Sei sulla pagina 1di 54

Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

PRECIPITACION TOTAL MENSUAL COMPLETADA Y EXTENDIDA (mm)

NOMBRE : PROGRESO
CUENCA : RAMIS LATITUD 14º56'13.21" REGION: PUNO
CODIGO : 11078 LONGITUD 70º53'09.59" PROV : AZANGARO
TIPO : CO ALTITUD 3980 msnm DIST : ASILLO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT
1964 83.50 99.50 71.50 35.90 8.50 0.00 0.00 0.00 11.50 21.50
1965 133.00 108.00 209.00 73.50 0.00 0.00 1.00 1.00 4.50 42.50
1966 97.50 148.10 90.50 12.00 32.30 0.00 0.00 0.00 14.50 83.10
1967 65.50 110.50 157.50 35.50 13.00 0.00 8.00 24.50 34.50 67.50
1968 175.30 245.90 93.00 30.00 1.50 8.00 2.00 3.00 4.50 44.50
1969 118.60 73.50 53.50 17.50 0.50 0.10 0.00 1.50 24.50 66.50
1970 202.00 160.20 160.50 51.50 11.00 0.00 0.00 0.00 16.50 14.00
1971 153.00 289.00 70.00 21.50 0.50 0.00 0.00 4.00 0.00 22.00
1972 270.00 110.50 136.50 37.50 3.50 0.00 9.00 10.00 12.50 45.00
1973 256.50 156.00 156.00 62.00 1.00 0.00 6.00 12.50 46.50 33.50
1974 226.60 213.50 142.50 103.00 2.50 18.50 4.00 96.50 12.00 16.50
1975 179.30 136.20 147.50 18.50 31.10 0.00 0.00 2.00 15.50 26.00
1976 221.50 103.00 222.00 28.00 29.50 12.50 0.50 11.00 55.00 13.00
1977 78.80 169.00 136.90 25.00 5.00 0.00 0.80 0.10 62.90 55.50
1978 394.70 158.00 96.90 76.70 0.00 0.00 5.20 9.80 31.50 26.90
1979 169.40 135.60 167.10 66.20 0.30 0.00 0.20 12.20 4.00 74.70
1980 52.30 44.70 147.30 15.80 8.60 0.00 0.80 5.00 31.70 120.80
1981 195.70 204.70 187.30 80.20 4.00 4.20 0.00 20.30 27.10 54.90
1982 156.60 116.40 162.50 74.00 0.40 0.00 0.30 0.00 25.50 82.50
1983 73.40 85.50 107.30 50.50 1.00 0.00 0.10 1.10 21.10 11.30
1984 230.70 237.70 171.40 45.50 23.50 0.00 3.60 10.40 3.60 79.60
1985 95.60 164.40 197.00 77.90 12.20 1.80 0.10 2.80 19.00 22.40
1986 142.10 178.20 187.20 84.10 11.10 0.00 0.10 12.10 32.20 9.50
1987 148.60 105.80 107.90 21.90 3.00 0.10 1.00 2.00 2.30 48.40
1988 201.10 108.80 169.00 78.70 9.00 0.00 0.00 0.00 32.70 49.70
1989 121.40 145.40 142.70 70.50 2.80 0.10 0.40 22.80 26.90 28.20
1990 137.30 153.60 85.70 24.60 7.60 41.40 0.00 0.70 9.60 76.50
1991 245.70 135.50 135.40 64.10 21.80 13.50 1.20 0.00 13.20 50.10
1992 86.20 124.20 76.90 35.50 0.20 1.00 0.00 16.80 1.70 46.80
1993 260.70 57.30 137.60 53.20 0.00 11.00 0.10 30.60 15.10 105.40
1994 208.20 173.30 154.40 75.20 2.80 0.00 0.00 0.00 5.00 15.90
1995 156.50 168.10 131.50 57.10 1.10 0.00 1.30 8.80 13.80 21.80
1996 176.60 163.40 117.30 60.90 16.60 0.00 0.00 3.90 9.80 25.10
1997 258.80 158.80 185.30 83.00 5.00 0.00 0.00 14.10 39.20 28.00
1998 218.60 175.90 90.00 37.60 0.00 1.10 0.00 9.10 5.30 80.20
1999 164.00 178.60 181.00 146.10 7.40 1.70 0.00 1.80 28.70 89.90
2000 241.50 184.80 127.70 24.10 18.50 5.10 9.00 12.40 7.80 115.80
2001 266.40 126.30 181.30 47.80 24.20 0.00 3.70 5.20 15.60 0.00
2002 155.90 150.40 131.70 56.00 30.20 0.60 16.00 110.00 23.20 115.90
2003 153.20 126.90 164.70 24.60 3.90 2.00 0.00 8.40 29.40 17.60
2004 207.10 118.80 105.40 50.40 7.00 4.00 11.00 15.80 26.00 17.90
2005 82.70 302.60 112.30 61.70 0.20 0.00 1.40 2.40 6.70 64.70
2006 260.50 142.60 178.60 80.90 0.00 8.20 0.00 9.10 10.60 39.90
2007 118.30 130.60 292.50 77.50 21.30 0.40 8.60 0.00 41.70 21.60
2008 220.10 136.90 102.40 0.30 4.30 4.50 0.00 2.10 20.80 52.90
2009 88.10 178.80 135.30 56.00 7.40 0.00 0.10 0.00 18.10 37.30
2010 188.50 198.10 101.40 79.00 5.20 0.00 0.40 0.00 0.00 24.90

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

2011 136.80 228.10 165.70 131.80 16.50 1.50 12.80 10.20 22.20 18.70
2012 116.00 129.60 126.10 60.50 2.00 0.10 0.00 3.90 6.10 13.00
2013 142.60 117.10 119.10 44.80 5.50 0.00 0.00 4.90 29.60 50.30
2014 208.50 136.80 102.50 34.80 2.10 0.10 0.60 3.30 22.10 59.10
PROM 171.40 151.08 139.85 54.14 8.36 2.77 2.14 10.55 19.49 46.06
STD 67.67 50.66 43.82 28.90 9.29 6.79 3.77 20.08 13.97 30.26
MIN 52.30 44.70 53.50 0.30 0.00 0.00 0.00 0.00 0.00 0.00
MAX 394.70 302.60 292.50 146.10 32.30 41.40 16.00 110.00 62.90 120.80
MEDIANA 164.00 145.40 136.90 53.20 5.00 0.00 0.20 4.00 16.50 42.50

Precip itació n (m m )
Fuente: ESTUDIOS PRORRIDRE

Precipitación Total Mensual (mm)


Estación Huancane
1200.00

1000.00

800.00

600.00

400.00

200.00

0.00
1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020

Años

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

HUMEDAD RELATIVA MEDIA MENSUAL COMPLETADA Y EXTENDIDA (%)

NOMBRE : PROGRESO
CUENCA : RAMIS LATITUD 14º56'13.21" REGION: PUNO
CODIGO : 11078 LONGITUD 70º53'09.59" PROV : AZANGARO
TIPO : CO ALTITUD 3980 msnm DIST : ASILLO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT
1964 46.0 57.0 62.0 62.0 47.0 25.0 26.0 19.0 42.0 34.0
1965 66.0 66.0 65.0 54.0 26.0 44.0 31.0 40.0 46.5 50.0
1966 70.0 80.0 77.0 55.0 60.0 47.9 51.0 50.0 49.0 65.0
1967 57.0 67.0 70.0 55.0 52.0 33.0 49.0 41.0 59.0 53.0
1968 69.0 70.0 69.0 63.0 48.0 40.0 47.7 37.0 35.0 45.0
1969 64.0 62.6 65.0 51.0 40.0 40.3 54.0 53.0 52.8 59.2
1970 66.0 64.0 62.0 63.0 56.0 47.0 46.0 34.0 39.0 35.0
1971 66.0 65.0 61.0 51.0 41.0 46.0 45.0 48.0 48.0 40.0
1972 69.0 67.2 64.7 58.0 52.0 51.0 45.0 47.0 46.0 44.0
1973 66.0 63.0 61.0 59.0 52.0 50.0 58.0 53.0 52.0 56.0
1974 69.0 68.0 64.0 67.0 53.0 52.0 53.0 65.0 54.0 53.4
1975 57.0 61.6 58.9 59.0 70.0 61.0 62.0 64.0 65.0 58.0
1976 71.0 67.0 67.0 83.0 57.0 59.0 56.0 60.0 53.0 59.0
1977 48.0 61.0 64.0 58.0 55.0 49.4 44.5 52.8 53.0 49.0
1978 62.0 57.0 58.0 60.0 36.0 54.0 47.0 42.0 43.0 49.0
1979 54.0 53.0 55.0 55.0 50.0 46.0 33.0 37.0 41.0 48.0
1980 54.0 52.0 57.0 53.0 47.0 45.0 52.0 45.0 51.0 50.0
1981 53.0 51.0 52.0 57.2 53.5 50.3 49.9 46.8 46.2 50.8
1982 59.8 58.0 58.3 62.9 50.7 43.2 42.0 42.8 46.8 47.7
1983 65.1 60.7 61.7 61.4 47.3 42.6 40.4 44.6 47.9 50.1
1984 64.4 65.8 67.6 57.4 49.1 39.8 40.6 38.1 40.2 51.4
1985 60.8 60.7 61.5 60.8 54.3 52.1 41.0 44.8 43.0 42.1
1986 62.4 58.9 59.1 63.6 51.6 52.6 47.0 42.2 54.3 57.2
1987 59.7 61.8 61.5 57.1 62.0 57.6 44.3 40.1 39.8 46.1
1988 64.9 66.2 68.8 50.9 43.3 43.5 42.4 51.2 47.5 46.2
1989 67.2 65.1 61.4 62.7 45.4 43.2 44.1 39.1 39.9 45.9
1990 62.2 69.5 66.0 55.7 47.2 41.1 46.9 48.8 50.6 47.4
1991 60.9 61.1 62.7 57.3 59.0 54.7 54.8 50.6 46.3 39.4
1992 58.2 63.7 61.9 63.5 54.5 47.9 51.7 42.4 48.9 49.0
1993 69.5 65.8 63.1 65.4 51.8 45.7 47.9 45.0 47.6 45.0
1994 65.0 61.0 58.0 55.0 35.0 32.0 26.0 26.0 35.0 38.0
1995 54.0 51.0 61.0 46.0 34.0 26.0 23.0 48.0 53.0 50.0
1996 68.0 74.0 63.0 66.0 59.0 53.0 58.0 61.0 49.0 47.0
1997 71.0 72.0 68.0 63.0 53.0 42.0 44.0 52.0 54.8 48.5
1998 54.0 55.0 53.0 38.0 50.0 34.0 47.0 28.0 22.0 43.0
1999 68.0 76.0 75.0 70.0 60.0 41.0 43.0 42.0 43.0 48.0
2000 64.0 65.0 61.0 38.0 43.0 38.0 30.0 32.0 49.0 63.0
2001 78.0 70.0 72.0 62.0 59.0 55.0 52.0 48.0 50.0 67.0
2002 66.0 75.0 76.0 70.0 66.0 58.0 61.0 54.0 51.0 60.0
2003 88.0 71.0 74.0 63.0 60.0 59.0 32.0 32.0 50.0 47.0
2004 74.0 70.0 89.0 65.0 54.0 63.0 40.0 52.0 50.0 63.0
2005 64.0 75.0 68.0 60.0 45.0 39.0 44.0 40.0 42.0 52.0
2006 75.0 70.0 73.0 66.0 55.0 58.0 52.0 53.0 43.0 51.0
2007 75.7 72.5 75.1 65.1 52.9 46.7 49.9 46.3 46.9 45.1
2008 69.2 75.2 72.7 59.8 48.7 45.9 39.9 41.8 48.6 49.8
2009 62.4 61.8 61.1 56.5 51.8 46.2 48.8 48.9 46.6 45.0
2010 66.3 74.4 76.5 65.0 49.0 47.8 41.6 47.7 50.5 56.9

