PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh

Employer: M/S.: Musanada PJSC Consultant: DiwiConsult


Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)

Personnel Lack of information Personal Injury 2 2 M  All personnel will be safely inducted prior 1 2 L A
1 Site about work to commence the job on site.
not familiar
personnel procedures and  All personnel will be briefed on MS and
with work related hazards Risk Assessment.
site a n d sa f e  Prior to Start Safety Talks to be
s y s t ems o f conducted.
w or k  Through supervision on site full time.
 Periodic Toolbox talks to be conducted.

2 Existing Site Slip, trip & fall Inadequate Slip and Trip, 2 2 M  Site will be inspected thoroughly to 1 2 L A
conditions Uneven, untidy arrangement of Property ensure a safe working environment.
ground, materials and lack damage and  Task Based PPE to be worn full time
slipping, of planning personal on site.
t ri pp in g o f injuries  All existing survey pegs will be identified
a cc i d ent s by properly and protected.
f a l li ng .

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 1
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
Weather  Personnel to avoid working in storm and
3 condition Heavy wind can Skin diseases 2 2 M Heavy windy conditions as far as possible 1 2 L A
and site causes dust and Headache, and stop work temporarily when visibility
environment workers can work dizziness & is significant affected until it reaches fine
in hot weather confusion. and safe for work.
without drinking Loss of  Sprinkle water for dust suppression.
Dust, cold water appetite, and  Ensure emergency vehicle available at
Heat Stress nausea site.
Sweating, with  Personnel to wear dusk mask as and when
pale, clammy required.
skin  Control working hours in hot periodsas
per local requirements.
 Provide water coolers & rest areas as
required on site.
Transportation Not follow safe  Follow OSHAD COP - 44.o
4 driving practices. Roll over, road 2 2 M  Trained (defensive driving) driver with 1 2 L A
Driving in graded traffic accident, valid UAE license.
road / sand, vehicular fire,  Seat belt to be worn by driver.
stuck up in  Ensure proper traffic management plan to
Driving in fog and sand organize vehicle traffic on site.
sand storm, Vehicle  Schedule timing for all deliveries to avoid
breakdown congestions on site.
Over speeding,
 Use of warning light system (glow stick),
Poor maintenance banks man /flag men etc.
 No driving during heavy fog or sand storm
when visibility is significantly affected.

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 2
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
 Pre-use inspection by driver.
 Ensure reversing vehicle provided with
banks man if hazards exits
(oncoming vehicle traffic nearby workers
etc)
Excavation Falls of personnel Open Fatality, 3 4 H  All Activities must comply to OSHAD COP 1 2 L A
5 Works for into excavations. Excavation/any Personal injury, – 29.0
Cable laying. excavation for road Electric Shock,  Permit to Work to be obtained from all
Fall of equipment crossing Fire or damage associated Authorities before excavating.
into excavations, to equipment  Only qualified and experienced employees
Old inundated to be used during the work.
Fall of spoil into drawings, no  Follow Approved MS
excavations, checking of  Excavation in loose earth or sand to be
existing cable stepped out or shored.
Collapse of through detector,  Excavation to be checked by qualified
excavation from trial pit and marker employee at work start and finish.
weight of earth, post  Approved existing services layout drawing
to be distributed to all concerned parties
Contact with through controlled document distribution,
underground verify the site indications such as route
services (Existed markers etc.
pipelines, existed  Use cable locators or similar equipments
live/ to check the presence of utilities, if
communication applicable, trial pit to trace any services,
cables) Existing services to be located and clearly
marked before beginning excavations.
Collapse of
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 3
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
excavation from  Do manual excavation very near to live
weight of adjacent utilities.
vehicle,  Excavation to be barricaded and warning
signs posted.
Vehicles driven into  No equipment to be lain within 1 meter of
excavations. the trench edge
 Spoil to be kept at least 1.5 meters from
Physical injury due the trench edge.
to proximity of  No vehicles to be positioned adjacent to
plant the excavation edge.
 Warning signs and notices to be posted
to prevent entry into the area by
unauthorized vehicles
 Lighting required for Excavations left
open overnight in public areas.
 Only GTGCE approved mechanical shovels
are to be used to carry out this work.
 Plant used to backfill excavations will
carry current certification and will be
maintained in a safe condition.
 The plant will be operated by trained and
authorized personnel
 Banks men will be used to control the
backfilling operation in order to prevent
plant working too close to the excavation
edge.

