Sei sulla pagina 1di 9

BH0665B-PRS-100-PF-001_Sh8 0016

NOTES:
1. FLUSHING DEVICE TO SWIPE BOTTOM OF BASIN;
2. DOTTED EQUIPMENT AND LINES ARE OUT OF BATTERY LIMIT ;
3. BASIN DESIGN TO CONSIDER PARTITIONS TO SEMPLIFY CLEANING PROCEDURES.

NOTE:
1. SISTEMA DI LAVAGGIO PER IL FONDO DEL BACINO;
2. LE APPARECCHIATURE E LE LINEE TRATTEGGIATE SONO ESTERNE AI LIMITI DI BATTERIA;
0002 BH0665B-PRS-100-PF-001_Sh7
3. LA PROGETTAZIONE DEL BACINO DEVE CONSIDERARE LA SUA PARTIZIONE INTERNA, PER SEMPLIFICARE LE
ATTIVITA' DI PULIZIA.

WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)

M
0001 BH0665B-PRS-100-PF-001_Sh2
EXISTING EQUIPMENT
(APPARECCHIATURA ESISTENTE)

STREAM NUMBER
(NUMERO DI STREAM)

0044 BH0665B-PRS-100-PF-001_Sh6

BH0665B-PRS-100-PF-001_Sh2 0003

BH0665B-PRS-100-PF-001_Sh3 0017

Firmato digitalmente da

GIACOMO PONTIGGIA
O = Ordine degli Ingegneri
della Provincia di Como
C = IT

CORNEGLIANO LAUDENSE (LO)


BH0665B-PRS-100-PF-001_Sh9 0020

BH0665B-PRS-100-PF-001_Sh9 0021

0022 BH0665B-PRS-100-PF-001_Sh9 NOTE:


1. FICTITIOUS LINE.

0023 BH0665B-PRS-100-PF-001_Sh9

NOTA:
BH0665B-PRS-100-PF-001_Sh9 0024
1. LINEA FITTIZIA.

0025 BH0665B-PRS-100-PF-001_Sh9

BH0665B-PRS-100-PF-001_Sh9 0026

WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)

0001 BH0665B-PRS-100-PF-001_Sh1 M M M
M 0004 BH0665B-PRS-100-PF-001_Sh7 PACKAGE BATTERY LIMIT
(LIMITE DI BATTERIA PACKAGE)
M

STREAM NUMBER
(NUMERO DI STREAM)

0043 BH0665B-PRS-100-PF-001_Sh7

BH0665B-PRS-100-PF-001_Sh1 0003

0005 BH0665B-PRS-100-PF-001_Sh3

M BH0665B-PRS-100-PF-001_Sh9 0019

Digita qui il testo


BH0665B-PRS-100-PF-001_Sh3 0027

CORNEGLIANO LAUDENSE (LO)

0028 BH0665B-PRS-100-PF-001_Sh9

BH0665B-PRS-100-PF-001_Sh9 0029
NOTE:
1. ELECTRICAL BOILER REQUIRED FOR CRYSTALLIZATOR START UP

NOTA:
1. BOILER ELETTRICO NECESSARIO PER LE OPERAZIONI DI AVVIAMENTO DEL CRISTALLIZZATORE

PACKAGE BATTERY LIMIT


(LIMITE DI BATTERIA PACKAGE)
0007 BH0665B-PRS-100-PF-001_Sh4
LINE USED DURING START-UP
(LINEA UTILIZZATA DURANTE START-UP)
M
STREAM NUMBER
(NUMERO DI STREAM)

BH0665B-PRS-100-PF-001_Sh4 0008

BH0665B-PRS-100-PF-001_Sh1 0017

0005 BH0665B-PRS-100-PF-001_Sh2
0006 BH0665B-PRS-100-PF-001_Sh4

BH0665B-PRS-100-PF-001_Sh6 0012

BH0665B-PRS-100-PF-001_Sh6 0011
BH0665B-PRS-100-PF-001_Sh2 0027

CORNEGLIANO LAUDENSE (LO)

0013 BH0665B-PRS-100-PF-001_Sh4
NOTES:
1. FICTITIOUS LINE;
0009 BH0665B-PRS-100-PF-001_Sh5 2. NEED OF DEDICATED PUMP FOR PURGE DISPOSAL TO BE DEVELOPED IN EPC PHASE.