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

2011 61.3 63.8 62.3 54.6 55.4 48.8 44.4 43.8 45.0 48.6
2012 71.7 70.0 67.7 62.1 45.4 33.9 49.5 51.6 49.9 49.1
2013 56.3 55.7 58.3 55.0 51.1 54.1 47.6 50.0 52.2 45.3
2014 61.4 66.3 68.1 61.0 54.3 48.8 46.1 43.4 45.1 46.9
PROM 64.22 64.99 65.08 59.27 50.85 46.57 45.35 45.21 47.15 49.61
STD 7.54 6.82 6.92 7.33 7.97 8.44 8.50 8.91 6.60 7.06
MIN 46.00 51.00 52.00 38.00 26.00 25.00 23.00 19.00 22.00 34.00
MAX 88.00 80.00 89.00 83.00 70.00 63.00 62.00 65.00 65.00 67.00
MEDIANA 64.90 65.10 63.10 60.00 51.80 46.70 46.10 45.00 47.90 49.00

H u m e d a d R e la t iv a ( % )
Fuente: ESTUDIOS PRORRIDRE

Humedad Relativa Media Mensual Completada y Extendida (%)


Estación Huancane
70
60
50
40
30
20
10
0
1960 1970 1980 1990 2000 2010 2020
Años

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

TEMPERATURA MEDIA MENSUAL COMPLETADA Y EXTENDIDA (ºC)

NOMBRE : PROGRESO
CUENCA : RAMIS LATITUD 14º56'13.21" REGION: PUNO
CODIGO : 11078 LONGITUD 70º53'09.59" PROV : AZANGARO
TIPO : CO ALTITUD 3980 msnm DIST : ASILLO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT
1964 9.4 9.6 8.8 7.6 5.8 4.0 3.1 5.5 6.4 7.5
1965 7.9 8.5 7.7 7.5 5.9 3.3 3.6 4.6 6.7 8.2
1966 8.9 8.7 8.0 6.5 4.5 3.0 3.0 4.8 6.3 9.8
1967 9.9 10.5 9.5 8.3 7.2 5.6 4.8 5.8 8.1 8.2
1968 8.4 8.6 7.8 6.9 5.0 4.2 3.7 5.9 7.6 8.8
1969 9.5 9.7 9.8 9.2 7.0 5.4 4.1 4.0 6.1 7.5
1970 9.0 9.2 7.9 7.4 5.5 4.2 3.2 4.8 6.9 7.7
1971 8.6 7.3 8.4 7.1 4.4 3.8 2.8 4.6 5.3 6.5
1972 8.1 8.5 8.8 7.6 4.9 3.0 4.4 4.9 6.8 8.2
1973 8.6 9.6 8.9 8.2 6.0 3.7 3.5 5.2 6.7 8.6
1974 8.1 8.2 7.5 7.1 4.8 3.7 5.0 4.4 6.3 7.6
1975 8.0 8.0 8.1 8.0 6.3 4.8 2.4 3.6 5.9 6.2
1976 7.8 7.7 8.6 6.3 5.2 4.4 4.0 4.9 6.0 7.3
1977 9.5 7.6 7.8 6.0 4.7 3.3 3.7 4.8 7.2 7.3
1978 8.1 8.7 7.9 7.2 4.3 3.7 1.8 4.3 5.7 7.1
1979 7.9 8.2 8.0 6.7 4.4 3.9 2.7 2.8 6.0 7.7
1980 8.6 8.3 7.6 6.0 4.7 3.9 4.1 4.1 6.4 8.1
1981 8.3 8.1 7.4 6.6 5.3 4.1 4.4 5.3 6.9 8.4
1982 8.6 8.3 8.1 7.5 5.4 3.8 3.9 5.2 7.0 8.2
1983 8.9 8.5 8.4 7.6 5.3 3.9 3.8 5.4 7.2 8.6
1984 8.9 9.1 9.1 7.9 5.7 3.8 3.9 4.8 6.5 8.2
1985 8.7 8.6 8.5 7.6 5.9 4.5 3.6 5.3 6.8 7.7
1986 8.7 8.3 8.1 7.5 5.5 4.5 4.2 4.9 7.6 9.2
1987 8.8 8.9 8.6 7.5 6.7 5.0 3.8 4.6 6.3 7.6
1988 8.9 9.1 9.2 7.5 5.3 4.1 4.0 6.1 7.5 8.5
1989 9.1 9.0 8.4 7.7 5.2 3.9 4.1 4.8 6.4 7.7
1990 8.7 9.4 8.8 7.5 5.4 3.8 4.4 5.7 7.6 8.6
1991 8.6 8.6 8.6 7.5 6.4 4.7 4.8 5.6 7.0 7.6
1992 8.3 8.7 8.3 7.7 5.9 4.1 4.7 4.9 7.0 8.3
1993 9.2 9.0 8.5 8.0 5.7 4.1 4.4 5.2 7.5 8.5
1994 8.7 9.0 8.5 8.2 5.7 3.0 3.7 5.0 7.4 8.6
1995 9.5 8.9 8.8 7.8 5.8 4.0 4.6 8.1 9.5 11.0
1996 8.9 8.9 9.5 8.9 6.5 3.9 3.9 6.3 7.0 8.4
1997 9.0 8.5 8.3 6.6 5.4 3.7 4.6 4.8 8.0 9.1
1998 10.7 11.0 10.1 9.3 6.1 5.7 5.1 7.1 7.5 9.3
1999 9.4 9.4 9.2 8.2 6.4 4.1 4.4 5.6 7.3 8.4
2000 9.0 8.8 8.8 6.4 8.0 4.3 3.9 6.1 7.6 7.7
2001 8.6 8.9 9.1 7.8 6.4 4.7 4.5 4.9 7.8 8.8
2002 8.7 9.6 9.7 8.6 7.2 6.0 5.0 6.0 8.2 9.2
2003 10.0 9.9 9.3 8.2 6.6 3.9 4.6 5.7 7.2 8.5
2004 9.5 9.0 9.4 8.6 5.7 4.3 5.0 5.9 8.1 9.8
2005 9.8 9.7 9.8 9.2 6.4 4.2 5.3 5.3 7.7 9.4
2006 8.9 10.0 9.8 8.6 5.2 5.0 4.0 6.7 7.7 9.5
2007 10.1 10.6 9.2 9.2 7.2 5.8 5.3 6.9 8.6 9.4
2008 9.9 9.4 8.6 8.6 5.3 5.2 4.4 6.0 7.6 9.5
2009 9.9 9.6 9.2 8.0 7.0 4.0 5.2 5.6 8.4 9.5

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

2010 10.2 10.5 10.4 9.4 7.6 6.5 5.0 6.4 8.4 9.6
2011 9.3 9.3 9.3 8.0 5.5 4.2 4.9 5.9 8.1 9.5
2012 9.4 9.3 8.8 7.5 5.1 4.2 4.7 6.7 8.1 9.2
2013 8.9 9.0 8.8 7.8 5.2 3.6 4.1 5.0 6.8 8.0
2014 9.0 9.2 8.6 7.3 5.5 3.9 4.5 6.7 8.6 9.9
PROM 8.97 9.00 8.71 7.72 5.77 4.24 4.13 5.36 7.20 8.46
STD 0.65 0.75 0.69 0.83 0.85 0.75 0.75 0.93 0.85 0.93
MIN 7.80 7.30 7.40 6.00 4.30 3.00 1.80 2.80 5.30 6.20
MAX 10.70 11.00 10.40 9.40 8.00 6.50 5.30 8.10 9.50 11.00
MEDIANA 8.90 9.00 8.60 7.60 5.70 4.10 4.10 5.30 7.20 8.40
Fuente: ESTUDIOS PRORRIDRE
Te m p e ra t u ra ( ºC )

Temperatura Media Mensual Completada y Extendida (ºC)


Estación Pucara

10.00
8.00
6.00
4.00
2.00
0.00
1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010

Años

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

VELOCIDAD DEL VIENTO MEDIA MENSUAL COMPLETADA Y EXTENDIDA (m/s)

NOMBRE : PROGRESO
CUENCA : RAMIS LATITUD 14º56'13.21" REGION: PUNO
CODIGO : 11078 LONGITUD 70º53'09.59" PROV : AZANGARO
TIPO : CO ALTITUD 3980 msnm DIST : ASILLO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT
1964 2.0 1.8 1.8 1.5 1.3 1.2 1.7 2.2 2.2 2.6
1965 2.0 2.0 2.0 1.4 1.3 1.0 2.0 2.1 2.2 2.1
1966 2.1 2.0 2.0 1.8 2.0 1.8 1.4 2.0 2.2 2.2
1967 1.9 1.9 1.7 1.4 1.7 1.6 1.9 2.3 3.0 3.2
1968 1.8 2.0 2.0 1.7 1.5 1.5 1.6 1.8 2.0 2.1
1969 2.4 2.3 2.0 1.8 1.6 2.0 1.6 2.0 2.1 2.2
1970 1.8 1.8 1.6 1.4 1.4 1.2 1.7 1.5 2.0 1.9
1971 2.0 2.0 1.7 2.1 1.7 2.2 1.3 1.7 2.2 3.5
1972 3.0 2.7 3.2 3.7 3.4 4.1 3.7 4.0 3.8 4.0
1973 4.0 2.1 2.0 2.0 1.5 2.5 3.2 2.6 2.4 3.0
1974 3.5 3.5 4.2 4.9 4.7 5.4 3.8 4.4 5.0 3.4
1975 4.4 3.9 2.2 2.0 2.4 2.4 2.3 2.1 1.8 1.5
1976 1.0 1.1 0.9 0.8 0.6 0.9 1.5 1.3 1.7 0.9
1977 1.4 1.3 1.4 1.2 1.6 1.8 2.1 1.9 2.3 1.8
1978 1.3 1.8 1.3 1.3 1.8 1.2 1.5 2.5 4.8 2.3
1979 2.5 2.2 1.7 1.8 1.9 1.9 1.7 2.2 2.3 2.2
1980 1.7 1.6 1.3 1.1 1.6 1.2 2.3 1.7 2.9 2.0
1981 2.0 2.5 1.8 1.3 1.2 2.1 1.8 2.8 2.7 2.5
1982 1.9 1.2 1.4 1.3 1.3 1.9 1.6 1.7 2.1 2.0
1983 1.8 1.8 1.9 2.2 1.7 2.5 1.9 1.8 2.0 1.8
1984 2.1 1.8 1.6 1.2 1.5 1.8 1.9 3.1 2.2 2.5
1985 1.6 1.0 1.4 1.6 1.4 1.4 1.5 1.4 1.6 1.7
1986 1.2 1.3 1.1 1.1 1.1 1.2 1.6 1.4 2.3 2.2
1987 1.4 1.3 1.3 1.6 1.9 1.8 2.3 1.6 1.9 2.1
1988 1.2 1.6 1.4 1.0 1.2 1.3 1.8 2.4 2.7 2.4
1989 2.0 1.6 1.4 1.1 1.3 1.4 1.3 2.2 2.5 2.0
1990 1.5 1.9 3.8 2.4 1.6 1.9 1.9 0.4 2.6 2.1
1991 1.6 1.8 2.1 1.4 1.4 1.7 1.7 1.4 1.7 2.1
1992 1.9 1.6 1.6 1.9 2.2 1.4 1.8 2.3 2.6 2.2
1993 1.7 1.9 1.3 1.7 1.8 1.3 2.1 1.8 2.3 1.7
1994 1.4 1.3 1.7 1.6 1.9 1.2 1.3 1.7 2.2 1.5
1995 2.0 2.2 1.8 1.9 1.8 1.9 2.1 2.7 2.7 2.8
1996 3.0 2.2 2.5 2.2 2.0 2.5 1.9 2.3 2.4 2.2
1997 3.2 2.8 2.3 1.9 2.1 2.1 2.5 2.5 2.6 2.2
1998 2.3 2.1 2.3 2.6 2.2 2.6 2.4 2.7 2.5 2.6
1999 2.3 2.4 2.8 2.3 1.9 2.6 3.1 2.5 2.6 2.8
2000 2.6 2.4 2.3 2.3 2.2 2.3 2.3 2.6 3.0 2.8
2001 2.3 2.3 2.2 2.0 2.1 2.2 2.2 2.0 2.3 2.0
2002 1.9 2.1 1.8 1.4 1.7 1.4 2.3 1.1 1.9 1.8
2003 2.1 2.1 1.8 1.6 1.7 1.7 1.9 1.8 2.0 1.8
2004 2.4 1.8 1.7 1.7 1.8 2.1 2.0 2.0 1.9 2.5
2005 2.2 1.7 1.9 1.6 1.7 1.8 2.8 1.6 4.5 4.2
2006 2.8 2.2 2.1 1.5 1.4 1.5 1.8 2.2 2.3 2.9
2007 2.2 1.4 1.8 1.3 1.6 1.2 2.1 1.9 2.5 2.3
2008 1.8 2.4 1.5 1.7 1.8 2.1 2.7 2.1 3.8 2.9
2009 2.4 3.0 2.4 3.0 2.0 2.0 2.4 1.6 2.5 2.1
2010 2.5 2.2 2.0 1.7 2.7 2.5 2.8 2.7 3.5 3.2
GOBIERNO REGIONAL PUNO
Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

