Sei sulla pagina 1di 12

DATOS CLIMATICOS/PRECIPITACION HUAMANGA

CUADRO N 01
Country
Altitude:
Latitude:

:
2761 meter
-13.09 De

Peru
meter(s)
(South)

Station
above

Month

MaxTemp
(deg.C)

MiniTemp
(deg.C)

Humidity
(%)

: Huamanga
M.S.L.
Longitude:
: -74.13 De

(West)

Wind
(Km/d)

Solar
(MJ/m2/d)

SunShine
(Hours)

ETo
(mm/d)

Rainfall
(mm/month)

January
February
March
April
May
June
July
August
September
October
November
December

23.5
23
22.7
23.6
23.9
23.1
22.8
23.8
24.4
25.1
26
24.5

9.6
9.7
9.4
8.5
5.9
3.8
4.1
5.4
7.6
8.6
8.7
9.3

67
72
73
65
69
63
62
71
62
60
56
64

173
173
130
130
130
130
130
173
173
173
173
173

6
6
5.4
6.8
7.7
8
7.3
6.8
7.4
6.9
7.8
6.4

19.6
19.5
17.8
18.2
17.4
16.7
16.3
17.3
20
20.5
22.4
20.2

4.21
4.02
3.56
3.62
3.31
3.12
3.12
3.61
4.26
4.55
4.99
4.44

110
113
106
29
11
6
6
10
26
44
40
89

Average

23.9

7.6

65.3

155.1

6.9

18.8

3.9

590

CEDULA DE CULTIVO / DEMANDA DE AGUA


CUADRO N 02
Pr oy ec t o
Di s t r i t o

Pr ov i nc i a
Depar t .

CONSTRUCCI ON DE RESERVORI O TI NYACCPUQUI O


LI RCAY
CULTI VO

AREA
( Has )

ANGARAES
HUNCAVELI CA

FEB

J UL

AGO

SET

5. 00

1. 15

1. 15

0. 75

0. 25

TRI GO

5. 00

1. 00

1. 15

1. 15

0. 90

HABA

5. 00

1. 10

1. 00

0. 70

0. 35

50. 00

50. 00

50. 00

50. 00

50. 00

35. 00

1. 00

5. 00

5. 00

31

28

31

30

31

30

31

31

Kc Ponder ado

1. 02

1. 02

0. 80

0. 60

0. 56

0. 00

0. 30

ETP ( mm/ d)

4. 21

4. 02

3. 56

3. 62

3. 31

3. 12

3. 12

ETP ( mm/ mes )

130. 51

112. 56

110. 36

108. 60

102. 61

93. 60

ETA ( mm/ mes )

132. 47

114. 81

88. 29

65. 16

57. 17

PP ( mm/ mes )

110. 00

113. 00

106. 00

29. 00

11. 00

77. 00

79. 10

74. 20

20. 30

7. 70

4. 20

4. 20

7. 00

18. 20

55. 47

35. 71

14. 09

44. 86

49. 47

- 4. 20

24. 82

82. 53

122. 38

DEMANDA BRUTA

( mm/ mes )
( mm/ mes )

DEMANDA UNI TARI A


MDULO DE RI EGO

( m3/ mes - ha)


( l / s / ha)

VOLMEN TOTAL ( m3)


DEMANDA DE AGUA TOTAL ( l / s )
OFERTA DE AGUA ( l / s )

Lami na de Ri ego Net o ( mm) /


Fr ec uenc ai a de Ri ego ( di a)

Ma z

Lami na de Ri ego Net o ( mm) /


Fr ec uenc ai a de Ri ego ( di a)

