Name of the project :

Area/Location:
Location Type of Class/ Chinage
Sl no Dia
From To pipe Thickness From To
DI 350 K7 0 5199

DI 350 K7 0 64

1 J50 T57
DI 350 K7 64 4597

DI 350 K7 4597 4696

DI 350 K7 4696 4977

DI 350 K7 0 720

DI 350 K7 0 98
2 J50 T55

DI 350 K7 98 716

MS 711 0 927
3 J51 T56 MS 711 0 24
MS 711 24 923.193

DI 450 K7 0 4077
DI 450 K7 0 60.0
DI 450 K7 60 1399.5
DI 450 K7 1399.5 1508.0
DI 450 K7 1508 1663.5
4 J49 T54 DI 450 K7 1663.5 1674.0
DI 450 K7 1674.0 1834.0
4 J49 T54

DI 450 K7 1834.0 3979.0

DI 450 K7 3979.0 3989.0


DI 450 K7 3989.0 4093.5
DI 450 K7 4093.5 4127.0

DI 500 K7 0 1020
DI 500 K7 0 40
DI 500 K7 40 337
5 J48 T53
DI 500 K7 337 345
DI 500 K7 345 867.5
DI 500 K7 867.5 1020

DI 400 K7 0 362
6 J51 J50 DI 400 K7 0 6
DI 400 K7 6 347

MS 914 6 0 1833
7 J49 J51 MS 914 6 1833 1614
MS 914 6 1614 8.85

MS 914 6 0 5773
MS 914 6 5773 5743.000
MS 914 6 5743.000 5299.674
MS 914 6 5299.674 5286.479
MS 914 6 5286.479 4988.079
8 J49 J48
MS 914 6 4988.079 4982.579
MS 914 6 4982.579 4563.594
MS 914 6 4563.594 2979.23
MS 914 6 2979.230 2500
MS 914 6 2500.000 0

MS 1067 7MM 0 3864


9 J48 J47 MS 1067 7MM 3864 3178.295
MS 1067 7MM 3178.295 1696.535
HDPE 250 10 0 672
10 J47 T52 HDPE 250 10 0 120
HDPE 250 10 120 672
MS 1168 7 0 9214
MS 1168 7 9215.265 6913.41
MS 1168 7 6913.41 5833.731
11 J47 J46 MS 1168 7 5833.731 5162.801
MS 1168 7 5162.801 5018.801
MS 1168 7 5018.801 3990
MS 1168 7 3990 0

12 J46 J26 MS 1168 0 2225


13 J26 DC2 MS 1168 0 545
14 J26 T10 DI 350 K7 0 118

DI 350 K7 0 3137
DI 350 K7 0 15
15 J46 J0 DI 350 K7 15 1002.5
DI 350 K7 1002.5 1002.5
DI 350 K7 1002.5 3102
DI 350 K7 3102 3137
16 J0 T2 HDPE 250 10 0 211

HDPE 250 10 0 7355


HDPE 250 0 4175
HDPE 250 102 4175
17 J0 J1 HDPE 250 4175 4403
HDPE 250 4403 6975
HDPE 250 6975 7215
HDPE 250 7215 7565

18 J1 T1 HDPE 200 10 0 630


HDPE 200 0 18
HDPE 200 18 618

19 J1 T9 HDPE 200 10 0 1530


0 984
984 1195
1195 1675

HDPE 10398
DI 14633
MS 24381
TOTAL 49412
Total Layed Balance
HDPE 250 8238 7583 655
200 2160 600 1560
TOTAL 10398 8183 2215
Total Layed Balance
DI 350 9174 8583 591
400 362 341 21
450 4077 4057 20
500 1020 819.5 200.5
TOTAL 14633 13800.5 832.5
Total Layed Balance
MS 711 927 899.193 27.807
926 914 7606 3245.09 4360.909
1081 1067 3864 1481.76 2382.24
1182 1168 11984 4001.59 7982.414
TOTAL 24381 9627.63 14753.37
Total Layed Balance
TOTAL 49412 31611 17800.87
GAJA ENGINEERING PVT LTD

Length Gap Remarks Layed length

5199

Connection gap 45
64 degree bend

4597

99 Ballari to pavagada road


gap
281

720

98 watermelon crop and


connection gap

618

927
24 connection gap
899.193

4077
60 work under progress
1339.5
Chinage overlap 108.5
155.5
Mango garden gap 10.5
160
2145.0

10.0 Bend gap


104.5
33.5

1020
40 connection gap
297

522.5
152.5 Hard rock gap

362
6 connection gap
341

1833
219 Mango trees
work under progress 1605.15

5773 Not started


30 Hard rock gap
443.326
13.195 Gap for bend 45
298.400
5.500 Gap for bend 90
418.985
1584.364 Gap for Hard rock
479.230
2500.000 Gap for crop

3864
685.705 Gap for crop
1481.76
672
120
552 Work under progress
9214 Not started
2301.855
1079.679
670.93
144
1028.801
3990

2225 Not started


545 Not started
118 Not started

3137
15 connection gap
987.5
0
2099.5
35 connection gap
211 Not started

7355
4175
4073
228
2572
240
350

630
18 connection gap
600

1530 Not started


984
211
480
LTD

Air valves Scour valves


Balance
As for Boq Layed As for Boq Layed
11 8 3 5 1
3469-2490-2453.5-1942-
1703(SCOUR)-4061-4404-
471.5-1111

1 1 0 1 1

2 0 2 1

8 5 3 4 0
2 0 2 1 0

1 0 1 0 0

2 2 2

11 11 5
8 8 4

1 0 1 1 0

19 19 9

5 5 3
1 1 1
0 0 0 0 0

6 5 1 3 0
1 0 1 0 0

15 0 15 7 0

1 0 1 0 0

3 0 3 1 0

98 19 79 48 2
Balance Remarks

4
1

5
4

3
1
0

3
0

44