Wall plastering
Framework & one side boarding
Floor screed
Wall boards closing
Ceiling stud works
Boarding, taping & jointing - ceiling
Wall ceramic tiles on gypsum board cladding
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
Door frames installation
Floor tiles installation
Painting 1st coat
Installation of fire place
Fixing skirting
TV wall units, Wall cabinets, Glass shelving, minibar
cabinets, walk in closet
Headboard fixing
Door panels & ironmongary installation
Final Painting on walls & ceiling
Wall covering installation
Cleaning & snagging
Water proofing works
Wall plastering
Cement board lining
Floor screed
Ceiling stud works
Boarding, taping & jointing
Monochrome matte blue tiles installation
Primers / stucco on walls & ceiling
Vanity counters fixing
Door frames installation
Painting 1st coat
Floor tiles installation
Shower marble benches fixing
Fixing skirting
Shower glass partitions
Door panels & ironmongary installation
Final Painting on walls & ceiling
Cleaning & snagging
Basaltine stone ST1 wall
White ceramic tiles to coutyard
Mirror & glass
motorised blind

3 Bedroom villa
Dry areas
AZ1-CON Wall plastering

1268
1292
949
1292
226
697
88
1292
8
860

16
88
1080
214

388
356
301
301
235
16
40
301
16
245
66
40
666
103
320
40
54

1622

AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
Wet areas
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON
AZ1-CON

Framework & one side boarding


Floor screed
Wall boards closing
Ceiling stud works
Boarding, taping & jointing - ceiling
Wall ceramic tiles on gypsum board cladding
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
Door frames installation
Floor tiles installation
Painting 1st coat
Installation of fire place
Fixing skirting
TV wall units, Wall cabinets, Glass shelving, minibar
cabinets, walk in closet
Headboard fixing
Door panels & ironmongary installation
Final Painting on walls & ceiling
Wall covering installation
Cleaning & snagging
Tempered glass stopsol
Water proofing works
Wall plastering
Cement board lining
Floor screed
Ceiling stud works
Boarding, taping & jointing
Monochrome matte blue tiles installation
Primers / stucco on walls & ceiling
Vanity counters fixing
Door frames installation
Painting 1st coat
Floor tiles installation
Shower marble benches fixing
Fixing skirting
Shower glass partitions
Door panels & ironmongary installation
Final Painting on walls & ceiling
Cleaning & snagging
Basaltine stone ST1 wall
White ceramic tiles to coutyard
Mirror & glass
motorised blind

1672
1419
1672
110
808
91
1672
8
1034

21
91
2281
174
138

739
441
408
408
507
21
49
408
21
320
39
49
850
147
320
49
54

Prodictivity

m2
m2

m2

no
m2
no

no
no

m2

no
no
m2
no
m2
no

no
m

Manpower

m2
m2

m2

no
m2
no
m

no
no
m2
m2

m2

no
no
m2
no
m
m2
no

no
m

Hotel sector 1 (North wing)


Corner Room
Dry areas
QTY
unit
Wall plastering
36.25
68.00
Framework & one side boarding
Floor screed
64 m2
Wall boards closing
Wall ceramic tiles on gypsum board cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
64
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
68
Floor tiles installation
64
Door frames installation
Painting 1st coat
Fixing skirting
41.83
TV wall units- 1 no, Wall cabinets- 1 no, laminated glass- 5.75m2, glass shelves- 1no, m
Headboard fixing
1 no
Wall covering installation
3.75
Final Painting on walls & ceiling
100
Door panels & ironmongary installation
5 no
Cleaning & snagging
Wet areas
Water proofing works
Wall plastering
25.25
17.08
Cement board lining
Floor screed
16
Ceiling stud works
Boarding, taping & jointing
16.08
Primers / stucco on walls & ceiling
Vanity counters fixing
1 no
Door frames installation
Dominico mori wall tiles installation
34.66
Painting 1st coat
Floor tiles installation
16
Shower marble benches fixing
1 no
Fixing skirting
Shower glass partitions
5.25 m2
Final Painting on walls & ceiling
41.33
Door panels & ironmongary installation
2 no
Cleaning & snagging
Standard Room
Dry areas
QTY
unit
Wall plastering
52.53
38.60
Framework & one side boarding
Floor screed
46.33
Wall boards closing
Wall ceramic tiles on gypsum board cladding