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 4
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
 Unauthorized personnel will be excluded
from areas where the backfilling of
excavations is taking place.
 A survey of the area will be carried out to
Asses risks to any adjacent structures
and/or utilities that may exist Operators
will be briefed on any identified potential
hazards.
 Tool box talks and regular training for
personal.
Cable Laying Hazards associated Accidental Fatality, 4 3 H  Ensure NOCs/PTW, 1 2 L A
6 Activity with Animal bite interaction with Electrocution,  avoid direct connection with live cable /
animals like snake, Fire, rash, water in trench,
Working in vicinity lizard, rat etc injures etc  Shutdown the power if possible,
to live cables/  Implement the PTW system,
other Live Utilities Bad insulation,  Competent personnel to operate
water in trench, machineries.
Hazards associated HV Cable.  Ensure safe working distance for HV
with Slipping live cable cable,
during pulling/ Weather and soil  Ensure and follow the up dated drawing
laying cables condition,  Drums must be stored in upright position,
loose sand  use stoppers,
 Ensure the lifting safety during the
cable termination Caught between
movement of drum
and jointing Moving parts
 During transportation, it must be fasten
well, Use safe lifting plan while lifting etc.
Use of Equipment Drums roll, Falling,
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 5
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
for cable pulling Heavy weight,  No entry to area during testing and
activities (winch energization.
Machines, Rollers  Assign competent team,
etc)  Good Tools & Equipments,
Handling of cable  Calibration of Equipments and Tools as
drums required,
 No entry or entry restricted only for
Testing and authorized persons
energizing cables  make the necessary Awareness/ Trainings,
 Tool Box Talks Prior Starting Work.
 Proper House Keeping.
 Maintain the proper/ suitable Warning
sign boards, Barricades etc.
 proper materials management
 Proper and Close supervision shall be
ensured.
 Ensure basic PPE

Lifting Overloading the Lack of Supervision Fatality, 3 4 H  All Activities must comply to OSHAD COP 1 3 L A
7 operations for crane Personal Injury – 34.0
Cable laying. Using damaged (Major/Minor) • Lifting permit should be taken prior
Crane Overturn lifting gears Property starting activity
Damage • Approved lifting plan must be followed
Uncertified and • Load To be lifted must not exceed the
Suspended Load uninspected crane SWL of the crane
and lifting gears • Check soil condition before placing the

