smoke and gas detection, sound, data / structured
cabling, and so on).

Numbers Of The Project

• More than € 30 million global investment


• 15,000 sqm of global covered area
• 17 classrooms with more than 1,500 seats
• 21 teaching and research laboratories
• 2.5 MVA of total electric power installed
• More than 2,500 luminaires
• 1 generator of 650 kVA

20
L’ampliamento della sede centrale produttiva della
FriulAir s.r.l., ditta presente in tutto il mondo specializzata
FRIULAIR s.r.l. nella costruzione di essiccatori e gruppi frigoriferi,
consta di ca. 10.000 mq. di nuovo capannone alto ca.
12 mt. interni con zona magazzino, area produzione e
mensa e di un nuovo corpo uffici sul fronte da tot.
ca. 1.000 mq. su 3 piani.
Sede Centrale Cervignano del Friuli (UD) SICE s.r.l. è stata scelta come partner impiantista unico
Servizi: impianti elettrici, speciali e meccanici sia elettrico che meccanico per la sua serietà e competenza.
Anno: 2013-2014
Importo Lavori: € 1.300.000,00 I Numeri del progetto

• 10.000 mq. di ampliamento


magazzini / produzione / mensa
• 1.000 mq. nuova palazzina uffici su 3 piani fuori terra
Headquarter Friulair s.r.l. • 7,5 milioni di Euro di investimento globale
Cervignano del Friuli (UD) • 1 MVA di potenza elettrica totale installata
• Tot. N. 462 apparecchi illuminanti full led installati
Services: electrical, mechanical and special plants • Tot. N. 40 torrette portaprese da incasso nel pavimento
Year: 2013-2014 flottante degli uffici
Amount of work: € 1.300.000,00 • Tot. 1.738 mt. di blindo luce e FM installate

The expansion of the production headquarters of


FRIULAIR Ltd, worldwide company specialized in the
construction of dryers and refrigeration units, consists of
approximately 10,000 square meters of new factory high
approximately 12 mt. with internal storage area,
production area and refectory and a new 3 floors office
block on the front of approximately 1,000 square meters.
SICE s.r.l has been chosen as a partner both electrical and
mechanical plant engineer only for his reliability and
expertise.

Numbers Of The Project

• 10,000 sqm expansion of


warehouse / production / refectory
• 1,000 sqm new office building on 3 floors
• 7.5 million global investment
• 1 MVA of total electric power installed
• 462 full led lighting fixtures installed
• 40 turret socket built in the raised floor of the offices
• 1,738 mt. light and power busway installed

21
Il nuovo Centro Cottura del Comune di Padova sorge
all’interno dell’Interporto in zona Z.I.P. in Corso Stati
DUSSMANN SERVICE s.r.l. Uniti 18. Detto consta di tot. 1.850 mq. adibiti a cucina
industriale, zona preparazione, cucina diete speciali
(celiachi, etc.), area lavaggio, area stoccaggio e zone e
locali tecnici.
Realizzato da SICE s.r.l. in meno di 14 settimane
Nuovo Centro Cottura Comune di Padova impiegando in media 18 maestranze con punte di 24
Servizi: impianti elettrici, speciali e meccanici operai, è il fiore all’occhiello della DUSSMANN SERVICE
S.r.l. non solo in Italia ma nel Mondo e rappresenta il suo
Anno: 2013 più grande e tecnologicamente avanzato Centro di
Importo Lavori: € 850.000,00 Cottura.

I Numeri del progetto


City of Padua – New Cooking Centre • 1.850 mq. totali coperti
Services: electrical, mechanical and special plants • Oltre 4 milioni di investimento globale
• Oltre 18.000 mq. di canalizzazioni aerauliche
Year: 2013 • N. 4 UTA per tot. 69.910 mc/h
Amount of work: € 850.000,00 • N. 1 gruppo frigorifero da 352 kWf
• N. 3 caldaie a condensazione per tot. 348 kWt

The new Cooking Center is located within the Interport


of Padua in the industrial area. It consists of 1,850 sqm
used for industrial kitchen, preparation area, cooking
special diets (gluten free meals, and so on), washing
area, storage area and technical rooms.

Realized by SICE s.r.l. in less than 14 weeks using an


average of 18 workers with a peak of 24 workers, it is
the flagship of the DUSSMANN SERVICE s.r.l. not only in
Italy but in the world and represents its largest and most
technologically advanced center of cooking.

Numbers Of The Project

• 1,850 sqm total covered


• More than 4 million global investment
• More than 18,000 sqm of ducting
• 4 air handling units for tot. 69,910 m³ / h
• 1 352 kWf chiller
• 3 condensing boilers for tot. 348 kWth

22
Il Marina Verde Wellness Resort è un avveniristico
complesso immobiliare che sorge fronte mare a Caorle (VE)
MARINA VERDE s.r.l. costituito da N. 2 torri gemelle da 6 piani fuori terra per
tot. N. 75 appartamenti di lusso, N. 1 bar / ristorante,
N. 1 autorimessa interrata da 8.200 mq. per ca. tot.
N. 100 posti auto e un wellness center da 1.500 mq.
L’edificio, progettato dal famoso Arch. Simone Micheli,
Marina Verde Wellness Resort, Caorle (VE) è realizzato interamente con struttura e solai in legno
Servizi: impianti meccanici ed affini Holzbau-Rubner, certificato in Classe Energetica A+
CasaClima, dotato di sofisticati impianti con pompe di
Anno: 2011-2012 calore geotermiche ad acqua di pozzo, fotovoltaico,
Importo Lavori: € 3.000.000,00 domotica, solare termico, trattamento aria automatizzato
Aldes e pavimenti radianti per oltre 4.500 mq.
Il complesso ha vinto due prestigiosi premi: il TrE Number
ONE Award 2011 Expo Venice e il Contemporary S.p.A.
Award 2011 – Best Future S.p.A., Arch. Simone Micheli.
Marina Verde Wellness Resort, Caorle (VE)
Services: mechanical plants
I Numeri del progetto
Years: 2011-2012
Amount of work: € 3.000.000,00 • 35 milioni di investimento globale
• Oltre 4.500 mq. di pavimento radiante
• N. 6 pompe di calore geotermiche condensate ad
altissima efficienza ad acqua di falda per tot. 297 kWf
• N. 75 unità motoventilanti a recupero di calore Aldes
• Circa N. 100 posti auto interrati per 8.200 mq. tot.

The Marina Verde Wellness Resort is a futuristic building


complex that is situated beachfront in Caorle (VE)
consisting of 2 twin towers of 6 floors above ground for
75 luxury apartments in total, 1 bar / restaurant,
1 underground garage of 8,200 sqm for approximately
100 parking spaces and a wellness center of 1,500 sqm
The structure and the floors of this building, designed
by the famous architect Simone Micheli, are made
entirely of Holzbau-Rubner wood. It is certified Climate
House Energy class A+, equipped with sophisticated
systems with well water geothermal heat pumps, solar,
home automation, solar thermal, Aldes automated air
handling and over 4,500 square meters of radiant floors.
The complex has won two prestigious awards: the Expo
Venice TrE Number ONE Award 2011 and the
Contemporary SpA Award 2011 – Best Future SpA,
Architect Simone Micheli.

Numbers Of The Project

• 35 million global investment


• More than 4,500 sqm radiant floor
• 6 high efficiency ground water geothermal heat
pumps for tot. 297 kWf
• 75 Aldes air handling units with heat recovery
• Approximately 100 underground parking spaces
distributed in 8,200 sqm.

23
Il complesso Redais di Via Casal Bertone a Roma consta
di oltre N. 90 appartamenti di lusso suddivisi in 7 piani
BROSS - REDAIS s.r.l. fuori terra e di un’ampia autorimessa interrata da
tot. 9.600 mq. con N. 180 posti auto.
Gli appartamenti, tutti in Classe A CasaClima, sono dotati
di pannelli radianti a pavimento, domotica Bticino My
Home SCS e di ampissime terrazze esterne dotate di tutti
Complesso Redais, Via Casal Bertone – Roma i confort ivi compresi degli ombrelli riscaldanti a soffitto
Servizi: impianti elettrici, speciali e meccanici da esterno per godere delle terrazze anche nelle stagioni
più rigide.
Anno: 2009-2011
Importo Lavori: € 5.700.000,00
I Numeri del progetto

• Ca. 40 milioni di investimento globale


• N. 90 appartamenti di lusso per tot. 7.000 mq.
Complex Redais, Via Casal Bertone – Rome • Una autorimessa interrata da N. 180 posti auto per
Services: electrical, mechanical and special plants ca. 9.600 mq.
• Una centrale termica centralizzata a gas metano
Years: 2009-2011 da 1.050 kWt
Amount of work: € 5.700.000,00 • Impianto solare termico da tot. 103 kWt

The Redais complex in Rome consists of over 90 luxury


apartments divided into 7 floors above ground and a
large 9,600 sqm underground garage with 180 parking
spaces.
All the Class A KlimaHouse apartments are equipped
with radiant floor, Bticino My Home SCS home automation
and very large outdoor terraces equipped with all the
comforts including ceiling patio heater to enjoy the
terraces even in the colder climate..