NOTE:
1. LINEA FITTIZIA;
2. LA NECESSITA' DI UNA POMPA DEDICATA PER LO SCARICO DELLA POMPA E' DA SVILUPPARE NELLA SUCCESSIVA
FASE DI INGEGNERIA.

0007 BH0665B-PRS-100-PF-001_Sh3

WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)

PACKAGE BATTERY LIMIT


M
(LIMITE DI BATTERIA PACKAGE)

STREAM NUMBER
(NUMERO DI STREAM)

BH0665B-PRS-100-PF-001_Sh3 0008

0030 BH0665B-PRS-100-PF-001_Sh7

BH0665B-PRS-100-PF-001_Sh9 0033

0031 BH0665B-PRS-100-PF-001_Sh9

0032 BH0665B-PRS-100-PF-001_Sh9

BH0665B-PRS-100-PF-001_Sh9 0034

BH0665B-PRS-100-PF-001_Sh9 0035
0006 BH0665B-PRS-100-PF-001_Sh3

M M M

BH0665B-PRS-100-PF-001_Sh7 0015
CORNEGLIANO LAUDENSE (LO)

0013 BH0665B-PRS-100-PF-001_Sh3
NOTES:
1. REVERSIBLE PUMP
0009 BH0665B-PRS-100-PF-001_Sh4 2. TYPE OF CHEMICAL TO BE CONFIRMED BY PACKAGE PK-133 VENDOR
3. NUMBER OF RACKS TO BE DEFINED BY PACKAGE VENDOR
4. SPARE PUMP IN WAREHOUSE
5. FICTITIOUS LINE

M
NOTE:
1. POMPA REVERSIBILE
M 2. CONFERMA DEL TIPO DI CHEMICAL UTILIZZATO A CURA DEL FORNITORE DEL PACKAGE PK-133
3. NUMERO DI RACK DA DEFINIRE DAL VENDOR DEL PACKAGE
M M
4. POMPA DI RISERVA IN MAGAZZINO
5. LINEA FITTIZIA

BH0665B-PRS-100-PF-001_Sh9 0042

0036 BH0665B-PRS-100-PF-001_Sh9 WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)
M M

PACKAGE BATTERY LIMIT


0010 BH0665B-PRS-100-PF-001_Sh6 (LIMITE DI BATTERIA PACKAGE)

STREAM NUMBER
(NUMERO DI STREAM)

M
BH0665B-PRS-100-PF-001_Sh9 0038
M

BH0665B-PRS-100-PF-001_Sh9 0039

BH0665B-PRS-100-PF-001_Sh9 0040

0018 BH0665B-PRS-100-PF-001_Sh9

0014 BH0665B-PRS-100-PF-001_Sh7
M

0037 BH0665B-PRS-100-PF-001_Sh9

BH0665B-PRS-100-PF-001_Sh9 0041

CORNEGLIANO LAUDENSE (LO)

M
NOTES:
1. TO VERIFY WITH IGS NEED FOR EMERGENCY POWER GENERATOR
2. VENDOR TO INCLUDE BACKWASH PUMP IF REQUIRED
3. SPARE PUMP IN WAREHOUSE
4. PUMP P-116 A/B TO BE ELECTRICALLY FED IN ALL CONDITIONS
5. TYPE OF CHEMICAL TO BE CONFIRMED BY PACKAGE PK-130 VENDOR.
6. NUMBER OF STAGES TO BE CONFIRMED BY PACKAGE PK-130 VENDOR

M NOTE:
1. DA VERIFICARE CON IGS LA NECESSITA' DI GENERATORE DI EMERGENZA
2. IL VENDOR DOVRA INCLUDERE LA POMPA DI CONTROLAVAGGIO SE NECESSARIA
3. POMPA DI RISERVA IN MAGAZZINO
4. ALIMENTAZIONE ELETTRICA DELLA POMPA P-116 A/B IN OGNI CONDIZIONE
5. CONFERMA DEL TIPO DI CHEMICAL UTILIZZATO A CURA DEL FORNITORE DEL PACKAGE PK-130
6. CONFERMA DEL NUMERO DI SEZIONI A CURA DEL FORNITORE DEL PACKAGE PK-130

WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)

PACKAGE BATTERY LIMIT


0010 BH0665B-PRS-100-PF-001_Sh5 (LIMITE DI BATTERIA PACKAGE)

LINE USED DURING START-UP


(LINEA UTILIZZATA DURANTE START-UP)

STREAM NUMBER
(NUMERO DI STREAM)

0044 BH0665B-PRS-100-PF-001_Sh1

BH0665B-PRS-100-PF-001_Sh3 0012

BH0665B-PRS-100-PF-001_Sh3 0011

CORNEGLIANO LAUDENSE (LO)


WTP BATTERY LIMIT
(LIMITE DI BATTERIA WTP)

PACKAGE BATTERY LIMIT


(LIMITE DI BATTERIA PACKAGE)

0002 BH0665B-PRS-100-PF-001_Sh1

STREAM NUMBER
(NUMERO DI STREAM)

0004 BH0665B-PRS-100-PF-001_Sh2

0043 BH0665B-PRS-100-PF-001_Sh2

0030 BH0665B-PRS-100-PF-001_Sh4

0014 BH0665B-PRS-100-PF-001_Sh5

BH0665B-PRS-100-PF-001_Sh4 0015
CORNEGLIANO LAUDENSE (LO)
BH0665B-PRS-100-PF-001_Sh1 0016
NOTES:
1. ALL PUMPS IN OPERATION , SPARE PUMP IN WAREHOUSE;
2. SEGREGATION OF FIRST FLUSH RANWATER FROM SECOND FLUSH RAINWATER IS INCLUDED IN THE SEWER
SYSTEM AND SHALL BE DEVELOPED BY CIVIL DEPT. ;

NOTE:
1. TUTTE LE POMPE SONO OPERATIVE, LA POMPA DI RISERVA E' IN MAGAZZINO;
2. LA SEGREGAZIONE DELLE ACQUE DI PRIMA PIOGGIA DALLE SECONDE PIOGGIE E' PARTE DEL SISTEMA FOGNARIO
E DA SVILUPPARE A CURA DEL DIPARTIMENTO CIVILE.

WTP BATTERY LIMIT


(LIMITE DI BATTERIA WTP)

CORNEGLIANO LAUDENSE (LO)


BH0665B-PRS-100-PF-001_Sh2 0020

BH0665B-PRS-100-PF-001_Sh2 0021

0022 BH0665B-PRS-100-PF-001_Sh2 NOTE:


1. PRELIMINARY SELECTED AS FERRIC CHLORIDE

0023 BH0665B-PRS-100-PF-001_Sh2

NOTA:
BH0665B-PRS-100-PF-001_Sh2 0024
1. CLORURO FERRICO PRELIMINARMENTE SELEZIONATO

0025 BH0665B-PRS-100-PF-001_Sh2

BH0665B-PRS-100-PF-001_Sh2 0026
PACKAGE BATTERY LIMIT
(LIMITE DI BATTERIA PACKAGE)

BH0665B-PRS-100-PF-001_Sh5 0042

0036 BH0665B-PRS-100-PF-001_Sh5

BH0665B-PRS-100-PF-001_Sh5 0038

BH0665B-PRS-100-PF-001_Sh5 0039

BH0665B-PRS-100-PF-001_Sh5 0040

BH0665B-PRS-100-PF-001_Sh4 0033

0031 BH0665B-PRS-100-PF-001_Sh4

0032 BH0665B-PRS-100-PF-001_Sh4

0018 BH0665B-PRS-100-PF-001_Sh5

BH0665B-PRS-100-PF-001_Sh4 0034

BH0665B-PRS-100-PF-001_Sh4 0035

BH0665B-PRS-100-PF-001_Sh2 0019

0037 BH0665B-PRS-100-PF-001_Sh5

BH0665B-PRS-100-PF-001_Sh5 0041

CORNEGLIANO LAUDENSE (LO)

0028 BH0665B-PRS-100-PF-001_Sh2

BH0665B-PRS-100-PF-001_Sh2 0029

Potrebbero piacerti anche