2011 3.0 2.7 3.2 2.9 2.7 3.0 3.0 3.4 3.3 3.9
2012 3.5 2.7 2.4 2.1 2.0 2.1 1.9 2.3 2.1 2.1
2013 1.8 1.7 1.8 1.6 1.7 1.7 1.8 2.2 2.4 2.6
2014 1.8 1.8 1.6 1.3 1.5 1.8 1.9 1.8 2.1 2.1
PROM 2.16 2.02 1.94 1.80 1.81 1.92 2.07 2.12 2.53 2.38
STD 0.69 0.56 0.62 0.69 0.61 0.75 0.56 0.67 0.73 0.64
MIN 1.00 1.00 0.90 0.80 0.60 0.90 1.30 0.40 1.60 0.90
MAX 4.40 3.90 4.20 4.90 4.70 5.40 3.80 4.40 5.00 4.20
MEDIANA 2.00 2.00 1.80 1.70 1.70 1.80 1.90 2.10 2.30 2.20

Te m p e ra t u ra ( ºC )
Temperatura Media Mensual Completada y Extendida (ºC)
Estación Pucara

10.00
8.00
6.00
4.00
2.00
0.00
1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010

Años

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

TENDIDA (mm)

: AZANGARO
: ASILLO
NOV DIC TOTAL
64.50 77.50 473.90
28.30 143.50 744.30
110.00 123.50 711.50
9.50 156.50 682.50
120.50 83.60 811.80
48.30 94.50 499.00
0.00 183.90 799.60
36.50 132.00 728.50
41.00 127.50 803.00
57.60 67.00 854.60
34.50 143.50 1013.60
44.00 126.00 726.10
16.00 71.00 783.00
164.20 54.50 752.70
152.70 152.20 1104.60
89.30 136.50 855.50
79.10 97.10 603.20
46.20 131.90 956.50
127.40 66.80 812.40
6.20 130.90 488.40
105.50 202.40 1113.90
125.40 134.70 853.30
64.60 150.70 871.90
94.00 84.30 619.30
6.20 144.20 799.40
39.80 99.40 700.40
49.80 91.20 678.00
22.40 132.00 834.90
99.40 88.70 577.40
153.30 137.30 961.60
75.40 122.20 832.40
43.20 97.90 701.10
41.80 158.00 773.40
82.40 121.80 976.40
73.20 89.80 780.80
21.20 116.10 936.50
23.00 104.40 874.10
0.00 69.20 739.70
92.00 104.50 986.40
29.00 118.00 677.70
50.90 172.70 787.00
80.30 102.00 817.00
77.10 151.00 958.50
66.70 138.70 917.90
14.80 239.10 798.20
131.80 159.00 811.90
70.00 171.00 838.50

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

58.60 225.30 1028.20


55.30 97.20 609.80
85.90 117.50 717.30
65.20 145.40 780.50
64.20 125.21 795.26
41.08 38.85 142.57
0.00 54.50 473.90
164.20 239.10 1113.90
58.60 126.00 799.40

005 2010 2015 2020

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

EXTENDIDA (%)

: AZANGARO
: ASILLO
NOV DIC PROM
43.0 54.0 43.08
50.0 76.0 51.21
53.0 59.0 59.74
61.5 70.0 55.63
62.0 52.0 53.14
62.4 53.0 54.78
48.0 61.0 51.75
48.0 56.0 51.25
45.0 52.0 53.41
46.0 46.0 55.17
41.0 50.0 57.45
52.0 65.0 61.13
53.0 57.0 61.83
54.0 53.0 53.48
50.0 54.0 51.00
45.0 53.0 47.50
52.0 49.0 50.58
52.3 57.3 51.69
52.0 55.4 51.63
51.2 55.6 52.38
55.1 59.4 52.41
49.6 55.4 52.18
53.3 60.9 55.26
51.3 61.9 53.60
49.0 56.0 52.49
52.0 60.3 52.19
47.4 52.4 52.93
47.1 50.8 53.73
47.0 58.3 53.92
50.0 55.0 54.32
43.0 48.0 43.50
59.0 59.0 47.00
54.0 64.0 59.67
49.0 57.5 56.23
53.0 64.0 45.08
50.0 52.0 55.67
65.0 67.0 51.25
73.5 80.0 63.88
58.0 63.0 63.17
54.0 63.0 57.75
51.0 64.0 61.25
52.0 64.0 53.75
62.0 66.0 60.33
46.8 57.7 56.73
47.5 52.5 54.30
49.9 55.2 52.85
50.4 51.2 56.44

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

54.8 66.2 54.08


49.4 50.9 54.27
46.5 53.2 52.11
56.7 55.0 54.43
51.94 57.88 54.01
5.98 6.77 4.40
41.00 46.00 43.08
73.50 80.00 63.88
51.20 56.00 53.73

xtendida (%)

2010 2020

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

XTENDIDA (ºC)

: AZANGARO
: ASILLO
NOV DIC PROM
7.3 8.3 6.94
8.5 8.2 6.72
10.1 11.0 7.05
8.4 8.2 7.88
8.7 9.3 7.08
8.9 9.5 7.56
8.8 8.3 6.91
7.7 8.4 6.24
10.2 10.5 7.16
9.0 8.7 7.23
8.7 8.8 6.68
7.5 8.1 6.41
8.4 9.1 6.64
8.0 8.4 6.53
7.7 8.8 6.28
8.7 8.2 6.27
7.7 9.0 6.54
8.9 9.1 6.90
8.8 8.9 6.98
8.9 9.0 7.13
8.9 9.2 7.17
8.5 8.9 7.05
9.2 9.6 7.28
8.4 9.3 7.13
8.8 9.1 7.34
8.6 9.2 7.01
8.6 8.8 7.28
8.3 8.5 7.18
8.3 9.2 7.12
8.9 9.4 7.37
9.6 9.4 7.23
10.4 9.1 8.13
8.7 9.2 7.51
9.4 10.4 7.32
9.0 9.5 8.37
8.1 9.2 7.48
8.9 9.0 7.38
7.7 9.5 7.39
9.4 10.2 8.15
9.4 10.1 7.78
10.0 9.8 7.93
9.5 9.9 8.02
9.8 10.0 7.93
9.4 9.7 8.45
10.1 9.6 7.85
10.8 10.4 8.13

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

9.6 9.8 8.62


9.5 9.5 7.75
9.2 9.5 7.64
8.7 9.0 7.08
9.6 9.8 7.72
8.91 9.25 7.31
0.76 0.65 0.57
7.30 8.10 6.24
10.80 11.00 8.62
8.90 9.20 7.23

000 2005 2010

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

Y EXTENDIDA (m/s)

: AZANGARO
: ASILLO
NOV DIC PROM
2.3 2.0 1.88
2.1 1.7 1.83
2.2 2.0 1.98
2.8 2.4 2.15
2.3 2.5 1.90
2.1 2.0 2.01
2.1 2.1 1.71
2.2 2.0 2.05
2.8 2.4 3.40
3.0 3.3 2.63
4.9 3.9 4.30
1.6 0.8 2.28
1.1 1.2 1.08
1.9 1.2 1.66
1.9 2.1 1.98
2.3 2.0 2.06
1.1 1.7 1.68
2.2 1.9 2.07
2.0 1.8 1.68
2.3 2.4 2.01
2.1 1.7 1.96
1.4 1.6 1.47
2.2 1.7 1.53
1.8 1.8 1.73
2.4 2.9 1.86
1.4 1.3 1.63
2.0 1.8 1.99
1.8 2.3 1.75
1.8 1.5 1.90
1.7 2.2 1.79
1.6 2.8 1.68
2.6 2.4 2.24
2.5 2.9 2.38
2.8 2.3 2.44
2.9 2.4 2.47
2.8 2.8 2.58
2.3 2.8 2.49
2.1 2.6 2.19
1.8 2.1 1.78
2.0 1.9 1.87
2.1 2.3 2.03
4.2 4.5 2.73
2.2 2.2 2.09
2.2 1.7 1.85
2.8 2.4 2.33
2.2 1.8 2.28
2.8 2.5 2.59
GOBIERNO REGIONAL PUNO
Direccion de Estudios y Proyectos PRORRIDRE
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora"

4.3 4.6 3.33


2.1 1.9 2.27
2.2 2.2 1.98
2.1 2.2 1.83
2.28 2.23 2.11
0.70 0.71 0.52
1.10 0.80 1.08
4.90 4.60 4.30
2.20 2.10 1.99

000 2005 2010

GOBIERNO REGIONAL PUNO


Direccion de Estudios y Proyectos PRORRIDRE
CUADRO DE INFROMACION METEOROLOGICA

FUENTE: SERVICIO NACIONAL DE METEREOLOGIA E HIDROLOGIA

INFORMACION GEOGRAFICA :

ESTACIÓN : LLALLI

LATITUD : 14 º 56 ' 13.2 '' SUR

LONGITUD : 70 º 53 ' 9.6 '' OESTE

ALTITUD : 3980 m.s.n.m.