Tr i go

0. 60

OCT

NOV

DI C

0. 50

0. 90

1. 10

1. 10

1. 00

0. 50

0. 30

0. 90

0. 90

0. 50

0. 75

0. 75

0. 40

0. 70

1. 10

5. 00

20. 00

50. 00

50. 00

30

31

30

31

0. 80

1. 10

1. 33

0. 88

0. 99

3. 61

4. 26

4. 55

4. 99

4. 44

96. 72

111. 91

127. 80

141. 05

149. 70

137. 64

0. 00

29. 02

89. 53

140. 58

186. 89

130. 99

135. 58

6. 00

6. 00

10. 00

26. 00

44. 00

40. 00

89. 00

30. 80

28. 00

62. 30

156. 09

102. 99

73. 28

0. 30

0. 80

1. 10

0. 30

158. 48

102. 03

40. 25

128. 17

141. 34

- 12. 00

70. 90

235. 79

349. 66

445. 98

294. 25

209. 36

1, 584. 79

1, 020. 32

402. 51

1, 281. 71

1, 413. 38

- 120. 00

709. 03

2, 357. 94

3, 496. 57

4, 459. 75

2, 942. 50

2, 093. 58

0. 59

0. 42

0. 15

0. 49

0. 53

- 0. 05

0. 26

0. 88

1. 35

1. 67

1. 14

0. 78

79, 239. 5

51, 016. 0

20, 125. 7 64, 085. 71

49, 468. 4

- 120. 0

3, 545. 1

11, 789. 7

17, 482. 9

89, 195. 0

########

########

29. 58

Deficit(-) / superavit (+) (l/s)

0. 75

J UN

CEBADA

DEMANDA NETA

0. 90

MAY

5. 00

PE ( mm/ mes )

1. 15

ABR

30. 00

( has )

1. 15

MAR

MAI Z

Nmer o de di as / mes

J ul - 04

MESES
ENE

PAPA

Ar ea Tot al

Fec ha

21. 09

7. 51
10. 00

24. 72

18. 47

( 0. 05)

10. 00

10. 00

( 14. 72)

( 8. 47)

10. 00

10. 00

( 19. 58)

( 11. 09)

35
8

35
9

35
10

35
10

45
11

45
11

45
13

45
12

2. 49

1. 32

4. 40

6. 74

10. 00

10. 00

10. 00

10. 00

10. 05

8. 68

5. 60

3. 26

33. 30

56. 76

39. 08

10. 00

10. 00

10. 00

( 23. 30)

( 46. 76)

( 29. 08)

35
8

35
8

35
7

35
8

45
11

45
10

45
9

45
10

CONSTRUCCION DE RESERVORIO TINYACCPUQUIO


CONSTRUCCION DE RESERVORIO TINYACCPUQUIO
DISEO HIDRULICO Y CARACTERSTICAS GEOMTRICAS
CANAL DE SECCION CIRCULAR-A GRAVEDAD

CUADRO N 03

No
1.00
2.00
3.00
4.00
5.00
6.00

Tramo
De
0.00
20.00
40.00
80.00
160.00
320.00

200.00
250.00
TOTAL

A
20.00
40.00
80.00
160.00
320.00
640.00
TOTAL

Longitud
(m)
20.00
20.00
40.00
80.00
160.00
320.00
640.00

Q
3
(m /s)
0.04
0.038
0.038
0.038
0.038
0.038

n
0.01
0.01
0.01
0.01
0.01
0.01

s
m/m
0.00
0.01
0.01
0.01
0.01
0.01

D(int)
(m)
0.24
0.19
0.24
0.24
0.19
0.24

D
(m)
160.00
160.00
160.00
160.00
160.00
160.00

L
180.00
460.00
640.00

COSTO DE TUBERIA
TUB 200 mm
180.00
TUB 250 mm
460.00

180.00
460.00

45.39 3.50 158.87 26.48 4765.95


71.73 3.50 251.06 41.84 19247.55
24013.50

Y
(m)
0.15
0.15
0.14
0.14
0.17
0.14

Y/D
0.63
0.77
0.57
0.61
0.88
0.57

1/8*(-sen)*D

1/2(D)

