VALOR UNITARIO

VALOR VALOR
N° CAPITULO UNIDAD CANTIDAD OBSERVACIONES
MANO DE EQUIPO Y TOTAL CAPITULO
MATERIAL
OBRA HERRAMIENTA TOTAL
0.010 PRELIMINARES $ 3,055,641.33
0.011 LOCALIZACION Y REPLANTEO M2 111.36 $ - $ 12,500.00 $ - $ 12,500.00 $ 1,392,000.00
0.012 DESMONTE Y LIMPIEZA M2 111.36 $ - $ 560.00 $ 1,000.00 $ 1,560.00 $ 173,721.60
0.013 DESCAPOTE INCLUYE BOTADA M2 111.36 $ - $ - $ 2,560.00 $ 2,560.00 $ 285,081.60
0.014 INSTALACIONES PROVISIONALES UND 1.00 $ 787,500.00 $ 345.83 $ 17.29 $ 787,863.13 $ 787,863.13
0.015 BAÑO PROVISIONAL PARA OBREROS UND 1.00 $ 202,000.00 $ 3,700.00 $ 185.00 $ 205,885.00 $ 205,885.00
0.016 EXCAVACIONES M3 11.11 $ - $ 2,000.00 $ 17,000.00 $ 19,000.00 $ 211,090.00
0.020 SUBESTRUCTURA $ 2,935,031.87
0.021 CONCRETO CICLOPEO 21Mpa. 40% EN PIEDRA M3 7.81 $ 110,281.22 $ 2,280.00 $ 3,714.00 $ 116,275.22 $ 908,109.47
0.022 CONCRETO DE 21Mpa PARA VIGA DE AMRRE DE FUNDACION M3 10.00 $ 168,468.70 $ 2,280.00 $ 3,714.00 $ 174,462.70 $ 1,744,627.00
0.023 CONCRETO DE 21Mpa PARA VIGA DE AMRRE SUPERIOR DE 15X20 ML 3.30 $ 5,054.06 $ 76,000.00 $ 4,490.00 $ 85,544.06 $ 282,295.40
0.030 MAMPOSTERIA $ 18,894,621.41
0.031 SOBRECIMIENTOS DE 15CM A 2 HILADAS ML 149.81 $ 6,900.70 $ 11,538.46 $ 576.92 $ 19,016.08 $ 2,848,799.64
0.032 MURO DE 0.15. LADRILLO HUECO TOLETE M2 359.30 $ 14,126.75 $ 10,000.00 $ 500.00 $ 24,626.75 $ 8,848,391.28
0.033 CONCRETO DINTELES 15X20 ML 43.00 $ 11,054.06 $ 75,047.62 $ 3,842.38 $ 89,944.06 $ 3,867,594.62
0.034 LAGRIMALES PREFABRICADOS BLOQUE M=15 ML 12.50 $ 20,500.25 $ 29,600.00 $ 1,480.00 $ 51,580.25 $ 644,753.13
0.035 SILLAR PREF. VENTANA M=15 ML 11.00 $ 20,500.25 $ 29,600.00 $ 1,480.00 $ 51,580.25 $ 567,382.75
0.036 IMPERMEABILIZANTE INTEGRAL SOBRE M=15 SIKA ML 120.00 $ 4,697.50 $ 12,333.33 $ 616.67 $ 17,647.50 $ 2,117,700.00
0.040 $ 10,065,802.65
0.041 REVOQUE LISO SOBRE PARED M2 480.00 $ 3,377.50 $ 12,333.33 $ 616.67 $ 16,327.50 $ 7,837,200.00
0.042 REVOQUE LISO SOBRE FACHADA M2 23.86 $ 3,377.50 $ 12,333.33 $ 716.67 $ 16,427.50 $ 391,960.15
0.043 RANURAS FILETES ML 70.00 $ 337.75 $ 24,666.67 $ 1,233.33 $ 26,237.75 $ 1,836,642.50
0.050 $ 1,516,985.63
0.051 ENCHAPE AZULEJO BLANCO 20.5X20.5 M2 25.00 $ 12,600.00 $ 9,250.00 $ 462.50 $ 22,312.50 $ 557,812.50
0.052 ENCHAPE CERAMICA M2 4.10 $ 15,922.41 $ 9,250.00 $ 462.50 $ 25,634.91 $ 105,103.13
0.053 ENCHAPE FACHADA TABLETA M2 32.00 $ 16,977.19 $ 9,250.00 $ 462.50 $ 26,689.69 $ 854,070.00
0.060 $ 2,048,372.00
0.061 CONCRETO DE 21MPA PARA LOSAS ALIGERADA CON ADOBE E=20 M2 1.92 $ 33,964.21 $ 2,266.67 $ 4,013.33 $ 40,244.21 $ 77,268.89
0.062 CONCRTEO DE 21MPA PARA COLUMNAS 25X25 ML 48.00 $ 15,255.76 $ 21,200.00 $ 1,397.50 $ 37,853.26 $ 1,816,956.41
0.063 CONCRETO DE 21MPA PARA ESCALERA MACIZA M3 0.80 $ 187,392.14 $ 1,325.00 $ 3,966.25 $ 192,683.39 $ 154,146.71
0.070 $ 4,082,762.50
0.071 CUBIERTA TEJA DE BARRO M2 85.00 $ 41,632.50 $ 6,000.00 $ 400.00 $ 48,032.50 $ 4,082,762.50
0.080 $ 18,353,652.16
0.081 ENTRESUELO PIEDRA 20 CM AFIRMADO M2 111.36 $ 5,407.50 $ 106,000.00 $ 5,600.00 $ 117,007.50 $ 13,029,955.20
0.082 PISO CONCRETO DE 21MPA REFORZADO E=5CM M2 6.20 $ 12,939.61 $ 32,066.67 $ 1,753.33 $ 46,759.61 $ 289,909.56
0.083 PISO CONCRETO DE 21MPA REFORZADO E=8CM M2 13.58 $ 18,246.37 $ 24,120.00 $ 1,356.00 $ 43,722.37 $ 593,749.80
0.084 GUARDA ESCOBA CERAMICO ML 48.00 $ 9,607.50 $ 50,000.00 $ 2,500.00 $ 62,107.50 $ 2,981,160.00
0.085 PISO BALDOSA ROCA 30X30 M2 19.41 $ 30,696.75 $ 12,333.33 $ 5,116.67 $ 48,146.75 $ 934,528.42
0.086 PISO DE GRESS 10X20 M2 9.30 $ 19,149.38 $ 12,333.33 $ 616.67 $ 32,099.38 $ 298,524.19
0.087 PISO VACIADO GRANITO PULIDO M2 9.00 $ 16,275.00 $ 4,111.11 $ 4,705.56 $ 25,091.67 $ 225,825.00
0.090 $ 3,563,273.36
0.091 CAJA DE INSPECCION DE 50X50 UNIDAD 1.00 $ 115,884.98 $ 2,312.50 $ 115.63 $ 118,313.11 $ 118,313.11
