Dry areas
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
Wet areas
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
Qty
Wall plastering
Framework & one side boarding
Floor screed
Wall boards closing
Ceiling stud works
Boarding, taping & jointing - ceiling
Wall ceramic tiles on gypsum board cladding
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
Door frames installation
Floor tiles installation
Painting 1st coat
Installation of fire place
Fixing skirting
TV wall units, Wall cabinets, Glass shelving, minibar
cabinets, walk in closet
Headboard fixing
Door panels & ironmongary installation
Final Painting on walls & ceiling
Wall covering installation
Cleaning & snagging
Water proofing works
Wall plastering
Cement board lining
Floor screed
Ceiling stud works
Boarding, taping & jointing
Monochrome matte blue tiles installation
Primers / stucco on walls & ceiling
Vanity counters fixing
Door frames installation
Painting 1st coat
Floor tiles installation
Shower marble benches fixing
Fixing skirting
Shower glass partitions
Door panels & ironmongary installation
Final Painting on walls & ceiling
Cleaning & snagging
Basaltine stone ST1 wall
White ceramic tiles to coutyard
Mirror & glass
motorised blind
3 Bedroom villa
Dry areas
AZ1-CON Wall plastering
1268
1292
949
1292
226
697
88
1292
8
860
16
88
1080
214
388
356
301
301
235
16
40
301
16
245
66
40
666
103
320
40
54
1622
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
Wet areas
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
1672
1419
1672
110
808
91
1672
8
1034
21
91
2281
174
138
739
441
408
408
507
21
49
408
21
320
39
49
850
147
320
49
54
Prodictivity
m2
m2
m2
no
m2
no
no
no
m2
no
no
m2
no
m2
no
no
m
Manpower
m2
m2
m2
no
m2
no
m
no
no
m2
m2
m2
no
no
m2
no
m
m2
no
no
m
TV wall units- 1 no, Wall cabinets- 1 no, laminated glass- 5.75 m2,glass shelves- 1no, m
Headboard fixing
1 no
Wall covering installation
3.67
Final Painting on walls & ceiling
98.88
Door panels & ironmongary installation
3 no
Cleaning & snagging
Wet areas
Water proofing works
Wall plastering
24.58
16.63
Cement board lining
Floor screed
15.92
Ceiling stud works
Boarding, taping & jointing
15.92
Primers / stucco on walls & ceiling
Vanity counters fixing
1
Door frames installation
Dominico mori wall tiles installation
33.68
Painting 1st coat
Floor tiles installation
15.92
Shower marble benches fixing
1 no
Fixing skirting
Shower glass partitions
5.25 m2
Final Painting on walls & ceiling
40.5
Door panels & ironmongary installation
2
Cleaning & snagging
Presidential suite
Dry areas
Wall plastering
253
101.00
Framework & one side boarding
Floor screed
154.5
Wall boards closing
Wall ceramic tiles on gypsum board cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
154.5
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
101
Floor tiles installation
154.5
Door frames installation
Wall covering installation
Painting 1st coat
Carpet installation
Fixing skirting
132.5
TV wall units- 2no, Wall cabinets- 2 no, Glass shelving- 31.5m2, minibar cabinets-2 no, w
Headboard fixing
2
Final Painting on walls & ceiling
253
Door panels & ironmongary installation
7
Cleaning & snagging
Wet areas
3
55
3
3 no
157
7
3.75
75m2, glass shelves- 1no, minibar cabinets- 1 no, walk in closet- 1no
13.08
3.73
12.40
3.67
12.38
16.50
Spa
Qty
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
Wall plastering
Stone wall cladding
Floor screed
Ceiling stud works
Boarding, taping & jointing - ceiling
Primers / stucco on walls & ceiling
Joinery installation
Door frames installation
Plastered wall finish
Wood flooring to Sauna
Stone flooring
Wooden wall paneling
Fixing skirting
Painting 1st coat
Decorative niche installation
Glass partitions & Glass doors instalaltion
Final Painting on walls & ceiling
Door panels & ironmongary installation
Mirrors installation
Fabric padded panels
Cleaning/ snagging / inspection
Handover of the area
1246
481
439
408
7
439
171
362
9
partition -18m2,Doors -8no
1449
46
13
42
GYM
AZ1-C Wall plastering
AZ1-C Stone wall cladding
AZ1-C Ceiling stud works
AZ1-C Boarding, taping & jointing - ceiling
AZ1-C Floor screed
AZ1-C Primers / stucco on walls & ceiling
AZ1-C Joinery installation
AZ1-C Door frames installation
AZ1-C Plastered wall finish
AZ1-C Wood flooring
AZ1-C Glass partitions
AZ1-C Resin flooring
AZ1-C Resin wall panels
AZ1-C Fixing skirting
AZ1-C Painting 1st coat
AZ1-C Final Painting on walls & ceiling
AZ1-C Door panels & ironmongary installation
AZ1-C Mirrors installation
AZ1-C Cleaning/ snagging / inspection
AZ1-C Handover of the area
Ball room & Business centre
AZ1
Wall plastering
AZ1
Floor screed
AZ1
Ceramic / stone wall cladding/resin
167
60
225
117
38
60
82
44
325
5
2
1461
969
470
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
All day Dining
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
Pool bar & day
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
64
2
789
318
2987
164
41
481
181
qty
Ceramic / stone wall cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
Tile / stone / concrete flooring
Primers / stucco on walls & ceiling
Bar counters installation
Fixing skirting
Glass partition @ Show kitchen / courtyard
Hand made tiles on walls / Ceiling
Floor screed
Door frames installation
Plastered wall finish installation
Painting 1st coat
Final Painting on walls & ceiling
Door panels & ironmongary installation
Cleaning/ snagging / inspection
Handover of the area
care
Wall plastering
Floor screed
Ceiling stud works
Boarding, taping & jointing
Stone flooring
Fixing skirting
Rubber / Linoleum flooring
Deck flooring
Shower glass partitions
Primers / stucco on walls & ceiling
859
994
1108
213
12
1020
363
1596
26
86
82
45
32
9
4
231
332
14
4
293.77
70.95
137
72.95
70.95
228.77
5
7
302
409
418
17
49
101
71
872
8
35
149
69
138
77
69
52
12
226
13
18
109
15
20
120
80
89
280
3
383
47
28
348
310
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
182
8
852
8
1297
22
65
10
4
7.00
no
artition -18m2,Doors -8no
no
no
m2
m2
no
no
380.00
no
no
m2
unit
pebble -13m2
36.00
no
no
no
no
no
21.00
no
107.00
no
no
Activity ID
A1990
A2000
A2010
A2020
A2030
A2040
A2050
A2060
A2070
Activity Name
Original
Work order confirmation
Receipt of drawings, documents & control samples from cli
Receipt of control samples
Client kick off meeting
Receipt of signed contract
Return of signed contract
Coordination meeting with main contractor
Preparation of drawings and drawing register as per lates
Issue of drawing register and drawing to the client for stam
Du% comp
1
10%
3
15%
1
20%
1
45%
1
35%
1
68%
1
35%
1
25%
0
0%
A1990
A2000
#NAME?
0%
A2010
A2020
A2030
A2040
A2050
A2060
A2070
0%
0%
0%
0%
0%
0%
0%