BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI
TAHUN ANGGARAN : 2021
ITEM PEKERJAAN : GALIAN A1 A2
H1 H2
B1 B2

PATOK A1 B1 H1 A2 B2 H2 LUAS P JUMLAH


No. VOLUME
No Jarak Sisi Kiri Sisi Kanan I II
(M') (M3)
Sta P0 -
- - 50.0 -
Sta P1 50.00
- - 50.0 -
Sta P2 100.00
- - 50.0 -
Sta P3 150.00
- - 50.0 -
Sta P4 200.00
- - 30.0 -
Sta P5 230.00
- - 50.0 -
Sta P6 280.00
- - 50.0 -
Sta P7 330.00
- - 50.0 -
Sta P8 380.00
- - 40.0
Sta P9 420.00
- - 50.0
Sta P10 470.00
- - 50.0 -
Sta P11 520.00
- - 50.0 -
Sta P12 570.00
- - 50.0 -
Sta P13 620.00
- - 50.0 -
Sta P14 670.00
- - 50.0 -
Sta P15 720.00
- - 50.0 -
Sta P16 770.00
- - 50.0 -
Sta P17 820.00
- - 40.0 -
Sta P18 860.00
- - 40.0
Sta P19 900.00
- - 46.0 -
Sta P20 946.00
- - 54.0 -
Sta R1 1,000.00
- - 50.0 -
Sta R2 1,050.00
- - 50.0 -
Sta R3 1,100.00
- - 50.0 -
Sta R4 1,150.00
- - 50.0 -
Sta R5 1,200.00
- - 50.0 -
Sta R6 1,250.00
- - 50.0 -
Sta R7 1,300.00
- - 50.0 -
Sta R8 1,350.00
- - 50.0 -
Sta R9 1,400.00
- - 50.0 -
Sta R10 1,450.00
- - 50.0 -
Sta R11 1,500.00
- - 50.0 -
Sta R12 1,550.00
- - 50.0 -
Sta R13 1,600.00
- - 50.0 -
Sta R14 1,650.00
- - 50.0 -
Sta R15 1,700.00
- - 50.0 -
Sta R16 1,750.00
- - 50.0 -
Sta R17 1,800.00
- - 50.0 -
Sta R18 1,850.00
- - 50.0 -
Sta R19 1,900.00
JUMLAH VOLUME ( I ) -
PATOK A1 B1 H1 A2 B2 H2 LUAS P JUMLAH
No. VOLUME
No Jarak Sisi Kiri Sisi Kanan I II (M') (M3)

- R19 1,900.00
- - 50.0 -
Sta R20 1,950.00
- - 30.0 -
Sta R21 1,980.00
- - 20.0 -
Sta R22 2,000.00
- - 50.0 -
Sta R23 2,050.00
- - 50.0 -
Sta R24 2,100.00
- - 50.0 -
Sta R25 2,150.00
- - 50.0 -
Sta R26 2,200.00
- - 50.0 -
Sta R27 2,250.00
- - 50.0 -
Sta R28 2,300.00
- - 50.0 -
Sta R29 2,350.00
- - 50.0 -
Sta R30 2,400.00
- - 50.0 -
Sta R31 2,450.00
- - 50.0 -
Sta R32 2,500.00
- - 50.0 -
Sta R33 2,550.00
- - 50.0 -
Sta R34 2,600.00
- - 50.0 -
Sta R35 2,650.00
- - 50.0 -
Sta R36 2,700.00
- - 50.0 -
Sta R37 2,750.00
- - 50.0 -
Sta R38 2,800.00
- - 50.0 -
Sta R39 2,850.00
- - 50.0 -
Sta R40 2,900.00
- - 50.0 -
Sta R41 2,950.00
- - 50.0 -
Sta R42 3,000.00
- - 50.0 -
Sta R43 3,050.00
- - 50.0 -
Sta R44 3,100.00
- - 50.0 -
Sta R45 3,150.00
- - 50.0 -
Sta R46 3,200.00
- - 50.0 -
Sta R47 3,250.00
- - 50.0 -
Sta R48 3,300.00
- - 50.0 -
Sta R49 3,350.00
- - 50.0 -
Sta R50 3,400.00
- - 50.0 -
Sta R51 3,450.00
0.02 - 50.0 0.80
Sta R52 3,500.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R53 3,550.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R54 3,600.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R55 3,650.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R56 3,700.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R57 3,750.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R58 3,800.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta R59 3,850.00 0.32 0.32 0.10
0.03 - 45.0 1.44
Sta R60 3,895.00 0.32 0.32 0.10
0.03 - 55.0 1.76
Sta K1 3,950.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K2 4,000.00 0.32 0.32 0.10
JUMLAH VOLUME ( II ) 16.80
PATOK A1 B1 H1 A2 B2 H2 LUAS P JUMLAH
No. VOLUME
No Jarak Sisi Kiri Sisi Kanan I II
(M') (M3)

Sta K2 4,000.00 0.32 0.32 0.10


0.03 - 50.0 1.60
Sta K3 4,050.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K4 4,100.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K5 4,150.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K6 4,200.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K7 4,250.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K8 4,300.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K9 4,350.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K10 4,400.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K11 4,450.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K12 4,500.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K13 4,550.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K14 4,600.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K15 4,650.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K16 4,700.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K17 4,750.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K18 4,800.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K19 4,850.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K20 4,900.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K21 4,950.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K22 5,000.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K23 5,050.00 0.32 0.32 0.10
0.03 - 50.0 1.60
Sta K24 5,100.00 0.32 0.32 0.10
0.03 - 21.0 0.67
Sta K25 5,121.00 0.32 0.32 0.10
JUMLAH VOLUME ( III ) 35.87

TOTAL JUMLAH VOLUME (I+II+ III ) 52.67


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021
ITEM PEKERJAAN : PENYIAPAN BADAN JALAN A1

PATOK A1 LUAS
No. P (M') JUMLAH VOLUME (M3) KET.
No Jarak I I

Sta P0 - 5.70
5.700 50.0 285.00
Sta P1 50.00 5.70
5.700 50.0 285.00
Sta P2 100.00 5.70
5.700 50.0 285.00
Sta P3 150.00 5.70
5.700 50.0 285.00
Sta P4 200.00 5.70
5.700 30.0 171.00
Sta P5 230.00 5.70
5.100 50.0 255.00
Sta P6 280.00 4.50
4.500 50.0 225.00
Sta P7 330.00 4.50
4.500 50.0 225.00
Sta P8 380.00 4.50
4.500 40.0 180.00
Sta P9 420.00 4.50
5.100 50.0 255.00
Sta P10 470.00 5.70
5.700 50.0 285.00
Sta P11 520.00 5.70
5.700 50.0 285.00
Sta P12 570.00 5.70
5.700 50.0 285.00
Sta P13 620.00 5.70
5.700 50.0 285.00
Sta P14 670.00 5.70
5.700 50.0 285.00
Sta P15 720.00 5.70
5.700 50.0 285.00
Sta P16 770.00 5.70
5.700 50.0 285.00
Sta P17 820.00 5.70
5.700 40.0 228.00
Sta P18 860.00 5.70
5.100 40.0 204.00
Sta P19 900.00 4.50
4.500 46.0 207.00
Sta P20 946.00 4.50
4.500 54.0 243.00
Sta R1 1,000.00 4.50
4.500 50.0 225.00
Sta R2 1,050.00 4.50
4.500 50.0 225.00
Sta R3 1,100.00 4.50
4.500 50.0 225.00
Sta R4 1,150.00 4.50
4.500 50.0 225.00
Sta R5 1,200.00 4.50
4.500 50.0 225.00
Sta R6 1,250.00 4.50
4.500 50.0 225.00
Sta R7 1,300.00 4.50
4.500 50.0 225.00
Sta R8 1,350.00 4.50
4.500 50.0 225.00
Sta R9 1,400.00 4.50
4.500 50.0 225.00
Sta R10 1,450.00 4.50
4.500 50.0 225.00
Sta R11 1,500.00 4.50
4.500 50.0 225.00
Sta R12 1,550.00 4.50
4.500 50.0 225.00
Sta R13 1,600.00 4.50
4.500 50.0 225.00
Sta R14 1,650.00 4.50
4.500 50.0 225.00
Sta R15 1,700.00 4.50
4.500 50.0 225.00
Sta R16 1,750.00 4.50
5.100 50.0 255.00
Sta R17 1,800.00 5.70
5.700 50.0 285.00
Sta R18 1,850.00 5.70
5.700 50.0 285.00
Sta R19 1,900.00 5.70
JUMLAH VOLUME ( I ) 9,528.00
PATOK A1 LUAS
No. P (M') JUMLAH VOLUME (M3) KET.
No Jarak I I

Sta R19 1,900.00 5.70


5.700 50.0 285.00
Sta R20 1,950.00 5.70
5.700 30.0 171.00
Sta R21 1,980.00 5.70
5.100 20.0 102.00
Sta R22 2,000.00 4.50
4.500 50.0 225.00
Sta R23 2,050.00 4.50
4.500 50.0 225.00
Sta R24 2,100.00 4.50
4.500 50.0 225.00
Sta R25 2,150.00 4.50
4.500 50.0 225.00
Sta R26 2,200.00 4.50
4.500 50.0 225.00
Sta R27 2,250.00 4.50
4.500 50.0 225.00
Sta R28 2,300.00 4.50
4.500 50.0 225.00
Sta R29 2,350.00 4.50
4.500 50.0 225.00
Sta R30 2,400.00 4.50
4.500 50.0 225.00
Sta R31 2,450.00 4.50
4.500 50.0 225.00
Sta R32 2,500.00 4.50
4.500 50.0 225.00
Sta R33 2,550.00 4.50
4.500 50.0 225.00
Sta R34 2,600.00 4.50
4.500 50.0 225.00
Sta R35 2,650.00 4.50
4.500 50.0 225.00
Sta R36 2,700.00 4.50
4.500 50.0 225.00
Sta R37 2,750.00 4.50
4.500 50.0 225.00
Sta R38 2,800.00 4.50
4.500 50.0 225.00
Sta R39 2,850.00 4.50
4.500 50.0 225.00
Sta R40 2,900.00 4.50
4.500 50.0 225.00
Sta R41 2,950.00 4.50
4.050 50.0 202.50
Sta R42 3,000.00 3.60
3.600 50.0 180.00
Sta R43 3,050.00 3.60
3.600 50.0 180.00
Sta R44 3,100.00 3.60
3.600 50.0 180.00
Sta R45 3,150.00 3.60
3.600 50.0 180.00
Sta R46 3,200.00 3.60
3.600 50.0 180.00
Sta R47 3,250.00 3.60
3.600 50.0 180.00
Sta R48 3,300.00 3.60
3.600 50.0 180.00
Sta R49 3,350.00 3.60
3.600 50.0 180.00
Sta R50 3,400.00 3.60
3.600 50.0 180.00
Sta R51 3,450.00 3.60
3.600 50.0 180.00
Sta R52 3,500.00 3.60
4.100 50.0 205.00
Sta R53 3,550.00 4.60
4.600 50.0 230.00
Sta R54 3,600.00 4.60
4.600 50.0 230.00
Sta R55 3,650.00 4.60
4.600 50.0 230.00
Sta R56 3,700.00 4.60
5.150 50.0 257.50
Sta R57 3,750.00 5.70
5.700 50.0 285.00
Sta R58 3,800.00 5.70
5.700 50.0 285.00
Sta R59 3,850.00 5.70
5.700 45.0 256.50
Sta R60 3,895.00 5.70
5.700 55.0 313.50
Sta K1 3,950.00 5.70
5.700 50.0 285.00
Sta K2 4,000.00 5.70
JUMLAH VOLUME ( II ) 9,413.00
PATOK A1 LUAS
No. P (M') JUMLAH VOLUME (M3) KET.
No Jarak I I