0.092 TUBERIA PVC 4" AGUAS N ML 28.04 $ 14,400.00 $ 24,000.00 $ 1,200.00 $ 39,600.00 $ 1,110,384.00
0.093 TUBERIA PVC 4" AGUAS LLUVIA ML 77.00 $ 3,091.25 $ 24,000.00 $ 1,200.00 $ 28,291.25 $ 2,178,426.25
0.094 TUBERIA PVC PRESION 1/2" AGUA F ML 2.00 $ 12,275.00 $ 24,000.00 $ 1,200.00 $ 37,475.00 $ 74,950.00
0.095 TUBERIA CPVC 1/2" AGUA C ML 2.00 $ 15,400.00 $ 24,000.00 $ 1,200.00 $ 40,600.00 $ 81,200.00
0.100 $ 2,090,285.00
0.101 ACOMETIDA ELECTRICA SAL 10.00 $ 900.00 $ 11,500.00 $ 575.00 $ 12,975.00 $ 129,750.00
0.102 SALIDA ELECTRICA SUICHE SAL 12.00 $ 39,500.00 $ 11,500.00 $ 575.00 $ 51,575.00 $ 618,900.00
0.103 SALIDA ELECTRICA PLAFONES SAL 10.00 $ 37,200.00 $ 11,500.00 $ 575.00 $ 49,275.00 $ 492,750.00
0.104 SALIDAS ELECTRICAS TOMA CORRIENTE SAL 8.00 $ 39,500.00 $ 11,500.00 $ 575.00 $ 51,575.00 $ 412,600.00
0.105 TABLERO ELECTRICO DE 8 BREACKER 1.00 $ 70,000.00 $ 1,533.33 $ 76.67 $ 71,610.00 $ 71,610.00
0.106 ACOMETIDA DE TV SAL 1.00 $ 600.00 $ 11,500.00 $ 575.00 $ 12,675.00 $ 12,675.00
0.107 SALIDA DE TV SAL 3.00 $ 26,300.00 $ 11,500.00 $ 575.00 $ 38,375.00 $ 115,125.00
0.108 SALIDA DE TELEFONO SAL 4.00 $ 36,500.00 $ 11,500.00 $ 575.00 $ 48,575.00 $ 194,300.00
0.109 SALIDA DE ESTUFA SAL 1.00 $ 30,500.00 $ 11,500.00 $ 575.00 $ 42,575.00 $ 42,575.00
0.110 $ 17,352,691.50
0.111 MARCO EN ROBLE 90X210 U 5.00 $ 95,000.00 $ 2,300.00 $ 115.00 $ 97,415.00 $ 487,075.00
0.112 PUERTA TRIPLEX DE LUJO U 5.00 $ 145,000.00 $ 2,300.00 $ 115.00 $ 147,415.00 $ 737,075.00
0.113 MUEBLE BAJO COCINA FORMICA ML 7.60 $ 800,000.00 $ 2,300.00 $ 115.00 $ 802,415.00 $ 6,098,354.00
0.114 MUEBLE ALTO COCINA FORMICA ML 12.50 $ 800,000.00 $ 2,300.00 $ 115.00 $ 802,415.00 $ 10,030,187.50
0.120 $ 669,372.63
0.121 VENTANA ALUMINIO CELOSIA M2 4.68 $ 20,500.00 $ 2,300.00 $ 115.00 $ 22,915.00 $ 107,127.63
0.122 PORTON DE ALUMINIO U 3.00 $ 185,000.00 $ 2,300.00 $ 115.00 $ 187,415.00 $ 562,245.00
0.130 $ 436,440.00
0.131 :CERRADURA ENTRADA PRINCIPAL SOBREPONER U 1.00 $ 78,000.00 $ 4,600.00 $ 230.00 $ 82,830.00 $ 82,830.00
0.132 :CERRADURA DE BAÑO MADERA DORADA U 2.00 $ 28,500.00 $ 4,600.00 $ 230.00 $ 33,330.00 $ 66,660.00
0.133 CERRADURA ALCOBA POMO MADERA ALUM U 3.00 $ 55,600.00 $ 4,600.00 $ 230.00 $ 60,430.00 $ 181,290.00
0.134 CERRADURA CLOSET POMO LUJO U 2.00 $ 48,000.00 $ 4,600.00 $ 230.00 $ 52,830.00 $ 105,660.00
0.140 $ 9,645,325.10
0.141 :ESTUCO EN MUROS M2 480.00 $ 1,407.00 $ 15,333.33 $ 766.67 $ 17,507.00 $ 8,403,360.00
0.142 ESTUCO EN CIELO M2 86.80 $ 1,407.00 $ 11,500.00 $ 675.00 $ 13,582.00 $ 1,178,917.60
0.143 VINILO TIPO I U 1.00 $ 2,005.50 $ 18,400.00 $ 920.00 $ 21,325.50 $ 21,325.50
0.144 BARNIZ U 1.00 $ 1,134.00 $ 18,400.00 $ 1,020.00 $ 20,554.00 $ 20,554.00
0.145 :LACA PARA PUERTAS INTERIORES U 1.00 $ 1,848.00 $ 18,400.00 $ 920.00 $ 21,168.00 $ 21,168.00
0.150 $ 475,040.00
0.151 SANITARIO BLANCO SEMIECONOMICO U 2.00 $ 70,350.00 $ 2,300.00 $ 115.00 $ 72,765.00 $ 145,530.00
0.152 LAVAMANO CON PEDESTAL BLANCO SEMIECONOMICO U 2.00 $ 65,350.00 $ 2,300.00 $ 115.00 $ 67,765.00 $ 135,530.00
0.153 INSTALACION DUCHA SENCILLA GRIVAL U 2.00 $ 20,000.00 $ 4,600.00 $ 230.00 $ 24,830.00 $ 49,660.00
0.154 BIDET SEMIECONOMICO COLOR BLANCO U 2.00 $ 35,000.00 $ 4,600.00 $ 230.00 $ 39,830.00 $ 79,660.00
0.155 INCRUSTACIONES SANITARIAS EN PORCELANA SEMIECONOMICA U 2.00 $ 26,000.00 $ 4,600.00 $ 1,730.00 $ 32,330.00 $ 64,660.00
0.160 $ 50,300.00
0.161 GRAMA TIPO MACANA M2 1.00 $ 2,000.00 $ 46,000.00 $ 2,300.00 $ 50,300.00 $ 50,300.00
0.170 $ 10,434,838.00
0.171 ACERO DE REFUERZO F'C=4200MPA KG 105.83 $ 2,000.00 $ 92,000.00 $ 4,600.00 $ 98,600.00 $ 10,434,838.00
VALOR TOTAL $ 105,670,435
ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:REFUERZO COD
0.170
ITEM:ACERO DE REFUERZO F'C=4200MPA COD UNIDAD
0.171 kg