Numbers Of The Project

• Approximately 40 million of global investment


• 90 luxury apartments for total 7,000 sqm
• A 9,600 sqm underground garage with 180 parking
spaces
• A 1,050 kWth natural gas centralized thermal power
plant
• A 103 kWth solar thermal plant

24
La piattaforma logistica lotto H dell’Interporto sorge in
zona industriale di Padova (Z.I.P.) in Via Inghilterra.
INTERPORTO DI PADOVA s.p.a. L’opera consta di un fabbricato adibito per 4.570 mq. a
magazzino di stoccaggio merci con altezza interna di ca.
12 mt. e di altri 622 mq. di blocco uffici su 2 piani fuori
terra. SICE ha realizzato l’impiantistica sia elettrica, sia
meccanica, sia antincendio per un valore di ca. Euro
Piattaforma Logistica Lotto H, 800.000, ultimando le opere in un tempo record
Via Inghilterra Z.I.P. (PD) inferiore ai 4 mesi.
Servizi: impianti elettrici, speciali e meccanici
Anno: 2011-2012 I Numeri del progetto
Importo Lavori: € 800.000,00
• Investimento globale di ca. 4 milioni di Euro
• Tot. 4.570 mq. di magazzino di stoccaggio h = 12 mt.
• Tot. 622 mq. di blocco uffici su 2 piani
Site H Logistic Platform, Via Inghilterra (PD) • N. 651 totali testine antincendio sprinklers ad umido
Services: electrical, mechanical and special plants tipo ESFR a norme NFPA13:2010
• 50.000 Kg. complessivi di tubazione acciaio zincato per
Years: 2011-2012 sprinklers
Amount of work: € 800.000,00

The Interporto site H logistics platform is situated in the


industrial area of Padova (ZIP) in Via Inghilterra.
The work consists of a building used for 4,570 sqm as a
storage warehouse with an internal height of
approximately 12 mt. and other 622 sqm as offices on 2
floors above ground. SICE has realized electrical,
mechanical and fire installations,for a value of approx.
€ 800,000,00 completing the works in a record time of
less than 4 months.

Numbers Of The Project

• Global investment of approx. 4 million Euro


• Total 4,570 sqm storage warehouse h = 12 m.
• Total 622 sqm block offices on 2 floors
• N. 651 nozzles of wet type sprinklers system ESFR
standards NFPA 13: 2010
• A total of 50,000 kg of galvanized steel piping for
sprinklers

25
Il restauro del Castello medievale di Castelfalfi a
Montaione (FI) rientra nel monumentale intervento di
TENUTA DI CASTELFALFI s.p.a. recupero e conversione dell’intera tenuta di Castelfalfi
ad opera del colosso tedesco del turismo TUI.

SICE è stata scelta come Appaltatore unico sia per gli


impianti elettrici che termotecnici. L’opera ha impegnato
Restauro Castello di Castelfalfi - Montaione (FI) per oltre due anni le maestranze ed i tecnici di SICE che
Servizi impianti elettrici, speciali e meccanici si sono trovati ad affrontare il non semplice compito di
trasformare il famoso castello, sede anche delle riprese
Anno 2012 - 2014 del set cinematografico del film “Pinocchio” di Roberto
Importo Lavori € 800.000,00 Benigni, in resort con suite di lusso, un prestigioso
ristorante con scuola di alta cucina e cantina vini.

I numeri del progetto


Restoration of Castelfalfi Castle - Montaione (FI)
Services: electrical, mechanical and special plants • C.A. 1.600 mq suddivisi tra piano terra, primo,
mezzanino e secondo
Years: 2012 - 2014 • Oltre 550 mq di pannelli radianti a pavimento
Amount of work: € 800.000,00 • Oltre 5500 kg di canalizzazioni aerauliche servite da
6 UTA, distinte per zona
• Impianti elettrici e domotici KNX di altissimo livello e
grado di automazione

The restoration of the medieval castle of Castelfalfi


Montaione (FI) is part of the monumental restoration
and conversion of the entire estate of Castelfalfi by the
big German tourism group TUI.

SICE has been chosen as the sole contractor for both


electrical systems and heat engineering. The work has
involved more than two years, workers and technicians
of SICE who have not had to deal with the simple task
of transforming the famous castle, also home of the
filming set of the movie "Pinocchio" by Roberto Benigni,
in luxury suites resort with a prestigious restaurant with
high school kitchen and wine cellar.

Numbers Of The Project

• About 1,600 square meters divided between ground


floor, first, entresol and second
• Over 550 square meters of radiant floor
• More than 5500 kg of ducts served by 6 air handling
units
• KNX electrical systems and home automation at the
highest level and degree of automation

26
L’intervento di ristrutturazione delle cucine interne
all’Ospedale San Bortolo dell’ULSS 6 di Vicenza e di
SERENISSIMA RISTORAZIONE s.p.a. realizzazione della nuova mensa da circa 320 posti
soprastante a dette ha impegnato SICE per oltre 3 anni.
Dette opere hanno portato al quasi rifacimento dei
totali 1.500mq di cucine industriali del nosocomio e alla
costruzione di una nuova mensa aperta al pubblico per
Cucine e Mensa Ospedale S. Bortolo altri circa 1.300mq, realizzata in carpenteria metallica e
ULSS 6 - Vicenza completamente vetrata.
SICE è stata scelta da Serenissima Ristorazione S.P.A.
Servizi impianti elettrici, speciali e meccanici come impiantista unico sia elettrico sia termotecnico
Anno 2009 - 2012 grazie alle sue riconosciute doti di solidità, competenza
Importo Lavori € 1.422.550,00 e affidabilità.

I Numeri del progetto


Kitchens and refectory of San Bortolo Hospital
ULSS6 - Vicenza • Nuova mensa da circa 1.300mq per 320 posti a sedere
• Ristrutturazione cucine ULSS6 Ospedale San Bortolo
Services: electrical, mechanical and special plants per circa 1500mq
Years: 2009 - 2012 • Oltre 15.000kg di canalizzazioni aerauliche
Amount of work: € 1.422.550,00 • N° 4 UTA e n° 2 estrattori cappe
• Impianti speciali di diffusione sonora EVAC, rivelazione
fumi e supervisione
• Impianto distribuzione vapore con rete tubazioni in
acciaio inox

The renovation of the internal kitchens of ULSS 6 San


Bortolo Hospital in Vicenza and construction of a new
refectory with about 320 seating above those, committed
SICE for over 3 years .
These works led to the almost total renovation of
1.500mq of industrial kitchens of the hospital and the
construction of a new refectory opened to the public for
other 1.300mq , made entirely of glass and metalwork .
SICE has been chosen by Serenissima Ristorazione SPA as
sole contractor for both electrical systems and heat
engineering due to its recognized qualities of strength,
competence and reliability.

Numbers Of The Project

• New refectory of about 1.300mq with 320 seating


• ULSS6 San Bortolo Hospital kitchens renovation for ap
proximately 1500sqm
• More than 15.000kg of ducts
• 4 air handling units and 2 extractor hoods
• EVAC sound system, smoke detection and monitoring
• Steam distribution system with stainless steel pipes

27
INDEX LIST OF REFERENCES

OPERE PUBBLICHE
INDICE ELENCO REFERENZE

PUBLIC WORKS pag. 30

CENTRI COMMERCIALI E GRANDE DISTIBUZIONE


SHOPPING CENTERS AND MALLS pag. 33

BANCHE E ASSICURAZIONI
BANKS AND INSURANCES pag. 36

IMPIANTI FOTOVOLTAICI
PHOTOVOLTAIC PLANTS pag. 37

TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE


OFFICE AND RETAIL pag. 38
A seguire riportiamo un breve elenco delle opere più significative
realizzate da Sice nell’ultimo trentennio , suddivise per tipologia di
intervento (opere pubbliche, centri commerciali e
ELENCO
grande distribuzione, banche e assicurazioni, impianti fotovoltaici,
terziario, residenziale, industriale, e direzionale).
Si tratta solo di un breve estratto della nostra lunga storia, un rapido
REFERENZE
sguardo nel nostro curriculum aziendale per capire cosa abbiamo
fatto finora e come siamo arrivati fino a qui.
LAVORI
In the next pages we quote a short list of the most significant works
LIST OF
realized by Sice in the last thirty years, divided by type of intervention
(public works, shopping centers and malls, banks and insurances,
commercial, photovoltaics plants, office and retail).
WORK
This is just a short example of our long history, a quick look in our
business curriculum to understand what we have done
so far and how we got here.
REFERENCES
OPERE PUBBLICHE
PUBLIC WORKS

U.L.S.S. n. 16 1985-1991 Lire 366.071.516 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL DAY HOSPITAL
ALTO VICENTINO DISTRETTO SANITARIO DI BASE E PIASTRA SERVIZI DELL’OSPEDALE DI
SCHIO (VI).
REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE DAY
HOSPITAL, OF SCHIO (VI).

