NO. URAIAN PEKERJAAN B H Panjang Lebar Jlh VOLUME
Tebal
m m m m m ( m2 )
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan dan Perataan Lokasi 9.50 9.50 90.25 90.25 m2
3 Pengukuran dan Pemasangan Bowplank 9.50 9.50 38.00 m'
4 Izin Mendirikan Bangunan (IMB) 1.00 Ls
5 Papan Nama Proyek 1.00 Ls
2 Gording + Nok Uk. 4/8 cm Kayu Klas II 0.04 0.08 67.97 0.0032 0.22 m3
3 Atap Seng Gelombang BJLS 0,20 37.02 m2
37.02 m2
4 Perabung / Jurai #REF! #REF! m'
5 Listplank Papan Kayu Klas I Uk. 2 x ( 2 x 15 ) cm 33.00 0.23 7.59 7.59 m2
28.00 0.23 6.44 6.44 m2
14.03 m2
6 Baut Kuda - Kuda 80.00 80.00 Bh
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
1 2 3
A. J U M L A H #REF!
B. BIAYA UMUM DAN KEUNTUNGAN 10% #REF!
C. TOTAL BIAYA (A + B) #REF!
D. DIBULATKAN (C) #REF!
Putussibau, 2010
Diperiksa Oleh : Dibuat Oleh :
KASI PERENCANAAN DAN PENGENDALIAN CV. KONSULTAN SURESTY
BIDANG BANGUNAN GEDUNG DAN TATA RUANG Konsultan Perencana
DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN KAPUAS HULU
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN VOLUME S A T U A N H A R G A
ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Lokasi PP. 03 90.25 m2 10,725.00 967,931.25
2 Pengukuran dan Pemasangan Bowplank PP. 02 38.00 m' 34,351.90 1,305,372.20
3 Izin Mendirikan Bangunan (IMB) - 1.00 Ls 137,600.00 137,600.00
4 Papan Nama Proyek - 1.00 Ls 500,000.00 500,000.00
Jumlah I 2,910,903.45
II. PEKERJAAN PONDASI
1 Galian Tanah PT. 01 11.91 m3 47,712.50 568,112.74
2 Urugan Bekas Galian PT. 09 8.33 m3 15,904.17 132,559.64
3 Tiang Tongkat Kayu Belian Uk. 9/9 - 2.70 m U&B 12.00 Btg 131,450.00 1,577,400.00
4 Laci Kayu Belian Uk. 2 x 5/10 cm - 80 cm U&B 24.00 Btg 8,580.00 205,920.00
5 Alas Kayu Hutan U&B 24.00 Btg 3,850.00 92,400.00
6 Baut Pondasi U&B 12.00 Btg 5,280.00 63,360.00
7 Meruncingkan Tiang Tongkat E.1 12.00 Btg 29,342.50 352,110.00
8 Memancang Tiang Tongkat E.13 6.00 m1 58,286.25 349,717.50
9 Membuat Pen dan Lobang E.4 12.00 Psg 41,910.00 502,920.00
10 Keep Kayu Belian Uk. 9/9 cm F.3 0.18 m3 10,538,495.00 1,857,472.97
Jumlah II 5,701,972.85
III. PEKERJAAN RANGKA BADAN
1 Rangka Badan Kayu Kls I Uk. 8/8 cm F.27.a 0.19 m3 5,909,695.00 1,119,532.62
3 Sengkang + Balok Tutup Kayu Kls I Uk. 8/8 cm F.27.a 0.23 m3 5,909,695.00 1,382,774.07
Jumlah III 2,502,306.70
IV. PEKERJAAN GELEGAR DAN LANTAI
1 Gelegar Induk Kayu Kls I Uk. 8/8 cm F.3.a 0.19 m3 5,728,965.00 1,103,627.82
3 Lantai Papan Kayu Klas I Uk. 2/18 cm F.38.a 13.76 m2 295,032.65 4,059,649.26
4 Papan Dourpel Kayu Klas I F.38.a 1.74 m2 295,032.65 511,940.65
Jumlah IV 5,675,217.74
V. PEKERJAAN DINDING
1 Plesteran Dinding Kawat Simpai PDND. 02 15.82 m2 121,155.37 1,916,968.79
Jumlah V 1,916,968.79
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN VOLUME S A T U A N H A R G A
ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
HARGA BIAYA
KODE URAIAN ANALISA
SATUAN SAT UAN KUANTITAS SAT UAN
ANALISA HARGA SATUAN PEKERJAAN
(Rp.) (Rp.)
1 2 3 4 5 6
PEKERJAAN PASANGAN PAVING BLOCK / M2
Tukang Batu Hari / Org 82,500.00 0.100 8,250.00
G.60
Pekerja Hari / Org 60,500.00 0.400 24,200.00
Paving Block Buah 3,520.00 50.000 176,000.00
HARGA SATUAN PER M2 208,450.00
DAFTAR HARGA SATUAN UPAH
BAHAN / MATERIAL DAN PERALATAN
TRIWULAN I TAHUN ANGGARAN 2010
PUTUSSIBAU DAN SEKITARNYA
UPAH
NO URAIAN TENAGA KERJA KODE (Rp / KETERANGAN
Hari)
A B C D E
1 Mandor Lapangan L.061 93,500.00
2 Mekanik L.071 82,500.00
3 Mekanik Pembantu L.072 77,000.00
4 Kepala Tukang L.073 88,000.00
5 Tukang L.079 82,500.00
6 Operator Terlatih L.081 82,500.00
7 Operator Kurang terlatih L.082 77,000.00
8 Pembantu Operator L.089 71,500.00
9 Supir Truck Material L.091 82,500.00
10 Supir Personil L.092 77,000.00
11 Pembantu Supir L.099 60,500.00
12 Buruh lapangan tak terlatih / Pekerja L.101 60,500.00
13 Buruh lapangan agak terlatih L.103 63,250.00
14 Buruh lapangan terlatih L.106 66,000.00
CATATAN :
n*) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat.
Misal : Buldozer, Grader, Whell Loader, Asphalt Finisher, dll.
n') Operator yang mengoperasikan peralatan untuk melayani pekerjaan berat yang agak ringan.
Misal : Steel Wheeled Roller, Stamper, Mechanical Rammer, Concrete Mixer / Mesin Pengaduk.
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
BAHAN PENGISI
1 Batu Gunung Quary M_010 m3 293,000.00
2 Batu Gunung Quary M_010.a m3 251,200.00
3 Batu Gunung Quary M_010.b m3 209,400.00
4 Kerikil dari galian bukit M_011 m3 215,000.00
5 Kerikil Sungai ( Leveransir ) M_012 m3 173,200.00
6 Kerikil Sungai ( Royality ) M_013 m3 66,000.00
7 Batu kali M_014 m3 251,200.00
8 Kerkil sungai ayak tanpa pasir M_015 m3 173,200.00
9 Batu Belah 10 - 15 cm. M_020 m3 323,000.00
10 Batu pecah 7 - 10 cm. M_021 m3 443,000.00
11 Batu pecah 5 - 7 cm. M_022 m3 563,000.00
12 Batu pecah 3 - 5 cm. M_023 m3 623,000.00
13 Batu pecah 2 - 3 cm. M_024 m3 683,000.00
14 Batu pecah 1 - 2 cm. M_025 m3 743,000.00
15 Batu pecah 0,5 - 1 cm. M_026 m3 803,000.00
16 Pasir urug / timbun M_040 m3 131,400.00
17 Pasir ayak untuk beton M_041 m3 149,400.00
18 Sirtu Sungai ( Leveransir ) M_042 m3 149,400.00
19 Sirtu Sungai ( Royality ) M_043 m3 90,000.00
20 Bahan timbunan pilihan (laterit) Leveransir M_050 m3 137,200.00
21 Bahan timbunan pilihan (laterit) Setempat M_051 m3 30,000.00
22 Timbunan setempat ( tanah biasa) M_052 m3 8,400.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
23 Aspal Bitument M_061 Kg. 11,660.00
24 Semen Portlant ( PC ) M_080 50 Kg. 106,700.00
25 Semen Portlant ( PC ) M_080.a Kg 2,134.00
26 Semen Warna (Oker) M_080.b Kg 16,544.00
27 Paving blok M_082 BH 3,520.00
28 Bataco Ukuran 15 x 30 x 7 cm M_239 Buah 2,970.00
29 Bataco Ukuran 20 x 40 x 7 cm M_239.a Buah 3,520.00
30 Bataco Ukuran 20 x 40 x 9 cm M_239.b Buah 3,795.00
31 Alat - alat bantu * M_171 Set 137,500.00
32 Alat - alat bantu ** M_172 Set 181,500.00
33 Alat - alat bantu pek. Latasir *** M_173 Set 225,500.00
34 Gerobak + kuali aspal M_174 Set 6,875,000.00
BAHAN MINYAK
35 Minyak tanah M_065 Ltr. 8,360.00
36 Minyak Diesel M_183 Ltr. 6,710.00
37 Premium / Bensin M_184 Ltr. 6,710.00
38 Minyak Pelumas M_185 Ltr. 28,160.00
39 Minyak Thinner M - 203 Ltr 33,011.00
40 Minyak Bekesting / Cetakan M - 203.a Ltr 8,030.00
BAHAN CAT
41 Cat Jembatan M_090 Kg 132,011.00
42 Cat Dasar M_187 Kg. 17,160.00
43 Teer M_188 Kg. 17,160.00
44 Cat Kilap M_193 Kg. 44,660.00
45 Cat Galvanis M - 202 Kg 281,600.00
46 Dempul M_230 Kg 16,555.00
47 Plamur M_231 Kg 16,555.00
48 Amplas M_232 Lbr 6,105.00
49 Cat Tembok Kualitas Biasa M_233 Kg 11,110.00
50 Cat Tembok Kualitas Sedang M_233.a Kg 16,610.00
51 Cat Tembok Weather Shield M_233.b Kg 71,610.00
52 Cat Vernis M_233.a Liter 60,610.00
53 Cat Melamic M_233.b Kg 60,610.00
54 Cat Meni M_233.c Kg 27,610.00
55 Soda Api M_234 Kg 23,210.00
56 Sabun M_235 Kg 18,810.00
57 Kuas Cat M_236 Buah 23,210.00
BAHAN BESI & BAJA
58 Baja Tralis M_161 Kg. 28,600.00
59 Kawat Bronjong Galvanis uk. 2.0 x 1.0 x 0.5 dia. 3 mm M_162 Unit 710,600.00
60 Kawat Bronjong Galvanis M_162. a Kg. 39,160.00
61 Kawat las M_162 b Kg. 155,100.00
62 Paku Jembatan M_166 Kg. 28,160.00
63 Baut Baja M_163 Kg. 39,600.00
64 Besi Galvanis sandaran jembatan M_164 btg 688,600.00
65 Baja Konstruksi (rangka baja Jembatan) M_165 Kg. 39,600.00
66 Baja Beton U.24 Tulangan Polos dan Ulir M_167 Kg. 17,270.00
67 Wire Mash M5 M_167. a Kg. 20,460.00
68 Wire Mash M6 M_167. b Kg. 21,010.00
69 Kawat Bindrat / Kawat Ikat M_170 Kg. 36,410.00
70 Beugel tebal plat 5 mm M_186 Bh. 28,160.00
71 Baut Panjang (15 - 30 cm) M_189 Btg. 20,460.00
72 Paku Baut 15 cm M. 189.A Btg. 7,260.00
73 Baut Pendek (4 - 12 cm) M_190 Btg. 5,280.00
74 Klem spore plank M_194 Btg. 33,660.00
75 Pipa baja tiang pancang M_197 Kg. 39,600.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
76 Sepatu besi untuk pancang kayu M_198 Bh 281,600.00
77 Baja konstruksi WF berbagai Ukuran: M - 199 Kg 39,600.00
78 Besi plat Uk berbagai Ukuran M - 200 Kg 39,600.00
79 Baja Kanal ( C ) Berbagai ukuran M - 201 Kg 39,600.00
80 Kawat Simpai M_237 Kg 35,970.00
81 Kawat Duri M_238 Kg 33,825.00
82 Paku Campuran M_241 Kg 25,960.00
83 Paku Triplek M_241.a Kg 40,260.00
84 Paku Seng / Belian M_241.b Kg 35,970.00
85 Sekrup M_242 Kg 11,660.00
86 Besi Strip M_243 Btg 35,200.00
87 Kabel / Seling 1" M_245 m1 85,525.00
88 Kabel / Seling 1/2" M_245.a m1 38,335.00
89 Kabel / Seling 1/4" M_245.b m1 23,980.00
90 Kabel Baja Pengaku dia. 19 mm M - 246 m1 54,780.00
91 Seling BaJa Dia. 1,5 " M - 247 m1 126,637.50
92 Seling Baja Dia. 2,5 " M - 247.a m1 209,000.00
93 Kantrol M - 248 Set 721,600.00
94 Warfel 2" M - 249 Buah 225,500.00
95 Warfel 1/2" M - 249.a Buah 26,950.00
96 Warfel 19 mm M - 249.b Buah 70,950.00
97 Cekak 1" M - 250 Buah 23,650.00
98 Cekak 1/2" M - 250.a Buah 12,210.00
99 Cekak 1/4" M - 250.b Buah 9,405.00
100 Cekak seling 19 mm M - 251 Buah 15,070.00
BAHAN KAYU
101 Kayu Bakar M_070 m3 253,000.00
102 Kayu bulat untuk turap panjang 2 m M_175 Btg 6,050.00
103 Kayu Bulat Untuk Turap Panjang 4 - 4,5 m M_176 Btg 12,210.00