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Acero de Refuerzp F'c=4200Mpa kg 1.00 $2,000.00 $2,000.00

SUB-TOTAL $2,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.05 $92,000.00

SUB-TOTAL $92,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $92,000.00 5% $4,600.00

SUB-TOTAL $4,600.00

TOTAL COSTO DIRECTO $98,600.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $14,790.00
TOTAL A TODO COSTO $113,390.00

PRECIO UNITARIO TOTAL $113,390.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:EXTERIORES COD
0.160
ITEM:GRAMA TIPO MACANA COD UNIDAD
0.161 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Grama Tipo Macana m2 1.00 $2,000.00 $2,000.00

SUB-TOTAL $2,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.10 $46,000.00

SUB-TOTAL $46,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $46,000.00 5% $2,300.00

SUB-TOTAL $2,300.00

TOTAL COSTO DIRECTO $50,300.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,545.00
TOTAL A TODO COSTO $57,845.00

PRECIO UNITARIO TOTAL $57,845.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:MUEBLES Y APARATOS SANITARIOS COD


0.150
ITEM:INCRUSTACIONES SANITARIAS EN PORCELANA SEMIECONOMICA COD UNIDAD
0.155 JUEGO

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Incrustaciones en porcelana Juego 1.00 $26,000.00 $26,000.00

SUB-TOTAL $26,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00
Taladro Manual dia $15,000.00 0.100 $1,500.00

SUB-TOTAL $1,730.00

TOTAL COSTO DIRECTO $32,330.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $4,849.50
TOTAL A TODO COSTO $37,179.50

PRECIO UNITARIO TOTAL $37,179.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:MUEBLES Y APARATOS SANITARIOS COD


0.150
ITEM:BIDET SEMIECONOMICO COLOR BLANCO COD UNIDAD
0.154 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Bidet Semieconomico Color Blanco und 1.00 $35,000.00 $35,000.00

SUB-TOTAL $35,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $39,830.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $5,974.50
TOTAL A TODO COSTO $45,804.50

PRECIO UNITARIO TOTAL $45,804.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:MUEBLES Y APARATOS SANITARIOS COD


0.150
ITEM:INSTALACION DUCHA SENCILLA GRIVAL COD UNIDAD
0.153 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Ducha Sencilla Grival und 1.00 $20,000.00 $20,000.00

SUB-TOTAL $20,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $24,830.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,724.50
TOTAL A TODO COSTO $28,554.50

PRECIO UNITARIO TOTAL $28,554.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:MUEBLES Y APARATOS SANITARIOS COD


0.150
ITEM:LAVAMANO CON PEDESTAL BLANCO SEMIECONOMICO COD UNIDAD
INCLUYE GRIFOS 0.152 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Lavamanos con Pedestal Semieconom und 1.00 $50,000.00 $50,000.00
Grifos und 1.00 $15,000.00 $15,000.00
Cemento Blanco bto 0.01 $35,000.00 $350.00

SUB-TOTAL $65,350.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $67,765.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $10,164.75
TOTAL A TODO COSTO $77,929.75

PRECIO UNITARIO TOTAL $77,929.75


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:MUEBLES Y APARATOS SANITARIOS COD


0.150
ITEM:SANITARIO BLANCO SEMIECONOMICO COD UNIDAD
0.151 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Sanitario Blanco Semieconomico und 1.00 $70,000.00 $70,000.00
Cemento Blanco bto 0.01 $35,000.00 $350.00

SUB-TOTAL $70,350.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $72,765.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $10,914.75
TOTAL A TODO COSTO $83,679.75

PRECIO UNITARIO TOTAL $83,679.75


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:PINTURAS COD
0.140
ITEM:LACA PARA PUERTAS INTERIORES COD UNIDAD
0.145 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Laca gal 5% 0.05 $35,200.00 $1,848.00

SUB-TOTAL $1,848.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00

SUB-TOTAL $18,400.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $18,400.00 5% $920.00

SUB-TOTAL $920.00

TOTAL COSTO DIRECTO $21,168.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,175.20
TOTAL A TODO COSTO $24,343.20

PRECIO UNITARIO TOTAL $24,343.20


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:PINTURAS COD
0.140
ITEM:BARNIZ COD UNIDAD
0.144 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Barniz gal 5% 0.05 $21,600.00 $1,134.00

SUB-TOTAL $1,134.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00

SUB-TOTAL $18,400.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $18,400.00 5% $920.00
Andamio gl $100.00 1.0 $100.00

SUB-TOTAL $1,020.00

TOTAL COSTO DIRECTO $20,554.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,083.10
TOTAL A TODO COSTO $23,637.10

PRECIO UNITARIO TOTAL $23,637.10


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:PINTURAS COD
0.140
ITEM:VINILO TIPO I COD UNIDAD
0.143 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Vinilo Tipo I gal 5% 0.05 $37,800.00 $1,984.50
Acronal gal 5% 0.01 $2,000.00 $21.00

SUB-TOTAL $2,005.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00

SUB-TOTAL $18,400.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $18,400.00 5% $920.00
$0.00

SUB-TOTAL $920.00

TOTAL COSTO DIRECTO $21,325.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,198.83
TOTAL A TODO COSTO $24,524.33

PRECIO UNITARIO TOTAL $24,524.33


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:PINTURAS COD
0.140
ITEM:ESTUCO EN CIELO COD UNIDAD
0.142 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Estucor bto 5% 0.06 $22,000.00 $1,386.00
Acronal gal 5% 0.01 $2,000.00 $21.00

SUB-TOTAL $1,407.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00
Andamios gl $100.00 1.0 $100.00

SUB-TOTAL $675.00

TOTAL COSTO DIRECTO $13,582.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,037.30
TOTAL A TODO COSTO $15,619.30

PRECIO UNITARIO TOTAL $15,619.30


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:PINTURAS COD
0.140
ITEM:ESTUCO EN MUROS COD UNIDAD
0.141 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Estucor bto 5% 0.06 $22,000.00 $1,386.00
Acronal gal 5% 0.01 $2,000.00 $21.00

SUB-TOTAL $1,407.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.30 $15,333.33

SUB-TOTAL $15,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $15,333.33 5% $766.67

SUB-TOTAL $766.67

TOTAL COSTO DIRECTO $17,507.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,626.05
TOTAL A TODO COSTO $20,133.05

PRECIO UNITARIO TOTAL $20,133.05


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CERRAJERIA COD
0.130
ITEM:CERRADURA CLOSET POMO LUJO COD UNIDAD
0.134 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cerradura closet pomo lujo und 1.00 $48,000.00 $48,000.00

SUB-TOTAL $48,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $52,830.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,924.50
TOTAL A TODO COSTO $60,754.50

PRECIO UNITARIO TOTAL $60,754.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CERRAJERIA COD
0.130
ITEM:CERRADURA ALCOBA POMO MADERA ALUM COD UNIDAD
0.133 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cerradura alcoba pomo madera al und 1.00 $55,600.00 $55,600.00

SUB-TOTAL $55,600.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $60,430.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $9,064.50
TOTAL A TODO COSTO $69,494.50

PRECIO UNITARIO TOTAL $69,494.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CERRAJERIA COD
0.130
ITEM:CERRADURA DE BAÑO MADERA DORADA COD UNIDAD
0.132 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cerradura de baño madera dorada und 1.00 $28,500.00 $28,500.00

SUB-TOTAL $28,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $33,330.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $4,999.50
TOTAL A TODO COSTO $38,329.50

PRECIO UNITARIO TOTAL $38,329.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CERRAJERIA COD
0.130
ITEM:CERRADURA ENTRADA PRINCIPAL SOBREPONER COD UNIDAD
0.131 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cerradura sobreponer und 1.00 $78,000.00 $78,000.00

SUB-TOTAL $78,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00

SUB-TOTAL $4,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,600.00 5% $230.00

SUB-TOTAL $230.00

TOTAL COSTO DIRECTO $82,830.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $12,424.50
TOTAL A TODO COSTO $95,254.50

PRECIO UNITARIO TOTAL $95,254.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA METALICA COD


