Sei sulla pagina 1di 16

CONCRETING 1 KM OF CABANGCALAN

ROAD
(6˚58'29.32” N 126˚00'43.41” E to
6˚58'30.47” N 126˚00'10.39” E)
(Esimate Project Cost: P 15,000,000.00)

SECTION: BRGY. CABANGCALAN


LOCATION: BRGY. CABANGCALAN, BANAYBANAY, DAVAO ORIENTAL
STATION LIMITS: STA 0+000 TO STA 1+020 VICINITY MAP
NET LENGTH: 1020 LM
THICKNESS: 280 mm
LANE WIDTH: 3.5 m PROPOSED ROAD PROJECT

SURIGAO-DAVAO COASTAL ROAD

END OF PROJECT BEG. OF PROJECT


STA 1+020 STA 0+000

1 LAYOUT PLAN
SCALE 1:10,000 mm
1 A4

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
2
3
A4
SCALE
STA 1+020

Ranlie Canoy
Jeryl P. Edlay
END OF PROJECT

Kenneth Jay V. Unabia


ROAD PROFILE
1:10,000 mm

FINISH
GROUND

GROUND
EXISTING

STATIONS
ELEVATIONS

ELEVATIONS
18.0
19.0
20.0
21.0
22.0
STA 1+020 18.3364 18.5000
18.5910

Group Members
STA 1+000 18.2874
STA 0+980 18.0809 18.682
STA 0+960 18.0635 18.773
18.0277 18.864
E: 4

STA 0+940
STA 0+920 18.0277 18.955
G = -2%

STA 0+900 17.9597 18.955


ELEV: 18.955

Desnielle G. Gaton
STA 0+880 17.7734 18.955
LENGTH: 39.9987
PVI @ STA: 0+920

STA 0+860 17.9047 18.955


STA 0+840 18.2026 18.955
STA 0+820 18.6782 18.955

Cherry Mae T. Literatus


G = 0%

STA 0+785.5 18.9550 18.955

STA 0+760 18.6458 18.955


2

STA 0+740 18.6458 18.955


STA 0+720 18.4010 18.955
STA 0+700 18.0731 18.877
2

18.1332 18.800
E: 4

STA 0+680
G = 2%

STA 0+660 18.2545 18.722


A4

STA 0+640 18.1393 18.644


ELEV: 18.955

STA 0+620 17.8936 18.566


LENGTH: 39.9987
PVI @ STA: 0+680

STA 0+600 17.4770 18.489


STA 0+580 17.2410 18.411
STA 0+560 17.1695 18.333
SCALE

17.2920 18.255
G = 0%

STA 0+540
STA 0+520 17.5258 18.178
STA 0+500 17.8473 18.100
18.0342 18.100
E: 4

STA 0+480
STA 0+460 18.8001 18.100
ELEV: 18.1

STA 0+440 19.7269 18.100


STA 0+420 20.7459 18.100
LENGTH: 39.9987
PVI @ STA: 0+460

21.0732 18.100
PLAN VIEW

STA 0+400
1:10,000 mm

21.1185 18.100
G = -2%

STA 0+380
21.1492 18.100
E: 4

STA 0+360
STA 0+340 21.2062 18.100
ELEV: 20

STA 0+320 21.1123 18.100


STA 0+300 20.9764 18.100
LENGTH: 39.9987
PVI @ STA: 0+360

STA 0+280 20.6886 18.100


STA 0+260 20.3918 18.100
G = 0%

STA 0+240 20.2583 18.100


20.4820 18.100
E: 4

STA 0+220
STA 0+200 20.2277 18.100
ELEV: 20

STA 0+180 20.0969 18.100


STA 0+160 19.9073 18.100
LENGTH: 39.9987
PVI @ STA: 0+200

STA 0+140 19.5027 18.100


G = 2%

STA 0+120 19.2807 18.100


18.9105 18.100
E: 4

STA 0+100
STA 0+080 18.7443 18.100
ELEV: 18.1

STA 0+060 18.6458 18.100


STA 0+040 18.3922 18.100
LENGTH: 39.9987
PVI @ STA: 0+100

G = 0%

STA 0+020 18.1305 18.100


STA 0+000 18.0588 18.100
Road Name

Cabangcalan Road
SURIGAO-DAVAO COASTAL ROAD

STA 0+000
BEG. OF PROJECT

Group & Section

PhilBuilds - CE 3B
4 TYPICAL DETAILS
SCALE 1:100 mm
3 A4

1500 3500 3500 1500

- 2% - 3% - 3% - 3%

NGL
2:1
2:1

1
1:

NORMAL CROWN

1:
1

TYPICAL ROADWAY CROSS-SECTION

1500 3500 3500 1500

FGL

- 2% - 3% - 3% - 3%

2:1
2:1

1
1:

1:
1

280 mm THK PORTLAND CEMENT CONCRETE


200 mm THK AGRREGATES SUB-BASE COURSE

TYPICAL ROADWAY CROSS-SECTION

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
4 CROSS-SECTIONS
SCALE 1:200 mm
3 A4

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1 m

18.1 m FINISH GROUND LINE


18.1 m FINISH GROUND LINE

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+000 STA. 0+020

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1 m

18.1 m FINISH GROUND LINE


18.1 m FINISH GROUND LINE

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+040 STA. 0+060

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.3 m
ELEVATION

ELEVATION
19.1 m 19.3 m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.3 m

17.1 m 17.3 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.3 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+080 STA. 0+100

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.5 m 20.9 m
ELEVATION

ELEVATION
19.5 m 19.9 m
FINISH GROUND LINE FINISH GROUND LINE

18.5 m 18.9 m

17.5 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.5 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+120 STA. 0+140