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 6
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
Failure of crane
equipment, No lifting plan • Out riggers of the crane to be extended
available fully and placed on wooden pads
Adverse weather • Use tag lines to control load
condition, Directing poles by • Identify and maintain close continuous
hands communication between the operator
Struck by load. and rigger.
unbalanced load • Operator, Rigger and lifting gears
Rigging point Falling including crane should have valid
failure uncontrolled load competency certificate from third party
and present color code
Overhead Utilities Incompetent • Lifting operation should be stopped
personnel temporarily during adverse weather
conditions.
Wrong signals/ • All operatives to move to safe location in
confusing signals/ case of adverse weather.
different signal, • Secure the load correctly before lifting
different sources • Follow correct lifting technique
• Crane lifting operation shall be stopped
when wind reaches or gust in excess of
38kph (20.5 knots).
• Daily check of all tools & equipment’s
(Check slings are inspected, color coded
and certified) by competent supervisor
• Defective equipment’s/ tools to be
replaced and tagged off (Red color), that
clearly reflect damage or defective tools
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 7
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
and to avoid confusion with inspected one
of the same color.
• Use secured hook with pin
• Swing area radius should be barricaded
and provided with signage (Rigging
signage)
• Daily equipment operator check list to be
filled by operator prior to start work.
• Wear appropriate PPE
• First aid facility shall be made available
and accessible."
• Training and TBT to be provided for
workforce
Manual Back injury due Lifting load Physical injury 3 3 H • All Activities must comply to OSHAD COP 1 3 L A
8 Handling While to manual beyond the – 14.0
Cable Pulling material capacity of the • Whenever practicable, mechanical lifting
handling, individual, aids e.g.
• Cranes, fork lift trucks etc., will be used to
Individual Improper lifting alleviate the requirement for manual
Capability, techniques, handling.
• Supervision will assess weight, center of
Inadequate Lack of training, gravity etc. and determine the number of
space, instruction & persons required to carry out the work
supervision, safely.
Trip and slip. • Personnel will be trained in manual
Inadequate handling techniques.
lighting • -Gloves/Safety footwear will be worn by
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 8
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
conditions, personnel engaged in manual handling.
• Avoid manual load lifting if possible. If not
Slippery surface then, check and ensure that the load is
below the recognized permissible limit,
• Stand as close as possible to the object to
be lifted. Bend the knees as much as
possible;
• Bend hip keeping head & back as straight
as possible;
• Use body weight to tilt the object or load
the object;
• Lift gradually using leg and stomach
muscles.
• Avoid twisting and sudden movement to
body while lifting the load;
• Train the staff for good posture; Use slip
resistance shoe with toe protection

Machinery Employee Struck Employee in Fatality, 4 4 H • All Activities must comply to OSHAD COP 2 2 L A
9 Works and by heavy vicinity to Personal Injury – 33.0
working equipment/ Vehicle heavy equipment Property • Follow PTW System
adjacent to during the road Damage • Close supervision for activity.
vehicular works. • Banks men to be available for equipment
traffic. reversing, each equipment must be fitted
Collision between with reverse alarm, flashing light and fire
Machineries/ extinguishers.
Vehicle • Competent and Certified Personnel to
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 9
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
operate Equipments/ Vehicles
• Adequate Barriers and Warning Signs
Available at Site
• Safety training and tool box talk to include
all active safety measures and emergency
procedure.
• Equipment to be inspected before
starting the job.
• Labors are not allowed to stay too close
to equipment.
• PPE including high visibility vest shall be
wear.
• Speed limit on site must be followed
Working with Vibration Lack of inspection Personnel 3 3 H  All Activities must comply to OSHAD COP 1 2 L A
10 Compactor of tools before use. Injury – 14.0, COP – 3.1, COP – 35.0 COP – 17.0
Machine/Powe Unguarded Tools  Reduce exposure time,
r tools/ hand incompetent WRULD  Job Rotation,
tools Personal injury due operator  Proper Awareness an Trainings
to use the Medical  Proper compaction machine is
incorrect/unsafe Use of homemade Emergency recommended along with competent
Use of tools, operator,
Machineries/ tools.  Use the correct the tool for the job.
Inadequate  Regular inspection of tools.
training, instruction  Protect the sharp edges of tools that are
& supervision, to be stored or carried.
 Renew wooden handles that are split.
Bad condition of
Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 10
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
hand tools,  Keep hammer head tightly wedged on
their shafts.
Operating  Never allow any employee to prepare tool
Procedures. at workplace.
 All employees should be properly
instructed the safe work procedure of all
hand tools.
 Adequate monitoring shall be
implemented to prevent the preparation
of homemade tools.
 Use Proper PPE
11 Electrical Electrical Hazard Bad insulation, Fatality 3 4 H  All Activities must comply to OSHAD COP 1 3 L A
works Electrocution – 15.0, COP – 24.0
Associated Improper Isolation Incompetent Major Injuries  Follow PTW and Approved MS
with Cable Personnel Fire  TBT Prior starting work
laying activity. Working in vicinity Burns,  Ensure Isolation is done and make sure it
to live cables/ Working without Property not accidently reconnected/ follow lock
other Live Utilities Proper PTW Damage out/ tag out method
 Proper earthing must be Provided
Pinch Point Hazard Unauthorized  Trained First aides/ Fire Fighters Available
Personnel Entering at site
site  Fire Extinguisher Available at site all the
time
Improper PPE  Regular Inspections
 Enough electrical hazard warning signs
must be posted in the area of activity