MINISTERO AFFARI ESTERI 1988-1991 Lire 2.275.110.105 COSTRUZIONE DEGLI IMPIANTI ELETTRICI NELL’AMBITO
DELL’AMPLIAMENTO DELL’OSPEDALE DI CANKIRI (TURCHIA).
REALIZATION OF ELECTRICAL SYSTEMS OF THE ENLARGEMTN OF
CANKIRI HOSPITAL (TURKEY).

CAVAGNIS 1988-1991 Lire 244.576.730 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO L’OSPEDALE
COSTRUZIONI S.R.L. DI FOLIGNO.
REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE
HOSPITAL OF FOLIGNO.

SIEMENS S.P.A. 1986-1993 Lire 2.522.289.763 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, DI SICUREZZA E SPECIALI
COMPRESA LA FORNITURA E POSA DEL GRUPPO ELETTROGENO
AUTOMATICO IN PARALLELO DA 500 KV PRESSO IL NUOVO
MONOBLOCCO DELL’OSPEDALE DI PIOVE DI SACCO PD
U.L.S.S. N. 23 CONSELVANA.
REALIZATION OF ELECTRICAL, SECURITY AND SPECIAL SYSTEMS
INCLUDING THE SUPPLY AND INSTALLATION OF AUTOMATIC GENERATOR
OF 500 KVA AT THE HOSPITAL OF PIOVE DI SACCO - PD - Health Units N.
HOSPITAL RAINS OF THE BAG - PD - Health Units N. 23 Conselvana.

COMUNE DI ESTE (PD) 1987-1993 Lire 509.594.102 OPERE DI STRAORDINARIA MANUTENZIONE DEGLI IMPIANTI DI
PUBBLICA ILLUMINAZIONE DEL CENTRO STORICO DI ESTE E DI ALTRE
VIE COMUNALI.
EXTRAORDINARY MAINTENANCE OF PUBLIC LIGHTING OF THE
CITY OF ESTE AND OTHER MUNICIPAL WAY.

BOTTACIN LUIGI S.R.L. 1992-1993 Lire 1.240.531.593 IMPIANTI ELETTRICI PER CENTRALI TECNOLOGICHE
C/O LA CASA DI CURA MORGAGNI - PADOVA.
REALIZATION OF ELECTRICAL SYSTEMS FOR POWER TECHNOLOGY
C/O THE NURSING HOME MORGAGNI - PADOVA.

U.L.S.S. N. 8 1992-1994 Lire 228.352.840 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO


L'OSPEDALE DI PEDEROBBA (TV).
REALIZATION OF ELECTRICAL SYSTEMS AT PEDEROBBA HOSPITAL (TV).

SIGLA SOC. COOP. A R.L. 1992-1994 Lire 690.237.250 RINNOVO ILLUMINAZIONE AEROSTAZIONE E PISTE
FORLI’ DELL’AEROPORTO DI FIRENZE - PERETOLA.
RENEWAL OF LIGHT OF THE AIRPORT TERMINAL AND TRACKS OF
FLORENCE AIRPORT - PERETOLA.

U.L.S.S. N. 36 1983-1994 Lire 401.857.232 RISTRUTTURAZIONE ED AMPLIAMENTO OSPEDALE / POLIAMBULATORI


GRUPPI OPERATORI MESSA A NORMA IMPIANTI ELETTRICI PRESSO
L'OSPEDALE DI MESTRE (VE).
RENOVATION AND EXPANSION OF HOSPITAL, AMBULATORY AND
OPERATING GROUP OF MESTRE HOSPITAL (VE)

REGIONE VENETO 1991-1995 Lire 2.958.473.752 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, RELATIVI AI LAVORI DI
COSTRUZIONE DELLA PIASTRA SERVIZI NUOVA PORTINERIA E PIASTRA
OPERATORIA. REALIZZAZIONE IMPIANTO INTERFONICO, IMPIANTO
RILEVAZIONE FUMI E MANUTENZIONE DEGLI IMPIANTI
ELETTRICI PRESSO L'OSPEDALE DI MONTEBELLUNA (TV).
REALIZATION OF ELECTRICAL SYSTEMS RELATING TO THE WORK OF
SERVICES ZONE CONSTRUCTION - NEW RECEPTION AND OPERATING
ZONE, NEW INTERCOM SYSTEM AND SMOKE DETECTION SYSTEM
CONSTRUCTION AND MAINTENANCE OF ELECTRICAL INSTALLATIONS AT
MONTEBELLUNA HOSPITAL (TV).

UNIVERSITA’ DEGLI STUDI 1991-1995 Lire 603.171.998 ADEGUAMENTO STRUTTURE ED IMPIANTI ALLE CONDIZIONI DI
PADOVA AGIBILITA’ E SICUREZZA NELL' ISTITUTO SEMEIOTICA DI PADOVA.
STRUCTURE AND SYSTEMS ADJUSTMENT OF THE SEMEIOTICS
INSTITUTE OF PADUA.

COMUNE DI PADOVA 1992-1996 Lire 864.003.270 NUOVO IMPIANTO DI ILLUMINAZIONE PUBBLICA NELLA ZONA
GUIZZA – PADOVA I° E II° STRALCIO.
NEW LIGHTING SYSTEM IN THE PUBLIC AREA OF GUIZZA PADOVA.

U.L.S.S. N. 7 1995-1996 Lire 626.293.502 ESECUZIONE OPERE ELETTRICHE PRESSO L'OSPEDALE DI CONEGLIANO (TV).
REALIZATION OF ELECTRICAL SYSTEMS AT CONEGLIANO HOSPITAL (TV).

AZIENDA OSPEDALIERA DI 1996-1999 Lire 751.277.736 OPERE ELETTRICHE ESEGUITE PRESSO IL CENTRO DI CARDIOLOGIA E
PADOVA CARDIOCHIRURGIA DI PADOVA (2^ FASE).
REALIZATION OF ELECTRICAL SYSTEMS AT THE CENTER OF CARDIOLOGY
AND CARDIAC SURGERY OF PADUA
30
OPERE PUBBLICHE
PUBLIC WORKS

SIRAM S.P.A. 1999-2001 € 2.053.192,20 REALIZZAZIONE IMPIANTI ELETTRICI, DI SICUREZZA ED AFFINI C/O
IL COMPLESSO BASILICALE DI S. ANTONIO - PADOVA
REALIZATON OF ELECTRICAL AND SECURITY SYSTEMS C/O S. ANTONIO
CHURCH OF PADOVA.

AZIENDA U.L.S.S. N. 16 2002-2003 € 3.602.107,90 MANUTENZIONE DEGLI IMMOBILI AZIENDALI, OPERE IDROTERMOSANITARIE,
DI CONDIZIONAMENTO ED ELETTRICHE PRESSO L’OSPEDALE “AI COLLI”,
“S. ANTONIO”, DISTRETTI E GERIATRICO DI PADOVA.
PROPERTY, WATER, HEATING, AIR CONDITIONING AND ELECTRICAL
MAINTENANCE AT THE HOSPITAL " AI COLLI"
"S.ANTONIO" GERIATRIC AND DISTRICTS OF PADUA.

CNR DI PADOVA 2004 € 272.601,11 RIFACIMENTO CENTRALE DI CONDIZIONAMENTO PRESSO IL CNR


CORSO STATI UNITI - PADOVA.
NEW CONTITIONIG PLANT AT THE CNR - STATI UNITI STREET- PADOVA.

ISTITUTO AGRARIO DI SAN 2002-2005 € 3.428.357,87 SISTEMAZIONE IMPIANTI TECNOLOGICI DEI LABORATORI DI ANALISI E
MICHELE ALL’ADIGE (TN) RICERCA DELL’ISTITUTO AGRARIO SAN MICHELE ALL’ADIGE (TN).
SET-UP OF TECHNOLOGICAL SYSTEMS OF ANALYSIS AND AGRICULTURAL
RESEARCH WORKSHOPS OF SAN MICHELE ALL'ADIGE INSTITUTE (TN).

AUTOSTRADA BS VR VI PD 2003-2007 € 722.000,00 AUTOSTRADA BS/VR/VI/PD - MANUTENZIONE E CONSERVAZIONE


S.P.A. IMPIANTI ELETTRICI. LOTTO II.
BS / VR / VI / PD HIGHWAY - MAINTENANCE OF ELECTRICAL SYSTEMS

COMUNE DI VENEZIA 2004-2006 € 659.905,00 MANUTENZIONE IMPIANTI ELETTRICI E TERMOTECNICI PRESSO GLI
IMPIANTI SPORTIVI TERRAFERMA - VENEZIA.
MAINTENANCE OF ELECTRICAL AND THERMOTECHNICAL
SYSTEMS OF SPORTS FACILITIES - VENICE.

COMUNE DI MODENA 2005-2007 € 377.493,00 REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE


PRESSO IL CENTRO POLIFUNZIONALE DELLA PROTEZIONE CIVILE
MARZAGLIA NUOVA (MO).
REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE
MULTIPURPOSE CENTER OF CIVIL PROTECTION - Marzaglia (MO).