Sta K2 4,000.00 5.70


5.125 50.0 256.25
Sta K3 4,050.00 4.55
4.550 50.0 227.50
Sta K4 4,100.00 4.55
4.550 50.0 227.50
Sta K5 4,150.00 4.55
5.125 50.0 256.25
Sta K6 4,200.00 5.70
5.700 50.0 285.00
Sta K7 4,250.00 5.70
5.700 50.0 285.00
Sta K8 4,300.00 5.70
5.700 50.0 285.00
Sta K9 4,350.00 5.70
5.700 50.0 285.00
Sta K10 4,400.00 5.70
5.700 50.0 285.00
Sta K11 4,450.00 5.70
5.700 50.0 285.00
Sta K12 4,500.00 5.70
5.700 50.0 285.00
Sta K13 4,550.00 5.70
5.125 50.0 256.25
Sta K14 4,600.00 4.55
4.550 50.0 227.50
Sta K15 4,650.00 4.55
4.550 50.0 227.50
Sta K16 4,700.00 4.55
4.550 50.0 227.50
Sta K17 4,750.00 4.55
5.125 50.0 256.25
Sta K18 4,800.00 5.70
5.700 50.0 285.00
Sta K19 4,850.00 5.70
5.700 50.0 285.00
Sta K20 4,900.00 5.70
5.700 50.0 285.00
Sta K21 4,950.00 5.70
5.700 50.0 285.00
Sta K22 5,000.00 5.70
5.700 50.0 285.00
Sta K23 5,050.00 5.70
4.525 50.0 226.25
Sta K24 5,100.00 3.35
3.350 21.0 70.35
Sta K25 5,121.00 3.35
JUMLAH VOLUME ( IIII ) 5,879.10

TOTAL JUMLAH VOLUME ( I+II+III ) 24,820.10


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1
ITEM PEKERJAAN : ASPAL EMULSI

JUMLAH VOLUME
PATOK A1 LUAS P KOEF.
( Liter )
No. KET.
No Jarak I I (M') Lapis Pengikat Lapis Pengikat

Sta P0 - 4.00
4.000 50.00 0.80 160.00
Sta P1 50.00 4.00
4.000 50.00 0.80 160.00
Sta P2 100.00 4.00
4.000 50.00 0.80 160.00
Sta P3 150.00 4.00
4.000 50.00 0.80 160.00
Sta P4 200.00 4.00
4.000 30.00 0.80 96.00
Sta P5 230.00 4.00
4.000 50.00 0.80 160.00
Sta P6 280.00 4.00
4.000 50.00 0.80 160.00
Sta P7 330.00 4.00
4.000 50.00 0.80 160.00
Sta P8 380.00 4.00
4.000 40.00 0.80 128.00
Sta P9 420.00 4.00
4.000 50.00 0.80 160.00
Sta P10 470.00 4.00
4.000 50.00 0.80 160.00
Sta P11 520.00 4.00
4.000 50.00 0.80 160.00
Sta P12 570.00 4.00
4.000 50.00 0.80 160.00
Sta P13 620.00 4.00
4.000 50.00 0.80 160.00
Sta P14 670.00 4.00
4.000 50.00 0.80 160.00
Sta P15 720.00 4.00
4.000 50.00 0.80 160.00
Sta P16 770.00 4.00
4.000 50.00 0.80 160.00
Sta P17 820.00 4.00
4.000 40.00 0.80 128.00
Sta P18 860.00 4.00
4.000 40.00 0.80 128.00
Sta P19 900.00 4.00
4.000 46.00 0.80 147.20
Sta P20 946.00 4.00
4.000 54.00 0.80 172.80
Sta R1 1,000.00 4.00
4.000 50.00 0.80 160.00
Sta R2 1,050.00 4.00
4.000 50.00 0.80 160.00
Sta R3 1,100.00 4.00
4.000 50.00 0.80 160.00
Sta R4 1,150.00 4.00
4.000 50.00 0.80 160.00
Sta R5 1,200.00 4.00
4.000 50.00 0.80 160.00
Sta R6 1,250.00 4.00
4.000 50.00 0.80 160.00
Sta R7 1,300.00 4.00
4.000 50.00 0.80 160.00
Sta R8 1,350.00 4.00
4.000 50.00 0.80 160.00
Sta R9 1,400.00 4.00
4.000 50.00 0.80 160.00
Sta R10 1,450.00 4.00
4.000 50.00 0.80 160.00
Sta R11 1,500.00 4.00
4.000 50.00 0.80 160.00
Sta R12 1,550.00 4.00
4.000 50.00 0.80 160.00
Sta R13 1,600.00 4.00
4.000 50.00 0.80 160.00
Sta R14 1,650.00 4.00
4.000 50.00 0.80 160.00
Sta R15 1,700.00 4.00
4.000 50.00 0.80 160.00
Sta R16 1,750.00 4.00
4.000 50.00 0.80 160.00
Sta R17 1,800.00 4.00
4.000 50.00 0.80 160.00
Sta R18 1,850.00 4.00
4.000 50.00 0.80 160.00
Sta R19 1,900.00 4.00
JUMLAH VOLUME ( I ) 6,080.00
JUMLAH VOLUME
PATOK A1 LUAS P KOEF.
( Liter )
No. KET.
No Jarak Kiri I (M') Lapis Pengikat Lapis Pengikat

- R19 1,900.00 4.00


4.000 50.00 0.80 160.00
Sta R20 1,950.00 4.00
4.000 30.00 0.80 96.00
Sta R21 1,980.00 4.00
4.000 20.00 0.80 64.00
Sta R22 2,000.00 4.00
4.000 50.00 0.80 160.00
Sta R23 2,050.00 4.00
4.000 50.00 0.80 160.00
Sta R24 2,100.00 4.00
4.000 50.00 0.80 160.00
Sta R25 2,150.00 4.00
4.000 50.00 0.80 160.00
Sta R26 2,200.00 4.00
4.000 50.00 0.80 160.00
Sta R27 2,250.00 4.00
4.000 50.00 0.80 160.00
Sta R28 2,300.00 4.00
4.000 50.00 0.80 160.00
Sta R29 2,350.00 4.00
4.000 50.00 0.80 160.00
Sta R30 2,400.00 4.00
4.000 50.00 0.80 160.00
Sta R31 2,450.00 4.00
4.000 50.00 0.80 160.00
Sta R32 2,500.00 4.00
4.000 50.00 0.80 160.00
Sta R33 2,550.00 4.00
4.000 50.00 0.80 160.00
Sta R34 2,600.00 4.00
4.000 50.00 0.80 160.00
Sta R35 2,650.00 4.00
4.000 50.00 0.80 160.00
Sta R36 2,700.00 4.00
4.000 50.00 0.80 160.00
Sta R37 2,750.00 4.00
4.000 50.00 0.80 160.00
Sta R38 2,800.00 4.00
4.000 50.00 0.80 160.00
Sta R39 2,850.00 4.00
4.000 50.00 0.80 160.00
Sta R40 2,900.00 4.00
4.000 50.00 0.80 160.00
Sta R41 2,950.00 4.00
4.000 50.00 0.80 160.00
Sta R42 3,000.00 4.00
4.000 50.00 0.80 160.00
Sta R43 3,050.00 4.00
4.000 50.00 0.80 160.00
Sta R44 3,100.00 4.00
4.000 50.00 0.80 160.00
Sta R45 3,150.00 4.00
4.000 50.00 0.80 160.00
Sta R46 3,200.00 4.00
4.000 50.00 0.80 160.00
Sta R47 3,250.00 4.00
4.000 50.00 0.80 160.00
Sta R48 3,300.00 4.00
4.000 50.00 0.80 160.00
Sta R49 3,350.00 4.00
4.000 50.00 0.80 160.00
Sta R50 3,400.00 4.00
4.000 50.00 0.80 160.00
Sta R51 3,450.00 4.00
4.000 50.00 0.80 160.00
Sta R52 3,500.00 4.00
4.000 50.00 0.80 160.00
Sta R53 3,550.00 4.00
4.000 50.00 0.80 160.00
Sta R54 3,600.00 4.00
4.000 50.00 0.80 160.00
Sta R55 3,650.00 4.00
4.000 50.00 0.80 160.00
Sta R56 3,700.00 4.00
4.000 50.00 0.80 160.00
Sta R57 3,750.00 4.00
4.000 50.00 0.80 160.00
Sta R58 3,800.00 4.00
4.000 50.00 0.80 160.00
Sta R59 3,850.00 4.00
4.000 45.00 0.80 144.00
Sta R60 3,895.00 4.00
4.000 55.00 0.80 176.00
Sta K1 3,950.00 4.00
4.000 50.00 0.80 160.00
Sta K2 4,000.00 4.00
JUMLAH VOLUME ( II ) 6,720.00
JUMLAH VOLUME
PATOK A1 LUAS P KOEF.
( Liter )
No. KET.
No Jarak Kiri I (M') Lapis Pengikat Lapis Pengikat