Ceiling stud works


Boarding, taping & jointing - ceiling
46.33
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
38.6
Floor tiles installation
46.33
Door frames installation
Painting 1st coat
Fixing skirting
36.77
TV wall units- 1 no, Wall cabinets- 1 no, laminated glass- 5.73 m2,glass shelves- 1no, m
Headboard fixing
1 no
Wall covering installation
3.73
Final Painting on walls & ceiling
98.87
Door panels & ironmongary installation
3 no
Cleaning & snagging
Wet areas
Water proofing works
Wall plastering
24.3
16.63
Cement board lining
Floor screed
15.93
Ceiling stud works
Boarding, taping & jointing
15.93
Primers / stucco on walls & ceiling
Vanity counters fixing
1
Door frames installation
Dominico mori wall tiles installation
46.1
Painting 1st coat
Floor tiles installation
15.93
Shower marble benches fixing
1 no
Fixing skirting
Shower glass partitions
5.27 m2
Final Painting on walls & ceiling
40.23
Door panels & ironmongary installation
2
Cleaning & snagging
Standard Twin Room
Dry areas
QTY
unit
Wall plastering
52.54
38.58
Framework & one side boarding
Floor screed
46.33
Wall boards closing
Wall ceramic tiles on gypsum board cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
46.33
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
38.58
Floor tiles installation
46.33
Door frames installation
Painting 1st coat
Fixing skirting
36.75

TV wall units- 1 no, Wall cabinets- 1 no, laminated glass- 5.75 m2,glass shelves- 1no, m
Headboard fixing
1 no
Wall covering installation
3.67
Final Painting on walls & ceiling
98.88
Door panels & ironmongary installation
3 no
Cleaning & snagging
Wet areas
Water proofing works
Wall plastering
24.58
16.63
Cement board lining
Floor screed
15.92
Ceiling stud works
Boarding, taping & jointing
15.92
Primers / stucco on walls & ceiling
Vanity counters fixing
1
Door frames installation
Dominico mori wall tiles installation
33.68
Painting 1st coat
Floor tiles installation
15.92
Shower marble benches fixing
1 no
Fixing skirting
Shower glass partitions
5.25 m2
Final Painting on walls & ceiling
40.5
Door panels & ironmongary installation
2
Cleaning & snagging
Presidential suite
Dry areas
Wall plastering
253
101.00
Framework & one side boarding
Floor screed
154.5
Wall boards closing
Wall ceramic tiles on gypsum board cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
154.5
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
101
Floor tiles installation
154.5
Door frames installation
Wall covering installation
Painting 1st coat
Carpet installation
Fixing skirting
132.5
TV wall units- 2no, Wall cabinets- 2 no, Glass shelving- 31.5m2, minibar cabinets-2 no, w
Headboard fixing
2
Final Painting on walls & ceiling
253
Door panels & ironmongary installation
7
Cleaning & snagging
Wet areas

Water proofing works


Wall plastering
65.5
Cement board lining
Floor screed
53.5
Ceiling stud works
Boarding, taping & jointing
53.5
Dominico mori wall tiles installation
84.5
Primers / stucco on walls & ceiling
Vanity counters fixing
2
Door frames installation
Floor tiles installation
53.5
Shower marble benches fixing
2
Painting 1st coat
Fixing skirting
Shower glass partitions
2 no
Final Painting on walls & ceiling
65.5
Door panels & ironmongary installation
5
Cleaning & snagging
Penthouse corner
Dry areas
Wall plastering
185.5
137.50
Framework & one side boarding
Floor screed
202.5
Wall boards closing
Wall ceramic tiles on gypsum board cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
170.5
Primers / stucco on walls & ceiling
Wooden cladding in the walk-in
137.5
Door frames installation
Floor tiles installation
202.5
Wall covering installation
16.5
Painting 1st coat
Fixing skirting
162 m
TV wall units-3 no, Wall cabinets- 3 no, Glass shelving- 50m2, minibar cabinets- 3 no, wa
Headboard fixing
3
Final Painting on walls & ceiling
185.5
Door panels & ironmongary installation
10
Cleaning & snagging
Wet areas
Water proofing works
Wall plastering
157
Cement board lining
Floor screed
55
Ceiling stud works
Boarding, taping & jointing
61.5
Dominico mori wall tiles installation
170
Primers / stucco on walls & ceiling

Vanity counters fixing


Door frames installation
Floor tiles installation
Shower marble benches fixing
Painting 1st coat
Fixing skirting
Shower glass partitions
Final Painting on walls & ceiling
Door panels & ironmongary installation
Cleaning & snagging