0.120
ITEM: PORTON DE ALUMINIO COD UNIDAD
0.121 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
porton aluminio und 1.00 $185,000.00 $185,000.00

SUB-TOTAL $185,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $187,415.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $28,112.25
TOTAL A TODO COSTO $215,527.25

PRECIO UNITARIO TOTAL $215,527.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA METALICA COD


0.120
ITEM: VENTANA ALUMINIO CELOSIA COD UNIDAD
0.121 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
ventana de aluminio M2 1.00 $20,500.00 $20,500.00

SUB-TOTAL $20,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $22,915.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,437.25
TOTAL A TODO COSTO $26,352.25

PRECIO UNITARIO TOTAL $26,352.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA DE MADERA COD


0.110
ITEM: MUEBLE ALTO COCINA FORMICA COD UNIDAD
0.112 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
mueble alto und 1.00 $800,000.00 $800,000.00

SUB-TOTAL $800,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $802,415.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $120,362.25
TOTAL A TODO COSTO $922,777.25

PRECIO UNITARIO TOTAL $922,777.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA DE MADERA COD


0.110
ITEM: MUEBLE BAJO COCINA FORMICA COD UNIDAD
0.113 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
mueble bajo und 1.00 $800,000.00 $800,000.00

SUB-TOTAL $800,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $802,415.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $120,362.25
TOTAL A TODO COSTO $922,777.25

PRECIO UNITARIO TOTAL $922,777.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA DE MADERA COD


0.110
ITEM: PUERTA TRIPLEX DE LUJO COD UNIDAD
0.112 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
puerta triplex und 1.00 $145,000.00 $145,000.00

SUB-TOTAL $145,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $147,415.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $22,112.25
TOTAL A TODO COSTO $169,527.25

PRECIO UNITARIO TOTAL $169,527.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:CARPINTERIA DE MADERA COD


0.110
ITEM: MARCO EN ROBLE 90X210 COD UNIDAD
0.111 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
marco en roble und 1.00 $95,000.00 $95,000.00

SUB-TOTAL $95,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00

SUB-TOTAL $2,300.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,300.00 5% $115.00

SUB-TOTAL $115.00

TOTAL COSTO DIRECTO $97,415.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $14,612.25
TOTAL A TODO COSTO $112,027.25

PRECIO UNITARIO TOTAL $112,027.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: SALIDA DE ESTUFA COD UNIDAD
0.109 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
toma de estufa sal 1.00 $1,500.00 $1,500.00
tuberia de 1/2 ml 10.00 $2,000.00 $20,000.00
cable N°12 ml 30.00 $300.00 $9,000.00

SUB-TOTAL $30,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $42,575.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $6,386.25
TOTAL A TODO COSTO $48,961.25

PRECIO UNITARIO TOTAL $48,961.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: SALIDA DE TELEFONO COD UNIDAD
0.107 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cable telefonico ml 10.00 $1,500.00 $15,000.00
tuberia de 1/2 ml 10.00 $2,000.00 $20,000.00
caja de telefono und 1.00 $1,500.00 $1,500.00

SUB-TOTAL $36,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $48,575.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,286.25
TOTAL A TODO COSTO $55,861.25

PRECIO UNITARIO TOTAL $55,861.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: SALIDA DE TV COD UNIDAD
0.107 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cable coaxial ml 10.00 $600.00 $6,000.00
tuberia de 1/2 ml 10.00 $2,000.00 $20,000.00
caja de television und 1.00 $300.00 $300.00

SUB-TOTAL $26,300.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $38,375.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $5,756.25
TOTAL A TODO COSTO $44,131.25

PRECIO UNITARIO TOTAL $44,131.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: ACOMETIDA DE TV COD UNIDAD
0.106 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cable coaxial ml 1.00 $600.00 $600.00

SUB-TOTAL $600.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $12,675.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $1,901.25
TOTAL A TODO COSTO $14,576.25

PRECIO UNITARIO TOTAL $14,576.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: TABLERO ELECTRICO DE 8 BREACKER COD UNIDAD
0.105 UND

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
caja electrica und 1.00 $6,000.00 $6,000.00
breacker und 8.00 $8,000.00 $64,000.00

SUB-TOTAL $70,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 3.00 $1,533.33

SUB-TOTAL $1,533.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $1,533.33 5% $76.67

SUB-TOTAL $76.67

TOTAL COSTO DIRECTO $71,610.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $10,741.50
TOTAL A TODO COSTO $82,351.50

PRECIO UNITARIO TOTAL $82,351.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: SALIDAS ELECTRICAS TOMA CORRIENTE COD UNIDAD
0.104 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
toma corriente doble UND 1.00 $3,500.00 $3,500.00
alambre N°12 ml 20.00 $800.00 $16,000.00
tb electrica 1/2 ml 10.00 $2,000.00 $20,000.00

SUB-TOTAL $39,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $51,575.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,736.25
TOTAL A TODO COSTO $59,311.25

PRECIO UNITARIO TOTAL $59,311.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM:SALIDA ELECTRICA PLAFONES COD UNIDAD
0.103 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
plafon und 1.00 $1,200.00 $1,200.00
alambre N°12 ml 20.00 $800.00 $16,000.00
tb electrica 1/2 ml 10.00 $2,000.00 $20,000.00

SUB-TOTAL $37,200.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $49,275.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,391.25
TOTAL A TODO COSTO $56,666.25

PRECIO UNITARIO TOTAL $56,666.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: SALIDAS ELECTRICAS SUICHE COD UNIDAD
0.102 SAL

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
suiche UND 1.00 $3,500.00 $3,500.00
alambre N°12 ml 20.00 $800.00 $16,000.00
tb electrica 1/2 ml 10.00 $2,000.00 $20,000.00

SUB-TOTAL $39,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $51,575.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,736.25
TOTAL A TODO COSTO $59,311.25

PRECIO UNITARIO TOTAL $59,311.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO:INSTALACION ELECTRICA COD


0.100
ITEM: ACOMETIDA ELECTRICA COD UNIDAD
0.101 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
alambre N°10 m 1.00 $900.00 $900.00

SUB-TOTAL $900.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.40 $11,500.00

SUB-TOTAL $11,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,500.00 5% $575.00

SUB-TOTAL $575.00

TOTAL COSTO DIRECTO $12,975.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $1,946.25
TOTAL A TODO COSTO $14,921.25

PRECIO UNITARIO TOTAL $14,921.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: INSTALACIONES SANITARIAS E HIDRAULICAS COD


0.090
ITEM: TUBERIA CPVC 1/2" AGUA C COD UNIDAD
0.095 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
tb agua c 1/2" ml 1.25 $12,000.00 $15,000.00
soldadura gl 0.010 $30,000.00 $300.00
limpiador gl 0.01 $20,000.00 $100.00

SUB-TOTAL $15,400.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.50 $5,600.00

SUB-TOTAL $24,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,000.00 5% $1,200.00

SUB-TOTAL $1,200.00

TOTAL COSTO DIRECTO $40,600.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $6,090.00
TOTAL A TODO COSTO $46,690.00

PRECIO UNITARIO TOTAL $46,690.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: INSTALACIONES SANITARIAS E HIDRAULICAS COD