Sta K2 4,000.00 4.00


4.000 50.00 0.80 160.00
Sta K3 4,050.00 4.00
4.000 50.00 0.80 160.00
Sta K4 4,100.00 4.00
4.000 50.00 0.80 160.00
Sta K5 4,150.00 4.00
4.000 50.00 0.80 160.00
Sta K6 4,200.00 4.00
4.000 50.00 0.80 160.00
Sta K7 4,250.00 4.00
4.000 50.00 0.80 160.00
Sta K8 4,300.00 4.00
4.000 50.00 0.80 160.00
Sta K9 4,350.00 4.00
4.000 50.00 0.80 160.00
Sta K10 4,400.00 4.00
4.000 50.00 0.80 160.00
Sta K11 4,450.00 4.00
4.000 50.00 0.80 160.00
Sta K12 4,500.00 4.00
4.000 50.00 0.80 160.00
Sta K13 4,550.00 4.00
4.000 50.00 0.80 160.00
Sta K14 4,600.00 4.00
4.000 50.00 0.80 160.00
Sta K15 4,650.00 4.00
4.000 50.00 0.80 160.00
Sta K16 4,700.00 4.00
4.000 50.00 0.80 160.00
Sta K17 4,750.00 4.00
4.000 50.00 0.80 160.00
Sta K18 4,800.00 4.00
4.000 50.00 0.80 160.00
Sta K19 4,850.00 4.00
4.000 50.00 0.80 160.00
Sta K20 4,900.00 4.00
4.000 50.00 0.80 160.00
Sta K21 4,950.00 4.00
4.000 50.00 0.80 160.00
Sta K22 5,000.00 4.00
4.000 50.00 0.80 160.00
Sta K23 5,050.00 4.00
4.000 50.00 0.80 160.00
Sta K24 5,100.00 4.00
4.000 21.00 0.80 67.20
Sta K25 5,121.00 4.00
JUMLAH VOLUME ( III ) 3,587.20

TOTAL JUMLAH VOLUME ( I+II+III ) 16,387.20


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1 H
H
ITEM PEKERJAAN : LASTON LAPIS ANTARA ( AC-BC ) 2
1
H1
H
A
3
3
PATOK A1 H1 LUAS P JUMLAH
No.
No Jarak I I (M') VOLUME (M2)
Sta P0 - 4.00 0.06
0.24 50.0 12.00
Sta P1 50.00 4.00 0.06
0.24 50.0 12.00
Sta P2 100.00 4.00 0.06
0.24 50.0 12.00
Sta P3 150.00 4.00 0.06
0.24 50.0 12.00
Sta P4 200.00 4.00 0.06
0.24 30.0 7.20
Sta P5 230.00 4.00 0.06
0.24 50.0 12.00
Sta P6 280.00 4.00 0.06
0.24 50.0 12.00
Sta P7 330.00 4.00 0.06
0.24 50.0 12.00
Sta P8 380.00 4.00 0.06
0.24 40.0 9.60
Sta P9 420.00 4.00 0.06
0.24 50.0 12.00
Sta P10 470.00 4.00 0.06
0.24 50.0 12.00
Sta P11 520.00 4.00 0.06
0.24 50.0 12.00
Sta P12 570.00 4.00 0.06
0.24 50.0 12.00
Sta P13 620.00 4.00 0.06
0.24 50.0 12.00
Sta P14 670.00 4.00 0.06
0.24 50.0 12.00
Sta P15 720.00 4.00 0.06
0.24 50.0 12.00
Sta P16 770.00 4.00 0.06
0.24 50.0 12.00
Sta P17 820.00 4.00 0.06
0.24 40.0 9.60
Sta P18 860.00 4.00 0.06
0.24 40.0 9.60
Sta P19 900.00 4.00 0.06
0.24 46.0 11.04
Sta P20 946.00 4.00 0.06
0.24 54.0 12.96
Sta R1 1,000.00 4.00 0.06
0.24 50.0 12.00
Sta R2 1,050.00 4.00 0.06
0.24 50.0 12.00
Sta R3 1,100.00 4.00 0.06
0.24 50.0 12.00
Sta R4 1,150.00 4.00 0.06
0.24 50.0 12.00
Sta R5 1,200.00 4.00 0.06
0.24 50.0 12.00
Sta R6 1,250.00 4.00 0.06
0.24 50.0 12.00
Sta R7 1,300.00 4.00 0.06
0.24 50.0 12.00
Sta R8 1,350.00 4.00 0.06
0.24 50.0 12.00
Sta R9 1,400.00 4.00 0.06
0.24 50.0 12.00
Sta R10 1,450.00 4.00 0.06
0.24 50.0 12.00
Sta R11 1,500.00 4.00 0.06
0.24 50.0 12.00
Sta R12 1,550.00 4.00 0.06
0.24 50.0 12.00
Sta R13 1,600.00 4.00 0.06
0.24 50.0 12.00
Sta R14 1,650.00 4.00 0.06
0.24 50.0 12.00
Sta R15 1,700.00 4.00 0.06
0.24 50.0 12.00
Sta R16 1,750.00 4.00 0.06
0.24 50.0 12.00
Sta R17 1,800.00 4.00 0.06
0.24 50.0 12.00
Sta R18 1,850.00 4.00 0.06
0.24 50.0 12.00
Sta R19 1,900.00 4.00 0.06
JUMLAH VOLUME ( I ) 456.00
PATOK A1 H1 LUAS P JUMLAH
No.
No Jarak I I (M') VOLUME (M2)
Sta R19 1,900.00 4.00 0.06
0.24 50.0 12.00
Sta R20 1,950.00 4.00 0.06
0.24 30.0 7.20
Sta R21 1,980.00 4.00 0.06
0.24 20.0 4.80
Sta R22 2,000.00 4.00 0.06
0.24 50.0 12.00
Sta R23 2,050.00 4.00 0.06
0.24 50.0 12.00
Sta R24 2,100.00 4.00 0.06
0.24 50.0 12.00
Sta R25 2,150.00 4.00 0.06
0.24 50.0 12.00
Sta R26 2,200.00 4.00 0.06
0.24 50.0 12.00
Sta R27 2,250.00 4.00 0.06
0.24 50.0 12.00
Sta R28 2,300.00 4.00 0.06
0.24 50.0 12.00
Sta R29 2,350.00 4.00 0.06
0.24 50.0 12.00
Sta R30 2,400.00 4.00 0.06
0.24 50.0 12.00
Sta R31 2,450.00 4.00 0.06
0.24 50.0 12.00
Sta R32 2,500.00 4.00 0.06
0.24 50.0 12.00
Sta R33 2,550.00 4.00 0.06
0.24 50.0 12.00
Sta R34 2,600.00 4.00 0.06
0.24 50.0 12.00
Sta R35 2,650.00 4.00 0.06
0.24 50.0 12.00
Sta R36 2,700.00 4.00 0.06
0.24 50.0 12.00
Sta R37 2,750.00 4.00 0.06
0.24 50.0 12.00
Sta R38 2,800.00 4.00 0.06
0.24 50.0 12.00
Sta R39 2,850.00 4.00 0.06
0.24 50.0 12.00
Sta R40 2,900.00 4.00 0.06
0.24 50.0 12.00
Sta R41 2,950.00 4.00 0.06
0.24 50.0 12.00
Sta R42 3,000.00 4.00 0.06
0.24 50.0 12.00
Sta R43 3,050.00 4.00 0.06
0.24 50.0 12.00
Sta R44 3,100.00 4.00 0.06
0.24 50.0 12.00
Sta R45 3,150.00 4.00 0.06
0.24 50.0 12.00
Sta R46 3,200.00 4.00 0.06
0.24 50.0 12.00
Sta R47 3,250.00 4.00 0.06
0.24 50.0 12.00
Sta R48 3,300.00 4.00 0.06
0.24 50.0 12.00
Sta R49 3,350.00 4.00 0.06
0.24 50.0 12.00
Sta R50 3,400.00 4.00 0.06
0.24 50.0 12.00
Sta R51 3,450.00 4.00 0.06
0.24 50.0 12.00
Sta R52 3,500.00 4.00 0.06
0.24 50.0 12.00
Sta R53 3,550.00 4.00 0.06
0.24 50.0 12.00
Sta R54 3,600.00 4.00 0.06
0.24 50.0 12.00
Sta R55 3,650.00 4.00 0.06
0.24 50.0 12.00
Sta R56 3,700.00 4.00 0.06
0.24 50.0 12.00
Sta R57 3,750.00 4.00 0.06
0.24 50.0 12.00
Sta R58 3,800.00 4.00 0.06
0.24 50.0 12.00
Sta R59 3,850.00 4.00 0.06
0.24 45.0 10.80
Sta R60 3,895.00 4.00 0.06
0.24 55.0 13.20
Sta K1 3,950.00 4.00 0.06
0.24 50.0 12.00
Sta K2 4,000.00 4.00 0.06
JUMLAH VOLUME ( II ) 504.00
PATOK A1 H1 LUAS P JUMLAH
No.
No Jarak I I (M') VOLUME (M2)
Sta K2 4,000.00 4.00 0.06
0.24 50.0 12.00
Sta K3 4,050.00 4.00 0.06
0.24 50.0 12.00
Sta K4 4,100.00 4.00 0.06
0.24 50.0 12.00
Sta K5 4,150.00 4.00 0.06
0.24 50.0 12.00
Sta K6 4,200.00 4.00 0.06
0.24 50.0 12.00
Sta K7 4,250.00 4.00 0.06
0.24 50.0 12.00
Sta K8 4,300.00 4.00 0.06
0.24 50.0 12.00
Sta K9 4,350.00 4.00 0.06
0.24 50.0 12.00
Sta K10 4,400.00 4.00 0.06
0.24 50.0 12.00
Sta K11 4,450.00 4.00 0.06
0.24 50.0 12.00
Sta K12 4,500.00 4.00 0.06
0.24 50.0 12.00
Sta K13 4,550.00 4.00 0.06
0.24 50.0 12.00
Sta K14 4,600.00 4.00 0.06
0.24 50.0 12.00
Sta K15 4,650.00 4.00 0.06
0.24 50.0 12.00
Sta K16 4,700.00 4.00 0.06
0.24 50.0 12.00
Sta K17 4,750.00 4.00 0.06
0.24 50.0 12.00
Sta K18 4,800.00 4.00 0.06
0.24 50.0 12.00
Sta K19 4,850.00 4.00 0.06
0.24 50.0 12.00
Sta K20 4,900.00 4.00 0.06
0.24 50.0 12.00
Sta K21 4,950.00 4.00 0.06
0.24 50.0 12.00
Sta K22 5,000.00 4.00 0.06
0.24 50.0 12.00
Sta K23 5,050.00 4.00 0.06
0.24 50.0 12.00
Sta K24 5,100.00 4.00 0.06
0.24 21.0 5.04
Sta K25 5,121.00 4.00 0.06
JUMLAH VOLUME ( III ) 269.04