104 Kayu untuk Perancah M_180 m3 995,500.00
105 Kayu Konstruksi Jembatan (belian) M_181 m3 8,116,350.00
106 Kayu Konstruksi Jembatan (Klas I) M_191 m3 2,671,350.00
107 Kayu Tembesu M_195 m3 3,771,350.00
108 Kayu Belian (Ketam) M_181.a m3 7,621,350.00
109 Kayu Belian (Tidak Ketam) M_181.b m3 7,016,350.00
110 Kayu Klas I (Ketam) M_191.a m3 2,764,850.00
111 Kayu Klas I (Tidak Ketam) M_191.b m3 2,671,350.00
112 Kayu Klas II (Ketam) M_192 m3 2,033,350.00
113 Kayu Klas II (Tidak Ketam) M_192.a m3 1,791,350.00
114 Kayu Klas III (Ketam) M_213 m3 1,758,350.00
115 Kayu Klas III (Tidak Ketam) M_213.a m3 1,527,350.00
116 Papan Kayu Belian (Ketam) M_181.c m3 11,251,350.00
117 Papan Kayu Belian (Tidak Ketam) M_181.d m3 10,591,350.00
118 Papan Kayu Klas I (Ketam) M_191.c m3 4,871,350.00
119 Papan Kayu Klas I (Tidak Ketam) M_191.d m3 4,321,350.00
120 Papan Kayu Klas II Ketam M_192.b m3 2,668,600.00
121 Papan Kayu Klas II Tidak Ketam M_192.c m3 2,173,600.00
122 Papan Kayu Klas III (Campuran) M_213.b m3 853,600.00
123 Tiang Tongkat Kayu Belian Uk. 9/9 - 4,20 M M_181.g Btg 236,500.00
124 Tiang Tongkat Kayu Belian Uk. 9/9 - 3,60 M M_181.h Btg 195,800.00
125 Tiang Tongkat Kayu Belian Uk. 9/9 - 3,20 M M_181.i Btg 155,100.00
126 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,70 M M_181.j Btg 131,450.00
127 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,50 M M_181.k Btg 114,070.00
128 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,20 M M_181.l Btg 90,970.00
129 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,10 M M_181.m Btg 85,140.00
130 Tiang Tongkat Kayu Belian Uk. 9/9 - 1,80 M M_181.n Btg 78,430.00
131 Tiang Tongkat Kayu Belian Uk. 9/9 - 1,50 M M_181.o Btg 71,830.00
132 Renglat M_215 Btg 6,930.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
133 Laci Kayu Belian 5/10 - 80 cm M_181.e Btg 8,580.00
134 Laci Kayu Belian 9/9 - 80 cm M_181.f Btg 44,000.00
135 Alas Kayu Hutan M_216 Btg 3,850.00
136 Konsul Kayu Klas I M_217 Buah 104,500.00
137 Triplek 3 mm M_218 Lbr 59,400.00
138 Triplek 3 mm M_218.a m2 19,954.31
139 Triplek 9 mm M_218.b Lbr 209,550.00
140 Plywood 4' x 8' x 4 mm M_218.c Lbr 85,800.00
141 Lem Kayu M_219 Kg 39,050.00
142 List Kayu Profil M_220 m' 7,150.00
143 Kayu Profil List Plafond M_221 m' 7,700.00
144 Gypsum Board M_222 Lbr 75,350.00
145 GRC Board M_223 Lbr 77,550.00
BAHAN SANITASI
146 Talang Gantung & Talang Tegak M_229 m1 22,550.00
147 Pipa Suling Dia. 3/4" M - 253 Buah 16,610.00
148 Pipa Galvanis Dia. 2" M - 253.a m' 172,150.00
149 Kloset Duduk M - 254 Buah 1,408,000.00
150 Kloset Jongkok M - 254.a Buah 236,500.00
151 Urinoir M - 255 Buah 635,690.00
152 Wastafel M - 256 Buah 594,000.00
153 Seal Tape Gypsum M - 257 Buah 49,610.00
154 Floor Drain M - 258 Buah 57,530.00
155 Kran Air Kualitas Biasa M - 259 Buah 11,330.00
156 Kran Air Kualitas Baik M - 259. a Buah 55,330.00
157 Seal Tape Kran M - 260 Buah 9,900.00
158 Bak Air Fiber Glass 0,75 M3 M - 261 Buah 1,705,000.00
159 Bak Air Fiber Glass 1 M3 M - 261.a Buah 1,925,000.00
160 Bak Air Fiber Glass 2 M3 M - 261.b Unit 3,410,000.00
161 Bak Air Fiber Glass 1,5 M3 M - 261.c Buah 2,832,500.00
BAHAN ATAP
162 Seng Gelombang BJLS 0,20 M_224 Lbr 45,650.00
163 Seng Gelombang BJLS 0,20 M_224.a m2 35,784.38
164 Seng Gelombang BJLS 0,30 M_224.b Lbr 72,050.00
165 Seng Gelombang BJLS 0,30 M_224.c m2 56,409.38
166 Genteng Metal Type PRIMA 0,35 M_225 Lbr 83,050.00
167 Genteng Metal Type ROYAL 0,35 M_225.a Lbr 83,050.00
168 Genteng Metal Type CLASSIC 0,35 M_225.b Lbr 83,050.00
169 Zincalume 0,3 Polos M_225.d m2 94,050.00
170 Zincalume 0,3 Color M_225.e m2 105,050.00
171 Seng Datar Colour 0,35 M_227 Lbr 77,165.00
172 Seng Datar Polos 0,30 M_227.a Lbr 50,050.00
173 Nok / Bubungan Genteng Metal 1/2 Lingkaran 0,35 M_228 Buah 53,350.00
BAHAN KERAMIK
174 Keramik 20 x 20 cm Polos M_240 Buah 2,970.00
175 Keramik 20 x 25 cm Polos M_240.a Buah 3,685.00
176 Keramik 30 x 30 cm Polos M_240.b Buah 6,050.00
177 Keramik 30 x 30 cm Artistik M_240.c Buah 7,040.00
178 Keramik 30 x 30 cm Unpolished M_240.d Buah 7,040.00
179 Keramik 40 x 40 cm Polos M_240.e Buah 13,310.00
180 Keramik 40 x 40 cm Anti Gores M_240.f Buah 44,110.00
181 Keramik 40 x 40 cm Unpolished M_240.g Buah 13,310.00
BAHAN KACA
182 Kaca Polos Tebal 5 mm M_244 m2 179,300.00
183 Kaca Polos Tebal 3 mm M_244.a m2 146,300.00
184 Kaca Rayben Tebal 5 mm M_244.b m2 190,300.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
BAHAN LISTRIK
185 Saklar Ganda Kualitas Biasa M - 262 Buah 16,555.00
186 Saklar Ganda Kualitas Baik M - 262.a Buah 27,555.00
187 Saklar Tunggal Kualitas Biasa M - 262.b Buah 11,055.00
188 Saklar Tunggal Kualitas Baik M - 262.c Set 22,055.00
189 Stop Kontak Kualitas Biasa M - 263 Set 12,445.40
190 Stop Kontak Kualitas Baik M - 263.a Set 22,055.00
191 Sekring Box / MCB M - 264 Set 132,110.00
192 Lampu Pijar 40 Watt M - 265.a Set 5,005.00
193 Lampu XL 20 Watt M - 265.b Set 71,555.00
194 Lampu TL 20 Watt M - 266.c Set 71,555.00
195 Kabel NYY 4 x 95 mm2 - m' 591,500.00
196 Kabel NYY 4 x 16 mm2 - m' 128,700.00
197 Kabel NYY 4 x 10 mm2 - m' 118,300.00
198 Kabel NYM 3 x 4 mm2 - m' 36,400.00
199 Kabel NYM 4 x 2,5 mm2 - m' 20,020.00
200 Kabel NYM 3 x 2,5 mm2 - m' 16,250.00
201 Kabel NYM 2 x 2,5 mm2 - m' 13,650.00
202 Instalasi Titik Lampu - Titik 248,050.00
BAHAN PENGUNCI & PENGGANTUNG
203 Engsel Pintu M - 267 Buah 22,055.00
204 Engsel Jendela M - 267.a Buah 16,555.00
205 Handle Pintu M - 268 Buah 82,555.00
206 Handle Jendela M - 268.a Buah 11,055.00
207 Slot Pintu M - 269 Buah 6,655.00
208 Slot Jendela M - 269.a Buah 11,055.00
209 Kait Angin M - 270 Buah 3,355.00
210 Kunci 2 Slaag M - 271 Buah 165,550.00
211 Kunci Pintu Tanam M - 271.a Buah 165,550.00
212 Pintu Folding Gate + Pemasangan M - 272 m2 649,000.00
213 Door Closer M - 273 Buah 220,550.00
BAHAN PERPIPAAN
214 Pipa Ø 1/2" PVC - m' 25,426.50
215 Pipa Ø 3/4" PVC - m' 35,222.00
216 Pipa Ø 1,5" PVC - m' 39,655.00
217 Pipa Ø 50 mm PVC - m' 37,015.00
218 Pipa Ø 2,5" PVC - m' 51,810.00
219 Pipa Ø 75 mm PVC - m' 65,945.00
220 Pipa Ø 100 mm PVC - m' 99,990.00
221 Pipa Ø 150 mm PVC - m' 183,370.00
222 Pipa Ø 50 mm GIP - m' 92,455.00
223 Pipa Ø 75 mm GIP - m' 172,425.00
224 Pipa Ø 100 mm GIP - m' 258,720.00
225 Pipa Ø 150 mm GIP - m' 389,290.00
226 Pipa Lateral Ø 100 mm GIP - Unit 1,520,970.00
227 Pipa Lateral Ø 150 mm GIP - Unit 1,667,050.00
228 Elbow 450 Ø 50 mm PVC - Buah 241,340.00
229 Elbow 450 Ø 75 mm PVC - Buah 333,850.00
230 Elbow 450 Ø 100 mm PVC - Buah 412,500.00
231 Elbow 450 Ø 150 mm PVC - Buah 527,450.00
232 Elbow 450 Ø 50 mm GIP - Buah 439,120.00
233 Elbow 450 Ø 75 mm GIP - Buah 503,250.00
234 Elbow 450 Ø 100 mm GIP - Buah 606,100.00
235 Elbow 450 Ø 150 mm GIP - Buah 661,100.00
236 Elbow 900 Ø 50 mm PVC - Buah 258,500.00
237 Elbow 900 Ø 75 mm PVC - Buah 344,300.00
238 Elbow 900 Ø 100 mm PVC - Buah 441,100.00
239 Elbow 900 Ø 150 mm PVC - Buah 578,600.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
240 Elbow 900 Ø 50 mm GIP - Buah 481,800.00
241 Elbow 900 Ø 75 mm GIP - Buah 551,100.00
242 Elbow 900 Ø 100 mm GIP - Buah 705,100.00
243 Elbow 900 Ø 150 mm GIP - Buah 771,100.00
244 Female Thread Tee Ø 50 x 50 PVC - Buah 424,600.00
245 Female Thread Tee Ø 75 x 50 PVC - Buah 512,600.00
246 Female Thread Tee Ø 75 x 75 PVC - Buah 584,100.00
247 Female Thread Tee Ø 100 x 75 PVC - Buah 600,600.00
248 Female Thread Tee Ø 100 x 100 PVC - Buah 721,600.00
249 Female Thread Tee Ø 150 x 150 PVC - Buah 1,211,100.00
250 Female Thread Tee Ø 75 x 75 GIP - Buah 661,100.00
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
2009 (Rp)
A B C D E F
251 Female Thread Tee Ø 100 x 100 GIP - Buah 743,600.00
252 Female Thread Tee Ø 150 x 150 GIP - Buah 1,156,100.00
253 Dop / Cap Ø 50 PVC - Buah 37,950.00
254 Dop / Cap Ø 75 PVC - Buah 59,950.00
255 Flange Spigot Ø 50 PVC - Buah 308,550.00
256 Flange Spigot Ø 75 PVC - Buah 413,600.00
257 Flange Spigot Ø 100 PVC - Buah 529,100.00
258 Flange Spigot Ø 150 PVC - Buah 732,600.00
259 Flange Socket Ø 50 PVC - Buah 320,100.00
260 Flange Socket Ø 75 PVC - Buah 402,600.00
261 Flange Socket Ø 100 PVC - Buah 463,100.00
262 Flange Socket Ø 150 PVC - Buah 732,600.00
263 Gate Valve Ø 50 GIP - Buah 843,150.00
264 Gate Valve Ø 75 GIP - Buah 953,150.00
265 Gate Valve Ø 100 GIP - Buah 1,173,150.00
266 Gate Valve Ø 150 GIP - Buah 2,146,650.00
267 Air Valve Ø 50 CI / MJ - Buah 969,100.00
268 Air Valve Ø 75 CI / MJ - Buah 1,172,600.00
269 Air Valve Ø 100 CI / MJ - Buah 1,464,100.00
270 Reducer Ø 100 x 75 mm - Buah 397,650.00
271 Reducer Ø 75 x 50 mm - Buah 370,150.00
272 Reducer Ø 150 x 100 mm - Buah 733,150.00
273 Flange Las PN. 10 Ø 150 - Buah 182,600.00
274 Flange Las PN. 10 Ø 100 - Buah 124,300.00
275 Flange Las PN. 10 Ø 75 - Buah 100,100.00
BAHAN LAINNYA
266 Air - Liter 275.00
Dengan Pertimbangan kondisi lokasi - lokasi yang bervariasi pada Kabupaten Kapuas Hulu, maka harga dasar dikelompokkan Dalam 6 wilayah sebagai berikut, lokasi yang
diluar 5 wilayah tersebut mengikuti standar harga dasar.