0.03
0.02
0.03
0.03
0.03
0.03

0.44
0.41
0.41
0.42
0.46
0.41

R=A/P

0.07
0.06
0.06
0.07
0.06
0.06

0.23
0.16
0.24
0.23
0.12
0.24

1.13
1.35
1.40
1.24
0.98
1.41

V
(m/s)
1.28
1.62
1.46
1.35
1.43
1.47

CONSTRUCCION DE RESERVORIO TINYACCPUQUIO

DIMENSIONES DEL RESERVORIO


CUADRO N 04
Datos
Reserv.
1

Q aporte
l/s
8.00

t llenado
hr
10.5

Calculo
vol
m3
302.4

L
m
15

l
m
10

Area
m2
150

Htotal
m
2.2

Evacuacin
h libre
m
0.2

h muerta
m

Hhidr
m
2

PESO PORTANTE DE LA ESTRUCTURA

ANCHO
ZAPATA
m

PESO EN
ALTURA
ANCHO
AREA
Peso espec ESTRUCTU PESO
ZAP
ALTURA MURO
MURO
TOTAL
VOLUMEN cemento
RA
TOTAL
AREA BASE cap portante
m
m
m
m2
m3
tn/m3
kg
KG
cm2
Kg/cm2
0.50
0.40
2.2
0.2
0.64
0.64
2.4
1536
2212.725
5000
0.44

MATERIAL
Tierra
Agua

Pesos de los
LADEO ZAP ALTURA PARED
VOLUMEN Pesos epecif materiales
m
m
m3
tn/m3
kg
0.15
2.2
0.33
2.05
676.5
0.15
1.5
0.225
0.001
0.225
676.725

H total disp
m
2

Vol Total
m3
300

t sal
hr
6

Q salid
l/s
13.89

CONSTRUCCION DE RESERVORIO TINYACCPUQUIO


EMPUJE TIERRA
DATOS Y CALCULOS DE DIMENSIONES

PRE DIMENSIONAMIENTO DE MUROS


(m)
H
htierra
T
Z
B
b
a
c

W4
w5
ht

w2
H

Calculado
Redon
2.40
2.40
0.40
0.30
1.90
0.70
0.40
0.80

2.40
2.40
0.20
0.30
1.50
0.30
0.40
0.80

TIERRA

Ea
w3

a
b
w1

Ep

CALCULOS DE FUERZAS
Fzas.

cz

W1
W2
W3
W4
W5

Area
m2
0.45
0.48
0.12
0.12
1.92

P.Espec.
Ton/m3
2.4
2.4
2.4
1.9
1.9

P.parcial
Ton
1.08
1.15
0.29
0.23
3.65

Fd
Wtotal=N

6.40

B
MOMENTO RESISTENTE EMPUJE ACTIVO -TIERRA
Eleme.
Wi
Brazo
Mi
N
(ton)
(m)
Ton-m
1
1.08
0.75
0.81
2
1.15
0.50
0.58
3
0.29
0.63
0.18
4
0.23
0.67
0.15
5
3.65
1.10
4.01
6
0.00
0
0.00
M r.
5.73
M a = Ea * H"/3
2.08
Ma
Momento activo
Mr
Momento Total resistente

FACTOR DE SEGURIDAD AL DESPLAZAMIENTO


FSD
(Fd+Ep)/Ea
Calculo de empuje activo
Ea = (g*H2/2)*Ka
Ea =

2.31 Tnm

Fd= u*N
Fd=

3.69

FSD= Fd/Ea

1.60 >1.5 OK

Ka =
Ka =

TAN2 ( 45-F/2)
0.33

f=
u =tan f

30
0.58

FACTOR DE SEGURIDAD AL VOLTEO

CALCULO DE LA EXCENTRICIDAD

FSV= Mr/Ma

e =B/2-X
X= (S Fy* Xi)/ S Fy
X=
e=
B/6

2.76 >1.75 OK

0.90
0.15
0.25

Bz/6 > e

FACTOR DE SEGURIDAD AL ASENTAMIENTO


ESFUERZOS MAXIMOS DE RESPUESTA DEL TERREMO
q1 = P/B( 1+ 6e/B)
q2 = P/B( 1 - 6e/B)

6.76 T/m2
1.77 T/m2

VERIFICACION DE CAPACIDAD PORTANTE DEL SUELO


s=
s =

Capacidad portante del suelo


Capacidad de respuesta estructura

s Cap portante suelo admisible > s estructura.