TOTAL JUMLAH VOLUME ( I+II+III ) 1,229.04


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1 A2 A3
ITEM PEKERJAAN : LAPIS PONDASI AREGAT KELAS A
H1 H2
H3

B1
PATOK A1 H1 A2 H2 H2 H3 B1 A3 LUAS P
JUMLAH
No.
No Jarak I II III I II III VOLUME (M2)
(M')
Sta P0 - 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P1 50.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P2 100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P3 150.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P4 200.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 30.0 22.26
Sta P5 230.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P6 280.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P7 330.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P8 380.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 40.0 29.67
Sta P9 420.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P10 470.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P11 520.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P12 570.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P13 620.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P14 670.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P15 720.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P16 770.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta P17 820.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 40.0 29.67
Sta P18 860.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 40.0 29.67
Sta P19 900.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 46.0 34.13
Sta P20 946.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 54.0 40.06
Sta R1 1,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R2 1,050.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R3 1,100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R4 1,150.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R5 1,200.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R6 1,250.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R7 1,300.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R8 1,350.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R9 1,400.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R10 1,450.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R11 1,500.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R12 1,550.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R13 1,600.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R14 1,650.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R15 1,700.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R16 1,750.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R17 1,800.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R18 1,850.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R19 1,900.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
JUMLAH VOLUME ( I ) 1,409.56
PATOK A1 H1 LUAS P
JUMLAH
No.
No Jarak I I VOLUME (M2)
(M')
Sta R19 1,900.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R20 1,950.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 30.0 22.26
Sta R21 1,980.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 20.0 14.84
Sta R22 2,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R23 2,050.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R24 2,100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R25 2,150.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R26 2,200.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R27 2,250.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R28 2,300.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R29 2,350.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R30 2,400.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R31 2,450.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R32 2,500.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R33 2,550.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R34 2,600.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R35 2,650.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R36 2,700.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R37 2,750.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R38 2,800.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R39 2,850.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R40 2,900.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R41 2,950.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R42 3,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R43 3,050.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R44 3,100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R45 3,150.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R46 3,200.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R47 3,250.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R48 3,300.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R49 3,350.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R50 3,400.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R51 3,450.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R52 3,500.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R53 3,550.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R54 3,600.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R55 3,650.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R56 3,700.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R57 3,750.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R58 3,800.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta R59 3,850.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 45.0 33.38
Sta R60 3,895.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 55.0 40.80
Sta K1 3,950.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K2 4,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
JUMLAH VOLUME ( II ) 1,557.94
PATOK A1 H1 LUAS P
JUMLAH
No.
No Jarak I I VOLUME (M2)
(M')
Sta K2 4,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K3 4,050.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K4 4,100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K5 4,150.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K6 4,200.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K7 4,250.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K8 4,300.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K9 4,350.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K10 4,400.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K11 4,450.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K12 4,500.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K13 4,550.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K14 4,600.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K15 4,650.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K16 4,700.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K17 4,750.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K18 4,800.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K19 4,850.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K20 4,900.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K21 4,950.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K22 5,000.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K23 5,050.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 50.0 37.09
Sta K24 5,100.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
0.60 0.02 0.122 21.0 15.58
Sta K25 5,121.00 4.00 0.150 0.500 0.040 0.200 0.050 1.000 0.950
JUMLAH VOLUME ( III ) 831.64

TOTAL JUMLAH VOLUME ( I+11+III ) 3,799.14


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1
ITEM PEKERJAAN : TIMBUNAN PILIHAN

H1

PATOK A1 H1 LUAS P JUMLAH VOLUME


No.
No Jarak I I (M') (M2)

Sta P0 - 5.64 0.000


- 50.0 -
Sta P1 50.00 5.64 0.000
0.34 50.0 16.92
Sta P2 100.00 5.64 0.120
0.90 50.0 45.12
Sta P3 150.00 5.64 0.200
1.27 50.0 63.45
Sta P4 200.00 5.64 0.250
1.41 30.0 42.30
Sta P5 230.00 5.64 0.250
1.41 50.0 70.50
Sta P6 280.00 5.64 0.250
1.41 50.0 70.50
Sta P7 330.00 5.64 0.250
1.41 50.0 70.50
Sta P8 380.00 5.64 0.250
1.41 40.0 56.40
Sta P9 420.00 5.64 0.250
1.41 50.0 70.50
Sta P10 470.00 5.64 0.250
1.41 50.0 70.50
Sta P11 520.00 5.64 0.250
1.41 50.0 70.50
Sta P12 570.00 5.64 0.250
1.41 50.0 70.50
Sta P13 620.00 5.64 0.250
1.41 50.0 70.50
Sta P14 670.00 5.64 0.250
1.41 50.0 70.50
Sta P15 720.00 5.64 0.250
1.41 50.0 70.50
Sta P16 770.00 5.64 0.250
1.41 50.0 70.50
Sta P17 820.00 5.64 0.250
1.41 40.0 56.40
Sta P18 860.00 5.64 0.250
1.41 40.0 56.40
Sta P19 900.00 5.64 0.250
1.41 46.0 64.86
Sta P20 946.00 5.64 0.250
1.41 54.0 76.14
Sta R1 1,000.00 5.64 0.250
1.41 50.0 70.50
Sta R2 1,050.00 5.64 0.250
1.41 50.0 70.50
Sta R3 1,100.00 5.64 0.250
1.41 50.0 70.50
Sta R4 1,150.00 5.64 0.250
1.41 50.0 70.50
Sta R5 1,200.00 5.64 0.250
1.41 50.0 70.50
Sta R6 1,250.00 5.64 0.250
1.41 50.0 70.50
Sta R7 1,300.00 5.64 0.250
1.41 50.0 70.50
Sta R8 1,350.00 5.64 0.250
1.41 50.0 70.50
Sta R9 1,400.00 5.64 0.250
1.41 50.0 70.50
Sta R10 1,450.00 5.64 0.250
1.41 50.0 70.50
Sta R11 1,500.00 5.64 0.250
1.41 50.0 70.50
Sta R12 1,550.00 5.64 0.250
1.41 50.0 70.50
Sta R13 1,600.00 5.64 0.250
1.41 50.0 70.50
Sta R14 1,650.00 5.64 0.250
1.41 50.0 70.50
Sta R15 1,700.00 5.64 0.250
1.41 50.0 70.50
Sta R16 1,750.00 5.64 0.250
1.41 50.0 70.50
Sta R17 1,800.00 5.64 0.250
1.41 50.0 70.50
Sta R18 1,850.00 5.64 0.250
1.41 50.0 70.50
Sta R19 1,900.00 5.64 0.250
JUMLAH VOLUME ( I ) 2,522.49
PATOK A1 H1 LUAS P JUMLAH VOLUME
No.
No Jarak I I (M') (M2)

Sta R19 1,900.00 5.64 0.250


1.41 50.0 70.50
Sta R20 1,950.00 5.64 0.250
1.41 30.0 42.30
Sta R21 1,980.00 5.64 0.250
1.41 20.0 28.20
Sta R22 2,000.00 5.64 0.250
1.41 50.0 70.50
Sta R23 2,050.00 5.64 0.250
1.41 50.0 70.50
Sta R24 2,100.00 5.64 0.250
1.41 50.0 70.50
Sta R25 2,150.00 5.64 0.250
1.41 50.0 70.50
Sta R26 2,200.00 5.64 0.250
1.41 50.0 70.50
Sta R27 2,250.00 5.64 0.250
1.41 50.0 70.50
Sta R28 2,300.00 5.64 0.250
1.41 50.0 70.50
Sta R29 2,350.00 5.64 0.250
1.41 50.0 70.50
Sta R30 2,400.00 5.64 0.250
1.41 50.0 70.50
Sta R31 2,450.00 5.64 0.250
1.41 50.0 70.50
Sta R32 2,500.00 5.64 0.250
1.41 50.0 70.50
Sta R33 2,550.00 5.64 0.250
1.41 50.0 70.50
Sta R34 2,600.00 5.64 0.250
1.41 50.0 70.50
Sta R35 2,650.00 5.64 0.250
1.41 50.0 70.50
Sta R36 2,700.00 5.64 0.250
1.41 50.0 70.50
Sta R37 2,750.00 5.64 0.250
1.41 50.0 70.50
Sta R38 2,800.00 5.64 0.250
1.41 50.0 70.50
Sta R39 2,850.00 5.64 0.250
1.41 50.0 70.50
Sta R40 2,900.00 5.64 0.250
1.41 50.0 70.50
Sta R41 2,950.00 5.64 0.250
1.41 50.0 70.50
Sta R42 3,000.00 5.64 0.250
1.41 50.0 70.50
Sta R43 3,050.00 5.64 0.250
1.41 50.0 70.50
Sta R44 3,100.00 5.64 0.250
1.41 50.0 70.50
Sta R45 3,150.00 5.64 0.250
1.41 50.0 70.50
Sta R46 3,200.00 5.64 0.250
1.41 50.0 70.50
Sta R47 3,250.00 5.64 0.250
1.41 50.0 70.50
Sta R48 3,300.00 5.64 0.250
1.41 50.0 70.50
Sta R49 3,350.00 5.64 0.250
1.41 50.0 70.50
Sta R50 3,400.00 5.64 0.250
1.41 50.0 70.50
Sta R51 3,450.00 5.64 0.250
1.41 50.0 70.50
Sta R52 3,500.00 5.64 0.250
1.41 50.0 70.50
Sta R53 3,550.00 5.64 0.250
1.41 50.0 70.50
Sta R54 3,600.00 5.64 0.250
1.41 50.0 70.50
Sta R55 3,650.00 5.64 0.250
1.41 50.0 70.50
Sta R56 3,700.00 5.64 0.250
1.41 50.0 70.50
Sta R57 3,750.00 5.64 0.250
1.41 50.0 70.50
Sta R58 3,800.00 5.64 0.250
1.41 50.0 70.50
Sta R59 3,850.00 5.64 0.250
1.41 45.0 63.45
Sta R60 3,895.00 5.64 0.250
1.41 55.0 77.55
Sta K1 3,950.00 5.64 0.250
1.41 50.0 70.50
Sta K2 4,000.00 5.64 0.250
JUMLAH VOLUME ( II ) 2,961.00
PATOK A1 H1 LUAS P JUMLAH VOLUME
No.
No Jarak I I (M') (M2)

Sta K2 4,000.00 5.64 0.250


1.41 50.0 70.50
Sta K3 4,050.00 5.64 0.250
1.41 50.0 70.50
Sta K4 4,100.00 5.64 0.250
1.41 50.0 70.50
Sta K5 4,150.00 5.64 0.250
1.41 50.0 70.50
Sta K6 4,200.00 5.64 0.250
1.41 50.0 70.50
Sta K7 4,250.00 5.64 0.250
1.41 50.0 70.50
Sta K8 4,300.00 5.64 0.250
1.41 50.0 70.50
Sta K9 4,350.00 5.64 0.250
1.41 50.0 70.50
Sta K10 4,400.00 5.64 0.250
1.41 50.0 70.50
Sta K11 4,450.00 5.64 0.250
1.41 50.0 70.50
Sta K12 4,500.00 5.64 0.250
1.41 50.0 70.50
Sta K13 4,550.00 5.64 0.250
1.41 50.0 70.50
Sta K14 4,600.00 5.64 0.250
1.41 50.0 70.50
Sta K15 4,650.00 5.64 0.250
1.41 50.0 70.50
Sta K16 4,700.00 5.64 0.250
1.41 50.0 70.50
Sta K17 4,750.00 5.64 0.250
1.41 50.0 70.50
Sta K18 4,800.00 5.64 0.250
1.41 50.0 70.50
Sta K19 4,850.00 5.64 0.250
1.41 50.0 70.50
Sta K20 4,900.00 5.64 0.250
1.41 50.0 70.50
Sta K21 4,950.00 5.64 0.250
1.41 50.0 70.50
Sta K22 5,000.00 5.64 0.250
1.41 50.0 70.50
Sta K23 5,050.00 5.64 0.250
1.41 50.0 70.50
Sta K24 5,100.00 5.64 0.250
1.41 21.0 29.61
Sta K25 5,121.00 5.64 0.250
JUMLAH VOLUME ( III ) 1,580.61