* Wilayah I Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) dan Harga Angkut (Jalur Darat) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaikan
Wilayah ini sesuai dengan kondisi daerah seperti : Empanang, Badau, Lanjak, dll
* Wilayah II Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) tetap, dan Harga Angkut (Jalur Air) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaika
Wilayah ini sesuai dengan kondisi daerah seperti : Mendalam, Kensurai, Na. Lebangan, dll.
* Wilayah III Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) dan Harga Angkut (Jalur Air) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaikan
#REF!
* Wilayah IV Meliputi #REF!
#REF!
* Wilayah Khusus Meliput #REF!
#REF!
UPAH TENAGA KERJA DAN HARGA
HARGA SATUAN MATERIAL / BAHAN
TRIWULAN I TAHUN 2010
PUTUSSIBAU DAN SEKITARNYA
K.9
Propinsi Kalimantan Barat : 61
Kabupaten Kapuas Hulu : 06
UPAH PPn UPAH
NO. TENAGA KERJA KODE TENAGA KERJA 10% TENAGA KERJA
( Rp / Hari ) ( Rp / Hari ) ( Rp / Hari )
1 Mandor Lapangan L.061 85,000.00 8500 93,500.00
2 Mekanik L.071 75,000.00 7500 82,500.00
3 Mekanik Pembantu L.072 70,000.00 7000 77,000.00
4 Kepala Tukang L.073 80,000.00 8000 88,000.00
5 Tukang L.079 75,000.00 7500 82,500.00
6 Operator Terlatih L.081 75,000.00 7500 82,500.00
7 Operator Kurang terlatih L.082 70,000.00 7000 77,000.00
8 Pembantu Operator L.089 65,000.00 6500 71,500.00
9 Supir Truck Material L.091 75,000.00 7500 82,500.00
10 Supir Personil L.092 70,000.00 7000 77,000.00
11 Pembantu Supir L.099 55,000.00 5500 60,500.00
12 Buruh lapangan tak terlatih / Pekerja L.101 55,000.00 5500 60,500.00
13 Buruh lapangan agak terlatih L.103 57,500.00 5750 63,250.00
14 Buruh lapangan terlatih L.106 60,000.00 6000 66,000.00
Dengan Pertimbangan kondisi lokasi - lokasi yang bervariasi pada Kabupaten Kapuas Hulu, maka harga dasar dikelompokkan Dalam 6 wilayah sebagai berikut, lokasi yang diluar 6 wilayah
tersebut mengikuti standar harga dasar (Harga Putussibau dan Sekitarnya).
* Wilayah I Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) dan Harga Angkut (Jalur Darat) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaikan
Wilayah ini sesuai dengan kondisi daerah seperti : Empanang, Badau, Lanjak, dll
* Wilayah II Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) tetap, dan Harga Angkut (Jalur Air) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaikan
Wilayah ini sesuai dengan kondisi daerah seperti : Mendalam, Kensurai, Na. Lebangan, dll.
* Wilayah III Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) dan Harga Angkut (Jalur Air) Bahan Pabrikan (Semen,Besi Tulangan,dll) dinaikan
Wilayah ini sesuai dengan kondisi daerah seperti : Kecamatan Embaloh Hilir, Bunut Hilir, Jongkong, dll.
* Wilayah IV Meliputi : Adalah Wilayah Dimana Harga Dasar Material Quarry ( Batu,Pasir,dll ) Tetap, dan Harga Angkut (Jalur Darat) Bahan Pabrikan (Semen,Besi Tulangan,dll) diturunkan
Wilayah ini sesuai dengan kondisi daerah seperti : Kecamatan Sejiram, Semitau, Suhaid, Selimbau, dll.
* Wilayah Khusus Meliputi: Adalah Wilayah Diluar Wilayah I - IV Misalnya : Tanjung Lokang, Beberuk, Sepan Padang, Sauk, dll. (Kondisi Transportasi Sulit).
Wilayah ini sesuai dengan kondisi daerah seperti : Tanjung Lokang, Beberuk, Sepan padang, Sauk, dll.
BAHAN PENGISI
1 Batu Gunung Quary m3 M_010 125,000.00 < 30 130,000.00 255,000.00 25,500.00 12,500.00 293,000.00
2 Batu Gunung Quary m3 M_010.a 125,000.00 < 20 92,000.00 217,000.00 21,700.00 12,500.00 251,200.00
3 Batu Gunung Quary m3 M_010.b 125,000.00 < 10 54,000.00 179,000.00 17,900.00 12,500.00 209,400.00
4 Kerikil dari galian bukit m3 M_011 60,000.00 < 30 130,000.00 190,000.00 19,000.00 6,000.00 215,000.00
5 Kerikil Sungai ( Leveransir ) m3 M_012 60,000.00 < 20 92,000.00 152,000.00 15,200.00 6,000.00 173,200.00
6 Kerikil Sungai ( Royality ) m3 M_013 55,000.00 - - 55,000.00 5,500.00 5,500.00 66,000.00
7 Batu kali m3 M_014 125,000.00 < 20 92,000.00 217,000.00 21,700.00 12,500.00 251,200.00
8 Kerkil sungai ayak tanpa pasir m3 M_015 60,000.00 < 20 92,000.00 152,000.00 15,200.00 6,000.00 173,200.00
9 Batu Belah 10 - 15 cm. m3 M_020 150,000.00 < 30 130,000.00 280,000.00 28,000.00 15,000.00 323,000.00
10 Batu pecah 7 - 10 cm. m3 M_021 250,000.00 < 30 130,000.00 380,000.00 38,000.00 25,000.00 443,000.00
11 Batu pecah 5 - 7 cm. m3 M_022 350,000.00 < 30 130,000.00 480,000.00 48,000.00 35,000.00 563,000.00
12 Batu pecah 3 - 5 cm. m3 M_023 400,000.00 < 30 130,000.00 530,000.00 53,000.00 40,000.00 623,000.00
13 Batu pecah 2 - 3 cm. m3 M_024 450,000.00 < 30 130,000.00 580,000.00 58,000.00 45,000.00 683,000.00
14 Batu pecah 1 - 2 cm. m3 M_025 500,000.00 < 30 130,000.00 630,000.00 63,000.00 50,000.00 743,000.00
15 Batu pecah 0,5 - 1 cm. m3 M_026 550,000.00 < 30 130,000.00 680,000.00 68,000.00 55,000.00 803,000.00
16 Pasir urug / timbun m3 M_040 60,000.00 < 20 54,000.00 114,000.00 11,400.00 6,000.00 131,400.00
17 Pasir ayak untuk beton m3 M_041 75,000.00 < 10 54,000.00 129,000.00 12,900.00 7,500.00 149,400.00
18 Sirtu Sungai ( Leveransir ) m3 M_042 75,000.00 < 10 54,000.00 129,000.00 12,900.00 7,500.00 149,400.00
19 Sirtu Sungai ( Royality ) m3 M_043 75,000.00 - - 75,000.00 7,500.00 7,500.00 90,000.00
20 Bahan timbunan pilihan (laterit) Leveransir m3 M_050 30,000.00 < 20 92,000.00 122,000.00 12,200.00 3,000.00 137,200.00
21 Bahan timbunan pilihan (laterit) Setempat m3 M_051 25,000.00 - - 25,000.00 2,500.00 2,500.00 30,000.00
22 Timbunan setempat ( tanah biasa) m3 M_052 7,000.00 - - 7,000.00 700.00 700.00 8,400.00
23 Aspal Bitument Kg. M_061 10,000.00 >100 600.00 10,600.00 1,060.00 - 11,660.00
24 Semen Portlant ( PC ) 50 Kg. M_080 95,000.00 < 10 2,000.00 97,000.00 9,700.00 - 106,700.00
25 Semen Portlant ( PC ) Kg M_080.a 1,900.00 < 10 40.00 1,940.00 194.00 - 2,134.00
26 Semen Warna (Oker) Kg M_080.b 15,000.00 100 40.00 15,040.00 1,504.00 - 16,544.00
27 Paving blok BH M_082 3,000.00 < 10 200.00 3,200.00 320.00 - 3,520.00
28 Bataco Ukuran 15 x 30 x 7 cm Buah M_239 2,500.00 < 10 200.00 2,700.00 270.00 - 2,970.00
29 Bataco Ukuran 20 x 40 x 7 cm Buah M_239.a 3,000.00 < 10 200.00 3,200.00 320.00 - 3,520.00
30 Bataco Ukuran 20 x 40 x 9 cm Buah M_239.b 3,250.00 < 10 200.00 3,450.00 345.00 - 3,795.00
31 Alat - alat bantu * Set M_171 120,000.00 < 10 5,000.00 125,000.00 12,500.00 - 137,500.00
32 Alat - alat bantu ** Set M_172 160,000.00 < 10 5,000.00 165,000.00 16,500.00 - 181,500.00
33 Alat - alat bantu pek. Latasir *** Set M_173 200,000.00 < 10 5,000.00 205,000.00 20,500.00 - 225,500.00
34 Gerobak + kuali aspal Set M_174 6,000,000.00 < 10 250,000.00 6,250,000.00 625,000.00 - 6,875,000.00
HARGA DI SUM- JARAK ONGKOS JUMLAH PAJAK JUMLAH HARGA
BER/QUARY ANGKUT ANGKUT HARGA PPn 10% GALIAN - C TERMASUK
NO MATERIAL UNIT KODE
(TANPA PAJAK) RATA-RATA PER UNIT TANPA PAJAK ( Rp ) ( 10 % ) PAJAK
( Rp ) ( Km ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
BAHAN MINYAK
35 Minyak tanah Ltr. M_065 7,000.00 >100 600.00 7,600.00 760.00 - 8,360.00
36 Minyak Diesel Ltr. M_183 5,500.00 >100 600.00 6,100.00 610.00 - 6,710.00
37 Premium / Bensin Ltr. M_184 5,500.00 >100 600.00 6,100.00 610.00 - 6,710.00
38 Minyak Pelumas Ltr. M_185 25,000.00 >100 600.00 25,600.00 2,560.00 - 28,160.00
39 Minyak Thinner Ltr M - 203 30,000.00 > 100 10.00 30,010.00 3,001.00 - 33,011.00
40 Minyak Bekesting / Cetakan Ltr M - 203.a 7,000.00 >100 300.00 7,300.00 730.00 - 8,030.00
BAHAN CAT
41 Cat Jembatan Kg M_090 120,000.00 10 10.00 120,010.00 12,001.00 - 132,011.00
42 Cat Dasar Kg. M_187 15,000.00 10 600.00 15,600.00 1,560.00 - 17,160.00
43 Teer Kg. M_188 15,000.00 10 600.00 15,600.00 1,560.00 - 17,160.00
44 Cat Kilap Kg. M_193 40,000.00 10 600.00 40,600.00 4,060.00 - 44,660.00