INFORMACION METEREOLOGICA :

ENE FEB MAR ABR MAY JUN JUL AGO SEP

Temperatura media Men. °C 8.97 9.00 8.71 7.72 5.77 4.24 4.13 5.36 7.20

Precipitacion (mm) 171.40 151.08 139.85 54.14 8.36 2.77 2.14 10.55 19.49

Humedad Relativa % 64.22 64.99 65.08 59.27 50.85 46.57 45.35 45.21 47.15

Veloc. Viento (m/s) 2.16 2.02 1.94 1.80 1.81 1.92 2.07 2.12 2.53

Horas de Sol (horas) 6.20 6.70 6.40 7.50 8.60 8.80 9.20 9.20 8.30

CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL ETP

METODO DE HARGRAVES - EN BASE A LA TEMPERATURA

CH  0.166100  HR 
1
ETP  MF  TMF  CH  CE CE  1.00  0.04
E 2 ; para HR  64%
2000 CH  1.00 ; para HR  64%
LATITUD ABSOLUTA : 14.94 Para usar la tabla de Factor de Latitud
ALTITUD PROMEDIO : 3980 Para la Correccion por Altitud

SET OCT NOV DIC ENE FEB MAR ABR MAY


Numero del Mes : 9 10 11 12 1 2 3 4 5
Factor de Latitud MF 2.132 2.496 2.587 2.736 2.705 2.325 2.334 1.938 1.702
Temp. Media en ºF TMF 44.96 47.23 48.04 48.65 48.15 48.20 47.68 45.90 42.39
Fact. Correc. Humed. CH 1.000 1.000 1.000 1.000 0.993 0.982 0.981 1.000 1.000
Fact. Correc. Altitud CE 1.080 1.080 1.080 1.080 1.080 1.080 1.080 1.080 1.080

ETP (mm/mes) 103.5 127.2 134.1 143.7 139.6 118.9 117.9 96.0 77.9

ETP (mm/dia) 3.45 4.10 4.47 4.64 4.50 4.24 3.80 3.20 2.51

METODO DE HARGRAVES - EN BASE A LA RADIACIÓN


n
ETP  0.0075  RSM  TMF RSM  0.0075  RMM  S RMM  Ra  DM S  100
N

LATITUD ABSOLUTA : 14.94 Para usar la tabla de Factor de Latitud


ALTITUD PROMEDIO : 3980 Para la Correccion por Altitud

SET OCT NOV DIC ENE FEB MAR ABR MAY


Numero del Mes : 9 10 11 12 1 2 3 4 5
Horas de Sol n 9.12 9.21 8.24 7.14 6.42 6.60 7.35 8.78 9.16
Horas de Insolación N 12.00 12.50 12.80 13.00 12.90 12.60 12.20 11.80 11.40
Porcentaje Horas Ins. S 76.0% 73.7% 64.4% 54.9% 49.8% 52.4% 60.3% 74.4% 80.3%
Radiación Extraterrestre Ra 14.41 15.80 16.59 16.69 16.79 16.40 15.25 13.61 11.91
Dias del Mes 30 31 30 31 31 28 31 30 31
Rad. Extrat. Equivalente RMM 432.18 489.80 497.82 517.51 520.61 459.20 472.84 408.18 369.27
Rad. Solar Equivalente de Evap Mens. RSM 282.57 315.35 299.59 287.69 275.49 249.28 275.27 264.07 248.23

ETP (mm/mes) 95.28 111.70 107.94 104.97 99.48 90.11 98.43 90.90 78.91

ETP (mm/dia) 3.18 3.60 3.60 3.39 3.21 3.22 3.18 3.03 2.55

ETP PROMEDIO (mm/mes) 99.38 119.47 121.04 124.34 119.56 104.48 108.15 93.47 78.40
ETP PROMEDIO (mm/día) 3.31 3.85 4.03 4.01 3.86 3.73 3.49 3.12 2.53

ETP maxima = 4.03 mm/dia


OCT NOV DIC

8.46 8.91 9.25

46.06 64.20 125.21

49.61 51.94 57.88

2.38 2.28 2.23

8.10 6.90 5.60

CH  0.166100  HR 
1
2 ; para HR  64%
CH  1.00 ; para HR  64%

JUN JUL AGO


6 7 8
1.502 1.614 1.869
39.63 39.43 41.65
1.000 1.000 1.000
1.080 1.080 1.080

64.3 68.7 84.0

2.14 2.22 2.71

n
S  100
N

JUN JUL AGO


6 7 8
9.38 9.33 9.75
11.20 11.30 11.60
83.7% 82.5% 84.0%
11.01 11.41 12.76
30 31 31
330.36 353.77 395.53
226.71 241.06 271.94

67.39 71.29 84.94

2.25 2.30 2.74

65.83 70.00 84.48


2.19 2.26 2.73
DETERMINACION DEL Kc DE LOS CULTIVOS DETERMINACION DE LA LAMINA DE REPO

"Kc" PARA EL CULTIVO: CB 27 CALCULO DE LA LAMINA NETA SEGÚN COEFICIENT

ETP en el mes Inicial o de Ciembra: ETP = 3.31 mm/dia "Ln" PARA EL CULTIVO: PAPA AMARGA
Para un Intervalo de riego inicial de: 7.00 dias Ok!
Kc = 0.52 para la etapa inicial Profundidad Raiz PR : PAPA AMARGA
valores de calculo y busqueda 3 3.00

Humedad. Relativa Minima HR %: HR = 45.21 % Agotamiento de la HFU: PAPA AMARGA


Velocidad del Viento Promedio Vv: Vv = 2.53 m/seg
Ln  HFU 
 CC %  PM %   Da  PR
Etapas Periodo Vegetat. Inicial Desar. Medio Medio Final Total 100
Duracion (dias) 30 40 50 30 30 180
Kc 0.52 0.56 1.07 1.10 0.90 -------- DATOS DE SU
Estratos del Suelo C.C.
CURVA Kc DEL CULTIVO: PAPA AMARGA (%)
0 - 30 cm 22
Kc del Cultivo

1.2 Inicial Desar. Medio Medio Final 30 - 50 cm 22


1.0 1 2 3 4 5 LAMINA NETA (cm)
0.8 0.52 0.56 1.07 1.10 0.90
0.6
Textura del Suelo: 5
0.4

0.2

0.0
1 2 3 4 5
Etapas del Periodo Vegetativo

DETERMINACION DEL Kc DE LOS CULTIVOS DETERMINACION DE LA LAMINA DE REPO

"Kc" PARA EL CULTIVO: CB 28 CALCULO DE LA LAMINA NETA SEGÚN COEFICIENT

ETP en el mes Inicial o de Ciembra: ETP = 3.86 mm/dia "Ln" PARA EL CULTIVO: TREBOL BLANCO MAS RY
Para un Intervalo de riego inicial de: 7.00 dias Ok!
Kc = 0.90 para la etapa inicial Profundidad Raiz PR : TREBOL BLANC
valores de calculo y busqueda 3 4.00

Humedad. Relativa Minima HR %: HR = 45.21 % Agotamiento de la HFU: TREBOL BLANC


Velocidad del Viento Promedio Vv: Vv = 2.53 m/seg
Ln  HFU 
 CC %  PM %   Da  PR
Etapas Periodo Vegetat. Inicial Desar. Medio Medio Final Total
100
Duracion (dias) 30 40 50 30 30 180
Kc 0.90 0.90 0.90 0.90 0.90 -------- DATOS DE SU
Estratos del Suelo C.C.
CURVA Kc DEL CULTIVO: TREBOL BLANCO MAS RYE GRASS (%)
0 - 30 cm 22
Kc del Cultivo

1.2 Inicial Desar. Medio Medio Final 30 - 35 cm 22


1.0 1 2 3 4 5 LAMINA NETA (cm)
0.8 0.90 0.90 0.90 0.90 0.90

0.6
Textura del Suelo: 5
0.4

0.2

0.0
1 2 3 4 5
Etapas del Periodo Vegetativo
DETERMINACION DEL Kc DE LOS CULTIVOS DETERMINACION DE LA LAMINA DE REPO

"Kc" PARA EL CULTIVO: CB 5 CALCULO DE LA LAMINA NETA SEGÚN COEFICIENT

ETP en el mes Inicial o de Ciembra: ETP = 3.85 mm/dia "Ln" PARA EL CULTIVO: AVENA FORRAJERA
Para un Intervalo de riego inicial de: 7.00 dias Ok!
Kc = 0.42 para la etapa inicial Profundidad Raiz PR : AVENA FORRAJ
valores de calculo y busqueda 3 4.00

Humedad. Relativa Minima HR %: HR = 45.21 % Agotamiento de la HFU: AVENA FORRAJ


Velocidad del Viento Promedio Vv: Vv = 2.53 m/seg
Ln  HFU 
 CC %  PM %   Da  PR
Etapas Periodo Vegetat. Inicial Desar. Medio Medio Final Total
100
Duracion (dias) 30 40 50 30 30 180
Kc 0.42 0.63 1.08 1.10 1.00 -------- DATOS DE SU
Estratos del Suelo C.C.
CURVA Kc DEL CULTIVO: AVENA FORRAJERA (%)
0 - 30 cm 22
Kc del Cultivo

1.2 Inicial Desar. Medio Medio Final 30 - 47.5 cm 22


1.0 1 2 3 4 5 LAMINA NETA (cm)
0.8 0.42 0.63 1.08 1.10 1.00
0.6
Textura del Suelo: 5
0.4

0.2

0.0
1 2 3 4 5
Etapas del Periodo Vegetativo

DETERMINACION DEL Kc DE LOS CULTIVOS DETERMINACION DE LA LAMINA DE REPO

"Kc" PARA EL CULTIVO: CB 10 CALCULO DE LA LAMINA NETA SEGÚN COEFICIENT

ETP en el mes Inicial o de Ciembra: ETP = 3.85 mm/dia "Ln" PARA EL CULTIVO: CEBADA FORRAJERA
Para un Intervalo de riego inicial de: 7.00 dias Ok!
Kc = 0.42 para la etapa inicial Profundidad Raiz PR : CEBADA FORRA
valores de calculo y busqueda 3 4.00

Humedad. Relativa Minima HR %: HR = 45.21 % Agotamiento de la HFU: CEBADA FORRA


Velocidad del Viento Promedio Vv: Vv = 2.53 m/seg

Ln  HFU 
 CC %  PM %   Da  PR
Etapas Periodo Vegetat. Inicial Desar. Medio Medio Final Total
100
Duracion (dias) 30 40 50 30 30 180
Kc 0.42 0.63 1.08 1.10 1.00 -------- DATOS DE SU
Estratos del Suelo C.C.
CURVA Kc DEL CULTIVO: CEBADA FORRAJERA (%)
0 - 30 cm 22
Kc del Cultivo

1.2 Inicial Desar. Medio Medio Final 30 - 47.5 cm 22


1.0 1 2 3 4 5 LAMINA NETA (cm)
0.8 0.42 0.63 1.08 1.10 1.00

0.6
Textura del Suelo: 5
0.4

0.2

0.0
1 2 3 4 5
Etapas del Periodo Vegetativo
DE LA LAMINA DE REPOSICION DE LOS CULTIVOS

ETA SEGÚN COEFICIENTES HIDRICOS

Ln = 2.10 cm

PR = 0.40 hasta 0.60 m


PR = 0.50 m Promedio

HFU = 0.25

%  PM % 
 Da  PR
100

DATOS DE SUELO
P.M. Da PR Ln
(%) (gr/cm3) (cm) (cm)
10 1.40 30 1.26
10 1.40 20 0.84
LAMINA NETA (cm) Ln (cm) = 2.10

DE LA LAMINA DE REPOSICION DE LOS CULTIVOS

ETA SEGÚN COEFICIENTES HIDRICOS

TREBOL BLANCO MAS RYE GRASS Ln = 2.65 cm

PR = 0.20 hasta 0.50 m


PR = 0.35 m Promedio

HFU = 0.45

%  PM % 
 Da  PR
100

DATOS DE SUELO
P.M. Da PR Ln
(%) (gr/cm3) (cm) (cm)
10 1.40 30 2.27
10 1.40 5 0.38
LAMINA NETA (cm) Ln (cm) = 2.65
DE LA LAMINA DE REPOSICION DE LOS CULTIVOS

ETA SEGÚN COEFICIENTES HIDRICOS

AVENA FORRAJERA Ln = 3.99 cm

PR = 0.40 hasta 0.55 m


PR = 0.48 m Promedio

HFU = 0.50

%  PM % 
 Da  PR
100
DATOS DE SUELO
P.M. Da PR Ln
(%) (gr/cm3) (cm) (cm)
10 1.40 30 2.52
10 1.40 17.5 1.47
LAMINA NETA (cm) Ln (cm) = 3.99