TOTAL JUMLAH VOLUME ( I+11+III ) 7,064.10


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1 H
H
ITEM PEKERJAAN : LAPIS PONDASI AREGAT KELAS C 2
1

H1 H
3
A
3
PATOK A1 H1 LUAS P JUMLAH VOLUME
No.
No Jarak I I (M') (M2)

Sta P0 - 0.50 0.150


0.08 50.0 3.75
Sta P1 50.00 0.50 0.150
0.08 50.0 3.75
Sta P2 100.00 0.50 0.150
0.08 50.0 3.75
Sta P3 150.00 0.50 0.150
0.08 50.0 3.75
Sta P4 200.00 0.50 0.150
0.08 30.0 2.25
Sta P5 230.00 0.50 0.150
0.08 50.0 3.75
Sta P6 280.00 0.50 0.150
0.08 50.0 3.75
Sta P7 330.00 0.50 0.150
0.08 50.0 3.75
Sta P8 380.00 0.50 0.150
0.08 40.0 3.00
Sta P9 420.00 0.50 0.150
0.08 50.0 3.75
Sta P10 470.00 0.50 0.150
0.08 50.0 3.75
Sta P11 520.00 0.50 0.150
0.08 50.0 3.75
Sta P12 570.00 0.50 0.150
0.08 50.0 3.75
Sta P13 620.00 0.50 0.150
0.08 50.0 3.75
Sta P14 670.00 0.50 0.150
0.08 50.0 3.75
Sta P15 720.00 0.50 0.150
0.08 50.0 3.75
Sta P16 770.00 0.50 0.150
0.08 50.0 3.75
Sta P17 820.00 0.50 0.150
0.08 40.0 3.00
Sta P18 860.00 0.50 0.150
0.08 40.0 3.00
Sta P19 900.00 0.50 0.150
0.08 46.0 3.45
Sta P20 946.00 0.50 0.150
0.08 54.0 4.05
Sta R1 1,000.00 0.50 0.150
0.08 50.0 3.75
Sta R2 1,050.00 0.50 0.150
0.08 50.0 3.75
Sta R3 1,100.00 0.50 0.150
0.08 50.0 3.75
Sta R4 1,150.00 0.50 0.150
0.08 50.0 3.75
Sta R5 1,200.00 0.50 0.150
0.08 50.0 3.75
Sta R6 1,250.00 0.50 0.150
0.08 50.0 3.75
Sta R7 1,300.00 0.50 0.150
0.08 50.0 3.75
Sta R8 1,350.00 0.50 0.150
0.08 50.0 3.75
Sta R9 1,400.00 0.50 0.150
0.08 50.0 3.75
Sta R10 1,450.00 0.50 0.150
0.08 50.0 3.75
Sta R11 1,500.00 0.50 0.150
0.08 50.0 3.75
Sta R12 1,550.00 0.50 0.150
0.08 50.0 3.75
Sta R13 1,600.00 0.50 0.150
0.08 50.0 3.75
Sta R14 1,650.00 0.50 0.150
0.08 50.0 3.75
Sta R15 1,700.00 0.50 0.150
0.08 50.0 3.75
Sta R16 1,750.00 0.50 0.150
0.08 50.0 3.75
Sta R17 1,800.00 0.50 0.150
0.08 50.0 3.75
Sta R18 1,850.00 0.50 0.150
0.08 50.0 3.75
Sta R19 1,900.00 0.50 0.150
JUMLAH VOLUME ( I ) 142.50
PATOK A1 H1 LUAS P JUMLAH VOLUME
No.
No Jarak I I (M') (M2)

Sta R19 1,900.00 0.50 0.150


0.08 50.0 3.75
Sta R20 1,950.00 0.50 0.150
0.08 30.0 2.25
Sta R21 1,980.00 0.50 0.150
0.08 20.0 1.50
Sta R22 2,000.00 0.50 0.150
0.08 50.0 3.75
Sta R23 2,050.00 0.50 0.150
0.08 50.0 3.75
Sta R24 2,100.00 0.50 0.150
0.08 50.0 3.75
Sta R25 2,150.00 0.50 0.150
0.08 50.0 3.75
Sta R26 2,200.00 0.50 0.150
0.08 50.0 3.75
Sta R27 2,250.00 0.50 0.150
0.08 50.0 3.75
Sta R28 2,300.00 0.50 0.150
0.08 50.0 3.75
Sta R29 2,350.00 0.50 0.150
0.08 50.0 3.75
Sta R30 2,400.00 0.50 0.150
0.08 50.0 3.75
Sta R31 2,450.00 0.50 0.150
0.08 50.0 3.75
Sta R32 2,500.00 0.50 0.150
0.08 50.0 3.75
Sta R33 2,550.00 0.50 0.150
0.08 50.0 3.75
Sta R34 2,600.00 0.50 0.150
0.08 50.0 3.75
Sta R35 2,650.00 0.50 0.150
0.08 50.0 3.75
Sta R36 2,700.00 0.50 0.150
0.08 50.0 3.75
Sta R37 2,750.00 0.50 0.150
0.08 50.0 3.75
Sta R38 2,800.00 0.50 0.150
0.08 50.0 3.75
Sta R39 2,850.00 0.50 0.150
0.08 50.0 3.75
Sta R40 2,900.00 0.50 0.150
0.08 50.0 3.75
Sta R41 2,950.00 0.50 0.150
0.08 50.0 3.75
Sta R42 3,000.00 0.50 0.150
0.08 50.0 3.75
Sta R43 3,050.00 0.50 0.150
0.08 50.0 3.75
Sta R44 3,100.00 0.50 0.150
0.08 50.0 3.75
Sta R45 3,150.00 0.50 0.150
0.08 50.0 3.75
Sta R46 3,200.00 0.50 0.150
0.08 50.0 3.75
Sta R47 3,250.00 0.50 0.150
0.08 50.0 3.75
Sta R48 3,300.00 0.50 0.150
0.08 50.0 3.75
Sta R49 3,350.00 0.50 0.150
0.08 50.0 3.75
Sta R50 3,400.00 0.50 0.150
0.08 50.0 3.75
Sta R51 3,450.00 0.50 0.150
0.08 50.0 3.75
Sta R52 3,500.00 0.50 0.150
0.08 50.0 3.75
Sta R53 3,550.00 0.50 0.150
0.08 50.0 3.75
Sta R54 3,600.00 0.50 0.150
0.08 50.0 3.75
Sta R55 3,650.00 0.50 0.150
0.08 50.0 3.75
Sta R56 3,700.00 0.50 0.150
0.08 50.0 3.75
Sta R57 3,750.00 0.50 0.150
0.08 50.0 3.75
Sta R58 3,800.00 0.50 0.150
0.08 50.0 3.75
Sta R59 3,850.00 0.50 0.150
0.08 45.0 3.38
Sta R60 3,895.00 0.50 0.150
0.08 55.0 4.13
Sta K1 3,950.00 0.50 0.150
0.08 50.0 3.75
Sta K2 4,000.00 0.50 0.150
JUMLAH VOLUME ( II ) 157.50
PATOK A1 H1 LUAS P JUMLAH VOLUME
No.
No Jarak I I (M') (M2)

Sta K2 4,000.00 0.50 0.150


0.08 50.0 3.75
Sta K3 4,050.00 0.50 0.150
0.08 50.0 3.75
Sta K4 4,100.00 0.50 0.150
0.08 50.0 3.75
Sta K5 4,150.00 0.50 0.150
0.08 50.0 3.75
Sta K6 4,200.00 0.50 0.150
0.08 50.0 3.75
Sta K7 4,250.00 0.50 0.150
0.08 50.0 3.75
Sta K8 4,300.00 0.50 0.150
0.08 50.0 3.75
Sta K9 4,350.00 0.50 0.150
0.08 50.0 3.75
Sta K10 4,400.00 0.50 0.150
0.08 50.0 3.75
Sta K11 4,450.00 0.50 0.150
0.08 50.0 3.75
Sta K12 4,500.00 0.50 0.150
0.08 50.0 3.75
Sta K13 4,550.00 0.50 0.150
0.08 50.0 3.75
Sta K14 4,600.00 0.50 0.150
0.08 50.0 3.75
Sta K15 4,650.00 0.50 0.150
0.08 50.0 3.75
Sta K16 4,700.00 0.50 0.150
0.08 50.0 3.75
Sta K17 4,750.00 0.50 0.150
0.08 50.0 3.75
Sta K18 4,800.00 0.50 0.150
0.08 50.0 3.75
Sta K19 4,850.00 0.50 0.150
0.08 50.0 3.75
Sta K20 4,900.00 0.50 0.150
0.08 50.0 3.75
Sta K21 4,950.00 0.50 0.150
0.08 50.0 3.75
Sta K22 5,000.00 0.50 0.150
0.08 50.0 3.75
Sta K23 5,050.00 0.50 0.150
0.08 50.0 3.75
Sta K24 5,100.00 0.50 0.150
0.08 21.0 1.58
Sta K25 5,121.00 0.50 0.150
JUMLAH VOLUME ( III ) 84.08

TOTAL JUMLAH VOLUME ( I+11+III ) 384.08


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1
ITEM PEKERJAAN : PASANGAN BATU KALI
H1

B1

PATOK A1 B1 H1 LUAS = ( P X L ) P JUMLAH VOLUME


No.
(M') (M3)
No Jarak Dinding Kiri I
Sta P0 - 0.25 0.35 0.30
0.09 50.0 4.50
Sta P1 50.00 0.25 0.35 0.30
0.11 50.0 5.25
Sta P2 100.00 0.25 0.35 0.40
0.12 50.0 6.00
Sta P3 150.00 0.25 0.35 0.40
0.14 50.0 6.75
Sta P4 200.00 0.25 0.35 0.50
0.15 30.0 4.50
Sta P5 230.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P6 280.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P7 330.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P8 380.00 0.25 0.35 0.50
0.15 40.0 6.00
Sta P9 420.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P10 470.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P11 520.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P12 570.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P13 620.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P14 670.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P15 720.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P16 770.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta P17 820.00 0.25 0.35 0.50
0.15 40.0 6.00
Sta P18 860.00 0.25 0.35 0.50
0.15 40.0 6.00
Sta P19 900.00 0.25 0.35 0.50
0.15 46.0 6.90
Sta P20 946.00 0.25 0.35 0.50
0.15 54.0 8.10
Sta R1 1,000.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R2 1,050.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R3 1,100.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R4 1,150.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R5 1,200.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R6 1,250.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R7 1,300.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R8 1,350.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R9 1,400.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R10 1,450.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R11 1,500.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R12 1,550.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R13 1,600.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R14 1,650.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R15 1,700.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R16 1,750.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R17 1,800.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R18 1,850.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R19 1,900.00 0.25 0.35 0.50
JUMLAH VOLUME ( I ) 277.50
PATOK A1 B1 H1 LUAS = ( P X L ) P JUMLAH VOLUME
No.
No Jarak Dinding Kiri I (M') (M3)