45 Cat Galvanis Kg M - 202 250,000.00 > 100 6,000.00 256,000.00 25,600.00 - 281,600.00
46 Dempul Kg M_230 15,000.00 10 50.00 15,050.00 1,505.00 - 16,555.00
47 Plamur Kg M_231 15,000.00 10 50.00 15,050.00 1,505.00 - 16,555.00
48 Amplas Lbr M_232 5,500.00 10 50.00 5,550.00 555.00 - 6,105.00
49 Cat Tembok Kualitas Biasa Kg M_233 10,000.00 10 100.00 10,100.00 1,010.00 - 11,110.00
50 Cat Tembok Kualitas Sedang Kg M_233.a 15,000.00 10 100.00 15,100.00 1,510.00 - 16,610.00
51 Cat Tembok Weather Shield Kg M_233.b 65,000.00 10 100.00 65,100.00 6,510.00 - 71,610.00
52 Cat Vernis Liter M_233.a 55,000.00 10 100.00 55,100.00 5,510.00 - 60,610.00
53 Cat Melamic Kg M_233.b 55,000.00 10 100.00 55,100.00 5,510.00 - 60,610.00
54 Cat Meni Kg M_233.c 25,000.00 10 100.00 25,100.00 2,510.00 - 27,610.00
55 Soda Api Kg M_234 21,000.00 10 100.00 21,100.00 2,110.00 - 23,210.00
56 Sabun Kg M_235 17,000.00 10 100.00 17,100.00 1,710.00 - 18,810.00
57 Kuas Cat Buah M_236 21,000.00 10 100.00 21,100.00 2,110.00 - 23,210.00
BAHAN BESI & BAJA
58 Baja Tralis Kg. M_161 20,000.00 10 6,000.00 26,000.00 2,600.00 - 28,600.00
59 Kawat Bronjong Galvanis uk. 2.0 x 1.0 x 0.5 dia. Unit M_162 640,000.00 >100 6,000.00 646,000.00 64,600.00 - 710,600.00
60 Kawat Bronjong Galvanis Kg. M_162. a 35,000.00 >100 600.00 35,600.00 3,560.00 - 39,160.00
61 Kawat las Kg. M_162 b 135,000.00 100 6,000.00 141,000.00 14,100.00 - 155,100.00
62 Paku Jembatan Kg. M_166 25,000.00 100 600.00 25,600.00 2,560.00 - 28,160.00
63 Baut Baja Kg. M_163 30,000.00 >100 6,000.00 36,000.00 3,600.00 - 39,600.00
64 Besi Galvanis sandaran jembatan btg M_164 620,000.00 100 6,000.00 626,000.00 62,600.00 - 688,600.00
65 Baja Konstruksi (rangka baja Jembatan) Kg. M_165 30,000.00 >100 6,000.00 36,000.00 3,600.00 - 39,600.00
66 Baja Beton U.24 Tulangan Polos dan Ulir Kg. M_167 15,100.00 100 600.00 15,700.00 1,570.00 - 17,270.00
67 Wire Mash M5 Kg. M_167. a 18,000.00 100 600.00 18,600.00 1,860.00 - 20,460.00
68 Wire Mash M6 Kg. M_167. b 18,500.00 100 600.00 19,100.00 1,910.00 - 21,010.00
69 Kawat Bindrat / Kawat Ikat Kg. M_170 32,500.00 100 600.00 33,100.00 3,310.00 - 36,410.00
70 Beugel tebal plat 5 mm Bh. M_186 25,000.00 10 600.00 25,600.00 2,560.00 - 28,160.00
71 Baut Panjang (15 - 30 cm) Btg. M_189 18,000.00 10 600.00 18,600.00 1,860.00 - 20,460.00
72 Paku Baut 15 cm Btg. M. 189.A 6,000.00 10 600.00 6,600.00 660.00 - 7,260.00
73 Baut Pendek (4 - 12 cm) Btg. M_190 4,200.00 10 600.00 4,800.00 480.00 - 5,280.00
74 Klem spore plank Btg. M_194 30,000.00 10 600.00 30,600.00 3,060.00 - 33,660.00
75 Pipa baja tiang pancang Kg. M_197 30,000.00 100 6,000.00 36,000.00 3,600.00 - 39,600.00
76 Sepatu besi untuk pancang kayu Bh M_198 250,000.00 6,000.00 256,000.00 25,600.00 - 281,600.00
77 Baja konstruksi WF berbagai Ukuran: Kg M - 199 30,000.00 > 100 6,000.00 36,000.00 3,600.00 - 39,600.00
78 Besi plat Uk berbagai Ukuran Kg M - 200 30,000.00 > 100 6,000.00 36,000.00 3,600.00 - 39,600.00
79 Baja Kanal ( C ) Berbagai ukuran Kg M - 201 30,000.00 > 100 6,000.00 36,000.00 3,600.00 - 39,600.00
80 Kawat Simpai Kg M_237 32,500.00 10 200.00 32,700.00 3,270.00 - 35,970.00
81 Kawat Duri Kg M_238 30,550.00 10 200.00 30,750.00 3,075.00 - 33,825.00
82 Paku Campuran Kg M_241 23,400.00 10 200.00 23,600.00 2,360.00 - 25,960.00
83 Paku Triplek Kg M_241.a 36,400.00 10 200.00 36,600.00 3,660.00 - 40,260.00
84 Paku Seng / Belian Kg M_241.b 32,500.00 10 200.00 32,700.00 3,270.00 - 35,970.00
85 Sekrup Kg M_242 10,400.00 10 200.00 10,600.00 1,060.00 - 11,660.00
86 Besi Strip Btg M_243 30,000.00 10 2,000.00 32,000.00 3,200.00 - 35,200.00
87 Kabel / Seling 1" m1 M_245 74,750.00 > 100 3,000.00 77,750.00 7,775.00 - 85,525.00
88 Kabel / Seling 1/2" m1 M_245.a 31,850.00 > 100 3,000.00 34,850.00 3,485.00 - 38,335.00
89 Kabel / Seling 1/4" m1 M_245.b 20,800.00 > 100 1,000.00 21,800.00 2,180.00 - 23,980.00
90 Kabel Baja Pengaku dia. 19 mm m1 M - 246 46,800.00 > 100 3,000.00 49,800.00 4,980.00 - 54,780.00
91 Seling BaJa Dia. 1,5 " m1 M - 247 112,125.00 > 100 3,000.00 115,125.00 11,512.50 - 126,637.50
92 Seling Baja Dia. 2,5 " m1 M - 247.a 187,000.00 > 100 3,000.00 190,000.00 19,000.00 - 209,000.00
93 Kantrol Set M - 248 636,000.00 > 100 20,000.00 656,000.00 65,600.00 - 721,600.00
94 Warfel 2" Buah M - 249 200,000.00 > 100 5,000.00 205,000.00 20,500.00 - 225,500.00
95 Warfel 1/2" Buah M - 249.a 19,500.00 > 100 5,000.00 24,500.00 2,450.00 - 26,950.00
96 Warfel 19 mm Buah M - 249.b 59,500.00 > 100 5,000.00 64,500.00 6,450.00 - 70,950.00
97 Cekak 1" Buah M - 250 19,500.00 > 100 2,000.00 21,500.00 2,150.00 - 23,650.00
98 Cekak 1/2" Buah M - 250.a 9,100.00 > 100 2,000.00 11,100.00 1,110.00 - 12,210.00
99 Cekak 1/4" Buah M - 250.b 7,800.00 > 100 750.00 8,550.00 855.00 - 9,405.00
100 Cekak seling 19 mm Buah M - 251 11,700.00 > 100 2,000.00 13,700.00 1,370.00 - 15,070.00
BAHAN KAYU
101 Kayu Bakar m3 M_070 75,000.00 10 155,000.00 230,000.00 23,000.00 - 253,000.00
102 Kayu bulat untuk turap panjang 2 m Btg M_175 5,000.00 10 500.00 5,500.00 550.00 - 6,050.00
103 Kayu Bulat Untuk Turap Panjang 4 - 4,5 m Btg M_176 10,000.00 10 1,100.00 11,100.00 1,110.00 - 12,210.00
104 Kayu untuk Perancah m3 M_180 750,000.00 10 155,000.00 905,000.00 90,500.00 - 995,500.00
105 Kayu Konstruksi Jembatan (belian) m3 M_181 6,950,000.00 > 100 428,500.00 7,378,500.00 737,850.00 - 8,116,350.00
HARGA DI SUM- JARAK ONGKOS JUMLAH PAJAK JUMLAH HARGA
BER/QUARY ANGKUT ANGKUT HARGA PPn 10% GALIAN - C TERMASUK
NO MATERIAL UNIT KODE
(TANPA PAJAK) RATA-RATA PER UNIT TANPA PAJAK ( Rp ) ( 10 % ) PAJAK
( Rp ) ( Km ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
106 Kayu Konstruksi Jembatan (Klas I) m3 M_191 2,000,000.00 > 100 428,500.00 2,428,500.00 242,850.00 - 2,671,350.00
107 Kayu Tembesu m3 M_195 3,000,000.00 > 100 428,500.00 3,428,500.00 342,850.00 - 3,771,350.00
108 Kayu Belian (Ketam) m3 M_181.a 6,500,000.00 > 100 428,500.00 6,928,500.00 692,850.00 - 7,621,350.00
109 Kayu Belian (Tidak Ketam) m3 M_181.b 5,950,000.00 > 100 428,500.00 6,378,500.00 637,850.00 - 7,016,350.00
110 Kayu Klas I (Ketam) m3 M_191.a 2,085,000.00 > 100 428,500.00 2,513,500.00 251,350.00 - 2,764,850.00
111 Kayu Klas I (Tidak Ketam) m3 M_191.b 2,000,000.00 > 100 428,500.00 2,428,500.00 242,850.00 - 2,671,350.00
112 Kayu Klas II (Ketam) m3 M_192 1,420,000.00 > 100 428,500.00 1,848,500.00 184,850.00 - 2,033,350.00
113 Kayu Klas II (Tidak Ketam) m3 M_192.a 1,200,000.00 > 100 428,500.00 1,628,500.00 162,850.00 - 1,791,350.00
114 Kayu Klas III (Ketam) m3 M_213 1,170,000.00 > 100 428,500.00 1,598,500.00 159,850.00 - 1,758,350.00
115 Kayu Klas III (Tidak Ketam) m3 M_213.a 960,000.00 > 100 428,500.00 1,388,500.00 138,850.00 - 1,527,350.00
116 Papan Kayu Belian (Ketam) m3 M_181.c 9,800,000.00 > 100 428,500.00 10,228,500.00 ### - 11,251,350.00
117 Papan Kayu Belian (Tidak Ketam) m3 M_181.d 9,200,000.00 > 100 428,500.00 9,628,500.00 962,850.00 - 10,591,350.00
118 Papan Kayu Klas I (Ketam) m3 M_191.c 4,000,000.00 > 100 428,500.00 4,428,500.00 442,850.00 - 4,871,350.00
119 Papan Kayu Klas I (Tidak Ketam) m3 M_191.d 3,500,000.00 > 100 428,500.00 3,928,500.00 392,850.00 - 4,321,350.00
120 Papan Kayu Klas II Ketam m3 M_192.b 2,350,000.00 10 76,000.00 2,426,000.00 242,600.00 - 2,668,600.00
121 Papan Kayu Klas II Tidak Ketam m3 M_192.c 1,900,000.00 10 76,000.00 1,976,000.00 197,600.00 - 2,173,600.00
122 Papan Kayu Klas III (Campuran) m3 M_213.b 700,000.00 10 76,000.00 776,000.00 77,600.00 - 853,600.00
123 Tiang Tongkat Kayu Belian Uk. 9/9 - 4,20 M Btg M_181.g 200,000.00 > 100 15,000.00 215,000.00 21,500.00 - 236,500.00