AUSL DI BOLOGNA 2006-2007 € 2.550.000,00 REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE


PRESSO IL NUOVO OSPEDALE DI BUDRIO (BO).
REALIZATION OF ELECTRICAL SYSTEMS AT BUDRIO HOSPITAL (B0).

U.L.S.S. N. 7 2006-2007 € 730.000,00 REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI


CONEGLIANO VENETO (TV) OSPEDALIERI U.L.S.S. N. 7
MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL
DISTRICT U.L.S.S. N. 7

U.L.S.S. N. 9 - TREVISO 2006-2007 € 565.000,00 REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI


PADOVA OSPEDALIERI U.L.S.S. N. 9
MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL
DISTRICT U.L.S.S. N. 9

AUSL DI BOLOGNA 2007-2008 € 1.320.000,00 REALIZZAZIONE OPERE EDILI E IMPIANTISTICHE ELETTRICHE E


MECCANICHE PRESSO IL NUOVO REPARTO DI DIALISI PADIGLIONE
TINOZZI OSPEDALE BELLARIA (BO).
REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE
DEPARTMENT OF DIALYSIS, BELLARIA HOSPITAL (BO)

U.L.S.S. N. 6 - VICENZA 2009-2012 € 1.422.550,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA
MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE
SAN BORTOLO (VI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS
OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING
C / O SAN BORTOLO HOSPITAL (VI)

COOP 80 S.c.a.r.l. 2010-2011 € 366.550,00 RISTRUTTURAZIONE IMPIANTI ELETTRICI E MECCANICI PALASPORT


ABANO TERME (PD).
RENOVATION OF ELECTRICAL AND MECHANICAL SYSTEMS OF
INDOOR STADIUM OF ABANO TERME (PD)

AGENZIA DEL TERRITORIO 2011 € 150.000,00 IMPIANTO SPEGNIMENTO A GAS E RILEVAZIONE FUMI PER NUOVO
ARCHIVIO CARTACEO AGENZIA DEL TERRITORIO (PD).
GAS FIRE EXTINTION AND SMOKE DETECTION SYSTEM FOR NEW
ARCHIVE OF LAND AGENCY (PD)

U.L.S.S. N. 2 - FELTRE 2011 € 50.430,00 REALIZZAZIONE IMPIANTI ELETTRICI RISTRUTTURAZIONE CUCINE


SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL).
REALIZATION OF ELECTRICAL SYSTEM FOR THE RENOVATION OF KITCHEN
OF SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL)

31
OPERE PUBBLICHE
PUBLIC WORKS

U.L.S.S. N. 4 2011-2012 € 910.240,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA


MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE UDINE.
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS
OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING C/O
UDINE HOSPITAL

FIORE S.c.a.r.l. 2011-2013 € 1.698.750,00 REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI NUOVA SEDE BIOLOGIA
E BIOMEDICINA DELL’UNIVERSITA’ DEGLI STUDI DI PADOVA
VIA PESCAROTTO.
REALIZATION OF ELECTRICAL AND SPECIAL SYSTEM OF NEW BIOLOGY
AND BIOMEDICINE HEADQUARTERS OF PADOVA UNIVERSITY
PESCAROTTO STREET

U.L.S.S. N. 6 - VICENZA 2012-2013 € 389.725,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVE DEGENZE IPAB 3°
PIANO ULSS 6 OSPEDALE DI SANDRIGO (VI).
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM FOR NEW IPAB WARDS
ON THE 3RD FLOOR OF ULSS6 SANDRIGO HOSPITAL (VI)

INTERPORTO DI 2011-2012 € 800.000,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO POLO LOGISTICO
PADOVA S.p.A. INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRRA.
ELECTRICAL, MECHANICAL AND SPECIAL SYATEM OF NEW LOGISTICS
PLATFORM H INTERPORT - ENGLAND STREET -PADOVA

INTERPORTO DI 2012 € 180.000,00 IMPIANTI ANTINCENDIO SPRINKLER ED ELETTRICI MAGAZZINI


PADOVA S.p.A. N. 23-24-28 INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRA
FIRE SPRINKLER AND ELECTRICAL SYSTEMS OF WAREHOUSES
N. 23 24-28 PADUA INTERPORT - CORSO STATI UNITI 18

U.L.S.S. N. 2 - FELTRE 2013 in corso € 420.000,00 REALIZZAZIONE IMPIANTI MECCANICI ED AFFINI NUOVE CUCINE
SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL).
REALIZATION OF MECHANICAL SYSTEM FOR THE NEW KITCHEN OF
SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL)

U.L.S.S. N. 6 - VICENZA 2014 in corso € 350.000,00 MANUTENZIONE IMPIANTI ELETTRICI E AFFINI ULSS 6 OSPEDALE
SAN BORTOLO - (VI)
MAINTENANCE OF ELECTRICAL SYSTEMS OF SAN BORTOLO HOSPITAL
ULSS6 (VI)

U.L.S.S. N. 1 - TRENTO 2014 in corso € 225.000,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA MENSA E CUCINE
SERENISSIMA RISTORAZIONE C/O OSPEDALE DI TRENTO (TN).
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW REFECTORY
AND KITCHEN OF SERENISSIMA CATERING C/O TRENTO HOSPITAL

32
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS

I.R.C.E.S. 55 S.P.A. 1988-1989 Lire 1.431.509.698 ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO
COMMERCIALE GIOTTO DI PADOVA.
ELECTRICAL AND MECHANICAL PLANT BY GIOTTO TRADING
CENTER - PADOVA.

SILOS CENTRI COMMERCIALI 1990-1991 Lire 2.209.741.184 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO
S.P.A. COMMERCIALE SILOS DI PARMA – VIA SILVIO PELLICO.
ELECTRICAL PLANTS BY SILOS - PARMA – VIA SILVIO PELLICO.

SILOS CENTRI COMMERCIALI 1991-1993 Lire 3.538.141.504 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI NEL NUOVO CENTRO
S.P.A. COMMERCIALE DI VIA TIBURTINA IN ROMA.
ELECTRICAL PLANTS BY SILOS - ROMA

RIZZANI DE ECCHER S.P.A. 1992-1993 Lire 1.115.999.981 OPERE ELETTRICHE NEL PARCHEGGIO INTERRATO E ILLUMINAZIONE
ESTERNA NEL COMPLESSO AD USO DIREZIONALE DENOMINATO
VALECENTER IN MARCON (VE).
ELECTRICAL PLANTS IN UNDERGROUND FLOOR AND OUTDOOR LIGHTING
BY VALECENTER - MARCON (VE)

COVER S.R.L. 1993-1995 Lire 1.482.972.908 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO
COMMERCIALE PIAZZA GRANDE SITO IN PIOVE DI SACCO (PD)
ELECTRICAL PLANTS INSIDE PIAZZAGRANDE TRADING CENTER
PIOVE DI SACCO (PD)..

BERNARDI S.R.L. 1993-1995 Lire 1.081.232.007 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI AL SERVIZIO DEL
NUOVO IPERMERCATO NEL CENTRO COMMERCIALE PIAZZAGRANDE SITO
IN PIOVE DI SACCO
ELECTRICAL PLANTS INSIDE THE SUPERMARKET PIAZZAGRANDE
TRADING CENTER - PIOVE DI SACCO (PD).

BERNARDI S.R.L. 1993-1995 Lire 727.799.939 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO
L’IPERMERCATO VIVO DI MONTEBELLUNA (TV).
ELECTRICAL PLANTS INSIDE FOR VIVO SUPERMARKET IN MONTEBELLUNA

PANORAMA S.P.A. 1993-1995 Lire 566.063.229 RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
PANORAMA IN S. MAURO TORINESE (TO).
NEW PLANTS BY PANORAMA IN S. MAURO TORINESE (TO).

