LOKASI PARIT PASANGAN (MORTAR)

Nomor Lokasi (STA - STA ) Satuan Volume Keterangan

I. Ruas : SP. POLA TEBU - POLA TEBU


1 Sta : 0 + 000 s/d 0 + 187 L/S TIPE - B M3 57.26
2 Sta : 0 + 187 s/d 0 + 194 L/S TIPE - B M3 3.52
3 Sta : 0 + 194 s/d 0 + 550 L/S TIPE - B M3 108.99
4 Sta : 0 + 835 s/d 1 + 440 L/S TIPE - A M3 306.22
5 Sta : 1 + 440 s/d 1 + 577 L/S TIPE - A M3 69.34
6 Sta : 1 + 577 s/d 1 + 655 L/S TIPE - A M3 39.48
7 Sta : 1 + 675 s/d 1 + 710 R/S TIPE - A M3 17.71
8 Sta : 1 + 711 s/d 1 + 930 R/S TIPE - A M3 110.85
9 Sta : 1 + 245 s/d 1 + 710 R/S TIPE - A M3 235.37
10 Sta : 1 + 711 s/d 1 + 930 R/S TIPE - A M3 110.85
11 Sta : 0 + 044 Saluran Out Let M3 4.87
12 Sta : 1 + 440 Saluran Out Let M3 19.48
13 Sta : 1 + 578 Saluran Out Let M3 7.31
II. Ruas : SP. POLA TEBU - KUTA MBELIN
Sta : 0 + 041 s/d 0 + 046 L TIPE - A M3 2.52
Sta : 0 + 649 s/d 0 + 730 L TIPE - A M3 41.00
Sta : 1 + 040 s/d 1 + 105 L TIPE - A M3 32.89
Sta : 1 + 150 s/d 1 + 155 L TIPE - A M3 2.52
Sta : 1 + 225 s/d 1 + 290 L TIPE - A M3 32.89
Sta : 1 + 320 s/d 1 + 742 L TIPE - A M3 213.59
Sta : 1 + 757 s/d 1 + 935 L TIPE - A M3 90.08
Sta : 1 + 978 s/d 2 + 012 L TIPE - A M3 17.22
Sta : 2 + 550 s/d 2 + 600 L TIPE - A M3 25.30
Sta : 0 + 000 s/d 0 + 232 R TIPE - A M3 117.41
Sta : 0 + 665 s/d 1 + 105 R TIPE - A M3 222.70
Sta : 1 + 150 s/d 1 + 322 R TIPE - A M3 87.04
Sta : 1 + 390 s/d 1 + 500 R TIPE - A M3 55.67
Sta : 1 + 679 s/d 1 + 860 R TIPE - A M3 91.60
Sta : 0 + 030 s/d 0 + 041 L TIPE - B M3 3.36
Sta : 0 + 730 s/d 1 + 040 L TIPE - B M3 94.89
Sta : 1 + 155 s/d 1 + 225 L TIPE - B M3 21.44
Sta : 1 + 290 s/d 1 + 320 L TIPE - B M3 9.19
Sta : 0 + 232 s/d 0 + 406 R TIPE - B M3 53.27
Sta : 0 + 406 s/d 0 + 665 R TIPE - B M3 79.28
Sta : 1 + 105 L Saluran Out Let M3 4.87
Sta : 1 + 106 R Saluran Out Let M3 4.87
Sta : 1 + 155 L Saluran Out Let M3 9.74
Sta : 1 + 150 R Saluran Out Let M3 4.87
Sta : 1 + 390 R Saluran Out Let M3 4.87
Sta : 1 + 860 R Saluran Out Let M3 4.87
III. Ruas : KUTA MBELIN - KUTA PENGKIH
Sta : 0 + 000 s/d 0 + 025 L TIPE - B M3 75.92
Sta : 3 + 025 s/d 3 + 050 L TIPE - B M3
Sta : 1 + 225 s/d 1 + 300 R TIPE - B M3
Sta : 0 + 025 s/d 0 + 273 L TIPE - A M3
Sta : 0 + 273 s/d 0 + 450 L TIPE - A M3 54.19
Sta : 0 + 450 s/d 0 + 525 L TIPE - A M3 22.96
Sta : 0 + 525 s/d 0 + 850 L TIPE - A M3 164.49
Sta : 1 + 010 s/d 1 + 100 L TIPE - A M3 45.56
Sta : 1 + 200 s/d 1 + 225 L TIPE - A M3 12.64
Sta : 1 + 275 s/d 1 + 390 L TIPE - A M3 58.19
Sta : 1 + 390 s/d 1 + 550 L TIPE - A M3 80.97
Sta : 1 + 550 s/d 1 + 800 L TIPE - A M3 126.52
Sta : 1 + 925 s/d 2 + 315 L TIPE - A M3 197.41
Sta : 2 + 315 s/d 2 + 375 L TIPE - A M3 30.37
Sta : 2 + 375 s/d 2 + 455 L TIPE - A M3 40.48
Sta : 2 + 455 s/d 2 + 920 L TIPE - A M3 235.37
Sta : 2 + 920 s/d 3 + 025 L TIPE - A M3 53.15
Sta : 3 + 050 s/d 3 + 200 L TIPE - A M3 75.93
Sta : 3 + 200 s/d 3 + 325 L TIPE - A M3 63.26
SUB TOTAL 1 3,756.58
LOKASI PARIT PASANGAN (MORTAR)