124 Tiang Tongkat Kayu Belian Uk. 9/9 - 3,60 M Btg M_181.h 165,000.00 > 100 13,000.00 178,000.00 17,800.00 - 195,800.00
125 Tiang Tongkat Kayu Belian Uk. 9/9 - 3,20 M Btg M_181.i 130,000.00 > 100 11,000.00 141,000.00 14,100.00 - 155,100.00
126 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,70 M Btg M_181.j 110,000.00 > 100 9,500.00 119,500.00 11,950.00 - 131,450.00
127 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,50 M Btg M_181.k 95,000.00 > 100 8,700.00 103,700.00 10,370.00 - 114,070.00
128 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,20 M Btg M_181.l 75,000.00 > 100 7,700.00 82,700.00 8,270.00 - 90,970.00
129 Tiang Tongkat Kayu Belian Uk. 9/9 - 2,10 M Btg M_181.m 70,000.00 > 100 7,400.00 77,400.00 7,740.00 - 85,140.00
130 Tiang Tongkat Kayu Belian Uk. 9/9 - 1,80 M Btg M_181.n 65,000.00 > 100 6,300.00 71,300.00 7,130.00 - 78,430.00
131 Tiang Tongkat Kayu Belian Uk. 9/9 - 1,50 M Btg M_181.o 60,000.00 > 100 5,300.00 65,300.00 6,530.00 - 71,830.00
132 Renglat Btg M_215 6,000.00 10 300.00 6,300.00 630.00 - 6,930.00
133 Laci Kayu Belian 5/10 - 80 cm Btg M_181.e 7,500.00 10 300.00 7,800.00 780.00 - 8,580.00
134 Laci Kayu Belian 9/9 - 80 cm Btg M_181.f 39,000.00 10 1,000.00 40,000.00 4,000.00 - 44,000.00
135 Alas Kayu Hutan Btg M_216 3,200.00 10 300.00 3,500.00 350.00 - 3,850.00
136 Konsul Kayu Klas I Buah M_217 85,000.00 10 10,000.00 95,000.00 9,500.00 - 104,500.00
137 Triplek 3 mm Lbr M_218 53,700.00 10 300.00 54,000.00 5,400.00 - 59,400.00
138 Triplek 3 mm m2 M_218.a 18,039.51 10 100.78 18,140.28 1,814.03 - 19,954.31
139 Triplek 9 mm Lbr M_218.b 187,500.00 10 3,000.00 190,500.00 19,050.00 - 209,550.00
140 Plywood 4' x 8' x 4 mm Lbr M_218.c 75,000.00 10 3,000.00 78,000.00 7,800.00 - 85,800.00
141 Lem Kayu ltr M_219 35,000.00 10 500.00 35,500.00 3,550.00 - 39,050.00
142 List Kayu Profil m' M_220 6,000.00 10 500.00 6,500.00 650.00 - 7,150.00
143 Kayu Profil List Plafond m' M_221 6,500.00 10 500.00 7,000.00 700.00 - 7,700.00
144 Gypsum Board Lbr M_222 65,500.00 10 3,000.00 68,500.00 6,850.00 - 75,350.00
145 GRC Board Lbr M_223 68,000.00 10 2,500.00 70,500.00 7,050.00 - 77,550.00
BAHAN SANITASI
146 Talang Gantung & Talang Tegak m1 M_229 20,000.00 10 500.00 20,500.00 2,050.00 - 22,550.00
147 Pipa Suling Dia. 3/4" Buah M - 253 15,000.00 10 100.00 15,100.00 1,510.00 - 16,610.00
148 Pipa Galvanis Dia. 2" m' M - 253.a 155,000.00 > 100 1,500.00 156,500.00 15,650.00 - 172,150.00
149 Kloset Duduk Buah M - 254 1,250,000.00 > 100 30,000.00 1,280,000.00 128,000.00 - 1,408,000.00
150 Kloset Jongkok Buah M - 254.a 200,000.00 10 15,000.00 215,000.00 21,500.00 - 236,500.00
151 Urinoir Buah M - 255 552,900.00 > 100 25,000.00 577,900.00 57,790.00 - 635,690.00
152 Wastafel Buah M - 256 520,000.00 > 100 20,000.00 540,000.00 54,000.00 - 594,000.00
153 Seal Tape Gypsum Buah M - 257 45,000.00 10 100.00 45,100.00 4,510.00 - 49,610.00
154 Floor Drain Buah M - 258 52,000.00 10 300.00 52,300.00 5,230.00 - 57,530.00
155 Kran Air Kualitas Biasa Buah M - 259 10,000.00 10 300.00 10,300.00 1,030.00 - 11,330.00
156 Kran Air Kualitas Baik Buah M - 259. a 50,000.00 10 300.00 50,300.00 5,030.00 - 55,330.00
157 Seal Tape Kran Buah M - 260 8,900.00 10 100.00 9,000.00 900.00 - 9,900.00
158 Bak Air Fiber Glass 0,75 M3 Buah M - 261 1,500,000.00 > 100 50,000.00 1,550,000.00 155,000.00 - 1,705,000.00
159 Bak Air Fiber Glass 1 M3 Buah M - 261.a 1,700,000.00 > 100 50,000.00 1,750,000.00 175,000.00 - 1,925,000.00
160 Bak Air Fiber Glass 2 M3 Unit M - 261.b 3,000,000.00 > 100 100,000.00 3,100,000.00 310,000.00 - 3,410,000.00
161 Bak Air Fiber Glass 1,5 M3 Buah M - 261.c 2,500,000.00 > 100 75,000.00 2,575,000.00 257,500.00 - 2,832,500.00
BAHAN ATAP
162 Seng Gelombang BJLS 0,20 Lbr M_224 41,000.00 10 500.00 41,500.00 4,150.00 - 45,650.00
163 Seng Gelombang BJLS 0,20 m2 M_224.a 32,031.25 10 500.00 32,531.25 3,253.13 - 35,784.38
164 Seng Gelombang BJLS 0,30 Lbr M_224.b 65,000.00 10 500.00 65,500.00 6,550.00 - 72,050.00
165 Seng Gelombang BJLS 0,30 m2 M_224.c 50,781.25 10 500.00 51,281.25 5,128.13 - 56,409.38
166 Genteng Metal Type PRIMA 0,35 Lbr M_225 75,000.00 10 500.00 75,500.00 7,550.00 - 83,050.00
167 Genteng Metal Type ROYAL 0,35 Lbr M_225.a 75,000.00 10 500.00 75,500.00 7,550.00 - 83,050.00
168 Genteng Metal Type CLASSIC 0,35 Lbr M_225.b 75,000.00 10 500.00 75,500.00 7,550.00 - 83,050.00
169 Zincalume 0,3 Polos m2 M_225.d 85,000.00 10 500.00 85,500.00 8,550.00 - 94,050.00
170 Zincalume 0,3 Color m2 M_225.e 95,000.00 10 500.00 95,500.00 9,550.00 - 105,050.00
171 Seng Datar Colour 0,35 Lbr M_227 69,650.00 10 500.00 70,150.00 7,015.00 - 77,165.00
172 Seng Datar Polos 0,30 Lbr M_227.a 45,000.00 10 500.00 45,500.00 4,550.00 - 50,050.00
173 Nok / Bubungan Genteng Metal 1/2 Lingkaran 0,35 Buah M_228 48,000.00 10 500.00 48,500.00 4,850.00 - 53,350.00
HARGA DI SUM- JARAK ONGKOS JUMLAH PAJAK JUMLAH HARGA
BER/QUARY ANGKUT ANGKUT HARGA PPn 10% GALIAN - C TERMASUK
NO MATERIAL UNIT KODE
(TANPA PAJAK) RATA-RATA PER UNIT TANPA PAJAK ( Rp ) ( 10 % ) PAJAK
( Rp ) ( Km ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
BAHAN KERAMIK
174 Keramik 20 x 20 cm Polos Buah M_240 2,600.00 10 100.00 2,700.00 270.00 - 2,970.00
175 Keramik 20 x 25 cm Polos Buah M_240.a 3,250.00 10 100.00 3,350.00 335.00 - 3,685.00
176 Keramik 30 x 30 cm Polos Buah M_240.b 5,400.00 10 100.00 5,500.00 550.00 - 6,050.00
177 Keramik 30 x 30 cm Artistik Buah M_240.c 6,300.00 10 100.00 6,400.00 640.00 - 7,040.00
178 Keramik 30 x 30 cm Unpolished Buah M_240.d 6,300.00 10 100.00 6,400.00 640.00 - 7,040.00
179 Keramik 40 x 40 cm Polos Buah M_240.e 12,000.00 10 100.00 12,100.00 1,210.00 - 13,310.00
180 Keramik 40 x 40 cm Anti Gores Buah M_240.f 40,000.00 10 100.00 40,100.00 4,010.00 - 44,110.00
181 Keramik 40 x 40 cm Unpolished Buah M_240.g 12,000.00 10 100.00 12,100.00 1,210.00 - 13,310.00
BAHAN KACA
182 Kaca Polos Tebal 5 mm m2 M_244 160,000.00 10 3,000.00 163,000.00 16,300.00 - 179,300.00
183 Kaca Polos Tebal 3 mm m2 M_244.a 130,000.00 10 3,000.00 133,000.00 13,300.00 - 146,300.00
184 Kaca Rayben Tebal 5 mm m2 M_244.b 170,000.00 10 3,000.00 173,000.00 17,300.00 - 190,300.00
BAHAN LISTRIK
185 Saklar Ganda Kualitas Biasa Buah M - 262 15,000.00 10 50.00 15,050.00 1,505.00 - 16,555.00
186 Saklar Ganda Kualitas Baik Buah M - 262.a 25,000.00 10 50.00 25,050.00 2,505.00 - 27,555.00
187 Saklar Tunggal Kualitas Biasa Buah M - 262.b 10,000.00 10 50.00 10,050.00 1,005.00 - 11,055.00
188 Saklar Tunggal Kualitas Baik Set M - 262.c 20,000.00 10 50.00 20,050.00 2,005.00 - 22,055.00
189 Stop Kontak Kualitas Biasa Set M - 263 11,264.00 10 50.00 11,314.00 1,131.40 - 12,445.40
190 Stop Kontak Kualitas Baik Set M - 263.a 20,000.00 10 50.00 20,050.00 2,005.00 - 22,055.00
191 Sekring Box / MCB Set M - 264 120,000.00 10 100.00 120,100.00 12,010.00 - 132,110.00
192 Lampu Pijar 40 Watt Set M - 265.a 4,500.00 10 50.00 4,550.00 455.00 - 5,005.00
193 Lampu XL 20 Watt Set M - 265.b 65,000.00 10 50.00 65,050.00 6,505.00 - 71,555.00
194 Lampu TL 20 Watt Set M - 266.c 65,000.00 10 50.00 65,050.00 6,505.00 - 71,555.00
195 Kabel NYY 4 x 95 mm2 m' - 537,677.27 10 50.00 537,727.27 53,772.73 - 591,500.00
196 Kabel NYY 4 x 16 mm2 m' - 116,950.00 10 50.00 117,000.00 11,700.00 - 128,700.00
197 Kabel NYY 4 x 10 mm2 m' - 107,495.45 10 50.00 107,545.45 10,754.55 - 118,300.00
198 Kabel NYM 3 x 4 mm2 m' - 33,040.91 10 50.00 33,090.91 3,309.09 - 36,400.00
199 Kabel NYM 4 x 2,5 mm2 m' - 18,150.00 10 50.00 18,200.00 1,820.00 - 20,020.00
200 Kabel NYM 3 x 2,5 mm2 m' - 14,722.73 10 50.00 14,772.73 1,477.27 - 16,250.00
201 Kabel NYM 2 x 2,5 mm2 m' - 12,359.09 10 50.00 12,409.09 1,240.91 - 13,650.00
202 Instalasi Titik Lampu Titik - 225,000.00 10 500.00 225,500.00 22,550.00 - 248,050.00