Sta R20 1,950.00 0.25 0.35 0.50


0.15 30.0 4.50
Sta R21 1,980.00 0.25 0.35 0.50
0.15 20.0 3.00
Sta R22 2,000.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R23 2,050.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R24 2,100.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R25 2,150.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R26 2,200.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R27 2,250.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R28 2,300.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R29 2,350.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R30 2,400.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R31 2,450.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R32 2,500.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R33 2,550.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R34 2,600.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R35 2,650.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R36 2,700.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R37 2,750.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R38 2,800.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R39 2,850.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R40 2,900.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R41 2,950.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R42 3,000.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R43 3,050.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R44 3,100.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R45 3,150.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R46 3,200.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R47 3,250.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R48 3,300.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R49 3,350.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R50 3,400.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R51 3,450.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R52 3,500.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R53 3,550.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R54 3,600.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R55 3,650.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R56 3,700.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R57 3,750.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R58 3,800.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta R59 3,850.00 0.25 0.35 0.50
0.15 45.0 6.75
Sta R60 3,895.00 0.25 0.35 0.50
0.15 55.0 8.25
Sta K1 3,950.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K2 4,000.00 0.25 0.35 0.50
JUMLAH VOLUME ( I ) 307.50
PATOK A1 B1 H1 LUAS = ( P X L ) P JUMLAH VOLUME
No.
No Jarak Dinding Kiri I (M') (M3)

Sta K2 4,000.00 0.25 0.35 0.50


0.15 50.0 7.50
Sta K3 4,050.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K4 4,100.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K5 4,150.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K6 4,200.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K7 4,250.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K8 4,300.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K9 4,350.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K10 4,400.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K11 4,450.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K12 4,500.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K13 4,550.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K14 4,600.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K15 4,650.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K16 4,700.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K17 4,750.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K18 4,800.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K19 4,850.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K20 4,900.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K21 4,950.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K22 5,000.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K23 5,050.00 0.25 0.35 0.50
0.15 50.0 7.50
Sta K24 5,100.00 0.25 0.35 0.50
0.15 11.0 1.65
Sta K25 5,111.00 0.25 0.35 0.50
JUMLAH VOLUME ( I ) 166.65

TOTAL JUMLAH VOLUME ( I+II+III ) 751.65


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


TAHUN ANGGARAN : 2021 A2
ITEM PEKERJAAN : TIMBUNAN BIASA
H1 H2

A1

PATOK A1 A2 H2 H1 LUAS
P JUMLAH
No. KET.
(M') VOLUME (M3)
No Jarak Sisi Kiri I

Sta P0 -
50.0
Sta P1 50.00
50.0
Sta P2 100.00
50.0
Sta P3 150.00
50.0
Sta P4 200.00
30.0
Sta P5 230.00
50.0
Sta P6 280.00 1.20 0.80 0.90 -
0.95 50.0 47.25
Sta P7 330.00 1.20 1.00 0.90 -
0.95 50.0 47.25
Sta P8 380.00 1.20 0.80 0.90 -
0.90 40.0 36.00
Sta P9 420.00 1.20 0.80 0.90 -
50.0 -
Sta P10 470.00
50.0 -
Sta P11 520.00
50.0 -
Sta P12 570.00
50.0 -
Sta P13 620.00
50.0 -
Sta P14 670.00
50.0 -
Sta P15 720.00
50.0 -
Sta P16 770.00
50.0 -
Sta P17 820.00
40.0 -
Sta P18 860.00
40.0 -
Sta P19 900.00 1.20 0.80 0.90 -
0.90 46.0 41.40
Sta P20 946.00 1.20 0.80 0.90 -
0.90 54.0 48.60
Sta R1 1,000.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R2 1,050.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R3 1,100.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R4 1,150.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R5 1,200.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R6 1,250.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R7 1,300.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R8 1,350.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R9 1,400.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R10 1,450.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R11 1,500.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R12 1,550.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R13 1,600.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R14 1,650.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R15 1,700.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R16 1,750.00 1.20 0.80 0.90 -
50.0
Sta R17 1,800.00
50.0
Sta R18 1,850.00
50.0
Sta R19 1,900.00
JUMLAH VOLUME ( I ) 895.50
PATOK A1 A2 H2 H1 LUAS P JUMLAH
No. KET.
No Jarak Sisi Kiri I (M') VOLUME (M3)
Sta R19 1,900.00
50.0
Sta R20 1,950.00
30.0
Sta R21 1,980.00
20.0
Sta R22 2,000.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R23 2,050.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R24 2,100.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R25 2,150.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R26 2,200.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R27 2,250.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R28 2,300.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R29 2,350.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R30 2,400.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R31 2,450.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R32 2,500.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R33 2,550.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R34 2,600.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R35 2,650.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R36 2,700.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R37 2,750.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R38 2,800.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R39 2,850.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R40 2,900.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta R41 2,950.00 1.20 0.80 0.90 -
1.09 50.0 54.68
Sta R42 3,000.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R43 3,050.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R44 3,100.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R45 3,150.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R46 3,200.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R47 3,250.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R48 3,300.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R49 3,350.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R50 3,400.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R51 3,450.00 2.29 2.00 0.60 -
1.29 50.0 64.35
Sta R52 3,500.00 2.29 2.00 0.60 -
0.93 50.0 46.43
Sta R53 3,550.00 1.20 0.70 0.60 -
0.57 50.0 28.50
Sta R54 3,600.00 1.20 0.70 0.60 -
0.57 50.0 28.50
Sta R55 3,650.00 1.20 0.70 0.60 -
0.57 50.0 28.50
Sta R56 3,700.00 1.20 0.70 0.60 -
50.0
Sta R57 3,750.00 -
50.0
Sta R58 3,800.00 -
50.0
Sta R59 3,850.00 -
45.0
Sta R60 3,895.00 -
55.0
Sta K1 3,950.00 -
50.0
Sta K2 4,000.00 -
JUMLAH VOLUME ( I ) 1,685.10
PATOK A1 A2 H2 H1 LUAS P JUMLAH
No. KET.
No Jarak Sisi Kiri I (M') VOLUME (M3)

Sta K2 4,000.00 -
50.0
Sta K3 4,050.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta K4 4,100.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta K5 4,150.00 1.20 0.80 0.90 -
50.0 -
Sta K6 4,200.00
50.0
Sta K7 4,250.00
50.0
Sta K8 4,300.00
50.0
Sta K9 4,350.00
50.0
Sta K10 4,400.00
50.0
Sta K11 4,450.00
50.0
Sta K12 4,500.00
50.0
Sta K13 4,550.00
50.0
Sta K14 4,600.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta K15 4,650.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta K16 4,700.00 1.20 0.80 0.90 -
0.90 50.0 45.00
Sta K17 4,750.00 1.20 0.80 0.90 -
50.0
Sta K18 4,800.00
50.0
Sta K19 4,850.00
50.0
Sta K20 4,900.00
50.0
Sta K21 4,950.00
50.0
Sta K22 5,000.00
50.0
Sta K23 5,050.00
50.0
Sta K24 5,100.00 2.60 1.70 1.55
3.33 21.0 69.98
Sta K25 5,121.00 2.60 1.70 1.55

JUMLAH VOLUME ( I ) 294.98

TOTAL JUMLAH VOLUME ( I+II+III ) 2,875.58


BACK-UP DATA MARKA JALAN

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021

Panjang Jalan Panjang Marka Spasi Marka Jumlah Marka Panjang Marka Total Volume
a b c d= a/(b+c) e= b x d f= e x 0.12
marka tengah 5,121.00 3.00 5.00 640.13 1,920.38 230.45

marka samping kiri 5,121.00 614.52

marka samping kanan 5,121.00 614.52


Jumlah Total 1,459.49 m2
BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
TAHUN ANGGARAN : 2021 A1 A2 A3
ITEM PEKERJAAN : TIMBUNAN PILIHAN ( SIRTU )
H1 H2
H3

B1

PATOK A2 H2 A3 B1 H2 H3 LUAS P
JUMLAH
No. KET.
No Jarak Tengah Sisi Kanan I II III VOLUME (M3)
(M')
Sta P0 - 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P1 50.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P2 100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P3 150.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P4 200.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 30.0 9.00
Sta P5 230.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P6 280.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P7 330.00 0.50 0.10 1.00 1.00 0.33 0.17
0.000 0.050 0.250 50.0 15.00
Sta P8 380.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 40.0 12.00
Sta P9 420.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P10 470.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P11 520.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P12 570.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P13 620.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P14 670.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P15 720.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P16 770.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta P17 820.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 40.0 12.00
Sta P18 860.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 40.0 12.00
Sta P19 900.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 46.0 13.80
Sta P20 946.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 54.0 16.20
Sta R1 1,000.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R2 1,050.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R3 1,100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R4 1,150.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R5 1,200.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R6 1,250.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R7 1,300.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R8 1,350.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R9 1,400.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R10 1,450.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R11 1,500.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R12 1,550.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R13 1,600.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R14 1,650.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R15 1,700.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R16 1,750.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R17 1,800.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R18 1,850.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R19 1,900.00 0.50 0.10 1.00 1.00 0.33 0.17
JUMLAH VOLUME ( I ) 570.00
PATOK A2 H2 A3 B1 H2 H3 LUAS P
JUMLAH
No. KET.
No Jarak Tengah Sisi Kanan I II III VOLUME (M3)
(M')
Sta R19 1,900.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R20 1,950.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 30.0 9.00
Sta R21 1,980.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 20.0 6.00
Sta R22 2,000.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R23 2,050.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R24 2,100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R25 2,150.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R26 2,200.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R27 2,250.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R28 2,300.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R29 2,350.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R30 2,400.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R31 2,450.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R32 2,500.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R33 2,550.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R34 2,600.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R35 2,650.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R36 2,700.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R37 2,750.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R38 2,800.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R39 2,850.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R40 2,900.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R41 2,950.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R42 3,000.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R43 3,050.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R44 3,100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R45 3,150.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R46 3,200.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R47 3,250.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R48 3,300.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R49 3,350.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R50 3,400.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R51 3,450.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R52 3,500.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R53 3,550.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R54 3,600.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R55 3,650.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R56 3,700.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R57 3,750.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R58 3,800.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta R59 3,850.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 45.0 13.50
Sta R60 3,895.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 55.0 16.50
Sta K1 3,950.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K2 4,000.00 0.50 0.10 1.00 1.00 0.33 0.17
JUMLAH VOLUME ( I ) 630.00
PATOK A2 H2 A3 B1 H2 H3 LUAS P
JUMLAH
No. KET.
No Jarak Tengah Sisi Kanan I II III VOLUME (M3)
(M')
Sta K2 4,000.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K3 4,050.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K4 4,100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K5 4,150.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K6 4,200.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K7 4,250.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K8 4,300.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K9 4,350.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K10 4,400.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K11 4,450.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K12 4,500.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K13 4,550.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K14 4,600.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K15 4,650.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K16 4,700.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K17 4,750.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K18 4,800.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K19 4,850.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K20 4,900.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K21 4,950.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K22 5,000.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K23 5,050.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 50.0 15.00
Sta K24 5,100.00 0.50 0.10 1.00 1.00 0.33 0.17
0.050 0.250 21.0 6.30
Sta K25 5,121.00 0.50 0.10 1.00 1.00 0.33 0.17
JUMLAH VOLUME ( I ) 336.30