Nomor Lokasi (STA - STA ) Satuan Volume Keterangan


M3
III. Ruas : KUTA MBELIN - KUTA PENGKIH
Sta : 3 + 325 s/d 3 + 415 L TIPE - A 45.56
Sta : 3 + 425 s/d 3 + 625 L TIPE - A 101.22
Sta : 3 + 625 s/d 3 + 650 L TIPE - A 12.64
Sta : 0 + 050 s/d 0 + 100 R TIPE - A 25.30
Sta : 0 + 100 s/d 0 + 250 R TIPE - A 75.93
Sta : 0 + 273 s/d 0 + 375 R TIPE - A 51.63
Sta : 0 + 450 s/d 0 + 525 R TIPE - A 37.96
Sta : 0 + 525 s/d 1 + 025 R TIPE - A 253.07
Sta : 1 + 025 s/d 1 + 125 R TIPE - A 50.60
Sta : 1 + 125 s/d 1 + 225 R TIPE - A 50.60
Sta : 1 + 300 s/d 1 + 375 R TIPE - A 37.96
Sta : 1 + 375 s/d 1 + 550 R TIPE - A 88.56
Sta : 1 + 550 s/d 1 + 810 R TIPE - A 131.59
Sta : 1 + 810 s/d 1 + 955 R TIPE - A 73.38
Sta : 1 + 955 s/d 2 + 315 R TIPE - A 182.22
Sta : 2 + 315 s/d 2 + 375 R TIPE - A 30.37
Sta : 2 + 375 s/d 2 + 455 R TIPE - A 40.48
Sta : 2 + 455 s/d 2 + 800 R TIPE - A 174.63
Sta : 2 + 800 s/d 2 + 920 R TIPE - A 60.74
Sta : 3 + 100 s/d 3 + 200 R TIPE - A 50.60
Sta : 3 + 200 s/d 3 + 325 R TIPE - A 63.26
Sta : 3 + 325 s/d 3 + 425 R TIPE - A 50.60
Sta : 3 + 425 s/d 3 + 625 R TIPE - A 101.22
Sta : 3 + 625 s/d 3 + 650 R TIPE - A 12.64
Sta : 1 + 100 s/d 1 + 125 L TIPE - C 7.64
Sta : 1 + 125 s/d 1 + 200 L TIPE - C 22.96
Sta : 3 + 415 s/d 3 + 425 L TIPE - C 3.04
Sta : 0 + 069 R Saluran Out Let 4.87
Sta : 0 + 180 R Saluran Out Let 4.87
Sta : 1 + 125 L Saluran Out Let 9.74
Sta : 1 + 390 L Saluran Out Let 24.35
Sta : 1 + 810 L Saluran Out Let 9.74
Sta : 3 + 200 R Saluran Out Let 9.74
IV. Ruas : KUTA PENGKIH - CERUMBU
Sta : 0 + 000 s/d 0 + 200 L TIPE - A 101.22
Sta : 0 + 300 s/d 0 + 540 L TIPE - A 121.48
Sta : 1 + 204 s/d 1 + 504 L TIPE - A 151.85
Sta : 1 + 950 s/d 2 + 150 L TIPE - A 101.22
Sta : 2 + 150 s/d 2 + 567 L TIPE - A 211.07
Sta : 3 + 025 s/d 3 + 150 L TIPE - A 63.26
Sta : 3 + 169 s/d 3 + 250 L TIPE - A 41.00
Sta : 3 + 400 s/d 3 + 800 L TIPE - A 202.45
Sta : 0 + 000 s/d 0 + 300 R TIPE - A 151.85
Sta : 0 + 300 s/d 0 + 365 R TIPE - A 32.89
Sta : 0 + 365 s/d 0 + 800 R TIPE - A 220.18
Sta : 1 + 800 s/d 1 + 935 R TIPE - A 68.33
Sta : 2 + 151 s/d 2 + 725 R TIPE - A 290.52
Sta : 2 + 729 s/d 3 + 169 R TIPE - A 222.70
Sta : 3 + 169 s/d 3 + 790 R TIPE - A 314.33
Sta : 3 + 825 s/d 4 + 050 R TIPE - A 113.89
Sta : 1 + 538 s/d 1 + 935 L TIPE - B 121.53
Sta : 2 + 150 s/d 2 + 567 L TIPE - B 127.67
Sta : 0 + 800 s/d 1 + 020 R TIPE - B 67.34
Sta : 1 + 020 s/d 1 + 150 R TIPE - B 39.78
Sta : 1 + 150 s/d 1 + 200 R TIPE - B 15.30
Sta : 1 + 200 s/d 1 + 235 R TIPE - B 10.71
Sta : 1 + 235 s/d 1 + 525 R TIPE - B 88.78
Sta : 0 + 300 R Saluran Out Let 2.44
Sta : 1 + 504 L Saluran Out Let 4.87
Sta : 1 + 538 L Saluran Out Let 9.74
Sta : 3 + 150 L Saluran Out Let 4.87
SUB TOTAL 2 4,800.97
LOKASI PARIT PASANGAN (MORTAR)