IMMOBILIARE VALLI S.R.L. 1993-1995 Lire 1.169.855.827 ESECUZIONE IMPIANTI ELETTRICI PRESSO IL FABBRICATO AD USO
COMMERCIALE DIREZIONALE SITO A PADOVA IN VIA T. ASPETTI ANGOLO
VIA ZANCHI.
ELECTRICAL PLANTS INSIDE NEW BUILDING IN PADOVA - VIA T. ASPETTI

PANORAMA S.P.A. 1994-1996 Lire 1.857.277.464 COSTRUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO IL CENTRO
COMMERCIALE PANORAMA LOCALITA’ S. CROCE – FORMIA (LT).
ELECTRICAL PLANTS BY THE NEW FORMIA TRADING CENTER

BERNARDI S.R.L. 1994-1996 Lire 835.221.198 RIFACIMENTO DEGLI IMPIANTI ELETTRICI ED AFFINI DELL’IPERMERCATO
BERTIN SITO A CASSOLA (VI).
ELECTRICAL PLANTS BY THE BERTIN SUPERMARKET IN CASSOLA (VI)

IMMOBILIARE R.C. S.R.L. 1995-1996 Lire 857.354.003 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI E TERMOIDRAULICI PRESSO IL
SUPERMERCATO PAM DI CASAL MORENA - ROMA
ELECTRICAL AND MECHANICAL PLANTS INSIDE SUPERMARKET PAM
CASALMORENA - ROME

SUPERMERCATI OR.VE.A. 1995-1996 Lire 946.555.270 ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
S.P.A. L’IPERMERCATO OR.VE.A. IN LOCALITA’ AFFI (VR).
ELECTRICAL PLANTS INSIDE OR.VE.A. SUPERMARKET - AFFI (VR)

SILOS CENTRI COMMERCIALI 1995-1996 Lire 759.399.982 RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
S.P.A. SILOS SITO IN VIA AURELIA A ROMA.
ELECTRICAL PLANTS INSIDE SILOS SUPERMARKET - VIA AURELIA - ROMA

SILOS CENTRI COMMERCIALI 1995-1997 Lire 2.466.125.057 IMPIANTI ELETTRICI RELATIVI ALLA RISTRUTTURAZIONE DELL’EDIFICIO DA
S.P.A. ADIBIRE A IPERMERCATO SITO IN VIALE VENEZIA A UDINE.
ELECTRICAL PLANTS FOR NEW SUPERMARKET - VIALE VENEZIA - UDINE

SUPERMERCATI PAM S.P.A. 1996-1997 Lire 566.411.777 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL SUPERMERCATO
PAM DI MESTRE (VE) P.ZZA XXVII OTTOBRE.
ELECTRICAL PLANTS INSIDE PAM SUPERMARKET - LE BARCHE TRADING
CENTER - MESTRE - VE.

PANORAMA S.P.A. 1999-2001 Lire 2.117.534.264 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO
L’IPERMERCATO PANORAMA LATINA-FIORI A LATINA..
ELECTRICAL PLANTS BY THE NEW PANORAMA CENTER - LATINAFIORI (LT)

BERNARDI S.R.L. 1996-1997 Lire 733.495.787 ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
COLMARK NEL CENTRO COMMERCIALE AIRONE DI MONSELICE (PD).
ELECTRICAL PLANTS INSIDE AIRONE TRADING CENTER - MONSELICE (PD

META' SUPERNEGOZI S.P.A. 1996-1997 Lire 751.020.793 ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL SUPERMERCATO
META' DI GENOVA.
ELECTRICAL PLANTS INSIDE META’ SUPERMARKET - GENOVA
33
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS

CAVAGNIS - POLICENTROSONA 1995-1998 Lit. 5.631.461.899 COSTRUZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO
COMMERCIALE "LA GRANDE MELA" SITO IN LOCALITA’ LUGAGNANO DI
SONA (VR).
ELECTRICAL PLANTS INSIDE “LA GRANDE MELA” SHOPPING CENTER IN
VERONA

PANORAMA 1995-1998 Lire 3.102.427.739 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL CENTRO
COMMERCIALE DI SASSUOLO (MO) AREA EX CAMPANELLA VIA RADICI
IN PIANO.
ELECTRICAL PLANTS INSIDE SASSUOLO SHOPPING CENTER - EX
CAMPANELLA AREA

SILEA SUD S.R.L. 1996-1998 Lire 3.330.277.014 ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
L'IPERMERCATO PANORAMA NEL CENTRO COMMERCIALE
"I GIGLI" DI CAMPI BISENZIO (FI).
ELECTRICAL PLANTS INSIDE “I GIGLI SHOPPING CENTER” - FIRENZE.

IPERLANDO S.R.L. 1997-1998 Lire 724.314.169 ESECUZIONE DEGLI IMPIANTI ELETTRICI NEL FABBRICATO SITO IN Z.I.
PADOVA CORSO STATI UNITI
ELECTRICAL PLANTS INSIDE LANDO SUPERMARKET - PADOVA

SUPERMERCATI ALI' S.P.A. 1997-1998 Lire 127.559.705 REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO ALI’ A
CAMPODARSEGO (PD)
ELECTRICAL PLANTS INSIDE ALI’ SUPERMARKET - CAMPODARSEGO - PD

PANORAMA S.P.A. 1996-1999 Lire 1.816.398.022 ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
L’IPERMERCATO PANORAMA SITO AD OSTIA – ROMA
IMPLEMENTATION OF ELECTRICAL AND RELATED AT THE SUPERMARKET
PANORAMA SITE TO Ostia - Rome...

BERNARDI S.R.L. 1997-1999 Lire 1.639.334.495 ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
COLMARK NEL CENTRO COMMERCIALE DIAMANTE DI FERRARA...
ELECTRICAL PLANTS BY NEW COLMARK SUPERMARKET INSIDE
DIAMANTE SHOPPING CENTER - FERRARA.

F.LLI LANDO S.P.A. 1997-1999 Lire 2.676.475.989 ESECUZIONE IMPIANTI ELETTRICI, TERMOTECNICI E SPECIALI PRESSO IL
NUOVO FABBRICATO SITO IN CAZZAGO DI PIANIGA (VE)
ELECTRICAL AND MECHANICAL PLANTS FOR THE NEW HEADQUARTER
OF CAZZAGO (VE)

BREK RISTORANTI S.P.A. 2000-2001 € 110.069,69 ESECUZIONE IMPIANTI ELETTRICI PRESSO IL RISTORANTE SITO A
CANNAREGGIO N.124 – VENEZIA.
ELECTRICAL PLANTS FOR RESTAURANT IN VENICE.

VIGNALE IMMOBILIARE 1999-2001 Lire 8.307.893.064 REALIZZAZIONE IMPIANTI MECCANICI PRESSO IL CENTRO COMMERCIALE
SITO IN VIA CASILINA A ROMA.
MECHANICAL PLANTS INSIDE CASILINA SHOPPING CENTER.

PANORAMA S.P.A. 1999-2001 € 3.704.137,84 ESECUZIONE IMPIANTI MECCANICI, ELETTRICI ED AFFINI PRESSO IL
CENTRO COMMERCIALE PANORAMA DI ALATRI (FR).
ELECTRICAL AND MECHANICAL PLANTS INSIDE PANORAMA SHOPPING
CENTER - ALATRI (FR)

PANORAMA S.P.A. 1999-2002 Lire 3.206.843.036 REALIZZAZIONE OPERE IMPIANTISTICHE PER AMPLIAMENTO DEL CENTRO
COMMERCIALE DI VIA TIBURTINA IN ROMA.
ELECTRICAL AND MECHANICAL PLANTS FOR TIBURTINA SHOPPING
CENTER - ROME.

TREVINORD S.R.L. / 2001-2003 € 3.661.717,60 REALIZZAZIONE IMPIANTI ELETTRICI, DI COMUNICAZIONE, SPECIALI E


PANORAMA S.P.A. MECCANICIPRESSO IL FABBRICATO 6 DEL PARCO COMMERCIALE DI
VILLORBA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW VILLORBA
SHOPPING AREA

VIVO PREGANZIOL S.R.L. 2002-2003 € 1.096.341,00 ESECUZIONE IMPIANTI MECCANICI, ELETTRICI E SPECIALI PRESSO
L'IMMOBILE COMMERCIALE VIVO A PREGANZIOL (TV).
ELECTRICAL AND MECHANICAL PLANTS INSIDE VIVO SUPERMARKET -
PREGANZIOL - TV

COOP.OP. DI TS ISTRIA E FRIULI 2003-2004 € 986.295,67 REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO COOP NEL
S.C.A.R.L. CENTRO COMMERCIALE DI TRIESTE.
ELECTRICAL PLANTS COOP SUPERMARKET - TRIESTE

POLICENTRO GESTIONI 2002-2005 € 3.322.273,91 REALIZZAZIONE IMPIANTI ELETTRICI C/O CENTRO COMMERCIALE
IMMOBILIARI S.R.L. “LE TORRI D’EUROPA” - TRIESTE.
ELECTRICAL CONSTRUCTION C / O COMMERCIAL CENTER "THE TOWERS
OF EUROPE" - TRIESTE.