1.00
0.68

kg/cm2
kg/cm2

Para incrementar la capacidad portante del suelo


se considera la compactacion del terreno con
material de prestamo de tipo grava
bien graduada en 2 capas de 0.25 cm.

DISEO POR CONCRETO ARMADO PANTALLA


DATOS DE MURO CONCRETO ARMADO
fc =
210.00 Kg/cm2
fy =
4200.00 Kg/cm2
h =
0.30 mts
d =
0.25 mts
b=
1.00 Prof. de pantalla
Bi =
0.85 Para Concretos hasta 280 kg/cm2
(para h) Ea=
1.82
CUANTIA BALANCEADA
Pb = 0.85 Bi ( fc/fy ) ( 6090 / ( 6090+fy )
Pb =
D
L
MOMENTO ULTIMO
Mu= Ea*( H"/3-z)

0.0214
0.0000 Carga permanente.
1.8240 Carga viva

Pmin. = 14 / fy
Pmin
Pmin. = 10 / fy
Pmin
7 As,temperatura = 0.002bt,

0.003 Vigas
0.002 Muros de contensin

1.4592
Pc<Pb
Pc>Pb

w = 0.85- ( 0.7225-1.7Mu/(f fc bd^2))^1/2


1.7*Mu
248,063.49
f fc bd^2
11,812,500.00
CALCULO DE CUANTIA DE ACERO
w=
0.0124
Pc =
0.00062

calculo adicional
Ku=1,7*Mu/f'c bd2
0.0189
tabla (w)
0.021
cuantia=w*f'c/fy
0.0011
cuanti max=0,75bal
0.0160
cuantia max>cuantia
ok
As=cuantia*b*d
2.625

Falla ductil
Falla Fragil

OK

RESULTADOS DE ACERO
As tem
6.00
Ascal
2.63
Amini
5.95

Efecto de fragua

REFUERZO MIN. VERTICAL

ANALISIS POR CORTE

cm

1.27
1/2
20.00 media de la altura
30.00

diam. acer
T

SECCION SOMETIDA A CORTE DEL MURO

revestim
Pmin

5.00
0.002

b =T
Corona del Muro

Asreq
As
@

5
H_1.00 m

Vu cortante ultimo de analisis externo (tn)


Vn Cortante nominal de la seccion (tn)
f = 0.85 factor de reduccion por corte
Vn < Vc

Ea = (g*H /2)*TAN ( 45-F/2)


Vu = Ea*1.8
Vn = Vu / f
b=
d=
Vc = toneladas

Vc = 0.53 ( fc )^1/2 * b d

1/2"
35

5.952
6.331
21.271

1/2"
20

Base del Muro


5

Vu = f Vn

RESULT. @ (cm)

3.571
6.331
35.452

Asreq
As
@

OK
1.824
3.28
3.86
0.25 m
1.00 m
19.20 ok

0.53

210 1

0.25

1.920107419

DISEO DE LA CIMENTACIN.
DATOS DE DIMENSIONAMIENTO DEL MURO
fc =
210.00 kg/cm2
fy =
4200.00 Kg/cm2
c
0.80 m
r ( rec)=
0.08 m
b
1.00 m
d (Z-r) =
0.22 m
z
0.30 m
B
1.50 m
Fr = W5+Pp-Qr
Q1 =
6.76 T/m2
Q2 =
1.77 T/m2
q
4.10 T/m2

w5

Carga distribuida
W5
Pp

3.65 w distri=
0.576 P distri=

4.56
0.72

Calculo de momentos en la cara de la pantalla


z

q2

Pp

q1

Mw5 =
Mpp =
Mq =
M(q1-q)
SM
SM
Mu =

1.46
0.23
1.31
0.57
Mq+M(q1-q) - (M w5+Mpp)
0.19
0.34

CUANTIA BALANCEADA
Pb = 0.85 Bi ( fc/fy ) ( 6090 / ( 6090+fy )