Nomor Lokasi (STA - STA ) Satuan Volume Keterangan


M3
V. Ruas : KUTA PENGKIH - KUTA KENDIT
Sta : 0 + 000 s/d 0 + 100 L TIPE - A 52.52
Sta : 0 + 100 s/d 0 + 227 L TIPE - A 66.45
Sta : 0 + 620 s/d 0 + 700 L TIPE - A 44.71
Sta : 0 + 785 s/d 0 + 790 L TIPE - A 6.26
Sta : 0 + 820 s/d 1 + 300 L TIPE - A 241.75
Sta : 1 + 325 s/d 1 + 625 L TIPE - A 148.49
Sta : 1 + 660 s/d 1 + 775 L TIPE - A 57.56
Sta : 2 + 175 s/d 2 + 300 L TIPE - A 68.52
Sta : 2 + 375 s/d 2 + 700 L TIPE - A 164.03
Sta : 2 + 975 s/d 3 + 225 L TIPE - A 122.99
Sta : 3 + 225 s/d 3 + 250 L TIPE - A 20.51
Sta : 3 + 275 s/d 3 + 535 L TIPE - A 129.21
Sta : 3 + 535 s/d 3 + 906 L TIPE - A 191.66
Sta : 3 + 906 s/d 4 + 200 L TIPE - A 151.60
Sta : 4 + 200 s/d 4 + 515 L TIPE - A 165.31
Sta : 0 + 000 s/d 0 + 100 R TIPE - A 53.01
Sta : 0 + 100 s/d 0 + 227 R TIPE - A 66.16
Sta : 0 + 600 s/d 0 + 700 R TIPE - A 53.01
Sta : 0 + 785 s/d 0 + 900 R TIPE - A 60.32
Sta : 1 + 325 s/d 1 + 650 R TIPE - A 162.59
Sta : 1 + 675 s/d 1 + 700 R TIPE - A 16.49
Sta : 1 + 730 s/d 1 + 740 R TIPE - A 9.18
Sta : 1 + 900 s/d 1 + 910 R TIPE - A 9.18
Sta : 2 + 180 s/d 2 + 300 R TIPE - A 62.75
Sta : 2 + 375 s/d 2 + 700 R TIPE - A 162.59
Sta : 2 + 700 s/d 2 + 875 R TIPE - A 89.54
Sta : 2 + 875 s/d 3 + 225 R TIPE - A 174.76
Sta : 3 + 225 s/d 3 + 450 R TIPE - A 113.89
Sta : 3 + 450 s/d 3 + 535 R TIPE - A 45.71
Sta : 3 + 535 s/d 3 + 906 R TIPE - A 184.99
Sta : 3 + 906 s/d 4 + 200 R TIPE - A 147.49
Sta : 4 + 200 s/d 4 + 335 R TIPE - A 70.06
Sta : 4 + 335 s/d 4 + 515 R TIPE - A 91.97
Sta : 0 + 705 s/d 0 + 785 L TIPE - B 30.95
Sta : 0 + 790 s/d 0 + 820 L TIPE - B 16.60
Sta : 1 + 625 s/d 1 + 660 L TIPE - B 18.04
Sta : 2 + 050 s/d 2 + 175 L TIPE - B 43.87
Sta : 2 + 440 s/d 2 + 500 L TIPE - B 25.21
Sta : 2 + 700 s/d 2 + 975 L TIPE - B 86.92
Sta : 3 + 270 s/d 3 + 275 L TIPE - B 9.43
Sta : 0 + 900 s/d 1 + 325 R TIPE - B 129.97
Sta : 1 + 650 s/d 1 + 675 R TIPE - B 15.17
Sta : 1 + 700 s/d 1 + 730 R TIPE - B 16.60
Sta : 1 + 740 s/d 1 + 900 R TIPE - B 53.91
Sta : 1 + 910 s/d 2 + 050 R TIPE - B 48.17
Sta : 2 + 050 s/d 2 + 180 R TIPE - B 45.30
Sta : 2 + 450 s/d 2 + 600 R TIPE - B 51.04
Sta : 0 + 785 R Saluran OUT LET 2.44
Sta : 1 + 325 L Saluran OUT LET 12.18
Sta : 2 + 600 R Saluran OUT LET 7.31
Sta : 3 + 535 R Saluran OUT LET 24.35
Sta : 3 + 906 L/R Saluran OUT LET 24.35
Sta : 4 + 335 R Saluran OUT LET 4.87
SUB TOTAL 3,871.92
JUMLAH = 1 + 2 + 3 12,429.47
LOKASI PASANGAN BATU (TPT)