TOTAL JUMLAH VOLUME ( I+II+III ) 1,536.30


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI -
A1
TAHUN ANGGARAN : 2021 H
H
2
1
ITEM PEKERJAAN : LASTON LAPIS ANTARA ( AC-WC )
H1
QUANTITY : 179.36 M3 H
3
A
3

PATOK A1 H1 LUAS P JUMLAH


No.
No Jarak I I (M') VOLUME (M2)

Sta P0 - 4.00 0.04


0.16 50.0 8.00
Sta P1 50.00 4.00 0.04
0.16 50.0 8.00
Sta P2 100.00 4.00 0.04
0.16 50.0 8.00
Sta P3 150.00 4.00 0.04
0.16 50.0 8.00
Sta P4 200.00 4.00 0.04
0.16 30.0 4.80
Sta P5 230.00 4.00 0.04
0.16 50.0 8.00
Sta P6 280.00 4.00 0.04
0.16 50.0 8.00
Sta P7 330.00 4.00 0.04
0.16 50.0 8.00
Sta P8 380.00 4.00 0.04
0.16 40.0 6.40
Sta P9 420.00 4.00 0.04
0.16 50.0 8.00
Sta P10 470.00 4.00 0.04
0.16 50.0 8.00
Sta P11 520.00 4.00 0.04
0.16 50.0 8.00
Sta P12 570.00 4.00 0.04
0.16 50.0 8.00
Sta P13 620.00 4.00 0.04
0.16 50.0 8.00
Sta P14 670.00 4.00 0.04
0.16 50.0 8.00
Sta P15 720.00 4.00 0.04
0.16 50.0 8.00
Sta P16 770.00 4.00 0.04
0.16 50.0 8.00
Sta P17 820.00 4.00 0.04
0.16 40.0 6.40
Sta P18 860.00 4.00 0.04
0.16 40.0 6.40
Sta P19 900.00 4.00 0.04
0.16 46.0 7.36
Sta P20 946.00 4.00 0.04
0.16 54.0 8.64
Sta R1 1,000.00 4.00 0.04
0.16 50.0 8.00
Sta R2 1,050.00 4.00 0.04
0.16 50.0 8.00
Sta R3 1,100.00 4.00 0.04
0.16 50.0 8.00
Sta R4 1,150.00 4.00 0.04
0.16 50.0 8.00
Sta R5 1,200.00 4.00 0.04
0.16 50.0 8.00
Sta R6 1,250.00 4.00 0.04
0.16 50.0 8.00
Sta R7 1,300.00 4.00 0.04
0.16 50.0 8.00
Sta R8 1,350.00 4.00 0.04
0.16 50.0 8.00
Sta R9 1,400.00 4.00 0.04
0.16 50.0 8.00
Sta R10 1,450.00 4.00 0.04
0.16 50.0 8.00
Sta R11 1,500.00 4.00 0.04
0.16 50.0 8.00
Sta R12 1,550.00 4.00 0.04
0.16 50.0 8.00
Sta R13 1,600.00 4.00 0.04
0.16 50.0 8.00
Sta R14 1,650.00 4.00 0.04
0.16 50.0 8.00
Sta R15 1,700.00 4.00 0.04
0.16 50.0 8.00
Sta R16 1,750.00 4.00 0.04
0.16 50.0 8.00
Sta R17 1,800.00 4.00 0.04
0.16 50.0 8.00
Sta R18 1,850.00 4.00 0.04
0.16 50.0 8.00
Sta R19 1,900.00 4.00 0.04
Sta R19 1,900.00 4.00 0.04

JUMLAH VOLUME ( I ) 304.00


PATOK A1 H1 LUAS P JUMLAH
No.
No Jarak I I (M') VOLUME (M2)

Sta R19 1,900.00 4.00 0.04


0.16 50.0 8.00
Sta R20 1,950.00 4.00 0.04
0.16 30.0 4.80
Sta R21 1,980.00 4.00 0.04
0.16 20.0 3.20
Sta R22 2,000.00 4.00 0.04
0.16 50.0 8.00
Sta R23 2,050.00 4.00 0.04
0.16 50.0 8.00
Sta R24 2,100.00 4.00 0.04
0.16 50.0 8.00
Sta R25 2,150.00 4.00 0.04
0.16 50.0 8.00
Sta R26 2,200.00 4.00 0.04
0.16 50.0 8.00
Sta R27 2,250.00 4.00 0.04
0.16 50.0 8.00
Sta R28 2,300.00 4.00 0.04
0.16 50.0 8.00
Sta R29 2,350.00 4.00 0.04
0.16 50.0 8.00
Sta R30 2,400.00 4.00 0.04
0.16 50.0 8.00
Sta R31 2,450.00 4.00 0.04
0.16 50.0 8.00
Sta R32 2,500.00 4.00 0.04
0.16 50.0 8.00
Sta R33 2,550.00 4.00 0.04
0.16 50.0 8.00
Sta R34 2,600.00 4.00 0.04
0.16 50.0 8.00
Sta R35 2,650.00 4.00 0.04
0.16 50.0 8.00
Sta R36 2,700.00 4.00 0.04
0.16 50.0 8.00
Sta R37 2,750.00 4.00 0.04
0.16 50.0 8.00
Sta R38 2,800.00 4.00 0.04
0.16 50.0 8.00
Sta R39 2,850.00 4.00 0.04
0.16 50.0 8.00
Sta R40 2,900.00 4.00 0.04
0.16 50.0 8.00
Sta R41 2,950.00 4.00 0.04
0.16 50.0 8.00
Sta R42 3,000.00 4.00 0.04
0.16 50.0 8.00
Sta R43 3,050.00 4.00 0.04
0.16 50.0 8.00
Sta R44 3,100.00 4.00 0.04
0.16 50.0 8.00
Sta R45 3,150.00 4.00 0.04
0.16 50.0 8.00
Sta R46 3,200.00 4.00 0.04
0.16 50.0 8.00
Sta R47 3,250.00 4.00 0.04
0.16 50.0 8.00
Sta R48 3,300.00 4.00 0.04
0.16 50.0 8.00
Sta R49 3,350.00 4.00 0.04
0.16 50.0 8.00
Sta R50 3,400.00 4.00 0.04
0.16 50.0 8.00
Sta R51 3,450.00 4.00 0.04
0.16 50.0 8.00
Sta R52 3,500.00 4.00 0.04
0.16 50.0 8.00
Sta R53 3,550.00 4.00 0.04
0.16 50.0 8.00
Sta R54 3,600.00 4.00 0.04
0.16 50.0 8.00
Sta R55 3,650.00 4.00 0.04
0.16 50.0 8.00
Sta R56 3,700.00 4.00 0.04
0.16 50.0 8.00
Sta R57 3,750.00 4.00 0.04
0.16 50.0 8.00
Sta R58 3,800.00 4.00 0.04
0.16 50.0 8.00
Sta R59 3,850.00 4.00 0.04
0.16 45.0 7.20
Sta R60 3,895.00 4.00 0.04
0.16 55.0 8.80
Sta K1 3,950.00 4.00 0.04
0.16 50.0 8.00
Sta K2 4,000.00 4.00 0.04

JUMLAH VOLUME ( II ) 336.00


PATOK A1 H1 LUAS P JUMLAH
No.
No Jarak I I (M') VOLUME (M2)

Sta K2 4,000.00 4.00 0.04


0.16 50.0 8.00
Sta K3 4,050.00 4.00 0.04
0.16 50.0 8.00
Sta K4 4,100.00 4.00 0.04
0.16 50.0 8.00
Sta K5 4,150.00 4.00 0.04
0.16 50.0 8.00
Sta K6 4,200.00 4.00 0.04
0.16 50.0 8.00
Sta K7 4,250.00 4.00 0.04
0.16 50.0 8.00
Sta K8 4,300.00 4.00 0.04
0.16 50.0 8.00
Sta K9 4,350.00 4.00 0.04
0.16 50.0 8.00
Sta K10 4,400.00 4.00 0.04
0.16 50.0 8.00
Sta K11 4,450.00 4.00 0.04
0.16 50.0 8.00
Sta K12 4,500.00 4.00 0.04
0.16 50.0 8.00
Sta K13 4,550.00 4.00 0.04
0.16 50.0 8.00
Sta K14 4,600.00 4.00 0.04
0.16 50.0 8.00
Sta K15 4,650.00 4.00 0.04
0.16 50.0 8.00
Sta K16 4,700.00 4.00 0.04
0.16 50.0 8.00
Sta K17 4,750.00 4.00 0.04
0.16 50.0 8.00
Sta K18 4,800.00 4.00 0.04
0.16 50.0 8.00
Sta K19 4,850.00 4.00 0.04
0.16 50.0 8.00
Sta K20 4,900.00 4.00 0.04
0.16 50.0 8.00
Sta K21 4,950.00 4.00 0.04
0.16 50.0 8.00
Sta K22 5,000.00 4.00 0.04
0.16 50.0 8.00
Sta K23 5,050.00 4.00 0.04
0.16 50.0 8.00
Sta K24 5,100.00 4.00 0.04
0.16 21.0 3.36
Sta K25 5,121.00 4.00 0.04

JUMLAH VOLUME ( I ) 179.36

TOTAL JUMLAH VOLUME ( I+II+III ) 819.36


BACK UP DATA QUANTITY

A1 A2
PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV
LOKASI -
TAHUN ANGGARAN : 2021 H1 H2
ITEM PEKERJAAN : Pas.Batu Kali
QUANTITY DRAINASE - 297.60 M3 A

B1 B2
L

PATOK A1 B1 H1 L A A2 B2 H2 LUAS = ( P X L ) P JUMLAH


No. VOLUME
No Jarak Dinding Kiri Lantai Dinding Kanan I II III (M') (M3)