CUANTIA MINIMA
Pmin. = 14/fy

Pb =

As,temperatura = 0.002bt, t espesor total de la losa en flexion


diam. acer
Z
CRITERIO DE COMPARACION
revestim
Pc<Pb
Falla ductil
OK
Pmin
Pc>Pb
Falla Fragil

0.0214

w = 0.85- ( 0.7225-1.7Mu/(f fc bd^2))^1/2


1.7*Mu
f fc bd^2
CUANTIA CALCULADA
w=
Pc =

58054.52
9147600.00
0.00374
0.00019

Pmin

0.003

REFUERZO MIN. ZAPATA

RESULTADO DE LA SECCION DE ACERO


Base de Zapata
As tem
6.00 cm2
Efecto de fraguaAs (cm2)
As bal
As cal
As mini

47.04 cm2
0.41 cm2
7.33 cm2

@ (cm)

cm
1.27
30.00
7.00
0.003

1/2

RESULT. @ (cm)

7.667
16.515

15

CONSTRUCCION DE RESERVORIO TINYACCPUQUIO


EMPUJE TIERRA
DATOS Y CALCULOS DE DIMENSIONES

PRE DIMENSIONAMIENTO DE MUROS


(m)
H
htierra
T
Z
B
b
a
c

W4
w5
ht

w2
H

Calculado
Redon
2.40
2.40
0.40
0.30
1.90
0.70
0.40
0.80

2.40
2.40
0.20
0.30
1.50
0.30
0.40
0.80

TIERRA

Ea
w3

a
b
w1

Ep

CALCULOS DE FUERZAS
Fzas.

cz

W1
W2
W3
W4
W5

Area
m2
0.45
0.48
0.12
0.12
1.92

P.Espec.
Ton/m3
2.4
2.4
2.4
1.9
1.9

P.parcial
Ton
1.08
1.15
0.29
0.23
3.65

Fd
Wtotal=N

6.40

B
MOMENTO RESISTENTE EMPUJE ACTIVO -TIERRA
Eleme.
Wi
Brazo
Mi
N
(ton)
(m)
Ton-m
1
1.08
0.75
0.81
2
1.15
0.50
0.58
3
0.29
0.63
0.18
4
0.23
0.67
0.15
5
3.65
1.10
4.01
6
0.00
0
0.00
M r.
5.73
M a = Ea * H"/3
2.08
Ma
Momento activo
Mr
Momento Total resistente

FACTOR DE SEGURIDAD AL DESPLAZAMIENTO


FSD
(Fd+Ep)/Ea
Calculo de empuje activo
Ea = (g*H2/2)*Ka
Ea =

2.31 Tnm

Fd= u*N
Fd=

3.69

FSD= Fd/Ea

1.60 >1.5 OK

Ka =
Ka =
f=
u =tan f

TAN2 ( 45-F/2)
0.33
30
0.58

FACTOR DE SEGURIDAD AL VOLTEO

CALCULO DE LA EXCENTRICIDAD

FSV= Mr/Ma

e =B/2-X
X= (S Fy* Xi)/ S Fy
X=
e=
B/6

2.76 >1.75 OK

0.90
0.15
0.25

Bz/6 > e

FACTOR DE SEGURIDAD AL ASENTAMIENTO


ESFUERZOS MAXIMOS DE RESPUESTA DEL TERREMO
q1 = P/B( 1+ 6e/B)
q2 = P/B( 1 - 6e/B)

6.76 T/m2
1.77 T/m2

VERIFICACION DE CAPACIDAD PORTANTE DEL SUELO


s=
s =

Capacidad portante del suelo


Capacidad de respuesta estructura

s Cap portante suelo admisible > s estructura.