0.090
ITEM: TUBERIA PVCPRESION 1/2" AGUA F COD UNIDAD
0.094 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
tb agua fria 1/2" ml 1.25 $9,500.00 $11,875.00
soldadura gl 0.010 $30,000.00 $300.00
limpiador gl 0.01 $20,000.00 $100.00

SUB-TOTAL $12,275.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.50 $5,600.00

SUB-TOTAL $24,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,000.00 5% $1,200.00

SUB-TOTAL $1,200.00

TOTAL COSTO DIRECTO $37,475.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $5,621.25
TOTAL A TODO COSTO $43,096.25

PRECIO UNITARIO TOTAL $43,096.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: INSTALACIONES SANITARIAS E HIDRAULICAS COD


0.090
ITEM: TUBERIA PVC 4" AGUAS LLUVIA COD UNIDAD
0.093 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
tb agua lluvia 4" ml 1.25 $2,153.00 $2,691.25
soldadura gl 0.010 $30,000.00 $300.00
limpiador gl 0.01 $20,000.00 $100.00

SUB-TOTAL $3,091.25

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.50 $5,600.00

SUB-TOTAL $24,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,000.00 5% $1,200.00

SUB-TOTAL $1,200.00

TOTAL COSTO DIRECTO $28,291.25


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $4,243.69
TOTAL A TODO COSTO $32,534.94

PRECIO UNITARIO TOTAL $32,534.94


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: INSTALACIONES SANITARIAS E HIDRAULICAS COD


0.090
ITEM: TUBERIA PVC 4" AGUAS N COD UNIDAD
0.092 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
tb sanitaria 4" ml 1.25 $11,200.00 $14,000.00
soldadura gl 0.010 $30,000.00 $300.00
limpiador gl 0.01 $20,000.00 $100.00

SUB-TOTAL $14,400.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.50 $5,600.00

SUB-TOTAL $24,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,000.00 5% $1,200.00

SUB-TOTAL $1,200.00

TOTAL COSTO DIRECTO $39,600.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $5,940.00
TOTAL A TODO COSTO $45,540.00

PRECIO UNITARIO TOTAL $45,540.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: INSTALACIONES SANITARIAS E HIDRAULICAS COD


0.090
ITEM: CAJA DE INSPECCION DE 50X50 COD UNIDAD
0.091 UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento blt 5% 2.60 $19,000.00 $51,870.00
arena m3 5% 0.060 $31,780.00 $2,002.14
trirurado m3 5% 0.36 $31,780.00 $12,012.84
herraje UND 1.00 $50,000.00 $50,000.00

SUB-TOTAL $115,884.98

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 3.20 $1,437.50
Ayudante $2,800.00 3.20 $875.00

SUB-TOTAL $2,312.50

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,312.50 5% $115.63

SUB-TOTAL $115.63

TOTAL COSTO DIRECTO $118,313.11


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $17,746.97
TOTAL A TODO COSTO $136,060.07

PRECIO UNITARIO TOTAL $136,060.07


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:PISO VACIADO GRANITO PULIDO COD UNIDAD
0.087 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento blt 5% 0.50 $19,000.00 $9,975.00
granito blt 5% 2.000 $3,000.00 $6,300.00

SUB-TOTAL $16,275.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.80 $2,555.56
Ayudante $2,800.00 1.80 $1,555.56

SUB-TOTAL $4,111.11

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $4,111.11 5% $205.56
pulidora-brilladora m2 $4,500.00 1.000 $4,500.00

SUB-TOTAL $4,705.56

TOTAL COSTO DIRECTO $25,091.67


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,763.75
TOTAL A TODO COSTO $28,855.42

PRECIO UNITARIO TOTAL $28,855.42


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:PISO DE GRESS 10*20 COD UNIDAD
0.086 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento blt 5% 0.36 $19,000.00 $7,231.88
arena m3 5% 0.058 $25,000.00 $1,522.50
baldosa de gress m2 5% 1.00 $9,000.00 $9,450.00
lechada blt 5% 0.02 $45,000.00 $945.00

SUB-TOTAL $19,149.38

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 0.60 $4,666.67

SUB-TOTAL $12,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $12,333.33 5% $616.67

SUB-TOTAL $616.67

TOTAL COSTO DIRECTO $32,099.38


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $4,814.91
TOTAL A TODO COSTO $36,914.28

PRECIO UNITARIO TOTAL $36,914.28


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:PISO BALDOSA ROCA 30*30 COD UNIDAD
0.085 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento blt 5% 0.15 $19,000.00 $2,892.75
arena m3 5% 0.023 $25,000.00 $609.00
baldosa m2 5% 1.00 $25,000.00 $26,250.00
lechada blt 5% 0.02 $45,000.00 $945.00

SUB-TOTAL $30,696.75

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 0.60 $4,666.67

SUB-TOTAL $12,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $12,333.33 5% $616.67
pulidora-brilladora m2 $4,500.00 1.000 $4,500.00

SUB-TOTAL $5,116.67

TOTAL COSTO DIRECTO $48,146.75


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,222.01
TOTAL A TODO COSTO $55,368.76

PRECIO UNITARIO TOTAL $55,368.76


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:GUARDAESCOBA CERAMICO COD UNIDAD
0.084 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
guarda escoba ceramico ml 5% 1.00 $8,000.00 $8,400.00
pegacor blt 5% 0.050 $23,000.00 $1,207.50

SUB-TOTAL $9,607.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.12 $38,333.33
Ayudante $2,800.00 0.24 $11,666.67

SUB-TOTAL $50,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $50,000.00 5% $2,500.00

SUB-TOTAL $2,500.00

TOTAL COSTO DIRECTO $62,107.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $9,316.13
TOTAL A TODO COSTO $71,423.63

PRECIO UNITARIO TOTAL $71,423.63


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:PISO CONCRETO DE 21 MPA REFORZADO E= 8CM COD UNIDAD
0.083 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cermento m3 5% 0.52 $19,000.00 $10,374.00
arena m3 5% 0.041 $31,780.00 $1,374.80
triturado 3/4 m3 5% 0.07 $31,780.00 $2,402.57
malla electrosoldada D-50 m2 5% 1.00 $2,400.00 $2,520.00
tabla ml 5% 0.50 $3,000.00 $1,575.00

SUB-TOTAL $18,246.37

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.20 $23,000.00
Ayudante $2,800.00 2.50 $1,120.00

SUB-TOTAL $24,120.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,120.00 5% $1,206.00
concretadora dia $15,000.00 0.010 $150.00

SUB-TOTAL $1,356.00

TOTAL COSTO DIRECTO $43,722.37


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $6,558.36
TOTAL A TODO COSTO $50,280.73

PRECIO UNITARIO TOTAL $50,280.73


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:PISO CONCRETO DE 21 MPA REFORZADO E= 5CM COD UNIDAD
0.082 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cermento m3 5% 0.33 $19,000.00 $6,483.75
arena m3 5% 0.026 $31,780.00 $859.25
triturado 3/4 m3 5% 0.05 $31,780.00 $1,501.61
malla electrosoldada D-50 m2 5% 1.00 $2,400.00 $2,520.00
tabla ml 5% 0.50 $3,000.00 $1,575.00

SUB-TOTAL $12,939.61

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.15 $30,666.67
Ayudante $2,800.00 2.00 $1,400.00