Nomor Lokasi (STA - STA ) Satuan Volume Keterangan


M3
I. Ruas : SP. POLA TEBU - POLA TEBU
1 Sta : 0 + 000 s/d 0 + 187 L/S TPT Gendong M3 158.95
2 Sta : 0 + 194 s/d 0 + 550 L/S TPT Gendong M3 302.60
3 Sta : 0 + 568 s/d 0 + 796 L/S TPT M3 99.98
4 Sta : 0 + 802 s/d 0 + 835 L/S TPT M3 14.47
5 Sta : 0 + 000 s/d 0 + 560 R/S TPT 245.56
6 Sta : 0 + 675 s/d 0 + 840 R/S TPT 72.35
7 Sta : 0 + 850 s/d 0 + 975 R/S TPT 54.81
8 Sta : 1 + 192 s/d 1 + 209 L/S TPT 31.85
9 Sta : 0 + 044 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
10 Sta : 0 + 193 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
11 Sta : 1 + 710 Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
II. Ruas : SP. POLA TEBU - KUTA MBELIN
Sta : 0 + 030 s/d 0 + 041 L TPT Gendong 9.35
Sta : 0 + 730 s/d 1 + 040 L TPT Gendong 263.50
Sta : 1 + 155 s/d 1 + 225 L TPT Gendong 59.50
Sta : 1 + 290 s/d 1 + 320 L TPT Gendong 25.50
Sta : 0 + 232 s/d 0 + 406 R TPT Gendong 147.90
Sta : 0 + 406 s/d 0 + 665 R TPT Gendong 220.15
Sta : 1 + 322 s/d 1 + 339 R TPT 7.33
Sta : 1 + 357 s/d 1 + 364 R TPT 3.03
Sta : 0 + 802 s/d 0 + 835 L TPT 14.22
Sta : 1 + 372 s/d 1 + 381 R TPT 13.94
Sta : 1 + 869 s/d 1 + 875 R Sayap TPT 16.70
Sta : 1 + 875 R Sayap TPT 5.74
Sta : 2 + 550 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 0 + 252 Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
III. Ruas : KUTA MBELIN - KUTA PENGKIH
Sta : 0 + 000 s/d 0 + 025 L TPT Gendong TIPE B 21.25
Sta : 3 + 025 s/d 3 + 050 L TPT Gendong TIPE B 21.25
Sta : 1 + 225 s/d 1 + 300 R TPT Gendong TIPE B 63.75
Sta : 1 + 100 s/d 1 + 125 L TPT Gendong TIPE C 15.94
Sta : 1 + 125 s/d 1 + 200 L TPT Gendong TIPE C 47.81
Sta : 0 + 000 s/d 3 + 425 L TPT Gendong TIPE C 8.50
Sta : 0 + 850 s/d 0 + 900 L TPT 21.11
Sta : 0 + 975 s/d 1 + 010 L TPT 14.72
Sta : 1 + 800 s/d 1 + 925 L TPT 52.63
Sta : 0 + 900 s/d 0 + 925 L TPT 16.21
Sta : 0 + 950 s/d 0 + 975 L TPT 16.21
Sta : 0 + 375 s/d 0 + 450 R TPT 48.69
Sta : 2 + 920 s/d 3 + 065 R TPT 94.11
Sta : 0 + 925 s/d 0 + 950 L 21.71
Sta : 0 + 273 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 0 + 450 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 1 + 125 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 1 + 390 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 1 + 810 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 455 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 920 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 200 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 425 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 612 Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 315 Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
Sta : 3 + 650 Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
IV. Ruas : KUTA PENGKIH - CERUMBU
Sta : 1 + 538 s/d 1 + 935 L TPT Gendong TIPE B 337.45
Sta : 2 + 150 s/d 2 + 567 L TPT Gendong TIPE B 354.45
Sta : 0 + 800 s/d 1 + 020 R TPT Gendong TIPE B 187.00
Sta : 1 + 020 s/d 1 + 150 R TPT Gendong TIPE B 82.88
Sta : 1 + 150 s/d 1 + 200 R TPT Gendong TIPE B 31.88
Sta : 1 + 200 s/d 1 + 235 R TPT Gendong TIPE B 29.75
Sta : 1 + 235 s/d 1 + 525 R TPT Gendong TIPE B 246.50
Sta : 0 + 865 s/d 0 + 897 L TPT 13.80
Sta : 1 + 235 s/d 1 + 250 R TPT 6.47
SUB TOTAL 1 3,608.94
LOKASI PASANGAN BATU (TPT)