1.00
0.68

kg/cm2
kg/cm2

Para incrementar la capacidad portante del suelo


se considera la compactacion del terreno con
mateterial de prestamo de tipo grava
bien graduada en 2 capas de 0.25 cm.

DISEO POR CONCRETO ARMADO PANTALLA


DATOS DE MURO CONCRETO ARMADO
fc =
210.00 Kg/cm2
fy =
4200.00 Kg/cm2
h =
0.30 mts
d =
0.25 mts
b=
1.00 Prof. de pantalla
Bi =
0.85 Para Concretos hasta 280 kg/cm2
CUANTIA BALANCEADA
Pb = 0.85 Bi ( fc/fy ) ( 6090 / ( 6090+fy )
Pb =
D
L
MOMENTO ULTIMO
Mu= Ea*( H"/3-z)

0.0214
0.0000 Carga permanente.
2.3085 Carga viva

Pmin. = 14 / fy
Pmin
Pmin. = 10 / fy
Pmin
7 As,temperatura = 0.002bt,

0.003 Vigas
0.002 Muros de contensin

1.3851
Pc<Pb
Pc>Pb

w = 0.85- ( 0.7225-1.7Mu/(f fc bd^2))^1/2


1.7*Mu
235,466.52
f fc bd^2
11,812,500.00
CALCULO DE CUANTIA DE ACERO
w=
0.0118
Pc =
0.00059

Falla ductil
Falla Fragil

OK

RESULTADOS DE ACERO
As tem
6.00
Ascal
1.48
Amini
5.95
Abal
53.45

Efecto de fragua

REFUERZO MIN. VERTICAL

ANALISIS POR CORTE

cm
1.27
20.00
30.00

diam. acer
T

SECCION SOMETIDA A CORTE DEL MURO

revestim
Pmin

1/2

5.00
0.002

b =T
Corona del Muro

As
@
H_1.00 m
Vu = f Vn

Ea = (g*H /2)*TAN ( 45-F/2)


Vu = Ea*1.8
Vn = Vu / f
b=
d=
Vc = toneladas

Vc = 0.53 ( fc )^1/2 * b d

35

5.952
21.271

20

Base del Muro

As
@

Vu cortante ultimo de analisis externo (tn)


Vn Cortante nominal de la seccion (tn)
f = 0.85 factor de reduccion por corte
Vn < Vc

RESULT. @ (cm)

3.571
35.452

OK
1.824
3.28
3.86
0.25 m
1.00 m
19.20

0.53

210 1

0.25

1.920107419

DISEO DE LA CIMENTACIN.
DATOS DE DIMENSIONAMIENTO DEL MURO
fc =
210.00 kg/cm2
fy =
4200.00 Kg/cm2
c
0.80 m
r ( rec)=
0.08 m
b
1.00 m
d (Z-r) =
0.22 m
z
0.30 m
B
1.50 m
Fr = W5+Pp-Qr
Q1 =
6.76 T/m2
Q2 =
1.77 T/m2
q
4.10 T/m2
w5
Carga distribuida
W5
Pp

3.65 w distri=
0.576 P distri=

4.56
0.72

Calculo de momentos en la cara de la pantalla


z

Pp

q2

Mw5 =
Mpp =
Mq =
M(q1-q)

q1

SM
SM
Mu =

1.46
0.23
1.31
0.57
Mq+M(q1-q) - (M w5+Mpp)
0.19
0.34

CUANTIA BALANCEADA
Pb = 0.85 Bi ( fc/fy ) ( 6090 / ( 6090+fy )