SUB-TOTAL $32,066.67

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $32,066.67 5% $1,603.33
concretadora dia $15,000.00 0.010 $150.00

SUB-TOTAL $1,753.33

TOTAL COSTO DIRECTO $46,759.61


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,013.94
TOTAL A TODO COSTO $53,773.55

PRECIO UNITARIO TOTAL $53,773.55


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PISOS COD


0.080
ITEM:ENTRESUELO PIEDRA 20 CM AFIRMADO COD UNIDAD
0.081 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
piedra de entresuelo m3 5% 0.20 $23,000.00 $4,830.00
arenilla m3 5% 0.050 $11,000.00 $577.50

SUB-TOTAL $5,407.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.05 $92,000.00
Ayudante $2,800.00 0.20 $14,000.00

SUB-TOTAL $106,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $106,000.00 5% $5,300.00
chencha dia $30,000.00 0.010 $300.00

SUB-TOTAL $5,600.00

TOTAL COSTO DIRECTO $117,007.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $17,551.13
TOTAL A TODO COSTO $134,558.63

PRECIO UNITARIO TOTAL $134,558.63


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: CUBIERTA COD


0.070
ITEM:ENCOROZADO DE MADERA 2"*4" COD UNIDAD
0.072 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
madera de 2*4 ml 5% 1.00 $16,000.00 $16,800.00

SUB-TOTAL $16,800.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.30 $15,333.33
Ayudante $2,800.00 0.30 $9,333.33

SUB-TOTAL $24,666.67

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,666.67 5% $1,233.33
andamios gl $100.00 1.000 $100.00

SUB-TOTAL $1,333.33

TOTAL COSTO DIRECTO $42,800.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $6,420.00
TOTAL A TODO COSTO $49,220.00

PRECIO UNITARIO TOTAL $49,220.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: CUBIERTA COD


0.070
ITEM:CUBIERTA EN TEJA DE BARRO COD UNIDAD
0.071 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
teja de barro und 5% 22.00 $450.00 $10,395.00
tablilla m2 5% 1.000 $5,800.00 $6,090.00
alfardas ml 5% 2.50 $5,500.00 $14,437.50
manto asfaltico m2 5% 2.00 $4,000.00 $8,400.00
cargueras ml 5% 0.40 $5,500.00 $2,310.00

SUB-TOTAL $41,632.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 1.00 $4,600.00
Ayudante $2,800.00 2.00 $1,400.00

SUB-TOTAL $6,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $6,000.00 5% $300.00
andamios gl $100.00 1.000 $100.00

SUB-TOTAL $400.00

TOTAL COSTO DIRECTO $48,032.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,204.88
TOTAL A TODO COSTO $55,237.38

PRECIO UNITARIO TOTAL $55,237.38


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: ESTRUCTURAS COD


0.060
ITEM:CONCRETO DE 21MPA PARA ESCALERA MACIZA COD UNIDAD
0.063 M3

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 5% 6.50 $19,000.00 $129,675.00
arena m3 5% 0.515 $31,780.00 $17,185.04
triturado m3 5% 0.90 $31,780.00 $30,032.10
formaleta gl 5% 1.00 $10,000.00 $10,500.00

SUB-TOTAL $187,392.14

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 4.00 $1,150.00
Ayudante $2,800.00 16.00 $175.00

SUB-TOTAL $1,325.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $1,325.00 5% $66.25
andamios gl $100.00 1.000 $100.00
concretadora dia $15,000.00 0.2 $3,000.00
vibrador dia $16,000.00 0.05 $800.00

SUB-TOTAL $3,966.25

TOTAL COSTO DIRECTO $192,683.39


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $28,902.51
TOTAL A TODO COSTO $221,585.89

PRECIO UNITARIO TOTAL $221,585.89


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: ESTRUCTURAS COD


0.060
ITEM:CONCRETO DE 21MPA PARA COLUMNAS 25*25 COD UNIDAD
0.062 ML

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 5% 0.41 $19,000.00 $8,104.69
arena m3 5% 0.032 $31,780.00 $1,074.06
triturado m3 5% 0.06 $31,780.00 $1,877.01
formaleta gl 5% 1.00 $4,000.00 $4,200.00

SUB-TOTAL $15,255.76

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 1.00 $2,800.00

SUB-TOTAL $21,200.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $21,200.00 5% $1,060.00
andamios gl $100.00 1.000 $100.00
concretadora dia $15,000.00 0.0125 $187.50
vibrador dia $16,000.00 0.003125 $50.00

SUB-TOTAL $1,397.50

TOTAL COSTO DIRECTO $37,853.26


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $5,677.99
TOTAL A TODO COSTO $43,531.25

PRECIO UNITARIO TOTAL $43,531.25


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: ESTRUCTURAS COD


0.060
ITEM: CONCRETO DE 21MPA PARA LOSA ALIGERADA CON ADOBE E=20 COD UNIDAD
0.061 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 5% 0.65 $19,000.00 $12,967.50
arena m3 5% 0.052 $31,780.00 $1,718.50
triturado m3 5% 0.09 $31,780.00 $3,003.21
adobe UND 5% 10.00 $850.00 $8,925.00
formaleta gl 5% 1.00 $7,000.00 $7,350.00

SUB-TOTAL $33,964.21

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 3
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.25 $2,044.44
Ayudante $2,800.00 12.60 $222.22

SUB-TOTAL $2,266.67

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,266.67 5% $113.33
andamios gl $100.00 1.000 $100.00
concretadora dia $15,000.00 0.2 $3,000.00
vibrador dia $16,000.00 0.05 $800.00

SUB-TOTAL $4,013.33

TOTAL COSTO DIRECTO $40,244.21


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $6,036.63
TOTAL A TODO COSTO $46,280.85

PRECIO UNITARIO TOTAL $46,280.85


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: FORROS COD


0.050
ITEM:ENCHAPE FACHADA TABLETA COD UNIDAD
0.053 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 5% 0.18 $19,000.00 $3,615.94
arena de pega m3 5% 0.029 $25,000.00 $761.25
tableta m2 5% 1.00 $12,000.00 $12,600.00

SUB-TOTAL $16,977.19

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.80 $5,750.00
Ayudante $2,800.00 0.80 $3,500.00

SUB-TOTAL $9,250.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $9,250.00 5% $462.50

SUB-TOTAL $462.50

TOTAL COSTO DIRECTO $26,689.69


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $4,003.45
TOTAL A TODO COSTO $30,693.14

PRECIO UNITARIO TOTAL $30,693.14


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: FORROS COD


0.050
ITEM:ENCHAPE CERAMICA COD UNIDAD
0.052 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
baldosa 15*22.5 m2 5% 1.00 $12,000.00 $12,600.00
pegacor bto 5% 0.100 $31,642.00 $3,322.41

SUB-TOTAL $15,922.41

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.80 $5,750.00
Ayudante $2,800.00 0.80 $3,500.00

SUB-TOTAL $9,250.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $9,250.00 5% $462.50

SUB-TOTAL $462.50

TOTAL COSTO DIRECTO $25,634.91


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,845.24
TOTAL A TODO COSTO $29,480.15

PRECIO UNITARIO TOTAL $29,480.15


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: FORROS COD


0.050
ITEM:ENCHAPE AZULEJO BLANCO 20.5X20.5 COD UNIDAD
0.051 M2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
baldosa 20.5x20.5 m2 5% 1.00 $12,000.00 $12,600.00
pegacor bto 5% 0.100 $0.00