F.LLI LANDO S.P.A. 2004-2005 € 1.389.558,39 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO
LOCALITA’ DI MIRANO (VE).
ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET
MIRANO (VE)

34
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS

F.LLI LANDO S.P.A. 2004-2005 € 1.186.884,73 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO
LOCALITA’ DI TREVISO
ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET
TREVISO
POLICENTRO RIJEKA (HR) 2005-2006 € 14.130.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO
COMMERCIALE “TOWER CENTER” - RIJEKA (FIUME) CROAZIA (HR).
THE NEW RIJEKA TOWER CENTER
PANORAMA S.P.A. 2006 € 2.940.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO
COMMERCIALE PANORAMA ARICCIA (ROMA).
ELECTRICAL AND MECHANICAL PLANTS BY THE TRADING CENTER IN
ARICCIA (RM)
F.LLI LANDO S.P.A. 2005-2006 € 2.000.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO
COMMERCIALE LANDO DI VEGGIANO (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN
VEGGIANO (PD)
FINBENI HOLDING S.R.L. 2008-2009 € 6.000.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO
COMMERCIALE LANDO DI CONSELVE (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW TRADING
CENTER IN CONSELVE (PD)
PANORAMA S.P.A. 2008-2009 € 1.750.300,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO
RISTRUTTURAZIONE IPERMERCATO PANORAMA DI STIORE (TV)
ELECTRICAL AND MECHANICAL PLANTS BY RESIZING OF
PANORAMA-STIORE (TV)
COMMERCIALE BRENDOLAN 2007-2009 € 1.100.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO NUOVO
S.P.A. IPERMERCATO FAMILA DI CREMONA VIA MAGAZZINI GENERALI
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN
CREMONA (CR)
PANORAMA S.P.A. 2008 € 65.000,00 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO RISTRUTTURAZIONE
IPERMERCATO PANORAMA I GRANAI (ROMA)
MAINTENANCE AND SETTING OF THE ELECTRICAL PLANTS BY TRADING
CENTER “I GRANAI” IN ROMA
GRUPPO PAM S.P.A. 2010 € 210.000,00 NUOVO IMPIANTO ILLUMINAZIONE IPERMERCATO PANORAMA
VIA TIBURTINA (ROMA).
NEW LIGHTING SYSTEM OF PANORAMA HYPERMARKET
TIBURTINA STREET - ROME
SANTA TERESA S.R.L. 2010-2011 € 1.750.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO
COMMERCIALE SHOPPING TEN TENCAROLA DI SELVAZZANO (PD)..
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
SHOPPING TEN MALL - TENCAROLA SELVAZZANO (PD)
NOVA COOP S.C. 2011-2012 € 300.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU
RAZIONE IPERCOOP CENTRO COMMERCIALE NOVACOOP NOVARA..
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF IPERCOOP MALL NOVACOOP NOVARA
F.LLI LANDO S.P.A. 2012-2013 € 6.000.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO
COMMERCIALE IPERLANDO A CITTADELLA (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
IPERLANDO MALL IN CITTADELLA (PD)
GRUPPO PAM S.P.A. 2012-2013 € 950.000,00 OPERE DI RISTRUTTURAZIONE IMPIANTI ELETTRICI, SPECIALI E
MECCANICI CENTRO COMMERCIALE PAM DI PANORAMA DI ARICCIA
(ROMA).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF PAM PANORAMA MALL - ARICCIA - ROME
SONAE SIERRA ITALIA S.P.A. 2012-2013 € 575.000,00 IMPIANTI ELETTRICI SPECIALI RISTRUTTURAZIONE AUTORIMESSA
INTERRATA CENTRO COMMERCIALE VALECENTER MARCON (VE).
ELECTRICAL AND SPECIAL SYSTEMS OF RENOVATION OF UNDERGROUND
GARAGE OF VALECENTER MALL - MARCON (VE)
F.LLI LANDO S.P.A. 2012 € 200.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU
RAZIONE IPERMERCATO IPERLANDO C/O EX PELLICANO A STRAELLE DI
CAMPOSAMPIERO (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
IPERLANDO INSIDE IL PELLICANO MALL IN CAMPOSAMPIERO (PD)
ALI’ S.P.A. 2013 - 2014 € 700.000,00 IMPIANTI ELETTRICI E SPECIALI NUOVO CENTRO COMMERCIALE E
IPERMERCATO ALI’ SPA DI DUEVILLE (VI)
ELECTRICAL AND SPECIAL SYSTEMS OF ALÌ MALL AND HYPERMARKET
DUEVILLE (VI)
NOVA COOP S.C. 2014 in corso € 2.000.000,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO SUPERMERCATO
COOP IN CORSO MOLISE A TORINO
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF IPERCOOP OF CORSO MOLISE TORINO

35
BANCHE E ASSICURAZIONI
BANKS AND INSURANCES

CIVIDIN CO. S.P.A. 1987-1991 Lire 1.379.979.261 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA SEDE CENTRALE DELLA
CASSA DI RISPARMIO DI TRIESTE. v
ELECTRICAL PLANTS INSIDE CRT BANK - TRIESTE

CASSA DI RISPARMIO 1987-1991 Lire 3.867.150.000 CENTRO ELABORAZIONE DATI IN MESTRE (VE) – VIA TORINO.
DI VENEZIA
CED CA.RI.VE IN MESTRE - VIA TORINO

FOCHI BUINI & GRANDI 1989-1991 Lire 173.224.251 RISTRUTTURAZIONI IN VARIE FILIALI E AGENZIE DEL BANCO DI ROMA DEL
TRIVENETO.
RESTRUCTURANTION OF SEVERAL AGENCIES OF BANCO DI ROMA
VENETO - FRIULI VENEZIA GIULIA - TRENTINO ALTO ADIGE

LLOYD ADRIATICO S.P.A. 1992-1993 Lire 143.871.231 RIFACIMENTO DEGLI IMPIANTI ELETTRICI NELLE SEGUENTI FILIALI DEL
LLOYD ADRIATICO: PADOVA VIA AQUILEIA E VIA MARCO POLO - RIMINI
MESTRE - BOLOGNA.
RESTRUCTURATION OF ELECTRICAL PLANTS OF LLOYD ADRIATICO
PADOVA - RIMINI - MESTRE - BOLOGNA.

IMPRESA ELETTROBETON 1988-1994 Lire 1.438.469.001 SEDE CENTRALE BANCA POPOLARE VENETA IN PADOVA - VIA VERDI
S.P.A. RISTRUTTURAZIONE GENERALE.
NEW HEADQUARTER OF BANCA POPOLARE VENETA IN PADOVA

SEA - SOCIETA’ EDILE 1995-1996 Lire 1.822.275.782 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE DEL LLOYD
ADRIATICA - TS ADRIATICO DI ASSICURAZIONI – PASSEGGIO S.ANDREA - TRIESTE.
ELECTRICAL PLANTS FOR THE NEW HEADQUARTER OF LLOYD ADRIATICO
TRIESTE

RIUNIONE ADRIATICA DI 1995-1997 Lire 149.446.759 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LE FILIALI RAS DI VERONA E
SICURTA’ S.P.A. TREVISO.
ELECTRICAL PLANTS FOR RAS SUBSIDIARY IN VERONA AND TREVISO.

CASSA DI RISPARMIO 1996-1997 Lire 1.606.978.145 SEDE CENTRALE IN VENEZIA – CAMPO MANIN
DI VENEZIA RISTRUTTURAZIONE TOTALE.
HEADQUARTER OF VENICE - TOTAL RENEW

SERVIZI ELETTROCONTABILI 1995-2000 Lire 2.171.189.468 GESTIONE, CONDUZIONE E MANUTENZIONE PROGRAMMATA IMPIANTI
BANCHE POP. TECNOLOGICI , ELETTRICI ED AFFINI PRESSO IL S.E.C. SITO
IN VIA TRANSALGARDO A PADOVA..
MAINTENANCE OF S.E.C. HEADQUARTER - PADOVA

HYPO ALPE ADRIA BANK S.P.A 2003-2004 € 307.833,85 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI
PADOVA VIALE VENEZIA E ROVIGO VIALE DELLA PACE.
ELECTRICAL AND MECHANICAL PLANTS FOR PADOVA AND ROVIGO
SUBSIDIARY

GUERRINO PIVATO S.P.A. 2002-2005 € 6.133.482,44 IMPIANTI TECNOLOGICI ED ELETTRICI PRESSO IL CENTRO SERVIZI 2000
VENETO BANCA A MONTEBELLUNA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF
VENETO BANCA IN MONTEBELLUNA (TV).

CESVE 2002 in corso € 677.006,17 MANUTENZIONE IMPIANTI ELETTRICI PRESSO LA CESVE DI PADOVA.
MAINTENANCE OF ELECTRICAL PLANTS IN PADOVA.

HYPO ALPE ADRIA BANK S.P.A 2005-2006 € 5.027.128,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO SEDE
CENTRALE ITALIA - TAVAGNACCO (UD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER IN
TAVAGNACCO (UD)

HYPO ALPE ADRIA BANK S.P.A. 2006 € 718.045,30 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI
MODENA -VILLORBA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF MODENA
AND TREVISO

HYPO ALPE ADRIA BANK S.P.A. 2010 € 161.878,50 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA FILIALE DI
PIOVE DI SACCO (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF
PIOVE DI SACCO IN PADOVA

36
IMPIANTI FOTOVOLTAICI
PHOTOVOLTAIC PLANTS

COOP 80 S.C.A.R.L. 2011 € 300.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 71,91KWP


PALASPORT DI ABANO TERME (PD).
71,91KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF ABANO TERME PALASPORT.