CUANTIA MINIMA
Pmin. = 14/fy

Pb =

As,temperatura = 0.002bt, t espesur total de la losa en flexion


diam. acer
Z
CRITERIO DE COMPARACION
revestim
Pc<Pb
Falla ductil
OK
Pmin
Pc>Pb
Falla Fragil

0.0214

w = 0.85- ( 0.7225-1.7Mu/(f fc bd^2))^1/2


1.7*Mu
58054.52
f fc bd^2
9147600.00
CUANTIA CALCULADA
w=
0.00374
Pc =

0.00019

cm
0.95
20.00
4.00
0.002

Corona del Muro

As (cm2)
@ (cm)

As bal
As cal
As mini

3/8

RESULT. @ (cm)

3.200
22.26

0.003

REFUERZO MIN. ZAPATA

RESULTADO DE LA SECCION DE ACERO


Base de Zapata
As tem
6.00 cm2
Efecto de fraguaAs (cm2)

REFUERZO MIN. LOSA


diam. acer
e losa
revestim
Pmin

Pmin

20

47.04 cm2
0.41 cm2
7.33 cm2

@ (cm)

cm
1.27
30.00
7.00
0.003

1/2

RESULT. @ (cm)

7.667
16.515

15

PLANTILLA DE MOVIMIENTO DE TIERRA


CUADRO N 07
CONSTRUCCION DE RESERVORIO TINYACCPUQUIO
Fecha: 03/2002

Progresiva

Corte

DE

Longitud

Base

Altura de corte

Ai

A(i+1)

(Ai+A(i+1))/2

Volumen

3000.00
3020.00
3040.00
3060.00
3080.00
3100.00
3120.00
3140.00
3160.00
3180.00
3200.00
3220.00
3240.00
3260.00
3280.00
3300.00
3320.00
3340.00
3360.00
3380.00
3400.00
3420.00
3440.00
3460.00
3480.00
3500.00
3520.00
3540.00
3560.00
3580.00
3600.00
3620.00
3640.00
3660.00
3680.00
3700.00
3720.00

3020.00
3040.00
3060.00
3080.00
3100.00
3120.00
3140.00
3160.00
3180.00
3200.00
3220.00
3240.00
3260.00
3280.00
3300.00
3320.00
3340.00
3360.00
3380.00
3400.00
3420.00
3440.00
3460.00
3480.00
3500.00
3520.00
3540.00
3560.00
3580.00
3600.00
3620.00
3640.00
3660.00
3680.00
3700.00
3720.00
3740.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.57
0.50
0.76
0.64
0.88
0.25
0.58
0.61
0.61
0.63
0.69
0.73
0.75
0.76
0.66
0.51
0.87
0.72
0.63
0.57
0.66
0.65
0.68
0.68
0.78
0.72
0.72
0.75
0.69
0.55
0.94
0.61
0.60
0.62
0.67
0.67
0.56

0.29
0.25
0.38
0.32
0.44
0.12
0.29
0.31
0.31
0.31
0.35
0.37
0.38
0.38
0.33
0.25
0.43
0.36
0.31
0.28
0.33
0.32
0.34
0.34
0.39
0.36
0.36
0.38
0.34
0.27
0.47
0.31
0.30
0.31
0.33
0.34
0.28

0.25
0.38
0.32
0.44
0.12
0.29
0.31
0.31
0.31
0.35
0.37
0.38
0.38
0.33
0.25
0.43
0.36
0.31
0.28
0.33
0.32
0.34
0.34
0.39
0.36
0.36
0.38
0.34
0.27
0.47
0.31
0.30
0.31
0.33
0.34
0.28
0.30

0.27
0.32
0.35
0.38
0.28
0.21
0.30
0.31
0.31
0.33
0.36
0.37
0.38
0.36
0.29
0.34
0.40
0.34
0.30
0.31
0.33
0.33
0.34
0.36
0.37
0.36
0.37
0.36
0.31
0.37
0.39
0.30
0.30
0.32
0.33
0.31
0.29