Nomor Lokasi (STA - STA ) Satuan Volume Keterangan


M3
Sta : 0 + 300 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m
Sta : 2 + 150 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 567 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 725 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 4 + 040 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 4 + 140 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 4 + 170 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 4 + 300 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 165 L/R Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
Sta : 4 + 265 L/R Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
V. Ruas : KUTA PENGKIH - KUTA KENDIT
Sta : 0 + 705 s/d 0 + 785 L TPT Gendong TIPE B 68.00
Sta : 0 + 790 s/d 0 + 820 L TPT Gendong TIPE B 25.50
Sta : 1 + 625 s/d 1 + 660 L TPT Gendong TIPE B 29.75
Sta : 2 + 050 s/d 2 + 175 L TPT Gendong TIPE B 79.69
Sta : 2 + 440 s/d 2 + 500 L TPT Gendong TIPE B 38.25
Sta : 2 + 700 s/d 2 + 975 L TPT Gendong TIPE B 233.75
Sta : 3 + 270 s/d 3 + 275 L TPT Gendong TIPE B 4.25
Sta : 0 + 900 s/d 1 + 325 R TPT Gendong TIPE B 361.25
Sta : 1 + 650 s/d 1 + 675 R TPT Gendong TIPE B 21.25
Sta : 1 + 700 s/d 1 + 730 R TPT Gendong TIPE B 25.50
Sta : 1 + 740 s/d 1 + 900 R TPT Gendong TIPE B 136.00
Sta : 1 + 910 s/d 2 + 050 R TPT Gendong TIPE B 119.00
Sta : 2 + 050 s/d 2 + 180 R TPT Gendong TIPE B 110.50
Sta : 2 + 450 s/d 2 + 600 R TPT Gendong TIPE B 127.50
Sta : 0 + 420 s/d 0 + 480 L/R TPT 61.78
Sta : 2 + 055 s/d 2 + 060 R TPT 4.46
Sta : 1 + 910 s/d 1 + 950 L TPT 50.86
Sta : 2 + 048 s/d 2 + 063 L TPT 19.36
Sta : 0 + 227 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 050 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 225 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 3 + 535 L/R Tembok Matahari Gorong Gorong Petak 1.0 m x 1.0 m 4.56
Sta : 2 + 300 L/R Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
Sta : 2 + 375 L/R Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04
Sta : 4 + 500 L/R Tembok Matahari Gorong Gorong Petak 1.5 m x 1.5 m 7.04

SUB TOTAL 2 1,602.03


JUMLAH = 1 + 2 5,210.97