BAHAN PENGUNCI & PENGGANTUNG
203 Engsel Pintu Buah M - 267 20,000.00 10 50.00 20,050.00 2,005.00 - 22,055.00
204 Engsel Jendela Buah M - 267.a 15,000.00 10 50.00 15,050.00 1,505.00 - 16,555.00
205 Handle Pintu Buah M - 268 75,000.00 10 50.00 75,050.00 7,505.00 - 82,555.00
206 Handle Jendela Buah M - 268.a 10,000.00 10 50.00 10,050.00 1,005.00 - 11,055.00
207 Slot Pintu Buah M - 269 6,000.00 10 50.00 6,050.00 605.00 - 6,655.00
208 Slot Jendela Buah M - 269.a 10,000.00 10 50.00 10,050.00 1,005.00 - 11,055.00
209 Kait Angin Buah M - 270 3,000.00 10 50.00 3,050.00 305.00 - 3,355.00
210 Kunci 2 Slaag Buah M - 271 150,000.00 10 500.00 150,500.00 15,050.00 - 165,550.00
211 Kunci Pintu Tanam Buah M - 271.a 150,000.00 10 500.00 150,500.00 15,050.00 - 165,550.00
212 Pintu Folding Gate + Pemasangan m2 M - 272 350,000.00 > 100 240,000.00 590,000.00 59,000.00 - 649,000.00
213 Door Closer Buah M - 273 200,000.00 10 500.00 200,500.00 20,050.00 - 220,550.00
BAHAN PERPIPAAN
214 Pipa Ø 1/2" PVC m' - 15,015.00 > 100 8,100.00 23,115.00 2,311.50 - 25,426.50
215 Pipa Ø 3/4" PVC m' - 23,920.00 > 100 8,100.00 32,020.00 3,202.00 - 35,222.00
216 Pipa Ø 1,5" PVC m' - 27,950.00 > 100 8,100.00 36,050.00 3,605.00 - 39,655.00
217 Pipa Ø 50 mm PVC m' - 25,400.00 > 100 8,250.00 33,650.00 3,365.00 - 37,015.00
218 Pipa Ø 2,5" PVC m' - 39,000.00 > 100 8,100.00 47,100.00 4,710.00 - 51,810.00
219 Pipa Ø 75 mm PVC m' - 47,200.00 > 100 12,750.00 59,950.00 5,995.00 - 65,945.00
220 Pipa Ø 100 mm PVC m' - 69,400.00 > 100 21,500.00 90,900.00 9,090.00 - 99,990.00
221 Pipa Ø 150 mm PVC m' - 128,200.00 > 100 38,500.00 166,700.00 16,670.00 - 183,370.00
222 Pipa Ø 50 mm GIP m' - 73,800.00 > 100 10,250.00 84,050.00 8,405.00 - 92,455.00
223 Pipa Ø 75 mm GIP m' - 135,500.00 > 100 21,250.00 156,750.00 15,675.00 - 172,425.00
224 Pipa Ø 100 mm GIP m' - 201,700.00 > 100 33,500.00 235,200.00 23,520.00 - 258,720.00
225 Pipa Ø 150 mm GIP m' - 290,400.00 > 100 63,500.00 353,900.00 35,390.00 - 389,290.00
226 Pipa Lateral Ø 100 mm GIP Unit - 1,349,200.00 > 100 33,500.00 1,382,700.00 138,270.00 - 1,520,970.00
227 Pipa Lateral Ø 150 mm GIP Unit - 1,452,000.00 > 100 63,500.00 1,515,500.00 151,550.00 - 1,667,050.00
228 Elbow 450 Ø 50 mm PVC Buah - 218,400.00 > 100 1,000.00 219,400.00 21,940.00 - 241,340.00
229 Elbow 450 Ø 75 mm PVC Buah - 302,500.00 > 100 1,000.00 303,500.00 30,350.00 - 333,850.00
230 Elbow 450 Ø 100 mm PVC Buah - 374,000.00 > 100 1,000.00 375,000.00 37,500.00 - 412,500.00
231 Elbow 450 Ø 150 mm PVC Buah - 478,500.00 > 100 1,000.00 479,500.00 47,950.00 - 527,450.00
232 Elbow 450 Ø 50 mm GIP Buah - 398,200.00 > 100 1,000.00 399,200.00 39,920.00 - 439,120.00
233 Elbow 45 Ø 75 mm GIP
0
Buah - 456,500.00 > 100 1,000.00 457,500.00 45,750.00 - 503,250.00
234 Elbow 450 Ø 100 mm GIP Buah - 550,000.00 > 100 1,000.00 551,000.00 55,100.00 - 606,100.00
235 Elbow 450 Ø 150 mm GIP Buah - 600,000.00 > 100 1,000.00 601,000.00 60,100.00 - 661,100.00
236 Elbow 900 Ø 50 mm PVC Buah - 234,000.00 > 100 1,000.00 235,000.00 23,500.00 - 258,500.00
237 Elbow 900 Ø 75 mm PVC Buah - 312,000.00 > 100 1,000.00 313,000.00 31,300.00 - 344,300.00
238 Elbow 900 Ø 100 mm PVC Buah - 400,000.00 > 100 1,000.00 401,000.00 40,100.00 - 441,100.00
239 Elbow 900 Ø 150 mm PVC Buah - 525,000.00 > 100 1,000.00 526,000.00 52,600.00 - 578,600.00
240 Elbow 900 Ø 50 mm GIP Buah - 437,000.00 > 100 1,000.00 438,000.00 43,800.00 - 481,800.00
241 Elbow 900 Ø 75 mm GIP Buah - 500,000.00 > 100 1,000.00 501,000.00 50,100.00 - 551,100.00
242 Elbow 900 Ø 100 mm GIP Buah - 640,000.00 > 100 1,000.00 641,000.00 64,100.00 - 705,100.00
243 Elbow 900 Ø 150 mm GIP Buah - 700,000.00 > 100 1,000.00 701,000.00 70,100.00 - 771,100.00
244 Female Thread Tee Ø 50 x 50 PVC Buah - 385,000.00 > 100 1,000.00 386,000.00 38,600.00 - 424,600.00
245 Female Thread Tee Ø 75 x 50 PVC Buah - 465,000.00 > 100 1,000.00 466,000.00 46,600.00 - 512,600.00
246 Female Thread Tee Ø 75 x 75 PVC Buah - 530,000.00 > 100 1,000.00 531,000.00 53,100.00 - 584,100.00
247 Female Thread Tee Ø 100 x 75 PVC Buah - 545,000.00 > 100 1,000.00 546,000.00 54,600.00 - 600,600.00
248 Female Thread Tee Ø 100 x 100 PVC Buah - 655,000.00 > 100 1,000.00 656,000.00 65,600.00 - 721,600.00
249 Female Thread Tee Ø 150 x 150 PVC Buah - 1,100,000.00 > 100 1,000.00 1,101,000.00 110,100.00 - 1,211,100.00
250 Female Thread Tee Ø 75 x 75 GIP Buah - 600,000.00 > 100 1,000.00 601,000.00 60,100.00 - 661,100.00
251 Female Thread Tee Ø 100 x 100 GIP Buah - 675,000.00 > 100 1,000.00 676,000.00 67,600.00 - 743,600.00
HARGA DI SUM- JARAK ONGKOS JUMLAH PAJAK JUMLAH HARGA
BER/QUARY ANGKUT ANGKUT HARGA PPn 10% GALIAN - C TERMASUK
NO MATERIAL UNIT KODE
(TANPA PAJAK) RATA-RATA PER UNIT TANPA PAJAK ( Rp ) ( 10 % ) PAJAK
( Rp ) ( Km ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
252 Female Thread Tee Ø 150 x 150 GIP Buah - 1,050,000.00 > 100 1,000.00 1,051,000.00 105,100.00 - 1,156,100.00
253 Dop / Cap Ø 50 PVC Buah - 33,500.00 > 100 1,000.00 34,500.00 3,450.00 - 37,950.00
254 Dop / Cap Ø 75 PVC Buah - 53,500.00 > 100 1,000.00 54,500.00 5,450.00 - 59,950.00
255 Flange Spigot Ø 50 PVC Buah - 279,500.00 > 100 1,000.00 280,500.00 28,050.00 - 308,550.00
256 Flange Spigot Ø 75 PVC Buah - 375,000.00 > 100 1,000.00 376,000.00 37,600.00 - 413,600.00
257 Flange Spigot Ø 100 PVC Buah - 480,000.00 > 100 1,000.00 481,000.00 48,100.00 - 529,100.00
258 Flange Spigot Ø 150 PVC Buah - 665,000.00 > 100 1,000.00 666,000.00 66,600.00 - 732,600.00
259 Flange Socket Ø 50 PVC Buah - 290,000.00 > 100 1,000.00 291,000.00 29,100.00 - 320,100.00
260 Flange Socket Ø 75 PVC Buah - 365,000.00 > 100 1,000.00 366,000.00 36,600.00 - 402,600.00
261 Flange Socket Ø 100 PVC Buah - 420,000.00 > 100 1,000.00 421,000.00 42,100.00 - 463,100.00
262 Flange Socket Ø 150 PVC Buah - 665,000.00 > 100 1,000.00 666,000.00 66,600.00 - 732,600.00
263 Gate Valve Ø 50 GIP Buah - 765,000.00 > 100 1,500.00 766,500.00 76,650.00 - 843,150.00
264 Gate Valve Ø 75 GIP Buah - 865,000.00 > 100 1,500.00 866,500.00 86,650.00 - 953,150.00
265 Gate Valve Ø 100 GIP Buah - 1,065,000.00 > 100 1,500.00 1,066,500.00 106,650.00 - 1,173,150.00
266 Gate Valve Ø 150 GIP Buah - 1,950,000.00 > 100 1,500.00 1,951,500.00 195,150.00 - 2,146,650.00
267 Air Valve Ø 50 CI / MJ Buah - 880,000.00 > 100 1,000.00 881,000.00 88,100.00 - 969,100.00
268 Air Valve Ø 75 CI / MJ Buah - 1,065,000.00 > 100 1,000.00 1,066,000.00 106,600.00 - 1,172,600.00
269 Air Valve Ø 100 CI / MJ Buah - 1,330,000.00 > 100 1,000.00 1,331,000.00 133,100.00 - 1,464,100.00
270 Reducer Ø 100 x 75 mm Buah - 360,000.00 > 100 1,500.00 361,500.00 36,150.00 - 397,650.00
271 Reducer Ø 75 x 50 mm Buah - 335,000.00 > 100 1,500.00 336,500.00 33,650.00 - 370,150.00
272 Reducer Ø 150 x 100 mm Buah - 665,000.00 > 100 1,500.00 666,500.00 66,650.00 - 733,150.00
273 Flange Las PN. 10 Ø 150 Buah - 165,000.00 > 100 1,000.00 166,000.00 16,600.00 - 182,600.00
274 Flange Las PN. 10 Ø 100 Buah - 112,000.00 > 100 1,000.00 113,000.00 11,300.00 - 124,300.00
275 Flange Las PN. 10 Ø 75 Buah - 90,000.00 > 100 1,000.00 91,000.00 9,100.00 - 100,100.00
BAHAN LAINNYA
276 Air Liter - 250.00 - - 250.00 25.00 - 275.00
DAFTAR HARGA SATUAN
UPAH DAN BAHAN MEKANIKAL DAN ELEKTRIKAL
HARGA BAHAN
NO URAIAN BAHAN / MATERIAL SATUAN KODE KET
( Rp. )
1 2 3 4 5 6
1 Generator Set 200 kVA Open PRIME Type Unit
16 Lampu Down Light RD 175 Ø 6" SL 18 watt ex. Artolite Buah 223,600.00
49 Mixer power amplifier 240 watt, lengkap surge arrester Unit 16,250,000.00
52 Power supply unit lengkap charger, rectifier dan arrester Unit 7,345,000.00
BIAYA
URAIAN ANALISA KODE SATU
NO
HARGA SATUAN PEKERJAAN ANALISA AN
(Rp.)