DE LA LAMINA DE REPOSICION DE LOS CULTIVOS

ETA SEGÚN COEFICIENTES HIDRICOS

CEBADA FORRAJERA Ln = 3.99 cm

PR = 0.40 hasta 0.55 m


PR = 0.48 m Promedio

HFU = 0.50

%  PM % 
 Da  PR
100
DATOS DE SUELO
P.M. Da PR Ln
(%) (gr/cm3) (cm) (cm)
10 1.40 30 2.52
10 1.40 17.5 1.47
LAMINA NETA (cm) Ln (cm) = 3.99
DETERMINACION DEL COEFICIENTE Kc PONDERADO

PROGRAMACION DE LA CAMPAÑA AGRICOLA - CEDULA DE CULTIVO

CULTIVO Has MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR
% 2% XXXX XXXX XXXX XXXX XXXX XXXX
PAPA AMARGA
Area 5.55 5.55 5.55 5.55 5.55 5.55 5.55
% 70% XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX XXXX
TREBOL BLANCO MAS RYE GRA
Area 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44 177.44
% 24% XXXX XXXX XXXX XXXX XXXX XXXX
AVENA FORRAJERA
Area 61.52 61.52 61.52 61.52 61.52 61.52 61.52
% 3% XXXX XXXX XXXX XXXX XXXX XXXX
CEBADA FORRAJERA
Area 8.50 8.50 8.50 8.50 8.50 8.50 8.50
% 0%
0
Area 0.00
% 0%
0
Area 0.00
% 0%
0
Area 0.00

% 100%
TOTAL 177.44 177.44 177.44 177.44 182.99 253.01 253.01 253.01 253.01 253.01 247.46 177.44
Area 253.01

CALCULO DEL Kc PONDERADO DE LA CEDULA DE CULTIVO

CULTIVO Has MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR
PAPA AMARGA 5.55 0.52 0.56 0.80 1.07 1.10 0.90
TREBOL BLANCO MAS RYE GRAS 177.44 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
AVENA FORRAJERA 61.52 0.42 0.63 0.86 1.08 1.10 1.00
CEBADA FORRAJERA 8.50 0.42 0.63 0.86 1.08 1.10 1.00
0 0.00
0 0.00
0 0.00

TOTAL 253.01 0.90 0.90 0.90 0.90 1.42 2.30 2.96 3.69 4.16 4.00 2.90 0.90
Kc Ponderado 0.90 0.90 0.90 0.90 0.89 0.76 0.82 0.89 0.95 0.96 0.93 0.90
Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado
Llanccaccahu - Sora"

DISTRIBUCION DE FRECUENCIAS O PROBABILIDAD DE OCURRENCIA DE LLUVIA EFECTIVA (f)


AL 75 %
N ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1 207.1 302.6 136.5 56.0 32.3 13.5 16.0 96.5 41.7 115.8 131.8 225.3
2 266.4 158.8 136.9 75.2 30.2 41.4 0.1 5.2 25.5 115.9 120.5 126.0
3 201.1 237.7 187.2 146.1 31.1 1.8 8.0 5.0 39.2 105.4 49.8 171.0
4 220.1 178.2 292.5 77.9 23.5 0.6 11.0 16.8 46.5 76.5 164.2 54.5
5 394.7 213.5 147.3 84.1 9.0 0.0 1.0 30.6 10.6 89.9 94.0 158.0
6 226.6 126.3 154.4 70.5 1.5 1.0 12.8 110.0 55.0 0.0 82.4 152.2
7 260.5 184.8 187.3 62.0 13.0 2.0 3.6 14.1 34.5 82.5 125.4 239.1
8 270.0 289.0 131.7 83.0 8.5 12.5 0.3 20.3 31.7 49.7 66.7 144.2
9 153.2 136.2 185.3 73.5 1.0 0.1 2.0 15.8 15.6 120.8 105.5 134.7
10 230.7 228.1 169.0 64.1 24.2 0.0 0.0 3.9 22.2 59.1 153.3 118.0
11 176.6 164.4 157.5 53.2 0.5 0.0 6.0 24.5 12.5 46.8 92.0 150.7
12 169.4 245.9 160.5 77.5 3.9 1.5 0.0 0.7 19.0 79.6 58.6 156.5
13 256.5 175.9 178.6 78.7 5.2 0.1 0.0 10.4 12.0 21.6 152.7 183.9
14 121.4 150.4 71.5 47.8 3.5 0.0 0.1 12.4 32.2 28.0 80.3 136.5
15 221.5 169.0 165.7 103.0 12.2 8.2 0.5 9.1 62.9 39.9 14.8 137.3
16 137.3 148.1 127.7 66.2 21.8 0.0 0.8 22.8 28.7 22.4 29.0 104.4
17 118.6 204.7 222.0 80.9 7.4 4.0 0.0 10.2 4.5 48.4 77.1 104.5
18 208.5 158.0 171.4 61.7 0.0 4.5 8.6 0.0 29.4 52.9 41.8 91.2
19 148.6 135.5 156.0 80.2 0.4 0.0 0.2 4.0 13.8 26.0 79.1 122.2
20 258.8 85.5 96.9 131.8 8.6 0.0 0.4 0.0 7.8 74.7 36.5 116.1
21 133.0 103.0 164.7 35.9 0.3 5.1 3.7 11.0 16.5 55.5 48.3 67.0
22 218.6 156.0 135.4 76.7 5.0 1.1 0.0 2.8 15.5 45.0 75.4 127.5
23 188.5 198.1 181.0 60.9 11.0 8.0 9.0 1.1 26.0 67.5 110.0 159.0
24 260.7 135.6 135.3 34.8 0.0 18.5 5.2 9.1 4.5 64.7 34.5 121.8
25 241.5 160.2 90.0 37.5 7.6 0.1 1.0 1.8 9.8 18.7 65.2 143.5
26 179.3 178.8 53.5 17.5 21.3 11.0 0.8 12.1 27.1 37.3 89.3 145.4
27 208.2 178.6 147.5 50.4 29.5 0.0 0.4 2.0 15.1 21.5 39.8 132.0
28 142.1 136.8 131.5 45.5 2.1 0.0 1.2 12.5 14.5 14.0 46.2 138.7
29 156.5 142.6 197.0 24.1 16.6 0.0 0.0 12.2 2.3 83.1 70.0 102.0
30 195.7 108.0 137.6 25.0 16.5 0.4 1.4 8.4 23.2 24.9 127.4 77.5
31 95.6 130.6 102.5 79.0 1.0 0.0 0.0 10.0 3.6 16.5 41.0 202.4
32 86.2 173.3 142.7 51.5 11.1 0.1 0.0 2.1 22.1 54.9 43.2 84.3
33 245.7 163.4 209.0 56.0 18.5 1.7 1.3 0.0 21.1 66.5 64.6 151.0
34 175.3 118.8 112.3 74.0 7.0 0.0 9.0 2.4 5.0 11.3 6.2 130.9
35 164.0 73.5 105.4 24.6 3.0 4.2 0.0 8.8 31.5 15.9 64.5 71.0
36 155.9 99.5 90.5 18.5 7.4 0.0 0.0 3.0 13.2 25.1 50.9 88.7
37 153.0 108.8 181.3 28.0 4.0 0.0 0.0 1.5 32.7 26.9 22.4 143.5
38 88.1 110.5 142.5 37.6 2.8 0.0 0.0 0.1 26.9 17.6 99.4 123.5
39 202.0 126.9 167.1 21.5 4.3 0.0 4.0 0.0 6.7 50.1 57.6 132.0
40 136.8 110.5 101.4 24.6 0.0 0.0 0.0 1.0 24.5 33.5 0.0 172.7
41 82.7 44.7 102.4 21.9 0.2 0.0 0.1 0.0 4.0 42.5 44.0 97.9
42 65.5 105.8 117.3 30.0 5.0 0.0 0.1 3.3 0.0 80.2 23.0 99.4
43 78.8 124.2 107.9 35.5 2.8 0.0 0.0 0.0 20.8 22.0 28.3 97.1
44 118.3 136.9 93.0 15.8 1.1 0.0 0.0 9.8 11.5 21.8 73.2 94.5
45 52.3 168.1 162.5 35.5 0.0 0.0 0.1 0.0 18.1 9.5 0.0 131.9
46 156.6 57.3 85.7 0.3 0.5 0.0 0.0 0.0 9.6 13.0 16.0 66.8
47 83.5 145.4 70.0 57.1 2.5 0.0 0.0 2.0 1.7 28.2 9.5 69.2
48 73.4 116.4 76.9 12.0 0.2 0.0 0.0 0.0 5.3 17.9 21.2 89.8
49 97.5 153.6 107.3 50.5 0.0 0.0 0.6 0.0 0.0 44.5 6.2 83.6
P 75% 153.7 106.5 158.6 25.6 4.9 0.0 0.0 1.9 27.8 26.5 29.5 129.8
MEDIA 173.1 152.2 140.6 54.2 8.6 2.9 2.2 10.8 19.6 46.7 63.9 125.9
Fuente: Elaboración Propia

Gobierno Regional Puno PRORRIDRE


Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado
Llanccaccahu - Sora"

VIA EFECTIVA (f)

f
2.0
4.1
6.1
8.2
10.2
12.2
14.3
16.3
18.4
20.4
22.4
24.5
26.5
28.6
30.6
32.7
34.7
36.7
38.8
40.8
42.9
44.9
46.9
49.0
51.0
53.1
55.1
57.1
59.2
61.2
63.3
65.3
67.3
69.4
71.4
73.5
75.5
77.6
79.6
81.6
83.7
85.7
87.8
89.8
91.8
93.9
95.9
98.0
100.0

Gobierno Regional Puno PRORRIDRE


CALCULO DE LA PRECIPITACION EFECTIVA
(Metodo de Water Power)

Estimacion de la Precipitacion Efectiva


Pe  50.00 250.95 250.90 250.82 250.65 250.45 250.25...
Pe  AMI  ( Pp  IPM )% Pe

Calculos Realizados para allar la preciptacion Efectiva


Metodo de Water Power Datos de Presipitación Prosesamiento de Datos Metodo Water Power Resultado
Pp AMI IPM %Pe
Distribucion de la Precipitacion Efectiva MES Precp. Acumulado Incremto de % Pe
(mm/mes) Menor Inmed. Precip. Menor Precp. Efect. (mm/mes)
Ipp %Pe AMI ENE 153.73 94.25 130 0.25 100.18
Incremento de % Precipitación Acumulado FEB 106.48 83.00 105 0.45 83.66
Precipitac. (mm) Efectiva Menor Inmed. MAR 158.60 100.50 155 0.05 100.68
5 0 0.00 ABR 25.63 0.00 5 0.95 19.59
30 95 0.00 MAY 4.85 0.00 0 0.00 0.00
55 90 23.75 JUN 0.00 0.00 0 0.00 0.00
80 82 46.25 JUL 0.00 0.00 0 0.00 0.00
105 65 66.75 AGO 1.88 0.00 0 0.00 0.00
130 45 83.00 SEP 27.83 0.00 5 0.95 21.68
155 25 94.25 OCT 26.45 0.00 5 0.95 20.38
> 155 5 100.50 NOV 29.53 0.00 5 0.95 23.30
DIC 129.80 83.00 105 0.45 94.16

Precipitacion Media Mensual al 75% deProbabilidad


MES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
Pe (mm/mes) 153.73 106.48 158.60 25.63 4.85 0.00 0.00 1.88 27.83 26.45 29.53 129.80

Precipitacion Efectiva Estimada (Pe) - Water Power


MES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
Pe (mm/mes) 100.18 83.66 100.68 19.59 0.00 0.00 0.00 0.00 21.68 20.38 23.30 94.16

Pe (mm/dia) 3.23 2.99 3.25 0.65 0.00 0.00 0.00 0.00 0.72 0.66 0.78 3.04
EFICIENCIA DE RIEGO
Proyecto : Sistema de Riego San Jose
Región : Puno
Provincia: Azangaro
Distrito : San Jose
EFICIENCIA DE APLICACIÓN
Evapotranspiración maxima : 4.03 mm/día