3
55
3

3 no
157
7

3.75

75m2, glass shelves- 1no, minibar cabinets- 1 no, walk in closet- 1no

13.08

3.73

73 m2,glass shelves- 1no, minibar cabinets- 1 no, walk in closet- 1no

12.40

3.67

75 m2,glass shelves- 1no, minibar cabinets- 1 no, walk in closet- 1 no

12.38

m2, minibar cabinets-2 no, walk in closet-2

16.50

, minibar cabinets- 3 no, walk in closet- 3

Spa

Qty
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C

Wall plastering
Stone wall cladding
Floor screed
Ceiling stud works
Boarding, taping & jointing - ceiling
Primers / stucco on walls & ceiling
Joinery installation
Door frames installation
Plastered wall finish
Wood flooring to Sauna
Stone flooring
Wooden wall paneling
Fixing skirting
Painting 1st coat
Decorative niche installation
Glass partitions & Glass doors instalaltion
Final Painting on walls & ceiling
Door panels & ironmongary installation
Mirrors installation
Fabric padded panels
Cleaning/ snagging / inspection
Handover of the area

1246
481
439
408

7
439
171
362
9
partition -18m2,Doors -8no
1449
46
13
42

GYM
AZ1-C Wall plastering
AZ1-C Stone wall cladding
AZ1-C Ceiling stud works
AZ1-C Boarding, taping & jointing - ceiling
AZ1-C Floor screed
AZ1-C Primers / stucco on walls & ceiling
AZ1-C Joinery installation
AZ1-C Door frames installation
AZ1-C Plastered wall finish
AZ1-C Wood flooring
AZ1-C Glass partitions
AZ1-C Resin flooring
AZ1-C Resin wall panels
AZ1-C Fixing skirting
AZ1-C Painting 1st coat
AZ1-C Final Painting on walls & ceiling
AZ1-C Door panels & ironmongary installation
AZ1-C Mirrors installation
AZ1-C Cleaning/ snagging / inspection
AZ1-C Handover of the area
Ball room & Business centre
AZ1
Wall plastering
AZ1
Floor screed
AZ1
Ceramic / stone wall cladding/resin

167
60

225
117
38
60
82
44
325
5
2

1461
969
470

AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
All day Dining
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
Pool bar & day
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C
AZ1-C

Ceiling stud works


Acoustic gypsum ceiling
Stone works @ Ablution
Stone flooring
Primers / stucco on walls & ceiling
Tracks for operable partitions
Counters installation
Fixing skirting
Veneer wall paneling
Painting 1st coat
Door frames installation
Resin flooring
Final Painting on walls & ceiling
Fabric padded panels on walls
Door panels & ironmongary installation
Carpet installation
Operable partitions installation
Cleaning/ snagging / inspection
Handover of the area

64
2
789

318

2987
164
41
481
181

qty
Ceramic / stone wall cladding
Ceiling stud works
Boarding, taping & jointing - ceiling
Tile / stone / concrete flooring
Primers / stucco on walls & ceiling
Bar counters installation
Fixing skirting
Glass partition @ Show kitchen / courtyard
Hand made tiles on walls / Ceiling
Floor screed
Door frames installation
Plastered wall finish installation
Painting 1st coat
Final Painting on walls & ceiling
Door panels & ironmongary installation
Cleaning/ snagging / inspection
Handover of the area
care
Wall plastering
Floor screed
Ceiling stud works
Boarding, taping & jointing
Stone flooring
Fixing skirting
Rubber / Linoleum flooring
Deck flooring
Shower glass partitions
Primers / stucco on walls & ceiling

859
994
1108

213
12
1020
363
1596
26

86
82
45
32
9
4

AZ1-C Joinery installation


AZ1-C Painting 1st coat
AZ1-C Door frames installation
AZ1-C Plain plastered wall finish
AZ1-C Final Painting on walls & ceiling
AZ1-C Door panels & ironmongary installation
AZ1-C Mirror installation
AZ1-C Cleaning/ snagging / inspection
AZ1-C Handover of the area
Pool Changing Room
AZ1
Wall plastering
AZ1
Floor screed
AZ1
Stone wall cladding
AZ1
Ceiling stud works
AZ1
Boarding, taping & jointing
AZ1
Stone flooring
AZ1
Primers / stucco on walls & ceiling
AZ1
Joinery installation
AZ1
Fixing skirting
AZ1
Rubber / Linoleum flooring
AZ1
Deck flooring
AZ1
Shower glass partitions
AZ1
Plain plastered wall finish
AZ1
Painting 1st coat
AZ1
Final Painting on walls & ceiling
AZ1
WC doors installation
AZ1
Mirror installation
AZ1
Cleaning/ snagging / inspection
AZ1
Handover of the area
Beach restaurant
AZ1- Ceramic / stone wall cladding
AZ1- Ceiling stud works
AZ1- Boarding, taping & jointing - ceiling
AZ1- Floor screed
AZ1- Primers / stucco on walls & ceiling
AZ1- Joinery installation
AZ1- Door frames installation
AZ1- Plastered wall finish
AZ1- Wooden flooring -107m2 ,ceramic flooring -408 m2
AZ1- Decorative niche installation
AZ1- Burnished brass wall cladding to Show kitchen
AZ1- Fixing skirting
AZ1- Painting 1st coat
AZ1- Entrance screen & Restaurant glass screen
AZ1- Final Painting on walls & ceiling
AZ1- Door panels & ironmongary installation
AZ1- Colored glass screens & mirrors @ toilets
AZ1- Cleaning/ snagging / inspection