1 2 3 4
1 1 M' Pembuatan Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter PP. 01 244,907.30
2 1 M' Pengukuran dan Pemasangan Bowplank PP. 02 34,351.90
3 1 M2 Pembersihan Lapangan dan Perataan Lokasi PP. 03 10,725.00
4 1 M2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Kerja PP. 04 724,051.46
5 1 M2 Pembuatan Jalan Sementara PP. 05 165,609.00
6 1 M3 Bongkaran Beton Bertulang PP. 06 434,489.00
7 1 M3 Bongkaran Dinding Tembok PP. 07 406,439.00
8 1 M' Melancip Tiang / Batang E.1 29,342.50
9 Membuat Puting dan Lobang / Pasang E.4 41,910.00
10 1 M' Memancang Tiang Ke Dalam Tanah E.13 58,286.25
65 Membuat 1 M3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87 PB. 01 1,317,114.71
66 Membuat 1 M3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87 PB. 01.a 939,862.71
67 Membuat 1 M3 Beton Mutu f'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, w/c = 0,78 PB. 02 1,381,202.47
68 Membuat 1 M3 Beton Mutu f'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, w/c = 0,78 PB. 02.a 999,041.28
69 Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150), Slump (12 ± 2) cm, w/c = 0,72 PB. 03 1,429,719.38
70 Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150), Slump (12 ± 2) cm, w/c = 0,72 PB. 03.a 1,045,670.05
71 Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), Slump (3 - 6) cm, w/c = PB. 04 1,257,171.78
72 Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), Slump (3 - 6) cm, w/c = PB. 04.a 869,346.15
73 Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66 PB. 05 1,489,246.63
74 Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66 PB. 05.a 1,100,665.75
75 Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c = 0,61 PB. 06 1,542,647.77
76 Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c = 0,61 PB. 06.a 1,153,311.62
77 Membuat 1 M3 Beton Mutu f'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58 PB. 07 1,587,767.02
78 Membuat 1 M3 Beton Mutu f'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58 PB. 07.a 1,192,388.79
79 Membuat 1 M3 Beton Mutu f'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0,56 PB. 08 1,610,821.32
80 Membuat 1 M3 Beton Mutu f'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0,56 PB. 08.a 1,218,464.14
81 Membuat 1 M3 Beton Mutu f'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, w/c = 0,53 PB. 09 1,650,338.57
82 Membuat 1 M3 Beton Mutu f'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, w/c = 0,53 PB. 09.a 1,262,890.57
83 Membuat 1 M3 Beton Mutu f'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, w/c = 0,52 PB. 10 1,662,426.80
84 Membuat 1 M3 Beton Mutu f'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, w/c = 0,52 PB. 10.a 1,276,866.95
85 Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K 325), Slump (12 ± 2) cm, w/c = 0,49 PB. 11 1,365,338.15
86 Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K 325), Slump (12 ± 2) cm, w/c = 0,49 PB. 11.a 1,365,338.15
87 Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c = 0,48 PB. 12 1,761,083.85
88 Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c = 0,48 PB. 12.a 1,383,454.22
89 Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir PB. 17 19,779.65
90 Pembesian 1 Kg Dengan Besi Wiremesh PB. 19 21,638.10
91 Memasang 1 M2 Bekisting Untuk Pondasi PB. 20 100,364.00
92 Memasang 1 M2 Bekisting Untuk Sloof PB. 21 104,632.00
BIAYA
URAIAN ANALISA KODE SATU
NO
HARGA SATUAN PEKERJAAN ANALISA AN
(Rp.)
1 2 3 4
93 Memasang 1 M2 Bekisting Untuk Kolom PB. 22 170,568.75
94 Memasang 1 M2 Bekisting Untuk Balok PB. 23 175,942.80
95 Memasang 1 M2 Bekisting Untuk Lantai PB. 24 170,568.75
96 Memasang 1 M2 Bekisting Untuk Dinding PB. 25 207,399.50
97 Memasang 1 M2 Bekisting Untuk Tangga PB. 26 161,631.25
98 Memasang 1 M2 Jembatan Untuk Pengecoran Beton PB. 27 58,262.60
119 Memasang 1 M2 Langit Langit Triplek Uk. 120 x 240 cm, Tebal 3 mm PLGT.05 39,130.30
120 Memasang 1 M1 List Langit Langit Kayu Profil PLGT.09 16,215.10
1 M' Pembuatan Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter PP. 01
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.4000 60,500.00 24,200.00
Tukang OH 0.2000 82,500.00 16,500.00
TENAGA KERJA
Kepala Tukang OH 0.0200 88,000.00 1,760.00
Mandor Lapangan OH 0.0200 93,500.00 1,870.00
Kayu Pancang (Dolken) Dia. 10 cm - 4 M Btg 1.2500 12,210.00 15,262.50
Seng Gelombang BJLS 0,20 Lbr 1.2000 45,650.00 54,780.00
BAHAN / MATERIAL
Kayu Klas II M3 0.0720 1,791,350.00 128,977.20
Paku Campuran Kg 0.0600 25,960.00 1,557.60
JUMLAH HARGA PER SATUAN PEKERJAAN 244,907.30
Acuan : RSNI. T-15-2002
1 M2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Kerja PP. 04
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.0000 60,500.00 60,500.00
Tukang OH 2.0000 82,500.00 165,000.00
TENAGA KERJA
Kepala Tukang OH 0.2000 88,000.00 17,600.00
Mandor Lapangan OH 0.0500 93,500.00 4,675.00
Kayu Pancang (Dolken) Dia. 10 cm - 4 M Btg 1.7000 12,210.00 20,757.00
Kayu Klas II M3 0.2100 1,791,350.00 376,183.50
BAHAN / MATERIAL Papan Kayu Klas III M3 0.0036 853,600.00 3,072.96
Seng Gelombang BJLS 0,20 Lbr 1.5000 45,650.00 68,475.00
Paku Campuran Kg 0.3000 25,960.00 7,788.00
JUMLAH HARGA PER SATUAN PEKERJAAN 724,051.46
Acuan : RSNI. T-15-2002
1 M2 Pembuatan Jalan Sementara PP. 05
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.0000 60,500.00 60,500.00
TENAGA KERJA
Mandor Lapangan OH 0.0500 93,500.00 4,675.00
Batu Pecah 15 - 20 cm M3 0.1500 323,000.00 48,450.00
BAHAN / MATERIAL Batu Pecah 5 -7 cm M3 0.0900 563,000.00 50,670.00
Pasir Urug M3 0.0100 131,400.00 1,314.00
JUMLAH HARGA PER SATUAN PEKERJAAN 165,609.00
Acuan : RSNI. T-15-2002
Memasang 1 M3 Pondasi Siklop, 60% Beton Campuran 1 PC : 2 PB : 3 KR & 40% Batu Pecah PPOND. 10
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 3.4000 60,500.00 205,700.00
Tukang Batu OH 0.8500 82,500.00 70,125.00
TENAGA KERJA
Kepala Tukang OH 0.0850 88,000.00 7,480.00
Mandor Lapangan OH 0.1700 93,500.00 15,895.00
Batu Pecah 15 / 20 CM M3 0.4800 323,000.00 155,040.00
Portland Cement (PC) Kg 194.0000 2,134.00 413,996.00
Pasir Ayak Untuk Beton M3 0.3120 149,400.00 46,612.80
BAHAN / MATERIAL
Kerikil Sungai (Leveransir) M3 0.4680 173,200.00 81,057.60
Besi Beton Kg 126.0000 17,270.00 2,176,020.00
Kawat Beton Kg 1.8000 36,410.00 65,538.00
JUMLAH HARGA PER SATUAN PEKERJAAN 3,237,464.40
Acuan : SNI DT 91 - 0007 - 2007
Membuat 1 M3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87 PB. 01
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 247.0000 2,134.00 527,098.00
Pasir Ayak Untuk Beton M3 0.6207 149,400.00 92,734.71
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7400 683,000.00 505,420.00
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,317,114.71
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87 PB. 01.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 247.0000 2,134.00 527,098.00
Pasir Ayak Untuk Beton M3 0.6207 149,400.00 92,734.71
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7400 173,200.00 128,168.00
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 939,862.71
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, w/c = 0,78 PB. 02
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 276.0000 2,134.00 588,984.00
Pasir Ayak Untuk Beton M3 0.5914 149,400.00 88,359.43
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7496 683,000.00 511,997.04
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,381,202.47
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, w/c = 0,78 PB. 02.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 276.0000 2,134.00 588,984.00
Pasir Ayak Untuk Beton M3 0.5914 149,400.00 88,359.43
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7496 173,200.00 129,835.85
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 999,041.28
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150), Slump (12 ± 2) cm, w/c = 0,72 PB. 03
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 299.0000 2,134.00 638,066.00
Pasir Ayak Untuk Beton M3 0.5707 149,400.00 85,264.71
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7533 683,000.00 514,526.67
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,429,719.38
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150), Slump (12 ± 2) cm, w/c = 0,72 PB. 03.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 299.0000 2,134.00 638,066.00
Pasir Ayak Untuk Beton M3 0.5707 149,400.00 85,264.71
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7533 173,200.00 130,477.33
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,045,670.05
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), Slump (3 - 6) cm, w/c = 0,87 PB. 04
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.2000 60,500.00 72,600.00
Tukang OH 0.2000 82,500.00 16,500.00
TENAGA KERJA
Kepala Tukang OH 0.0200 88,000.00 1,760.00
Mandor Lapangan OH 0.0600 93,500.00 5,610.00
Portland Cement (PC) Kg 230.0000 2,134.00 490,820.00
Pasir Ayak Untuk Beton M3 0.6379 149,400.00 95,295.86
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7607 683,000.00 519,585.93
Air Liter 200.0000 275.00 55,000.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,257,171.78
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), Slump (3 - 6) cm, w/c = 0,87 PB. 04.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.2000 60,500.00 72,600.00
Tukang OH 0.2000 82,500.00 16,500.00
TENAGA KERJA
Kepala Tukang OH 0.0200 88,000.00 1,760.00
Mandor Lapangan OH 0.0600 93,500.00 5,610.00
Portland Cement (PC) Kg 230.0000 2,134.00 490,820.00
Pasir Ayak Untuk Beton M3 0.6379 149,400.00 95,295.86
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7607 173,200.00 131,760.30
Air Liter 200.0000 275.00 55,000.00
JUMLAH HARGA PER SATUAN PEKERJAAN 869,346.15
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66 PB. 05
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 326.0000 2,134.00 695,684.00
Pasir Ayak Untuk Beton M3 0.5429 149,400.00 81,102.86
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7622 683,000.00 520,597.78
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,489,246.63
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66 PB. 05.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 326.0000 2,134.00 695,684.00
Pasir Ayak Untuk Beton M3 0.5429 149,400.00 81,102.86
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7622 173,200.00 132,016.89
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,100,665.75
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c = 0,61 PB. 06
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 352.0000 2,134.00 751,168.00
Pasir Ayak Untuk Beton M3 0.5221 149,400.00 78,008.14
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7637 683,000.00 521,609.63
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,542,647.77
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c = 0,61 PB. 06.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 352.0000 2,134.00 751,168.00
Pasir Ayak Untuk Beton M3 0.5221 149,400.00 78,008.14
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7637 173,200.00 132,273.48
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,153,311.62
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58 PB. 07
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 371.0000 2,134.00 791,714.00
Pasir Ayak Untuk Beton M3 0.4986 149,400.00 74,486.57
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7756 683,000.00 529,704.44
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,587,767.02
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58 PB. 07.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 371.0000 2,134.00 791,714.00