Velocidad del Viento Máxima: 2.53 m/seg

Ln : 39.90 mm

Efap = 66.79 % (Tabla N° 8)

EFICIENCIA DE DISTRIBUCIÓN

Qp
Efd 
Qe
Efd : Eficiencia de Distribución
Qp : Caudal de Entrada al Predio (l/seg)
Qe : Caudal de Entrada al Área de Riego (l/seg)
En caso de que la distribución se realiza por medio de tuberías, esta eficiencia se considera el 100 %

Efd = 100.00 %

EFICIENCIA DE CONDUCCIÓN

Qe
Efc 
Qc
Efdc: Eficiencia de Conducción
Qp : Caudal de Capatación en Bocatoma (l/seg)
Qe : Caudal a la Entrada al Área de Riego (l/seg)
En caso de que la distribución se realiza por medio de tuberías, esta eficiencia se considera el 100 %

Efc = 100.00 %

EFICIENCIA DE RIEGO

Efr  Efap  Efd  Efc


Efr: Eficiencia de Riego
Efap : Eficiencia de Aplicación
Efd : Eficiencia de Distribución
Efc : Eficiencia de Conducción

Efr: 66.79%
Hidrología Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora""
CALCULO DE DEMANDA DE AGUA SISTEMA DE RIEGO
Nº CONCEPTO UND SET OCT NOV DIC ENE FEB MAR ABR MAY
1 Coeficiente : Kc 0.89 0.76 0.82 0.89 0.95 0.96 0.93 0.90 0.90
2 Area de Cultivo Hás 182.99 253.01 253.01 253.01 253.01 253.01 247.46 177.44 177.44
3 Evapotranspiración Potencial (ETP) mm/mes 99.38 119.47 121.04 124.34 119.56 104.48 108.15 93.47 78.40
4 Evapotranspiración Real (ETR =Kc*ETP) mm/mes 88.30 90.76 99.63 110.99 114.08 99.81 100.40 84.12 70.56
5 Precipitación Media (Pm) mm/mes 19.49 46.06 64.20 125.21 171.40 151.08 139.85 54.14 8.36
6 Precipitación Efectiva (PPef) mm/mes 21.68 20.38 23.30 94.16 100.18 83.66 100.68 19.59 -
7 Lámina de Riego Neta (LRN= ETR-Ppef) mm/mes 66.62 70.38 76.33 16.83 13.90 16.15 - 64.53 70.56
8 Eficiencia de Riego (Efr) % 66.8% 66.8% 66.8% 66.8% 66.8% 66.8% 66.8% 66.8% 66.8%
9 Lámina de Riego Bruta (LRB=LRN/Efr) mm/mes 99.74 105.38 114.29 25.20 20.81 24.17 - 96.61 105.64
10 Volumen de Agua/Há m3/Há 997.40 1,053.79 1,142.85 251.98 208.10 241.75 - 966.11 1,056.45
11 Días del Mes Días 30 31 30 31 31 28 31 30 31
12 Módulo de Riego (24 horas) Lt/seg/há 0.38 0.39 0.44 0.09 0.08 0.10 - 0.37 0.39
13 Requerimiento Total Caudal (Q) 24 h Lt/seg 69.54 98.67 111.32 22.77 20.24 25.30 - 65.65 69.20
14 Requerimiento Total Caudal (Q) 24 h m3/seg 0.07 0.10 0.11 0.02 0.02 0.03 - 0.07 0.07
15 Requerimiento Total Volumen (Vt) MM3 0.18 0.26 0.29 0.06 0.05 0.06 - 0.17 0.19

Gobierno Regional Puno PRORRIDRE


Hidrología Expediente Tecnico: "Instalacion del Sistema de Riego Tecnificado Llanccaccahua - Sora""

JUN JUL AGO TOTAL


0.90 0.90 0.90
177.44 177.44 177.44
65.83 70.00 84.48
59.25 63.00 76.03
2.77 2.14 10.55
- - -
59.25 63.00 76.03
66.8% 66.8% 66.8%
88.71 94.33 113.83
887.11 943.25 1,138.34
30 30 31
0.34 0.36 0.43
60.33 63.88 76.30
0.06 0.06 0.08
0.16 0.17 0.20 1.79

Gobierno Regional Puno PRORRIDRE


DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION
33 de 54

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI
CALCULO DEL Kc PONDERADO DE LA CEDULA DE CULTIVO

CULTIVO Unid. MAY JUN JUL AGO SEP OCT NOV DIC
Evapotranspiración Potencial (ETP) mm/día 2.53 2.19 2.26 2.73 3.31 3.85 4.03 4.01
Kc Ponderado 0.90 0.90 0.90 0.90 0.89 0.76 0.82 0.89
Evapotranspiración Real (ETR) mm/día 2.28 1.97 2.03 2.46 2.94 2.92 3.32 3.58
Velocidad del Viento m/s 1.81 1.92 2.07 2.12 2.53 2.38 2.28 2.23
Velocidad de Infiltracion Basica (Ib) mm/h 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
Jornal Horas de Trabajo horas 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Eficiencia de Aplicación % 66.79% 66.79% 66.79% 66.79% 66.79% 66.79% 66.79% 66.79%
Lámina Neta (Ln) mm 26.46 39.90 39.90 39.90 39.90 39.90 39.90 39.90
Intervalo de Riego (IR) días 11.62 20.24 19.62 16.24 13.57 13.64 12.03 11.15

Intervalo de Riego Ajustado (IR) días 12.00 20.00 20.00 16.00 14.00 14.00 12.00 11.00

Lámina Neta Ajustada (Lna) mm 27.32 39.42 40.68 39.31 41.17 40.95 39.80 39.38
Lámina Real (Lr) mm 40.90 59.02 60.91 58.86 61.64 61.31 59.59 58.96
Pluviometria del Aspersor (Ppa) mm/h 7.17 7.17 7.17 7.17 7.17 7.17 7.17 7.17

Tiempo de Aplicación (Ta) horas 6.00 8.00 8.00 8.00 9.00 9.00 8.00 8.00

A Informacion Requerida mes crítico :

Evaptranspiracion Potencial ETP = 4.03 mm/dia

Coeficiente del cultivo Kc = 0.82

Evapotranspiracion Real ETR = 3.32 mm/dia

Velocidad del Viento Vv = 2.11 m/s

Velocidad de Infiltracion Basica Ib = 8.00 mm/h

Cultivo Proyectado SEGÚN CEDULA DE CULT.

Jornal, horas de trabajo J= 8 horas/dia

Eficiencia de Riego Er = 66.79%

Caudal Disponible Qd = lt / seg


Los datos son obtenidos del estudio hidrológico
B Calculos de Demanda Hidrica

1.- Lamina neta ( Ln ): Ln = 39.9 mm

CULTIVO LAMINA REQUERIDA


PAPA AMARGA Ln = 2.10 cm
TREBOL BLANCO MAS RYE GRASS Ln = 2.65 cm
AVENA FORRAJERA Ln = 3.99 cm
CEBADA FORRAJERA Ln = 3.99 cm

LAMINA NETA MAX. Ln = 3.99 cm

2.- Intervalo de riego ( IR ): IR = Ln / ETR IR = 12.00 Dias

Evaptranspiracion Real ETR = 3.32 mm/dia


Lamina neta ( Ln ) Ln = 39.90 mm
34 de 54

DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI
IR = 12.03 Dias
DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION
35 de 54

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI
3.- Lamina Neta Ajustada ( Ln ): Ln = IR * ETR Ln = 39.80 mm

Evaptranspiracion Real ETR = 3.32 mm/dia


Lamina neta ( Ln ) IR = 12.00 Días
Ln = 39.80 mm

4.- Lamina Real o Bruta ( Lr ): Lr = ( Ln/Er ) Lr = 59.59 mm 5.959 cm 0.05959 m

Lamina neta ( Ln ): Ln = 39.80 mm


Eficiencia de Riego Er = 66.79%
Lr = 59.59 mm

5.- Tiempo de aplicación Preliminar: Ta = Lr / Ib Ta = 5.000 horas

Lamina Real Lr = 59.59 mm


Velocidad de Infiltracion Ib = 13.00 mm/hora
Ta = 4.58 mm

6.- Caudal para Selección de Aspersor: qa = (Ea*El*Lr)/Ta qa = 2.15 m3 / h


qa = 2,150 l / h
Espasiamento de Aspersores Ea = 12.0 m
Espasiamento de Lineas El = 15.0 m
Lamina real Lr = 0.0596 m
Tiempo de aplicación Ta = 5.00 horas
qa = 2.15 m3 / h

C Caracteristicas Hidraulicas de los Aspersoers

Especificaciones de Diseño de los Aspersores Marca : VYR 35


PVC
Diametro de boquillas del Asprsor f 3.96x2.38 mm
Espasiamento de Aspersores Ea Ea = 12.0 m
Espasiamento de Lineas El El = 15.0 m
Pluviometria del Aspersor Pp Pp = 7.2 mm / h
Presion de trabajo en Bar. Po = 3.16 Bars
Caudal del aspersor qa qa = 1.29 m3 /h 0.358 lt / seg 1,290 lt / h
Diamt. Alcance de Chorro D= 31.2 m

D Calculos de Disposición de Aspersores

1.- Conprovacion del Espaciamiento: E= 12.00 m

Valores de E según Vv
Velocidad del Viento Vv = 2.11 m/s Vv (m/s) Espaciamiento
Diamt. Alcance de Chorro D= 31.2 m <2 0.60 x D
Ea = 15.60 m 2 a 3.5 0.50 x D
Ea = 12.00 m OK! 3.5 a 4.5 0.45 x D
> 4.5 0.40 x D
E= 0.50 x D

2.- Obtencion de la Pluviometria Real: Pp = qa * 1000 Pp = 7.17 mm / h


36 de 54

DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI
Ea * El
Caudal del aspersor qa qa = 1.29 m3 /h 0.36 lt / seg
Espasiamento de Aspersores Ea Ea = 12.0 m
Espasiamento de Laterales El El = 15.0 m

Comprovacion de la Pluviometria: Pp < Ib

Pluviometria del Aspersor Pp Pp < Ib Velocidad de Infiltracion Basica


7.2 < 13.0 OK!
mm / h OK! mm / h
DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION 37 de 54

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI

3.- Tiempo de Aplicación ( Ta ): Ta = Lr / Pp Ta = 8.00 horas

Lamina Real ( Lr ) Lr = 59.59 mm


Pluviometria del Aspersor Pp Pp = 7.2 mm / h
Ta = 8.3 horas

4.- Caudal por Línea de Riego (Qlr) Qlr=qa*Na Qlr = 1.08 l/s

Caudal por Aspersor (qa) qa = 0.36 l/s


Na por Línea de Riego Na = 3 Aspers.
Caudal por Línea de Riego Qlr = 1.08 l/s

5.- No de posiciones /dia /linea de R.: Np/dia/lat. = Jornal Np/ d/ lat.= 1.00 Posiciones/ Dia
Ta + Tc

Jornal, horas de trabajo J= 8 horas/dia


Tiempo de Aplicación ( Ta ) Ta = 8 horas
Tiempo de Cambios ( Tc ) Tc = 60 minutos 1.00 horas
Np/d/lat.= 0.89 Posic.