231
332
14
4

293.77
70.95
137
72.95
70.95

228.77
5
7

302
409

418
17
49
101
71
872
8
35

AZ1- Handover of the area


Beach restaurant toilet block & changing room
AZ1- Wall plastering
AZ1- Floor screed
AZ1- Concrete wall tiles
AZ1- Ceiling stud works
AZ1- Boarding, taping & jointing
AZ1- Primers / stucco on walls & ceiling
AZ1- Concrete tile flooring
AZ1- Joinery installation
AZ1- Fixing skirting
AZ1- Shower glass partitions
AZ1- Painting 1st coat
AZ1- Final Painting on walls & ceiling
AZ1- Doors installation
AZ1- Mirror installation
AZ1- Cleaning/ snagging / inspection
AZ1- Handover of the area
Concept store
AZ1
Wall plastering
AZ1
Ceramic / stone wall cladding
AZ1
Ceiling stud works
AZ1
Boarding, taping & jointing
AZ1
Stone flooring - 89m2, concrete flooring -6m2
AZ1
Fixing skirting
AZ1
Veneer wall paneling
AZ1
Modular open wooden ceiling
AZ1
Floor screed
AZ1
Primers / stucco on walls & ceiling
AZ1
Desks, cabinets & shelvings installation
AZ1
Painting 1st coat
AZ1
Door frames installation
AZ1
Glass boxes installation
AZ1
Final Painting on walls & ceiling
AZ1
Door panels & ironmongary installation
AZ1
Carpet installation
AZ1
Cleaning/ snagging / inspection
AZ1
Handover of the area
Lobby
AZ1
Floor screed
AZ1
Wall plastering
AZ1
Ceramic / stone wall cladding
AZ1
Wooden paneling @ Reception backwall
AZ1
Ceiling stud works
AZ1
Supports for chandeliers
AZ1
Boarding, taping & jointing - ceiling
AZ1
Terrazzo / Stone flooring
AZ1
Primers / stucco on walls & ceiling

149
69
138
77
69
52
12
226
13
18

109

15
20
120
80
89

280
3

383
47
28

348
310

AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1
AZ1

Fixing skirting (Wooden & Metal)


Vanity counters / Reception counter installation
Glass partitions
Stone wall cladding
Plastered wall finish installation
Door frames installation
Painting 1st coat
Wooden deck flooring to Vestibule
Final Painting on walls & ceiling
Door panels & ironmongary installation
Carpet flooring
Fixing chandeliers
Fixing mirrors
Cleaning/ snagging / inspection
Handover of the area

182
8
852

8
1297
22
65
10
4

7.00

no
artition -18m2,Doors -8no
no
no
m2

m2

no
no

380.00

no

no
m2

unit

pebble -13m2

36.00

no

no
no

no

no

21.00

no

107.00

no

no

Activity ID
A1990
A2000
A2010
A2020
A2030
A2040
A2050
A2060
A2070

Activity Name
Original
Work order confirmation
Receipt of drawings, documents & control samples from cli
Receipt of control samples
Client kick off meeting
Receipt of signed contract
Return of signed contract
Coordination meeting with main contractor
Preparation of drawings and drawing register as per lates
Issue of drawing register and drawing to the client for stam

Du% comp
1
10%
3
15%
1
20%
1
45%
1
35%
1
68%
1
35%
1
25%
0
0%

Early Start Early Finish


19-Apr-15
19-Apr-15
20-Apr-15
22-Apr-15
20-Apr-15
20-Apr-15
23-Apr-15
23-Apr-15
2-May-15
2-May-15
8-May-15
8-May-15
9-May-15
9-May-15
3-Jun-15
3-Jun-15
3-Jun-15

A1990
A2000

#NAME?
0%

A2010
A2020
A2030
A2040
A2050
A2060
A2070

0%
0%
0%
0%
0%
0%
0%

Potrebbero piacerti anche