Pasir Ayak Untuk Beton M3 0.4986 149,400.00 74,486.57
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7756 173,200.00 134,326.22
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,192,388.79
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0,56 PB. 08
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 384.0000 2,134.00 819,456.00
Pasir Ayak Untuk Beton M3 0.4943 149,400.00 73,846.29
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7696 683,000.00 525,657.04
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,610,821.32
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0,56 PB. 08.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 384.0000 2,134.00 819,456.00
Pasir Ayak Untuk Beton M3 0.4943 149,400.00 73,846.29
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7696 173,200.00 133,299.85
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,218,464.14
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, w/c = 0,53 PB. 09
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 406.0000 2,134.00 866,404.00
Pasir Ayak Untuk Beton M3 0.4886 149,400.00 72,992.57
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7600 683,000.00 519,080.00
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,650,338.57
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, w/c = 0,53 PB. 09.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 406.0000 2,134.00 866,404.00
Pasir Ayak Untuk Beton M3 0.4886 149,400.00 72,992.57
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7600 173,200.00 131,632.00
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,262,890.57
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, w/c = 0,52 PB. 10
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 413.0000 2,134.00 881,342.00
Pasir Ayak Untuk Beton M3 0.4864 149,400.00 72,672.43
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7563 683,000.00 516,550.37
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,662,426.80
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, w/c = 0,52 PB. 10.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.6500 60,500.00 99,825.00
Tukang OH 0.2750 82,500.00 22,687.50
TENAGA KERJA
Kepala Tukang OH 0.0280 88,000.00 2,464.00
Mandor Lapangan OH 0.0830 93,500.00 7,760.50
Portland Cement (PC) Kg 413.0000 2,134.00 881,342.00
Pasir Ayak Untuk Beton M3 0.4864 149,400.00 72,672.43
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7563 173,200.00 130,990.52
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,276,866.95
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K 325), Slump (12 ± 2) cm, w/c = 0,49 PB. 11
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 2.1000 60,500.00 127,050.00
Tukang OH 0.3500 82,500.00 28,875.00
TENAGA KERJA
Kepala Tukang OH 0.0350 88,000.00 3,080.00
Mandor Lapangan OH 0.1050 93,500.00 9,817.50
Portland Cement (PC) Kg 439.0000 2,134.00 936,826.00
Pasir Ayak Untuk Beton M3 0.4786 149,400.00 71,498.57
BAHAN / MATERIAL
Kerikil Sungai (Leveransir) (Maksimum 30 M3 0.7452 173,200.00 129,066.07
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,365,338.15
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K 325), Slump (12 ± 2) cm, w/c = 0,49 PB. 11.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 2.1000 60,500.00 127,050.00
Tukang OH 0.3500 82,500.00 28,875.00
TENAGA KERJA
Kepala Tukang OH 0.0350 88,000.00 3,080.00
Mandor Lapangan OH 0.1050 93,500.00 9,817.50
Portland Cement (PC) Kg 439.0000 2,134.00 936,826.00
Pasir Ayak Untuk Beton M3 0.4786 149,400.00 71,498.57
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7452 173,200.00 129,066.07
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,365,338.15
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c = 0,48 PB. 12
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 2.1000 60,500.00 127,050.00
Tukang OH 0.3500 82,500.00 28,875.00
TENAGA KERJA
Kepala Tukang OH 0.0350 88,000.00 3,080.00
Mandor Lapangan OH 0.1050 93,500.00 9,817.50
Portland Cement (PC) Kg 448.0000 2,134.00 956,032.00
Pasir Ayak Untuk Beton M3 0.4764 149,400.00 71,178.43
BAHAN / MATERIAL
Kerikil (Maksimum 30 mm) M3 0.7407 683,000.00 505,925.93
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,761,083.85
Acuan : SNI DT 91 - 0008 - 2007
Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c = 0,48 PB. 12.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 2.1000 60,500.00 127,050.00
Tukang OH 0.3500 82,500.00 28,875.00
TENAGA KERJA
Kepala Tukang OH 0.0350 88,000.00 3,080.00
Mandor Lapangan OH 0.1050 93,500.00 9,817.50
Portland Cement (PC) Kg 448.0000 2,134.00 956,032.00
Pasir Ayak Untuk Beton M3 0.4764 149,400.00 71,178.43
BAHAN / MATERIAL
Kerikil Sungai Ayak Tanpa Pasir (Mak.30 mm M3 0.7407 173,200.00 128,296.30
Air Liter 215.0000 275.00 59,125.00
JUMLAH HARGA PER SATUAN PEKERJAAN 1,383,454.22
Acuan : SNI DT 91 - 0008 - 2007
Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir PB. 17
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.0700 60,500.00 4,235.00
Tukang OH 0.0700 82,500.00 5,775.00
TENAGA KERJA
Kepala Tukang OH 0.0070 88,000.00 616.00
Mandor Lapangan OH 0.0040 93,500.00 374.00
Besi Beton (Polos / Ulir) Kg 10.5000 17,270.00 181,335.00
BAHAN / MATERIAL
Kawat Beton Kg 0.1500 36,410.00 5,461.50
JUMLAH HARGA PER 10 Kg 197,796.50
JUMLAH HARGA PER 1 Kg PEKERJAAN 19,779.65
Acuan : SNI DT 91 - 0008 - 2007
Membuat dan Memasang 1 M2 Pintu dan Jendela Kaca Kayu Klas I PKY.06
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.8000 60,500.00 48,400.00
Tukang OH 2.4000 82,500.00 198,000.00
TENAGA KERJA
Kepala Tukang OH 0.2400 88,000.00 21,120.00
Mandor Lapangan OH 0.0400 93,500.00 3,740.00
Papan Kayu Klas I (Ketam) M3 0.0240 4,871,350.00 116,912.40
BAHAN / MATERIAL
Lem Kayu Kg 0.3000 39,050.00 11,715.00
JUMLAH HARGA PER SATUAN PEKERJAAN 399,887.40
Acuan : SNI DT 91 - 0011 - 2007
Membuat dan Memasang 1 M2 Pintu dan Jendela Jalusi Kayu Klas I PKY.07
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 1.0000 60,500.00 60,500.00
Tukang OH 3.0000 82,500.00 247,500.00
TENAGA KERJA
Kepala Tukang OH 0.3000 88,000.00 26,400.00
Mandor Lapangan OH 0.0500 93,500.00 4,675.00
Papan Kayu Klas I (Ketam) M3 0.0640 4,871,350.00 311,766.40
BAHAN / MATERIAL
Lem Kayu Kg 0.5000 39,050.00 19,525.00
JUMLAH HARGA PER SATUAN PEKERJAAN 670,366.40
Acuan : SNI DT 91 - 0011 - 2007
Membuat 1 M2 Daun Pintu Kayu Lapis( Plywood ) Rangkap, Rangka Tertutup Kayu Klas II( Lebar Sa PKY.08.a
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.7000 60,500.00 42,350.00
Tukang OH 2.1000 82,500.00 173,250.00
TENAGA KERJA
Kepala Tukang OH 0.2100 88,000.00 18,480.00
Mandor Lapangan OH 0.0350 93,500.00 3,272.50
Papan Kayu Klas II ( Ketam ) M3 0.0250 2,668,600.00 66,715.00
Paku Campuran Kg 0.0300 25,960.00 778.80
BAHAN / MATERIAL
Lem Kayu Kg 0.5000 39,050.00 19,525.00
Triplek Tebal 3 mm Lembar 1.0000 59,400.00 59,400.00
JUMLAH HARGA PER SATUAN PEKERJAAN 383,771.30
Acuan : SNI DT 91 - 0011 - 2007
Membuat dan Memasang 1 M2 Jalusi Kusen Kayu Klas I PKY.10
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.6700 60,500.00 40,535.00
Tukang OH 2.0000 82,500.00 165,000.00
TENAGA KERJA
Kepala Tukang OH 0.2000 88,000.00 17,600.00
Mandor Lapangan OH 0.3350 93,500.00 31,322.50
Papan Kayu Klas I (Ketam) M3 0.0600 4,871,350.00 292,281.00
BAHAN / MATERIAL
Paku Campuran Kg 0.1500 25,960.00 3,894.00
JUMLAH HARGA PER SATUAN PEKERJAAN 550,632.50
Acuan : SNI DT 91 - 0011 - 2007
1 M' Memasang Bubungan Dengan Seng Datar BJLS 0,30 / 10 M' PPA. 09
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.2500 60,500.00 15,125.00
TENAGA KERJA Tukang OH 0.2500 82,500.00 20,625.00
Kepala Tukang OH 0.0250 88,000.00 2,200.00
Seng Datar BJLS 0,30 Lbr 6.0000 50,050.00 300,300.00
BAHAN / MATERIAL Papan Kayu Klas II (Tidak Ketam) M3 0.0720 2,173,600.00 156,499.20
Paku Campuran Kg 0.1000 25,960.00 2,596.00
JUMLAH HARGA PER SATUAN PEKERJAAN 497,345.20
JUMLAH HARGA PER SATUAN M' 49,734.52
Acuan : Analisa Biaya Pekerjaan BOW - H.10
J. PEKERJAAN LANGIT LANGIT (PLGT)
Memasang 1 M2 Langit Langit Triplek Uk. 120 x 240 cm, Tebal 3 mm PLGT.05
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.1000 60,500.00 6,050.00
Tukang OH 0.1000 82,500.00 8,250.00
TENAGA KERJA
Kepala Tukang OH 0.0100 88,000.00 880.00
Mandor Lapangan OH 0.0050 93,500.00 467.50
Triplek Tebal 3 mm Lembar 0.3750 59,400.00 22,275.00
BAHAN / MATERIAL
Paku Triplek Kg 0.0300 40,260.00 1,207.80
JUMLAH HARGA PER SATUAN PEKERJAAN 39,130.30
Acuan : SNI DT 91 - 0013 - 2007
1 2 3 4 5
Pengecatan 1 M2 Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Minyak/Kilat ) PCT. 08
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.0700 60,500.00 4,235.00
Tukang OH 0.0090 82,500.00 742.50
TENAGA KERJA
Kepala Tukang OH 0.0060 88,000.00 528.00
Mandor Lapangan OH 0.0025 93,500.00 233.75
Cat Meni Kg 0.2000 27,610.00 5,522.00
Plamur / Dempul Kg 0.1500 16,555.00 2,483.25
BAHAN / MATERIAL
Cat Dasar Kg 0.1700 17,160.00 2,917.20
Cat Minyak/Kilat 2 x Kg 0.2600 44,660.00 11,611.60
JUMLAH HARGA PER SATUAN PEKERJAAN 28,273.30
Acuan : SNI 6.15
Pengecatan 1 M2 Cat Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Tembok) PCT. 14
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.0200 60,500.00 1,210.00
Tukang OH 0.0630 82,500.00 5,197.50
TENAGA KERJA
Kepala Tukang OH 0.0063 88,000.00 554.40
Mandor Lapangan OH 0.0025 93,500.00 233.75
Plamur Kg 0.1000 16,555.00 1,655.50
BAHAN / MATERIAL Cat Dasar Kg 0.1000 17,160.00 1,716.00
Cat Tembok Kg 0.2600 16,610.00 4,318.60
JUMLAH HARGA PER SATUAN PEKERJAAN 14,885.75
Acuan : SNI 6.15
Pengecatan 1 M2 Permukaan Baja Dengan Meni Besi PCT. 20
HARGA BIAYA
KEBUTUHAN SATUAN INDEKS SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja OH 0.0200 60,500.00 1,210.00
Tukang OH 0.2000 82,500.00 16,500.00
TENAGA KERJA
Kepala Tukang OH 0.2000 88,000.00 17,600.00
Mandor Lapangan OH 0.0100 93,500.00 935.00
Cat Meni Besi Kg 0.1000 27,610.00 2,761.00
BAHAN / MATERIAL
Kuas Kg 0.0100 23,210.00 232.10
JUMLAH HARGA PER SATUAN PEKERJAAN 39,238.10
Acuan : SNI 6.15
PEKERJA 291,500.00
Volume Harga Satuan Jumlah Biaya Sub Jumlah
Material Jumlah Kode
Satuan (Rp.) (Rp.) (Rp.)
MATERIAL 137,500.00
Jumlah Hari Jam Biaya Jumlah Biaya Sub Jumlah
Peralatan Kode
Alat Kerja Kerja (Rp. / Jam) (Rp.) (Rp.)
PERALATAN #REF!
JUMLAH #REF!
PEKERJA 770,000.00
Harga Satuan Jumlah Biaya Sub Jumlah
Material Jumlah Satuan Kode
(Rp.) (Rp.) (Rp.)
MATERIAL 805,200.00
Jumlah Hari Jam Biaya Jumlah Biaya Sub Jumlah
Peralatan Kode
Alat Kerja Kerja (Rp. / Jam) (Rp.) (Rp.)
PERALATAN 0.00
JUMLAH 1,575,200.00
PEKERJA 1,908,500.00
VOL. HARGA SATUAN B I A Y A SUB JUMLAH
MATERIAL JUMLAH KODE
SAT. ( Rp. ) ( Rp. ) ( Rp. )
MATERIAL 206,250.00
JUMLAH HARI JAM BIAYA B I A Y A SUB JUMLAH
PERALATAN KODE
ALAT KERJA KERJA ( Rp. / JAM ) ( Rp. ) ( Rp. )
PERALATAN
JUMLAH 2,114,750.00
PEKERJA 418,000.00
VOL. HARGA SATUAN B I A Y A SUB JUMLAH
MATERIAL JUMLAH KODE
SAT. ( Rp. ) ( Rp. ) ( Rp. )
MATERIAL 137,500.00
JUMLAH HARI JAM BIAYA B I A Y A SUB JUMLAH
PERALATAN KODE
ALAT KERJA KERJA ( Rp. / JAM ) ( Rp. ) ( Rp. )
PERALATAN 0.00
JUMLAH 555,500.00
PEKERJA 368,500.00
MATERIAL 0.00
PERALATAN 0.00
JUMLAH 368,500.00
1
1. DEPREASI : 90 % x HARGA ALAT x (CRF) x
JAM / HARI
2. LAIN - LAIN 1
ASURANSI 3 % / TH + PPN 10 % = 0.033 x ### x = 26,224.00
1,500
1
1. DEPREASI : 90 % x HARGA ALAT x (CRF) x
JAM / HARI
2. LAIN - LAIN 1
ASURANSI 3 % / TH + PPN 10 % = 0.033 x 276,200,000.00 x = 7,011.23
1,300
1
1. DEPREASI : 90 % x HARGA ALAT x (CRF) x
JAM / HARI
2. LAIN - LAIN 1
ASURANSI 3 % / TH + PPN 10 % = 0.033 x 9,400,000.00 x = 413.60
750
KODE TENAGA
KAPASITAS BIAYA
NO. JENIS ALAT SATUAN
ALAT (Rp)
ANL (HP)