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 11
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
 Competent, certified and Approved
personnel must be allowed to do the work
 Restrict unauthorized entry at site
 Ensure proper supervision
 Adequate Training
 Electrical Hazard Safe PPE must be used

Working in hot Heat Stress for site Employees Personal 3 3 H  All Activities must comply to OSHAD COP 1 3 L A
12 environment worker, exposed to heat, Fatigue – 11.0
&remote Serious injuries,  Personal to drink sufficient drinking water
location Skin Burn Dehydration (from 5-7 liters of water\day).
Heat stroke Hot working Respiratory  Employees to sit under sun shed during
Exposure to Sun environment. Disorders the rest.
light. Giddiness  Following the rest time break down of
Headache local authorities during July and august.
Unconsciousne  -Cold water to be available on site and
ss. employees to have their water coolers
filled with water on site.
 Ensure the availability of plenty of cool
drinking water at worksite.
 Provide rest shelters at worksites.
 Drink plenty of cold water.
 Intermittent rest under shades.
 Eating more vegetables and fruits.
 Appropriate PPEs to protect body against
direct exposure to heat or hot sun. Rest

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 12
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)
Breaks.
 Reduced work periods.
 Long sleeved coverall, Balaclava, Sun
Glass & Shade.
 -Dedicated rest areas with shelters to be
provided for remote locations.
1 2 L A
13 Emergency Lack of Death / 2 2 M  All Activities must comply to OSHAD COP
consultation. extensive loss – 4.0
Inadequate  First-aid box and trained first aider onsite.
emergency  Emergency response should be in
response and accordance with the project emergency
arrangements, response plan.
 Emergency contact number will be posted
Poor at site. Emergency contact numbers are
communication. available with the HSE Plan.
 First Aid Clinic with first Aider available at
site
 Communication by mobile
Site welfare  All Activities must comply to OSHAD COP
14 facilities Lack of Environmental 2 2 M – 8.0, 9.0 1 2 L A
maintenance Inadequate management pollution,  Portable toilet and periodical cleaning.
maintenance of commitment  Site shade, drinking water availability and
welfare facilities. towards welfare Health effects. sealed.
facilities.  First-aid box and trained First-aider. Site
Clinic.

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 13
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

S/ ACTIVITY HAZARD/ASPE Cause of Consequenc Risk Risk Recommended Control measures Risk Risk Evaluation
N CT Hazard and e/ Evalua level Eval level
o Condition that impact tion uatio
develop the n
hazard

P S (E/H/M/ P S E/H/M/L
L)

Housekeeping  Housekeeping on daily basis.


15 Improper Slips and Trips, 2 2 M  Fire Extinguisher to be provided on site. 1 2 L A
Tripping hazard, arrangement of  Skips / drums to be provided to dispose
materials. Personnel debris.
fire hazard. Injury.  Food waste should be removed from site
on daily basis.

Risk Assessor: Reviewed & Approved By:

Name: Designation: Name: Designation:

Signature: Date: Signature Date:

RISK MATRIX

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 14
PROJECT: Construction of Internal Roads & Infrastructure for 647 houses in Al Shawamekh
Employer: M/S.: Musanada PJSC Consultant: DiwiConsult
Contractor: Ghantoot Transport & Gen. Cont. LLC. (GTGC). Rev.: 0.0 Dated on 26 April 2017
Risk Assessment for Cable Laying & Allied Works

Ghantoot Group (Roads Division), E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk 15