4.- No de Aspersores en Operación Simultanea: Na = Qd / qa No Asper = 0.00

Caudal Disponible Qd = 0.0 lt / seg


Caudal del Aspersor qa = 1.29000001 m3 /h 0.36 lt / seg

5.- No de Posiciones N: N = t / Ta No Posic. = 12.00


t = Ir x J
Intervalo de Riego (Ir) Ir = 12 días
Jornal, horas de trabajo J= 8 horas /día
Horas disponibles (t) t= 96 horas
Tiempo de aplicación (Ta) Ta = 8.00 horas
Numero de posiciones (N) N= 12 Posiciones

8.- Superficie de Riego de cada Lateral: SRL = Na *Ara *(Np/ dia /lat SRL = 0.109 Has/dia

Numero de Aspersores por lateral Na = 3.0 Aspersores en un Lateral


Area de Riego de un Aspersor Area = 363.9 m2
Numero de posiciones /dia /lateral Np/ dia/ lat. = 1.00 Posiciones en un Dia

SRL = 1092 m2/dia

9.- Area Total que Llegara a Regar Cada lateral STRL = SRL * IR STRL = 1.308 Has

Superficie de Riego Cada Lateral: SRL = 0.109 Has/dia


Intervalo de riego ( IR ) IR = 12 dias

10.- Superficie Total de Riego del Proyecto : STR = STRL * N° STR = 26.16 Has

Superficie de Riego Cada Línea: SRL = 1.308 Has/dia


38 de 54

DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI
N° de Líneas de Riego N° L = 20 Lineas de R.
39 de 54

Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los


ol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno

ENE FEB MAR ABR


3.86 3.73 3.49 3.12
0.95 0.96 0.93 0.90
3.68 3.56 3.24 2.81
2.16 2.02 1.94 1.80
13.00 13.00 13.00 13.00
8.00 8.00 8.00 8.00
66.79% 66.79% 66.79% 66.79%
39.90 39.90 39.90 39.90
10.83 11.20 12.32 14.21

11.00 11.00 12.00 14.00

40.52 39.20 38.88 39.31


60.67 58.69 58.21 58.86
7.17 7.17 7.17 7.17

8.00 8.00 8.00 8.00


40 de 54

RESULTADOS DISEÑO DEL SISTEMA DE RIEGO POR ASPERSION

PROYECTO:
Mejoramiento y Ampliacion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
Sectores de Llanccaccahua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
OBRA:
REGIÓN: PUNO
PROVINCIA: MELGAR
DISTRITO: UMACHIRI

A Informacion Requerida:

Evaptranspiracion Potencial ETP = 4.03 mm/dia

Coeficiente del cultivo Kc = 0.90 Maximo

Evapotranspiracion Real ETR = 3.63 mm/dia

Velocidad del Viento Vv = 2.53 m/s

Velocidad de Infiltracion Basica Ib = 13.00 mm/h

Cultivo Proyectado SEGÚN CEDULA DE CULTIVO

Jornal, horas de trabajo J= 8 horas/dia

Eficiencia de Riego Er = 66.79%

Caudal Disponible Qd = 0 lt / seg


Los datos son obtenidos del estudio hidrológico
B Resultados

Asperso : VYR 35 PVC

Diametro de Boquilla : f 3.96x2.38 mm

Caudal del Aspesor : qa = 0.36 lt / seg

Presion en Boquilla : Po = 3.16 Bars

Espasiamento de Aspersores Ea : Ea = 12.00 m

Espasiamento de Lineas El : El = 15.00 m

Pluviometría del Aspersor : Pp = 7.17 mm / h

Intervalos de Riego : IR = 12 Dias

Tiempo de Aplicación entre Posturas: Ta = 8.00 horas

No de posiciones /dia /linea de Riego: Np/ d/ lat.= 1 Posiciones/ Dia

N° Aspersores en Operación Simultanea: No Asper = 0 Aspersores

N° Aspersores Total/día : No Asper/día = 0 Aspersores

Superficie de Riego de cada Línea de Riego : SRL = 0.109 Has/dia

Superficie Total que Regara C/Linea de Riego: STRL = 1.308 Has

Superficie Total de Riego: STR = 26.16 Has


41 de 54

cion del Servicio de Agua para el Sistema de Riego Tecnificado Llanccaccahua Sora, en los
ua, Trebol, Sora y Huanacomarca, Distroto de Umachiri, Provincia de Melgar, Región Puno
TABAL 01 (TB 01)
FACTOR MENSUAL DE LATITUD MF
PARA CALCULAR LA EVAPOTRANSPIRACION POTENCIAL
SEGÚN HARGRAVES

Lat. Sur MESES DEL AÑO


(º) ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
31 28 31 30 31 30 31 31 30 31 30 31
1 2.788 2.117 2.354 2.197 2.137 1.990 2.091 2.216 2.256 2.358 2.234 2.265
2 2.371 2.136 2.357 2.182 2.108 1.956 2.050 2.194 2.251 2.372 2.263 2.301
3 2.353 2.154 2.360 2.167 2.079 1.922 2.026 2.172 2.246 2.386 2.290 2.337
4 2.385 2.172 2.362 2.151 2.050 1.888 1.995 2.150 2.240 2.398 2.318 2.372
5 2.416 2.189 2.363 2.134 2.020 1.854 1.960 2.126 2.234 2.411 2.345 2.407
6 2.447 2.050 2.363 2.117 1.980 1.820 1.976 2.103 2.226 2.422 2.371 2.442
7 2.478 2.221 2.363 2.099 1.959 1.785 1.893 2.078 2.218 2.433 2.397 2.476
8 2.508 2.237 2.362 2.081 1.927 1.750 1.858 2.054 2.210 2.443 2.423 2.510
9 2.538 2.251 2.360 2.062 1.896 1.715 1.824 2.028 2.201 2.453 2.448 2.544
10 2.567 2.266 2.357 2.043 1.864 1.679 1.789 2.003 2.191 2.462 2.473 2.577
11 2.596 2.279 2.354 2.023 1.832 1.644 1.754 1.976 2.180 2.470 2.497 2.610
12 2.625 2.292 2.350 2.002 1.799 1.608 1.719 1.950 2.169 2.477 2.520 2.643
13 2.652 2.305 2.345 1.981 1.767 1.572 1.684 1.922 2.157 2.484 2.543 2.675
14 2.680 2.317 2.340 1.959 1.733 1.536 1.648 1.895 2.144 2.490 2.566 2.706
15 2.707 2.326 2.334 1.937 1.700 1.500 1.612 1.867 2.131 2.496 2.588 2.738
16 2.734 2.339 2.317 1.914 1.666 1.464 1.576 1.838 2.117 2.500 2.610 2.769
17 2.760 2.349 2.319 1.891 1.632 1.427 1.540 1.809 2.103 2.504 2.631 2.799
18 2.785 2.359 2.311 1.867 1.598 1.391 1.504 1.780 2.088 2.508 2.651 2.830
19 2.811 2.368 2.302 1.843 1.654 1.354 1.467 1.750 2.072 2.510 2.671 2.859
Fuente: El Riego - Absalon Vasques Villanueva - 2000
TABAL 02 (TB 02)
DURACIÓN MÁXIMA DIARIA MEDIA DE LAS HORAS DE FUERTE INSOLACIÓN (N)
PARA CALCULAR LA EVAPOTRANSPIRACION POTENCIAL
SEGÚN HARGRAVES

Lat. Sur MESES DEL AÑO


(º) ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
31 28 31 30 31 30 31 31 30 31 30 31
1 50 15.90 14.50 12.70 10.80 9.10 8.10 8.50 10.10 11.80 13.80 15.40 16.30
2 48 15.60 14.30 12.60 10.90 9.30 8.30 8.80 10.20 11.80 13.60 15.20 16.00
3 46 15.40 14.20 12.60 10.90 9.50 8.70 9.10 10.40 11.90 13.50 14.90 15.70
4 44 15.20 14.00 12.60 11.00 9.70 8.90 9.30 10.50 11.90 13.40 14.70 15.40
5 42 14.90 13.90 12.90 11.10 9.80 9.10 9.40 10.60 11.90 13.40 14.60 15.20
6 40 14.70 13.70 12.50 11.20 10.00 9.30 9.60 10.70 11.00 13.30 14.40 15.00
7 35 14.30 13.50 12.40 11.30 10.30 9.80 10.10 11.00 9.00 13.10 14.00 14.50
8 30 13.90 13.20 12.40 11.50 10.60 10.20 10.40 11.10 11.90 12.90 13.60 14.00
9 25 13.50 13.00 12.30 11.60 10.90 10.60 10.70 11.30 12.00 12.70 13.30 13.70
10 20 13.20 12.80 12.30 11.70 11.20 10.90 11.00 11.50 12.00 12.60 13.10 13.30
11 15 12.90 12.60 12.20 11.80 11.40 11.20 11.30 11.60 12.00 12.50 12.80 13.00
12 10 12.60 12.40 12.10 11.80 11.60 11.50 11.60 11.80 12.00 12.30 12.60 12.70
13 5 12.30 12.30 12.10 12.00 11.90 11.80 11.80 11.90 12.00 12.20 12.30 12.40
14 0 12.10 12.10 12.10 12.10 12.10 12.10 12.10 12.10 12.10 12.10 12.10 12.10
Fuente: El Riego - Absalon Vasques Villanueva - 2000
TABAL 03 (TB 03)
RADIACIÓN EXTRATERRESTRE (Ra)
EXPREASDA EN EVAPORACIÓN (mm/día)
PARA CALCULAR LA EVAPOTRANSPIRACION POTENCIAL
SEGÚN HARGRAVES
Lat. Sur MESES DEL AÑO
(º) ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
31 28 31 30 31 30 31 31 30 31 30 31
1 50 17.50 14.70 10.90 7.00 4.20 3.10 3.50 5.50 8.90 12.70 16.50 18.20
2 48 17.60 14.90 11.20 7.50 4.70 3.50 4.00 6.00 9.30 13.00 16.60 18.20
3 46 17.70 15.10 11.50 7.90 5.20 4.00 4.40 6.50 9.70 13.30 16.70 18.30
4 44 17.80 15.30 11.90 8.40 6.10 4.40 4.90 6.90 10.20 13.70 16.70 18.30
5 42 17.80 15.50 12.20 8.80 6.60 4.90 5.40 7.40 10.60 14.00 16.80 18.30
6 40 17.90 15.70 12.50 9.20 7.10 5.30 5.90 7.90 11.00 14.30 16.90 18.30
7 38 17.90 15.80 12.80 9.60 7.50 5.80 6.30 8.30 11.40 14.50 17.00 18.30
8 36 17.90 16.00 13.20 10.10 8.00 6.30 6.60 8.80 11.70 14.70 17.00 18.20
9 34 17.80 16.10 13.50 10.50 8.50 6.80 7.20 9.20 12.00 14.80 17.10 18.20
10 32 17.80 16.20 13.80 10.90 8.90 7.30 7.70 9.60 12.40 15.00 17.20 18.10
11 30 17.80 16.40 14.00 11.30 8.90 7.80 8.10 10.10 12.70 15.20 17.30 18.10
12 28 17.70 16.40 14.30 11.60 9.30 8.20 8.60 10.40 13.00 15.30 17.20 17.90
13 26 17.60 16.40 14.40 12.00 9.70 8.70 9.10 10.90 13.20 15.40 17.20 17.80
14 24 17.50 16.50 14.60 12.30 10.20 9.10 9.50 11.20 13.40 15.60 17.10 17.70
15 22 17.40 16.50 14.80 12.60 10.60 9.60 10.00 11.60 13.70 15.70 17.00 17.50
16 20 17.30 16.50 15.00 13.00 11.00 10.00 10.40 12.00 13.90 15.80 17.00 17.40
17 18 17.10 16.50 15.10 13.20 11.40 10.40 10.80 12.30 14.10 15.80 16.80 17.10
18 16 16.90 16.40 15.20 13.50 11.70 10.80 11.20 12.60 14.30 15.80 16.70 16.80
19 14 16.70 16.40 15.30 13.70 12.10 11.20 11.60 12.90 14.50 15.80 16.50 16.60
20 12 16.60 16.30 15.40 14.00 12.50 11.60 12.00 13.20 14.70 15.80 16.40 16.50
21 10 16.40 16.30 15.50 14.20 12.80 12.00 12.40 13.50 14.80 15.90 16.20 16.20
22 8 16.10 16.10 15.50 14.40 13.10 12.40 12.70 13.70 14.90 15.80 16.00 16.00
23 6 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
24 4 15.50 15.80 15.60 14.90 13.80 13.20 13.40 14.30 15.10 15.60 15.50 15.40
25 2 15.30 15.70 15.70 15.10 14.10 13.50 13.70 14.50 15.20 15.50 15.30 15.10
26 0 15.00 15.20 15.70 15.30 14.40 13.90 14.10 14.80 15.30 15.40 15.10 14.80
Fuente: El Riego - Absalon Vasques Villanueva - 2000
TABAL 04 (TB 04)