BOSCHELLO 2011 € 200.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 58,00KWP


MUSIC STORE S.R.L. BOSCHELLO MUSIC STORE VIA G. GALILEI MIRANO (VE).
58,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR
BOSCHELLO MUSIC STORE - G. GALILEI STREET MIRANO (VE)

DIADORA SPORT S.R.L. 2011-2012 € 300.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 130,75KWP
SEDE DIADORA SPORT VIA MONTELLO 80 CAERANO SAN MARCO (TV).
130,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR DIADORA
SPORT HEADQUARTER - MONTELLO 80 STREET - CAERANO SAN MARCO (TV)

SICE IMMOBILIARE S.R.L. 2012 € 160.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 48,96KWP SEDE SICE
IMMOBILIARE SRL VIA LISBONA 3 PADOVA (PD).
30,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR SICE
REAL ESTATE SRL VIA LISBON 3 PADOVA (PD).

NOVA COOP S.C. 2012-2013 € 680.000,00 N.4 IMPIANTI FOTOVOLTAICI “GRID CONNECTED” PER TOTALI 503,00KWP
SU COPERTURE IPERMERCATI NOVA COOP DI BORGOSESIA, NOVARA,
SANTHIA’ E TRADATE.
N.4 "GRID CONNECTED" PHOTOVOLTAIC SYSTEMS FOR A TOTAL OF
503,00KWP ON THE ROOF OF NOVA COOP SUPERMARKET OF
BORGOSESIA, NOVARA, SANTHIÀ AND TRADATE

SMA S.P.A. 2013 € 142.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 99,00KWP SU


COPERTURA SUPERMERCATO SMA SIMPLY DI PONTEVICO (BS)..
99,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF SMA SIMPLY SUPERMARKET OF PONTEVICO (BS)

NOVA COOP S.C. 2013 € 183.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 132 KWP SU
COPERTURA IPERMERCATO NOVA COOP DI PINASCA (TO)
132,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF NOVA COOP SUPERMARKET OF PINASCA (TO)

GRUPPO VEGA S.C. 2013 - 2014 € 100.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 68,75 KWP SU
COPERTURA PUNTO VENDITA “IL TULIPANO” DI ODERZO (TV).
68,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF "IL TULIPANO" SUPERMARKET OF ODERZO (TV)

NOVA COOP S.C. 2014 in corso € 257.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 198,00KWP SU
COPERTURA IPERMERCATO NOVA COOP DI CORSO MOLISE (TO).
198,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF SUPERMARKET COOP OF CORSO MOLISE (TO).

NOVA COOP S.C. 2014 in corso € 135.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 104,00KWP SU
COPERTURA IPERMERCATO NOVA COOP DI COLLEGNO (TO).
104,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE
ROOF OF NEW IPERMARKET COOP OF COLLEGNO (TO).

37
TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE
OFFICE AND RETAIL

COGEFAR IMPRESIT S.P.A. 1993 Lire 2.356.999.997 REALIZZAZIONE IMPIANTI ELETTRICI NEL FABBRICATO EX-PALAZZO
BORLETTI A MILANO.
ELECTRICAL PLANTS - EX BORLETTI PALACE - MILANO

TELECOM ITALIA S.P.A 1994 Lire 1.174.473.728 ADEGUAMENTO ALLA L.46/90 DELLE OPERE TECNOLOGICHE PRESSO LA
CENTRALE TLC DI BARI.
SETUP TO 46/90 LAW OF CED - BARI

TELECOM ITALIA S.P.A 1995-1997 Lire 1.640.356.284 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA
CENTRALE TELECOM DI FAVARO VENETO (VE).
GENERAL CONTRACTOR - CED - FAVARO VENETO - VE.

CAVAGNIS COSTRUZIONI S.R.L. 1997-1998 Lire 2.382.403.569 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA CASA D
RIPOSO “S.CHIARA” DI FERRARA.
ELECTRICAL AND MECHANICAL PLANT FOR S.CHIARA HOSPITAL
FERRARA.

CAVAGNIS COSTRUZIONI S.R.L. 1997-1998 Lire 962.600.501 REALIZZAZIONE IMPIANTI ELETTRICI ADIBITI AL CINEMA AD 8 SALE
PRESSO IL C.C. “LA GRANDE MELA” DI LUGAGNANO DI SONA (VR).
ELECTRICAL PLANTS FOR CINEMA VILLAGE BY LA GRANDE MELA
SHOPPING CENTER - VERONA

TELECOM ITALIA S.P.A 1996-1998 Lire 785.515.559 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TECNOLOGICHE PRESSO LA
CENTRALE TELECOM DI S.DONA’ DI PIAVE (VE).
GENERAL CONTRACTOR - CED - SAN DONA’ DI PIAVE - VE

TELECOM ITALIA S.P.A 1998-1999 Lire 986.822.987 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM DI
TRIESTE.
ELECTRICAL PLANTS FOR CED - TRIESTE

CIR COSTRUZIONI S.R.L. 1999-2000 € 924.457,84 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI
ACCOGLIENZA DI MESSIDORO (FE).
ELECTRICAL PLANTS - MESSIDORO OFFICE - FERRARA.

TELECOM ITALIA S.P.A 1998-2000 € 935.930,46 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA
CENTRALE TELECOM DI SCHIO (VI).
CONSTRUCTION WORKS, ELECTRICAL AND AT THE CENTRAL TELECOM
TERMOTECNICHE IN SCHIO (VI).

PAVAN COSTRUZIONI S.P.A. 1998-2001 € 223.199,74 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM
ITALIA A PORDENONE.
ELECTRICAL PLANTS - TELECOM ITALIA CED - PORDENONE

COOPCOSTRUTTORI SOC. 1999-2001 € 2.283.729,39 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI
COOP. A R.L. ACCOGLIENZA O.I.C. - MANDRIA - PADOVA.
ELECTRICAL PLANTS - OIC LA MANDRIA - PADOVA.

SICEA S.P.A.. 2000-2001 € 2.104.124,22 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO LA TORRE 2 NEL
CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA.
ELECTRICAL PLANTS - TOWER 2 - CITTADELLA CENTER - PADOVA.

SICEA S.P.A. 2001-2002 € 222.706,51 REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI PRESSO IL


COMMISSARIATO POLIZIA DI STATO NEL CENTRO DIREZIONALE
“LA CITTADELLA” DI PADOVA.
ELECTRICAL PLANTS - POLICE CITY OFFICE - CITTADELLA CENTER
PADOVA

VODAFONE OMNITEL S.P.A. 2001-2002 € 122.815,49 REALIZZAZIONE IMPIANTI SPECIALI LOTTO IV E VII PRESSO LA TORRE
OMNITEL NEL CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA
ELECTRICAL PLANTS - NEW HEADQUARTER - PADOVA

IMMOBILIARE TOMMASEO 2003-2004 € 625.833,97 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE
S.R.L. PROVINCIALE DELL’INAIL DI PADOVA - VIA NANCY 2
ELECTRICAL PLANTS OF SUBSIDIARY - PADOVA

S.V.E.C. S.P.A. 2003-2005 € 671.777,44 IMPIANTI ELETTRICI ED AFFINI PRESSO LA NUOVA SEDE DELLA FACOLTA’
DI ECONOMIA DELL’UNIVERSITA’ DI PADOVA VIA BASSI N. 1.
ELECTRICAL PLANTS - NEW BUILDING - UNIVERITY OF PADOVA

TIFS INGEGNERIA S.R.L. 2004-2005 € 314.500,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI A SERVIZIO
DELL’EDIFICIO AD USO SERVIZI E UFFICI SITO A PADOVA IN C.SO STATI
UNITI (NUOVA SEDE DELLO STUDIO).
ELECTRICAL AND MECHANICAL PLANTS FOR NEW HEADQUARTER IN
PADOVA

SINTECO S.P.A. 2004-2005 € 2.371.199,26 ESECUZIONE IMPIANTI ELETTRICI E MECCANICI NELL’EDIFICIO AD USO
ALLOGGI UNIVERSITARI IN VIA DARSENA A FERRARA
ELECTRICAL AND MECHANICAL PLANTS FOR NEW UNIVERSITY SITE
LA DARSENA - FERRARA