SUB-TOTAL $12,600.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.80 $5,750.00
Ayudante $2,800.00 0.80 $3,500.00

SUB-TOTAL $9,250.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $9,250.00 5% $462.50

SUB-TOTAL $462.50

TOTAL COSTO DIRECTO $22,312.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,346.88
TOTAL A TODO COSTO $25,659.38

PRECIO UNITARIO TOTAL $25,659.38


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: RECUBRIMIENTO DE MUROS COD


0.004
ITEM:RANURAS Y FILETES COD UNIDAD
0.043 Ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 0.02 $17,600.00 $264.00
arena de revoque m3 0.003 $25,000.00 $73.75

SUB-TOTAL $337.75

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.30 $15,333.33
Ayudante $2,800.00 0.30 $9,333.33

SUB-TOTAL $24,666.67

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $24,666.67 5% $1,233.33

SUB-TOTAL $1,233.33

TOTAL COSTO DIRECTO $26,237.75


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,935.66
TOTAL A TODO COSTO $30,173.41

PRECIO UNITARIO TOTAL $30,173.41


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: RECUBRIMIENTO DE MUROS COD


0.004
ITEM:REVOQUE LISO FACHADA COD UNIDAD
0.042 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 0.15 $17,600.00 $2,640.00
arena de revoque m3 0.030 $25,000.00 $737.50

SUB-TOTAL $3,377.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 0.60 $4,666.67

SUB-TOTAL $12,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $12,333.33 5% $616.67
Andamios gl $100.00 1.000 $100.00

SUB-TOTAL $716.67

TOTAL COSTO DIRECTO $16,427.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,464.13
TOTAL A TODO COSTO $18,891.63

PRECIO UNITARIO TOTAL $18,891.63


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: RECUBRIMIENTO DE MUROS COD


0.004
ITEM:REVOQUE LISO SOBRE PARED COD UNIDAD
0.041 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 0.15 $17,600.00 $2,640.00
arena de revoque m3 0.030 $25,000.00 $737.50

SUB-TOTAL $3,377.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 0.60 $4,666.67

SUB-TOTAL $12,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $12,333.33 5% $616.67

SUB-TOTAL $616.67

TOTAL COSTO DIRECTO $16,327.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,449.13
TOTAL A TODO COSTO $18,776.63

PRECIO UNITARIO TOTAL $18,776.63


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM:IMPERMEABILIZANTE INTEGRAL SOBRE M=15 SIKA 1 COD UNIDAD
0.036 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
cemento bto 0.15 $17,600.00 $2,640.00
arena de revoque m3 0.030 $25,000.00 $737.50
sika1 Kg 0.30 $4,400.00 $1,320.00

SUB-TOTAL $4,697.50

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 0.60 $4,666.67

SUB-TOTAL $12,333.33

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $12,333.33 5% $616.67

SUB-TOTAL $616.67

TOTAL COSTO DIRECTO $17,647.50


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,647.13
TOTAL A TODO COSTO $20,294.63

PRECIO UNITARIO TOTAL $20,294.63


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM: SILLAR PREF. VENTANA M=15 COD UNIDAD
0.035 ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.02 $19,000.00 $413.25
Arena pega m3 0.003 $25,000.00 $87.00
sillar prefabricado ml 1.00 $20,000.00 $20,000.00

SUB-TOTAL $20,500.25

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.25 $11,200.00

SUB-TOTAL $29,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $29,600.00 5% $1,480.00

SUB-TOTAL $1,480.00

TOTAL COSTO DIRECTO $51,580.25


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,737.04
TOTAL A TODO COSTO $59,317.29

PRECIO UNITARIO TOTAL $59,317.29


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM: LAGRIMALES PREFABRICADOS BLOQUE M=15 COD UNIDAD
0.034 ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.02 $19,000.00 $413.25
Arena pega m3 0.003 $25,000.00 $87.00
lagrimal prefabricado ml 1.00 $20,000.00 $20,000.00

SUB-TOTAL $20,500.25

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.25 $18,400.00
Ayudante $2,800.00 0.25 $11,200.00

SUB-TOTAL $29,600.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $29,600.00 5% $1,480.00

SUB-TOTAL $1,480.00

TOTAL COSTO DIRECTO $51,580.25


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $7,737.04
TOTAL A TODO COSTO $59,317.29

PRECIO UNITARIO TOTAL $59,317.29


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM: CONCRETO DINTELES 15X20 COD UNIDAD
0.033 ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.20 $19,000.00 $3,705.00
Arena m3 0.02 $31,780.00 $491.00
triturado 3/4 m3 0.03 $31,780.00 $858.06
formaleta gl 1.00 $6,000.00 $6,000.00

SUB-TOTAL $11,054.06

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 4
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.07 $65,714.29
Ayudante $2,800.00 0.30 $9,333.33

SUB-TOTAL $75,047.62

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $75,047.62 5% $3,752.38
concretadora dia $15,000.00 0.006 $90.00

SUB-TOTAL $3,842.38

TOTAL COSTO DIRECTO $89,944.06


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $13,491.61
TOTAL A TODO COSTO $103,435.67

PRECIO UNITARIO TOTAL $103,435.67


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM: MURO DE 0.15. LADRILLO HUECO TOLETE COD UNIDAD
0.032 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.15 $19,000.00 $2,892.75
Arena pega m3 0.02 $25,000.00 $609.00
Ladrillo tolete de 15 und 12.50 $850.00 $10,625.00

SUB-TOTAL $14,126.75

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.60 $7,666.67
Ayudante $2,800.00 1.20 $2,333.33

SUB-TOTAL $10,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $10,000.00 5% $500.00
$0.00

SUB-TOTAL $500.00

TOTAL COSTO DIRECTO $24,626.75


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $3,694.01
TOTAL A TODO COSTO $28,320.76

PRECIO UNITARIO TOTAL $28,320.76


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: MAMPOSTERIA COD


0.003
ITEM: SOBRECIMIENTOS DE 15CM A 2 HILADAS COD UNIDAD
0.031 ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.06 $19,000.00 $1,157.10
Arena pega m3 0.01 $25,000.00 $243.60
Bloque 15cm und 5.00 $1,100.00 $5,500.00

SUB-TOTAL $6,900.70

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.52 $8,846.15
Ayudante $2,800.00 1.04 $2,692.31

SUB-TOTAL $11,538.46

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $11,538.46 5% $576.92
$0.00

SUB-TOTAL $576.92

TOTAL COSTO DIRECTO $19,016.08


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,852.41
TOTAL A TODO COSTO $21,868.50

PRECIO UNITARIO TOTAL $21,868.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: SUBESTRUCTURA COD


0.002
ITEM: CONCRETO DE 21Mpa PARA VIGA DE AMRRE SUPERIOR DE 15X20 COD UNIDAD
0.023 ml

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 0.20 $19,000.00 $3,705.00
Arena m3 0.02 $31,780.00 $491.00
Triturado 3/4 m3 0.03 $31,780.00 $858.06
$0.00

SUB-TOTAL $5,054.06

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 4
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 0.07 $66,666.67
Ayudante $2,800.00 0.30 $9,333.33