Profundidad de Raiz y Agotamiento de la Humedad Fasilmente Utilisable


para Diferentes Cultivos

CODIGO CULTIVO Profundidad de Raiz Agotamiento


BUSQUEDA PR (m) de la HFU
1 ALFALFA 0.90 a 1.50 0.55
2 ALGODÓN 1.00 a 1.70 0.65
3 ARVEJA 0.60 a 1.00 0.35
4 APIO 0.30 a 0.50 0.20
5 AVENA FORRAJERA 0.40 a 0.55 0.50
6 AVENA FORRAJERA VERDE 0.40 a 0.60 0.55
7 CAMOTE 1.00 a 1.50 0.65
8 CAÑA DE AZUCAR 1.20 a 2.00 0.60
9 CAÑIHUA 0.30 a 0.60 0.35
10 CEBADA FORRAJERA 0.40 a 0.55 0.50
11 CEBOLLA 0.30 a 0.50 0.25
12 CITRICOS 1.20 a 1.50 0.50
13 COL 0.40 a 0.50 0.45
14 ESPINACA 0.30 a 0.50 0.20
15 FRESAS 0.20 a 0.30 0.15
16 FRIJOL 0.50 a 0.70 0.45
17 FRUTALES 1.00 a 2.00 0.50
18 GIRASOL 0.80 a 1.50 0.45
19 HABAS 0.50 a 0.70 0.45
20 LECHUGA 0.30 a 0.50 0.30
21 LEGUMINOSAS 0.30 a 0.60 0.20
22 MAIZ 0.50 a 0.70 0.45
23 MANI 0.50 a 1.00 0.40
24 MELON 1.00 a 1.50 0.35
25 OLIVO 1.20 a 1.70 0.65
26 PAPA DULCE 0.40 a 0.60 0.25
27 PAPA AMARGA 0.40 a 0.60 0.25
28 TREBOL BLANCO MAS RYE GRA 0.20 a 0.50 0.45
29 PEPINO 0.70 a 1.20 0.50
30 PIMIENTO 0.50 a 1.00 0.25
31 QUINUA 0.30 a 0.60 0.35
32 QUINUA ORGANICA 0.30 a 0.60 0.35
33 SISAL 0.50 a 1.00 0.75
34 SORGO 0.80 a 1.00 0.55
35 SOYA 0.60 a 1.30 0.50
36 TABACO 0.50 a 1.00 0.35
37 TOMATE 0.70 a 1.20 0.40
38 TREBOL 0.60 a 0.90 0.35
39 TRIGO 1.00 a 1.50 0.55
40 VID 1.00 a 2.00 0.35
41 ZANAHORIA 0.50 a 1.00 0.35
42
43
44 a
45 a
Fuente: Sistemas Hidraulicos de Riego - C. A. Benites Castro - 2000
TABAL 05 (TB 05)

Valores de Kc para Diferentes Cultivos


Según Clima Y Fases de Cresimiento

PASES DEL PERIODO VEGETATIVO


INICIAL FASE MEDIA
CODIGO CULTIVO HR min > 70% HR min < 70%
BUSQUEDA MES Kc Vv (0-5m/s) Vv (5-8m/s) Vv (0-5m/s) Vv (5-8m/s)
1 ALFALFA 01 0.95 0.95 0.95 0.95 0.95
2 ALGODÓN
3 ARVEJA (Verde)
4 APIO
5 AVENA FORRAJERA 10 0.42 0.63 0.86 1.08 1.10
6 AVENA FORRAJERA VERDE 03 0.42 0.63 0.86 1.08 1.10
7 CAMOTE
8 CAÑA DE AZUCAR
9 CAÑIHUA 09 0.57 0.90 1.10 1.10 1.07
10 CEBADA FORRAJERA 10 0.42 0.63 0.86 1.08 1.10
11 CEBOLLA (Cavesa)
12 CITRICOS
13 COL
14 ESPINACA
15 FRESAS
16 FRIJOLES (Verdes)
17 FRUTALES
18 GIRASOL
19 HABAS 07 0.57 0.90 1.10 1.10 1.07
20 LECHUGA
21 LEGUMINOSAS
22 MAIZ (Choclo)
23 MANI
24 MELON
25 OLIVO
26 PAPA DULCE 11 0.53 0.57 0.87 1.10 1.10
27 PAPA AMARGA 09 0.52 0.56 0.80 1.07 1.10
28 TREBOL BLANCO MAS RYE GR 01 0.90 0.90 0.90 0.90 0.90
29 PEPINO
30 PIMIENTO (fresco)
31 QUINUA 10 0.57 0.90 1.10 1.10 1.07
32 QUINUA ORGANICA 09 0.57 0.90 1.10 1.10 1.07
33 SISAL
34 SORGO
35 SOYA
36 TABACO
37 TOMATE
38 TREBOL
39 TRIGO
40 VID
41 ZANAHORIA
42
43
44
45
Fuente: Sistemas Hidraulicos de Riego - C. A. Benites Castro - 2000
Valores de Kc para Diferentes Cultivos
Según Clima Y Fases de Cresimiento

PASES DEL PERIODO VEGETATIVO


FASE FINAL
HR min > 70% HR min < 70%
Vv (0-5m/s) Vv (5-8m/s) Vv (0-5m/s) Vv (5-8m/s)
0.95 0.95 0.95 0.95

1.00
1.00

0.52
1.00

0.52 0.52 0.52 0.52

0.92
0.90
0.90 0.90 0.90 0.90

0.52
0.52
Coeficiente del Cultivo Kc
Relacion ETP - Kc y Frecuencia de Riego
ETP Kc Kc Kc Kc Kc
2 4 7 10 20
Relacion ETP - Kc y Frecuencia de Riego
0.50 1.08 1.01 0.81 0.65 0.49
1.2
1.00 1.05 0.96 0.76 0.60 0.45
2.00 1.00 0.87 0.66 0.50 0.37
1.0
3.00 0.95 0.79 0.58 0.43 0.31
4.00 0.91 0.73 0.52 0.37 0.26Dias 2
0.8
5.00 0.88 0.68 0.47 0.33 0.22
6.00 0.85 0.63 0.44 0.30 0.20
0.6
7.00 0.83 0.59 0.40 0.27 0.18Dias 4
8.00 0.81 0.56 0.37 0.25 0.17
0.4
9.00 0.79 0.54 0.35 0.23 0.16Dias 7
9.70 0.79 0.53 0.34 0.22 0.16Dias 10
0.2
Dias 20

0.0
0 1 2 3 4 5 6 7 8 9 10
ETP (mm/dia) - Etapa Inicial

Fuente: El Riego - Absalon Vasques Villanueva - 2000


TABAL 07 (TB 07)

PROPIEDADES FÍSICAS DEL SUELO

FILTRACIÓN Y TOTAL ESPACIO DENSIDAD CAPACIDAD DE PUNTO DE HUMEDAD TOTAL UTILIZABLE


CODIGO TEXTURA DEL PERMEABILIAD POROSO APARENTE CAMPO (CC) MARCHITEZ (PMP) Peso Seco Volumen
BUSQUEDA SUELO cm/hr (1) % gr/cm 3
% % % %
1 ARENOSO 5.00 38.00 1.65 9.00 4.00 5.00 8.00
2 (2.50-25.5) (32.00-42.00) (1.55-1.80) (6.00-12.00) (2.00-6.00) (4.00-6.00) (6.00-10.00)
3 FRANCO ARENOSO 2.50 43.00 1.50 14.00 6.00 8.00 12.00
4 (1.40-7.60) (40.00-47.00) (1.40-1.60) (10.00-18.00) (4.00-8.00) (6.00-10.00) (9.00-15.00)
5 FRANCO 1.30 47.00 1.40 22.00 10.00 12.00 17.00
6 (0.80-2.00) (43.00-49.00) (1.35-1.50) (18.00-26.00) (8.00-12.00) (10.00-14.00) (14.00-20.00)
7 FRANCO ARCILLOSO 0.80 49.00 1.35 27.00 13.00 14.00 19.00
8 (0.25-1.50) (47.00-51.00) (1.30-1.40) (23.00-31.00) (11.00-15.00) (12.00-16.00) (16.00-22.00)
9 ARCILLO ARENOSO 0.25 51.00 1.30 31.00 15.00 16.00 21.00
10 (0.03-0.50) (49.00-53.00) (1.25-1.35) (27.00-35.00) (13.00-17.00) (14.00-18.00) (18.00-23.00)
11 ARCILLOSO 0.05 53.00 1.25 35.00 17.00 18.00 23.00
12 (0.01-0.10) (51.00-55.00) (1.20-1.30) (31.00-39.00) (15.00-19.00) (16.00-20.00) (20.00-25.00)
Fuente: Sistemas Hidraulicos de Riego - C. A. Benites Castro - 2000
ROPIEDADES FÍSICAS DEL SUELO

HUMEDAD TOTAL UTILIZABLE


Lámina
cm/m
8.00
(6.00-10.00)
12.00
(9.00-15.00)
17.00
(14.00-20.00)
19.00
(17.00-22.00)
21.00
(18.00-23.00)
23.00
(20.00-25.00)
TABLA 08 (TB 08)

EFICIENCIA DE APLICACIÓN DEL RIEGO POR ASPERSIÓN CONVENCIONAL (%) NECESIDADES DIARIAS DE USO MÁXIMO
DE AGUA POR CULTIVO

EVAPOTRANSPIRACIÓN MÁXIMA EN mm/día CÓDIGO CULTIVO CONSUMO MAXIMO (mm/día)


5 ó menos 5 - 7.5 7.5 ó mas BUSQUEDA
mm mm mm 1 Alfalfa 0.68 - 0.89 0.79
LAMINA DE AGUA 2 Maiz 0.35 - 0.63 0.49
mm VELOCIDAD DEL VIENTO PROMEDIO < 1.67 m/s 3 Algodón 0.68 - 0.79 0.74
25 68.00 65.00 62.00 4 Gramineas 0.38 - 0.53 0.46
50 70.00 68.00 65.00 5 Vid 0.48 - 0.48
100 75.00 70.00 68.00 6 Citricos 0.33 - 0.53 0.43
150 80.00 75.00 70.00 7 frutales 0.56 - 0.56
8 Pastos 0.74 - 0.81 0.78
VELOCIDAD DEL VIENTO PROMEDIO 1.67 - 4.44 m/s 9 Papa 0.63 - 0.74 0.69
25 65.00 62.00 60.00 10 Tomate 0.51 - 0.51
50 68.00 65.00 62.00 11 Hortalizas 0.51 - 0.66 0.59
100 70.00 68.00 65.00 11 Hortalizas 0.51 - 0.66 0.59
150 75.00 70.00 68.00

VELOCIDAD DEL VIENTO PROMEDIO 4.44 - 6.94 m/s


25 62.00 60.00 58.00
50 65.00 62.00 60.00
100 68.00 65.00 62.00
150 70.00 68.00 65.00
Fuente: Manual 24 de la FAO, Serie "Riego y Drenaje". Fuente: Sistemas Hidraulicos de Riego - C. A. Benites Castro - 2000