5.37
6.31
7.02
7.63
5.65
4.13
5.97
6.14
6.21
6.61
7.13
7.42
7.57
7.10
5.83
6.87
7.94
6.74
5.96
6.15
6.55
6.64
6.80
7.29
7.49
7.18
7.34
7.18
6.17
7.43
7.75
6.06
6.08
6.43
6.70
6.13
5.79

PLANTILLA DE MOVIMIENTO DE TIERRA


CUADRO N 07
CONSTRUCCION DE RESERVORIO TINYACCPUQUIO
Fecha: 03/2002

Progresiva
DE

3740.00
3760.00
3760.00
3780.00
3780.00
3800.00
3800.00
3820.00
3820.00
3840.00
3840.00
3860.00
3860.00
3880.00
3880.00
3900.00
3900.00
3920.00
3920.00
3940.00
3940.00
3960.00
3960.00
3980.00
3980.00
4000.00
4000.00
4020.00
4020.00
4040.00
4040.00
4060.00
4060.00
4080.00
4080.00
4100.00
4100.00
4120.00
4120.00
4140.00
4140.00
4160.00
4160.00
4180.00
4180.00
4200.00
4200.00
4220.00
4220.00
4240.00
4240.00
4260.00
4260.00
4280.00
4280.00
4300.00
4300.00
4320.00
4320.00
4340.00
4340.00
4360.00
4360.00
4380.00
4380.00
4400.00
4400.00
4420.00
4420.00
4440.00
4440.00
4460.00
4460.00
4480.00
4480.00
4500.00
TOTAL

Corte
Longitud

Base

Altura de corte

Ai

A(i+1)

(Ai+A(i+1))/2

Volumen

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
1500.00

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.60
0.67
0.74
0.72
0.69
0.77
0.72
0.65
0.66
0.67
0.68
0.63
0.65
0.67
0.61
0.59
0.59
0.58
0.53
0.62
0.67
0.64
0.53
0.58
0.69
0.81
0.83
0.84
0.97
0.58
0.61
0.71
0.82
0.82
0.81
0.93
0.52
0.56

0.30
0.34
0.37
0.36
0.35
0.38
0.36
0.33
0.33
0.34
0.34
0.32
0.33
0.33
0.30
0.29
0.29
0.29
0.27
0.31
0.33
0.32
0.27
0.29
0.35
0.41
0.42
0.42
0.49
0.29
0.30
0.35
0.41
0.41
0.41
0.47
0.26
0.28

0.34
0.37
0.36
0.35
0.38
0.36
0.33
0.33
0.34
0.34
0.32
0.33
0.33
0.30
0.29
0.29
0.29
0.27
0.31
0.33
0.32
0.27
0.29
0.35
0.41
0.42
0.42
0.49
0.29
0.30
0.35
0.41
0.41
0.41
0.47
0.26
0.28
0.33

0.32
0.35
0.37
0.35
0.37
0.37
0.34
0.33
0.33
0.34
0.33
0.32
0.33
0.32
0.30
0.29
0.29
0.28
0.29
0.32
0.33
0.29
0.28
0.32
0.38
0.41
0.42
0.45
0.39
0.30
0.33
0.38
0.41
0.41
0.44
0.36
0.27
0.30
CORTE

6.36
7.04
7.30
7.09
7.32
7.42
6.83
6.56
6.67
6.78
6.58
6.42
6.58
6.35
5.96
5.87
5.82
5.56
5.76
6.43
6.52
5.83
5.54
6.34
7.51
8.21
8.35
9.05
7.74
5.93
6.59
7.62
8.18
8.17
8.73
7.28
5.40
6.06
504.28

MATERIAL LONGITUD
Tierra suelta
1060.00
Roca suelta
440.00
TOTAL
1500.00

VOLUMEN
149.63
354.65
504.28

Potrebbero piacerti anche