SUB-TOTAL $76,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $76,000.00 5% $3,800.00
Concretadora dia $15,000.00 0.006 $90.00
Formaleta gl $3,000.00 0.2 $600.00

SUB-TOTAL $4,490.00

TOTAL COSTO DIRECTO $85,544.06


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $12,831.61
TOTAL A TODO COSTO $98,375.67

PRECIO UNITARIO TOTAL $98,375.67


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: SUBESTRUCTURA COD


0.002
ITEM: CONCRETO DE 21Mpa PARA VIGA DE AMRRE DE FUNDACION COD UNIDAD
0.022 m3

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 6.50 $19,000.00 $123,500.00
Arena m3 0.52 $31,780.00 $16,366.70
Triturado 3/4 m3 0.90 $31,780.00 $28,602.00

SUB-TOTAL $168,468.70

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 4
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.30 $2,000.00
Ayudante $2,800.00 10.00 $280.00
$3,000.00

SUB-TOTAL $2,280.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,280.00 5% $114.00
Concretadora m3 $15,000.00 0.200 $3,000.00
Formaleta gl $3,000.00 0.200 $600.00

SUB-TOTAL $3,714.00

TOTAL COSTO DIRECTO $174,462.70


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $26,169.41
TOTAL A TODO COSTO $200,632.11

PRECIO UNITARIO TOTAL $200,632.11


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: SUBESTRUCTURA COD


0.002
ITEM: CONCRETO CICLOPEO 21Mpa. 40% EN PIEDRA COD UNIDAD
0.021 m3

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Cemento bto 3.90 $19,000.00 $74,100.00
Arena m3 0.31 $31,780.00 $9,820.02
Triturado 3/4 m3 0.54 $31,780.00 $17,161.20
Piedra m3 0.40 $23,000.00 $9,200.00
gl

SUB-TOTAL $110,281.22

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 4
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.30 $2,000.00
Ayudante $2,800.00 10.00 $280.00

SUB-TOTAL $2,280.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,280.00 5% $114.00
Concretadora m3 $15,000.00 0.200 $3,000.00
Formaleta $3,000.00 0.200 $ 600.00

SUB-TOTAL $3,714.00

TOTAL COSTO DIRECTO $116,275.22


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $17,441.28
TOTAL A TODO COSTO $133,716.50

PRECIO UNITARIO TOTAL $133,716.50


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: EXCAVACION A MANUAL. INCLUYE CARGUE TRANSPORTE Y COD UNIDAD
BOTADA 0.016 m3

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
$0.00
$0.00

SUB-TOTAL $0.00

MANO DE OBRA
OFICIAL
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Ayudantes $2,800.00 1.40 $2,000.00
$0.00

SUB-TOTAL $2,000.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $2,000.00 5% $100.00
Botada de material m3 $13,000.00 1.300 $16,900.00

SUB-TOTAL $17,000.00

TOTAL COSTO DIRECTO $19,000.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $2,850.00
TOTAL A TODO COSTO $21,850.00

PRECIO UNITARIO TOTAL $21,850.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: BAÑO PROVISIONAL COD UNIDAD
0.015 und

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Sanitarios und 1.00 $70,000.00 $70,000.00
Tuberias sanitaria 4" ml 12.00 $11,000.00 $132,000.00

SUB-TOTAL $202,000.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 2.00 $2,300.00
Ayudantes $2,800.00 2.00 $1,400.00

SUB-TOTAL $3,700.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $3,700.00 5% $185.00

SUB-TOTAL $185.00

TOTAL COSTO DIRECTO $205,885.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $30,882.75
TOTAL A TODO COSTO $236,767.75

PRECIO UNITARIO TOTAL $236,767.75


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: INSTALACIONES PROVICIONALES COD UNIDAD
0.014 und

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL
Teleras und 50.00 $11,000.00 $550,000.00
tablas und 15.00 $2,500.00 $37,500.00
Laminas de zinc und 20.00 $10,000.00 $200,000.00

SUB-TOTAL $787,500.00

MANO DE OBRA
OFICIAL 1
CUADRILLA
AYUDANTE 3
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Oficial $4,600.00 16.00 $287.50
Ayudantes $2,800.00 48.00 $58.33

SUB-TOTAL $345.83

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Herramienta menor gl $345.83 5% $17.29
$0.00

SUB-TOTAL $17.29

TOTAL COSTO DIRECTO $787,863.13


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $118,179.47
TOTAL A TODO COSTO $906,042.59

PRECIO UNITARIO TOTAL $906,042.59


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: DESCAPOTE, INCLUYE BOTADA COD UNIDAD
0.013 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL

SUB-TOTAL $0.00

MANO DE OBRA
OFICIAL
CUADRILLA
AYUDANTE
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
$0.00

SUB-TOTAL $0.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Retroexcavadora hr $50,000.00 0.020 $1,000.00
Volquetas m3 $8,000.00 0.195 $1,560.00

SUB-TOTAL $2,560.00

TOTAL COSTO DIRECTO $2,560.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $384.00
TOTAL A TODO COSTO $2,944.00

PRECIO UNITARIO TOTAL $2,944.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: DESMONTE Y LIMPIEZA COD UNIDAD
0.012 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL

SUB-TOTAL $0.00

MANO DE OBRA
OFICIAL
CUADRILLA
AYUDANTE 1
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Ayudante $2,800.00 5.00 $ 560.00

SUB-TOTAL $560.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.
Retroexcavadora hr $50,000.00 0.020 $1,000.00

SUB-TOTAL $1,000.00

TOTAL COSTO DIRECTO $1,560.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $234.00
TOTAL A TODO COSTO $1,794.00

PRECIO UNITARIO TOTAL $1,794.00


ANALISIS E PRECIOS UNITARIOS
OBRA: EDWIN GUILLERMO MORALES FECHA: 20/11/4

CAPITULO: PRELIMINARES COD


0.001
ITEM: LOCALIZACION Y REPLANTEO COD UNIDAD
0.011 m2

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL

SUB-TOTAL

MANO DE OBRA
OFICIAL 1
CUADRILLA
OBRERO 2
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.
Topografo $150,000.00 0.08 $12,500.00

SUB-TOTAL $12,500.00

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.

SUB-TOTAL

TOTAL COSTO DIRECTO $12,500.00


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL
ADMINISTRACION, IMPREVISTO, UTILIDAD 15% $1,875.00
TOTAL A TODO COSTO $14,375.00

PRECIO UNITARIO TOTAL $14,375.00


ANALISIS E PRECIOS UNITARIOS
OBRA FECHA

CAPITULO COD

ITEM COD UNIDAD

MATERIALES
DESCRIPCION UND %DESP CANTIDAD PRECIO UNIT. VAL PARCIAL

SUB-TOTAL

MANO DE OBRA
OFICIAL
CUADRILLA
OBRERO
TRABAJADOR COSTO HORA/HOM RENDIMIENTO VALOR UNIT.

SUB-TOTAL

EQUIPO Y HERRAMIENTAS
DESCRIPCION UNID. TARIFA O VALOR RENDIMIENTO VALOR INIT.

SUB-TOTAL

TOTAL COSTO DIRECTO


VALORES A TODO COSTO
DESCRIPCION UNIDAD VALOR TOTAL

TOTAL A TODO COSTO

PRECIO UNITARIO TOTAL