38
TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE
OFFICE AND RETAIL

CARMINE S.R.L. 2005-2006 € 768.604,54 ESECUZIONE IMPIANTI ELETTRICI E AFFINI PRESSO LA NUOVA SEDE DELLA
AGENZIA DELLE ENTRATE E DEL TERRITORIO VIA TURAZZA (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF
INCOMING-TAX AND LAND OFFICES IN PADOVA
CARMINE S.R.L. 2007-2009 € 910.000,00 IMPIANTI ELETTRICI E MECCANICI PRESSO LA NUOVA SEDE DELLA
CASERMA DELLA GUARDIA DI FINANZA DI VIA S. FIDENZIO (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER
FINANCE CONTROL ARMY IN PADOVA
INTERCANTIERI VITTADELLO 2006-2007 € 1.450.000,00 IMPIANTI ELETTRICI E MECCANICI PRESSO EDIFICIO DIREZIONALE
S.P.A. RICETTIVO
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER OF
VIA PO IN PADOVA
IMMOBILIARE MILANESE 2006 2008-2010 € 2.553.804,44 IMPIANTI MECCANICI PRESSO NUOVO COMPLESSO RICETTIVO POGGIO
S.R.L.
MECHANICAL PLANTS BY THE NEW TOURIST-CENTER POGGIO
DELL’AGNELLO - POPULONIA - PIOMBINO (LI)
CO.GE.VI. S.R.L. 2009-2010 € 1.500.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI EDIFICIO
DIREZIONALE-COMMERCIALE CENTER ONE VIA BREDA LIMENA (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
NEW TRADE AND DIRECTIONAL BUILDING - CENTER ONE - LIMENA (PD)
BROSS S.R.L. 2009-2011 € 5.700.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO
RESIDENZIALE-COMMERCIALE REDAIS VIA CASAL BERTONE (ROMA).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
RESIDENTIAL AND COMMERCIAL BUILDING REDAIS
VIA CASAL BERTONE (ROME)
MARINA VERDE S.R.L. 2011-2012 € 3.000.000,00 IMPIANTI MECCANICI COMPLESSO RESIDENZIALE MARINA VERDE
WELNESS RESORT, CAORLE (VE).
REALIZATION OF MECHANICAL SYSTEM OF RESIDENTIAL BUILDING
MARINA VERDE WELLNESS RESORT, CAORLE (VE)
TENUTA DI CASTELFALFI S.P.A. 2012 - 2014 € 400.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO
RICETTIVO-RESIDENZIALE I BIANCHI - TENUTA DI CASTELFALFI A
MOTAIONE (FI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
RESIDENTIAL AND RICEPTIVE BUILDING I BIANCHI
CASTELFALFI ESTATE - MONTAIONE (FI)
TENUTA DI CASTELFALFI S.P.A 2012 - 2014 € 800.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CASTELLO
TENUTA DI CASTELFALFI A MOTAIONE (FI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
THE CASTLE - CASTELFALFI ESTATE - MONTAIONE (FI)
FRIULAIR S.R.L. 2012 - 2014 € 1.300.000,00 IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI
AMPLIAMENTO SEDE E SITO PRODUTTIVO FRIULAIR VIA CISIS
FRAZ. STRASSOLDO, CERVIGNANO DEL FRIULI (UD).
ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEMS OF NEW
ENLARGEMENT OF OFFICES AND PRODUCTION SITE OF FRIULAIR VIA CISIS
FRAZ. STRASSOLDO CERVIGNANO DEL FRIULI (UD)
DUSSMANN SERVICE S.P.A. 2013 € 850.000,00 IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI NUOVO
CENTRO COTTURA COMUNE DI PADOVA C/O INTERPORTO
CORSO STATI UNITI N. 187 - PADOVA.
ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEM OF NEW COOKING
CENTRE OF PADUA INTERPORT - CORSO STATI UNITI 18
NOVA COOP S.C. 2012 - 2014 € 400.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI CENTRALE
TERMOFRIGORIFERIA NUOVA SEDE NOVACOOP A VERCELLI
FRAZIONE LARIZZATE
REALIZATION OF ELECTRICAL AND MECHANICAL HEATING-COOLING OF
NEW HEADQUARTER NOVACOOP IN LARIZZATE - VERCELLI
CARREFOUR ITALIA S.P.A. 2014 in corso € 115.000,00 RIFACIMENTO IMPIANTO DI RILEVAZIONE FUMI E ALLARME INCENDI
IPERMERCATO CARREFOUR C/O CENTRO COMMERCIALE
VALLECENTER A MARCON (VE)
REALIZATION OF SMOKE DETECTION AND FIRE ALARM SYSTEM OF
CARREFOUR HYPERMARKET INSIDE VALECENTER MALL LMARCON (VE)
PROVINCIA DEI FRATI MINORI 2014 in corso € 900.000,00 IMPIANTI MECCANICI E AFFINI - RISTRUTTURAZIONE COMPLESSO
CONVENTUALI DI PADOVA “VILLAGGIO S. ANTONIO” A NOVENTA PADOVANA (PD)
MECHANICAL SYSTEMS - RESTRUCTURING OF COMPLEX
“S. ANTONIO VILLAGE” IN NOVENTA PADOVANA (PD)
HOFFMANN ITALIA S.R.L. 2014 in corso € 650.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI NUOVA SEDE
CENTRALE ITALIA A VIGONZA (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER
OF VIGONZA (PD).

39
LE NOSTRE CERTIFICAZIONI
OUR CERTIFICATIONS

Certificazioni ISO
Sice, nell’ottica della piena soddisfazione del cliente,
ha sottoposto la propria struttura alla certificazione di
qualità secondo lo standard UNI EN ISO 9001.
Questo traguardo diventa ogni giorno un inizio, in quanto,
nell’ottica di un costante sviluppo delle proprie
potenzialità, l’azienda tiene costantemente corsi di
formazione dedicati al proprio personale,
in risposta alla continua evoluzione che la tecnologia impone.
L’azienda è inoltre costantemente impegnata a
perseguire i più elevati standard di qualità e di
attenzione al cliente nel proporre i propri prodotti e servizi.
Il rispetto puntuale degli impegni assunti con i propri clienti e il
superamento delle loro aspettative costituiscono un obbligo
permanente di tutto il team aziendale.

Oggi l’azienda possiede sia la Certificazione a norma UNI EN ISO


9001:2008 settore EA 28b relativa alla Progettazione,
Installazione e Manutenzione di Impianti Elettrici,
Termoidraulici, di Condizionamento e Fotovoltaici
sia la Certificazione di Conformità al D.P.R. n. 43/2012
attuazione del Regolamento (CE) n. 842/2006,
al Regolamento (CE) n. 303/2008
e al regolamento Tecnico Accredia RT-29 rev. 02
inerente l’installazione di Apparecchiature Fisse
di Refrigerazione, di Condizionamento e di
pompe di Calore contenenti taluni Gas Fluorurati
ad Effetto Serra (F-GAS sec. G.U. n. 93 del 20 aprile 2012).

ISO Certifications
SICE, caring his customers, obtains the ISO 9001 certification.
But this target is only a beginning of a quality process, because
all the manpower is costantly updated to the recent technology
to apply with special courses and tests.
Satisfy and overcoming customer’s target is need by our staff.

Today, the company owns both the certification UNI EN ISO


9001:2008 EA 28b on the design,
Installation and Maintenance of Electrical Installations,
HVAC, Conditioning and Photovoltaic
both the Certification of Compliance with
the Presidential Decree n. 43/2012
implementation of Regulation (EC) no. 842/2006,
to Regulation (EC) no. 303/2008
Technical Regulation and Accreditation RT-29 rev. 02
regarding installation of refrigeration,
equipment Air Conditioning and
Heat pumps containing certain Greenhouse Effect F-Gas
(F-GAS sec. G.U. n. 93 of 20 April 2012).

40
Attestazione SOA SOA Certification
L’ottenimento della certificazione SOA e’ una ulteriore conferma della Obtaining this certification is a confirm to join and develop
volontà di continuare a crescere anche nell’ambito public works, DNA of Sice is to effort the customers like
tradizionalmente proprio delle opere pubbliche. and to realize in the right time every order.
E’ nel DNA di Sice essere un partner affidabile rispetto al Sice is certified for general construction (OG1),
committente pubblico, ormai sempre piu’ esigente
systems of power generation (OG9),
in quanto al rispetto di qualita’ e tempistiche di progetto.
public lighting (OG10) and plants (OG11)
Le categorie generali delle quali l’azienda si può avvalere vanno dalla
OG1 (costruzioni edili), up to the 6 class (over 10.000.000 €)
OG9 (impianti produzione energia elettrica) and specialized in hydraulic plants (OS3),
OG10 e OG11 (complessi di impianti) fino alla VI classifica (10 mln di euro). air treatment (OS28) and electrical plants (OS30)
Da non sottovalutare la presenza delle classifiche specialistiche OS3 (im- up to the 5° class (5.165.000 €).
pianti idrico-sanitari), OS28 (impianti termomeccanici) e OS30 (impianti
elettrici e di telecomunicazioni), che certificano la corretta esecuzione di
singoli lavori per importi fino alla V classifica (5,165 mln di euro).
gruppo
NEL CUORE
DI OGNI GRANDE OPERA
45
thh

IN THE HEART OF
EVERY GREAT WORK 1969 - 2014
4

SICE srl PRESIDENTE / PRESIDENT


Via Lisbona, 3 - 35127 Padova - Italy Dott. Ing. Vito Villari
tel. +39 049 8286911 - Fax +39 049 8286940
sice@siceimpianti.com - www.siceimpianti.com AMMINISTRATORE DELEGATO / C.E.O.
Dott. Ing. Alberto Villari

DIRETTORE TECNICO / TECHNICAL DIRECTOR


Per. Ind. Andrea Noventa
la soatech s.p.a.
organismo di attestazione
ORGANISMO
DI CERTIFICAZIONE

S G Q certificato secondo la Norma DIRETTORE AMMINISTRATIVO / C.F.O.


UNI EN ISO 9 0 0 1 : 2 00 8 Dott. Arch. Emanuela Villari

Potrebbero piacerti anche