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

21.2 m 21.6 m

ELEVATION
ELEVATION

20.2 m 20.6 m
FINISH GROUND LINE FINISH GROUND LINE

19.2 m 19.6 m

18.2 m 18.6 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
17.2 m 17.6 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+160 STA. 0+180

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

21.8 m 22.0 m

ELEVATION
ELEVATION

20.8 m 21.0 m
FINISH GROUND LINE FINISH GROUND LINE

19.8 m 20.0 m

18.8 m 19.0 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
17.8 m 18.0 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+200 STA. 0+220

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

22.0 m 22.0 m

ELEVATION
ELEVATION

21.0 m 21.0 m
FINISH GROUND LINE FINISH GROUND LINE

20.0 m 20.0 m

19.0 m 19.0 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
18.0 m 18.0 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+240 STA. 0+260

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

22.0 m 22.0 m

ELEVATION
ELEVATION

21.0 m 21.0 m
FINISH GROUND LINE FINISH GROUND LINE

20.0 m 20.0 m

19.0 m 19.0 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
18.0 m 18.0 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+280 STA. 0+300

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

22.0 m 22.0 m

ELEVATION
ELEVATION

21.0 m 21.0 m
FINISH GROUND LINE FINISH GROUND LINE

20.0 m 20.0 m

19.0 m 19.0 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
18.0 m 18.0 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+320 STA. 0+340

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

21.8 m 21.6 m
ELEVATION

ELEVATION
20.8 m 20.6 m
FINISH GROUND LINE FINISH GROUND LINE

19.8 m 19.6 m

18.8 m 18.6 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
17.8 m 17.6 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+360 STA. 0+380

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

21.2 m 20.9 m

ELEVATION
ELEVATION

FINISH GROUND LINE FINISH GROUND LINE

20.2 m 19.9 m

19.2 m 18.9 m

18.2 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
17.2 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+400 STA. 0+420

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.5 m 20.3 m

ELEVATION
ELEVATION

19.5 m 19.3 m
FINISH GROUND LINE FINISH GROUND LINE

18.5 m 18.3 m

17.5 m 17.3 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.5 m 16.3 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+440 STA. 0+460

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.9 m

ELEVATION
ELEVATION

FINISH GROUND LINE FINISH GROUND LINE

19.1 m 19.9 m

18.1 m 18.9 m

17.1 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+480 STA. 0+500

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m

ELEVATION
ELEVATION

19.1 m 19.1 m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.1 m

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+520 STA. 0+540

Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1 m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.1 m

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0560 STA. 0+580

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1 m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.1 m

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+600 STA. 0+620


Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.1 m

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+640 STA. 0+660

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.4 m
ELEVATION

ELEVATION
19.2 m 19.4 m
FINISH GROUND LINE FINISH GROUND LINE

18.2 m 18.4 m

17.2 m 17.4 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.2 m 16.4 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+680 STA. 0+700


Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.7 m 20.9 m
ELEVATION

ELEVATION
19.7 m 19.9 m
FINISH GROUND LINE FINISH GROUND LINE

18.7 m 18.9 m

17.7 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.7 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+720 STA. 0+740

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.9 m 20.9 m
ELEVATION

ELEVATION
19.9 m 19.9 m
FINISH GROUND LINE FINISH GROUND LINE

18.9 m 18.9 m

17.9 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.9 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+760 STA. 0+785.5


Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.9 m 20.9 m
ELEVATION

ELEVATION
19.9 m 19.9 m
FINISH GROUND LINE FINISH GROUND LINE

18.9 m 18.9 m

17.9 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.9 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+820 STA. 0+840

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.1 m 20.3 m
ELEVATION

ELEVATION
19.9 m 19.9 m
FINISH GROUND LINE FINISH GROUND LINE

18.9 m 18.9 m

17.9 m 17.9 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.9 m 16.9 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+860 STA. 0+880


Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.9 m 20.9 m
ELEVATION

ELEVATION
19.9 m 19.7 m
FINISH GROUND LINE FINISH GROUND LINE

18.9 m 18.7 m

17.9 m 17.7 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.9 m 16.7 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+900 STA. 0+920

CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.8 m 20.2 m
ELEVATION

ELEVATION
19.8 m 19.2 m
FINISH GROUND LINE FINISH GROUND LINE

18.8 m 18.2 m

17.8 m 17.2 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.8 m 16.2 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+940 STA. 0+960


Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay
CL CL

SHOULDER CARRIAGEWAY SHOULDER SHOULDER CARRIAGEWAY SHOULDER

20.5 m 20.1 m
ELEVATION

ELEVATION
19.1 m 19.1 m
FINISH GROUND LINE FINISH GROUND LINE

18.1 m 18.1 m

17.1 m 17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m 16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m -9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 0+980 STA. 1+000

CL

SHOULDER CARRIAGEWAY SHOULDER

20.1 m
ELEVATION

19.1 m

18.1 m FINISH GROUND LINE

17.1 m
FLAT BOTTOM DITCH CONCRETE PAVEMENT, 280 mm THK
16.1 m
NATURAL GROUND LINE SUB-BASE COURSE, 200 mm THK

-9 m -8 m -7 m -6 m -5 m -4 m -3 m -2 m -1 m 0 m 1 m 2 m 3 m 4 m 5 m 6 m 7 m 8 m 9 m

STA. 1+020
Group Members Road Name Group & Section

Kenneth Jay V. Unabia Desnielle G. Gaton


Ranlie Canoy Cherry Mae T. Literatus Cabangcalan Road PhilBuilds - CE 3B
Jeryl P. Edlay