Sta P0 - 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60


0.17 0.15 0.17 50.0 24.00
Sta P1 50.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P2 100.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P3 150.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P4 200.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 30.0 14.40
Sta P5 230.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.08 0.08 0.08 50.0
Sta P6 280.00
- - - 50.0 -
Sta P7 330.00
- - - 50.0 -
Sta P8 380.00
- - - 40.0
Sta P9 420.00
0.08 0.08 0.08 50.0
Sta P10 470.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P11 520.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P12 570.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P13 620.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P14 670.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P15 720.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P16 770.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 50.0 24.00
Sta P17 820.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.17 0.15 0.17 40.0 19.20
Sta P18 860.00 0.20 0.35 0.60 1.00 0.15 0.20 0.35 0.60
0.08 0.08 0.08 40.0
Sta P19 900.00
- - - 46.0 -
Sta P20 946.00
- - - 54.0 -
Sta R1 1,000.00
- - - 50.0 -
Sta R2 1,050.00
- - - 50.0 -
Sta R3 1,100.00
- - - 50.0 -
Sta R4 1,150.00
- - - 50.0 -
Sta R5 1,200.00
- - - 50.0 -
Sta R6 1,250.00
Sta R6 1,250.00
- - - 50.0 -
Sta R7 1,300.00
- - - 50.0 -
Sta R8 1,350.00
- - - 50.0 -
Sta R9 1,400.00
- - - 50.0 -
Sta R10 1,450.00
- - - 50.0 -
Sta R11 1,500.00
- - - 50.0 -
Sta R12 1,550.00
- - - 50.0 -
Sta R13 1,600.00
- - - 50.0 -
Sta R14 1,650.00
- - - 50.0 -
Sta R15 1,700.00
- - - 50.0 -
Sta R16 1,750.00
- - - 50.0 -
Sta R17 1,800.00
- - - 50.0 -
Sta R18 1,850.00
- - - 50.0 -
Sta R19 1,900.00
- - - 50.0 -
Sta R20 1,950.00
- - - 30.0 -
Sta R21 1,980.00
- - - 20.0 -
Sta R22 2,000.00
- - - 50.0 -
Sta R23 2,050.00
- - - 50.0 -
Sta R24 2,100.00
- - - 50.0 -
Sta R25 2,150.00
- - - 50.0 -
Sta R26 2,200.00
- - - 50.0 -
Sta R27 2,250.00
- - - 50.0 -
Sta R28 2,300.00
- - - 50.0 -
Sta R29 2,350.00
- - - 50.0 -
Sta R30 2,400.00
- - - 50.0 -
Sta R31 2,450.00
- - - 50.0 -
Sta R32 2,500.00
- - - 50.0 -
Sta R33 2,550.00
- - - 50.0 -
Sta R34 2,600.00
- - - 50.0 -
Sta R35 2,650.00
- - - 50.0 -
Sta R36 2,700.00
- - - 50.0 -
Sta R37 2,750.00
- - - 50.0 -
Sta R38 2,800.00
- - - 50.0 -
Sta R39 2,850.00
- - - 50.0 -
Sta R40 2,900.00
- - - 50.0 -
Sta R41 2,950.00
Sta R41 2,950.00
- - - 50.0 -
Sta R42 3,000.00
- - - 50.0 -
Sta R43 3,050.00
- - - 50.0 -
Sta R44 3,100.00
- - - 50.0 -
Sta R45 3,150.00
- - - 50.0 -
Sta R46 3,200.00
- - - 50.0 -
Sta R47 3,250.00
- - - 50.0 -
Sta R48 3,300.00
- - - 50.0 -
Sta R49 3,350.00
- - - 50.0 -
Sta R50 3,400.00
- - - 50.0 -
Sta R51 3,450.00
- - - 50.0 -
Sta R52 3,500.00
- - - 50.0 -
Sta R53 3,550.00
- - - 50.0 -
Sta R54 3,600.00
- - - 50.0 -
Sta R55 3,650.00
- - - 50.0 -
Sta R56 3,700.00
- - - 50.0 -
Sta R57 3,750.00
- - - 50.0 -
Sta R58 3,800.00
- - - 50.0 -
Sta R59 3,850.00
- - - 45.0 -
Sta R60 3,895.00
- - - 55.0 -
Sta K1 3,950.00
- - - 50.0 -
Sta K2 4,000.00
- - - 50.0 -
Sta K3 4,050.00
- - - 50.0 -
Sta K4 4,100.00
- - - 50.0 -
Sta K5 4,150.00
- - - 50.0 -
Sta K6 4,200.00
- - - 50.0 -
Sta K7 4,250.00
- - - 50.0 -
Sta K8 4,300.00
- - - 50.0 -
Sta K9 4,350.00
- - - 50.0 -
Sta K10 4,400.00
- - - 50.0 -
Sta K11 4,450.00
- - - 50.0 -
Sta K12 4,500.00
- - - 50.0 -
Sta K13 4,550.00
- - - 50.0 -
Sta K14 4,600.00
- - - 50.0 -
Sta K15 4,650.00
- - - 50.0 -
Sta K16 4,700.00
Sta K16 4,700.00
- - - 50.0 -
Sta K17 4,750.00
- - - 50.0 -
Sta K18 4,800.00
- - - 50.0 -
Sta K19 4,850.00
- - - 50.0 -
Sta K20 4,900.00
- - - 50.0 -
Sta K21 4,950.00
- - - 50.0 -
Sta K22 5,000.00
- - - 50.0 -
Sta K23 5,050.00
- - - 50.0 -
Sta K24 5,100.00
- - - 21.0 -
Sta K25 5,121.00

JUMLAH VOLUME ( I ) 297.60


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTANG IV


LOKASI :
TAHUN ANGGARAN : 2021
A1 A2 A3
ITEM PEKERJAAN : LANTAI KERJA BETON
QUANTITY 141.00 M3 H1 H2 H3

PATOK A1 H1 A2 H2 A3 H3 LUAS JUMLAH


P
No. VOLUME KET.
No Jarak Sisi Kiri tengah Sisi Kanan I II III (M')
(M3)

Sta P0 - 0.40 0.10


0.040 0.000 0.000 50.0 2.00
Sta P1 50 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P2 100 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P3 150 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P4 200 0.40 0.10
0.040 0.000 0.000 30.0 1.20
Sta P5 230 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P6 280 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P7 330 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P8 380 0.40 0.10
0.040 0.000 0.000 40.0 1.60
Sta P9 420 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P10 470 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P11 520 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P12 570 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P13 620 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P14 670 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P15 720 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P16 770 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta P17 820 0.40 0.10
0.040 0.000 0.000 40.0 1.60
Sta P18 860 0.40 0.10
0.040 0.000 0.000 40.0 1.60
Sta P19 900 0.40 0.10
0.040 0.000 0.000 46.0 1.84
Sta P20 946 0.40 0.10
0.040 0.000 0.000 54.0 2.16
Sta R1 1,000 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R2 1,050 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R3 1,100 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R4 1,150 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R5 1,200 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R6 1,250 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R7 1,300 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R8 1,350 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R9 1,400 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R10 1,450 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R11 1,500 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R12 1,550 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R13 1,600 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R14 1,650 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R15 1,700 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R16 1,750 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R17 1,800 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R18 1,850 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R19 1,900 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R20 1,950 0.40 0.10
0.040 0.000 0.000 30.0 1.20
Sta R21 1,980 0.40 0.10
0.040 0.000 0.000 20.0 0.80
Sta R22 2,000 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R23 2,050 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R24 2,100 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R25 2,150 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R26 2,200 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R27 2,250 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R28 2,300 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R29 2,350 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R30 2,400 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R31 2,450 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R32 2,500 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R33 2,550 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R34 2,600 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R35 2,650 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R36 2,700 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R37 2,750 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R38 2,800 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R39 2,850 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R40 2,900 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R41 2,950 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R42 3,000 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R43 3,050 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R44 3,100 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R45 3,150 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R46 3,200 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R47 3,250 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R48 3,300 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R49 3,350 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R50 3,400 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R51 3,450 0.40 0.10
0.040 0.000 0.000 50.0 2.00
Sta R52 3,500 0.40 0.10
0.020 0.000 0.000 50.0 1.00
Sta R53 3,550
0.000 0.000 0.000 50.0 -
Sta R54 3,600
0.000 0.000 0.000 50.0 -
Sta R55 3,650
0.000 0.000 0.000 50.0 -
Sta R56 3,700
0.000 0.000 0.000 50.0 -
Sta R57 3,750
0.000 0.000 0.000 50.0 -
Sta R58 3,800
0.000 0.000 0.000 50.0 -
Sta R59 3,850
0.000 0.000 0.000 45.0 -
Sta R60 3,895
0.000 0.000 0.000 55.0 -
Sta K1 3,950
0.000 0.000 0.000 50.0 -
Sta K2 4,000
0.000 0.000 0.000 50.0 -
Sta K3 4,050
0.000 0.000 0.000 50.0 -
Sta K4 4,100
0.000 0.000 0.000 50.0 -
Sta K5 4,150
0.000 0.000 0.000 50.0 -
Sta K6 4,200
0.000 0.000 0.000 50.0 -
Sta K7 4,250
0.000 0.000 0.000 50.0 -
Sta K8 4,300
0.000 0.000 0.000 50.0 -
Sta K9 4,350
0.000 0.000 0.000 50.0 -
Sta K10 4,400
0.000 0.000 0.000 50.0 -
Sta K11 4,450
0.000 0.000 0.000 50.0 -
Sta K12 4,500
0.000 0.000 0.000 50.0 -
Sta K13 4,550
0.000 0.000 0.000 50.0 -
Sta K14 4,600
0.000 0.000 0.000 50.0 -
Sta K15 4,650
0.000 0.000 0.000 50.0 -
Sta K16 4,700
0.000 0.000 0.000 50.0 -
Sta K17 4,750
0.000 0.000 0.000 50.0 -
Sta K18 4,800
0.000 0.000 0.000 50.0 -
Sta K19 4,850
0.000 0.000 0.000 50.0 -
Sta K20 4,900
0.000 0.000 0.000 50.0 -
Sta K21 4,950
0.000 0.000 0.000 50.0 -
Sta K22 5,000
0.000 0.000 0.000 50.0 -
Sta K23 5,050
0.000 0.000 0.000 50.0 -
Sta K24 5,100
0.000 0.000 0.000 21.0 -
Sta K25 5,121

JUMLAH VOLUME ( I ) 141.00


BACK UP DATA QUANTITY

PEKERJAAN : REKONSTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ( KHUSUS KOTA ) JL.SALUBATTA


LOKASI -
TAHUN ANGGARAN : 2021 A1
ITEM PEKERJAAN : LAPIS PONDASI AREGAT KELAS C
QUANTITY : 7764.666 M3 H1

PATOK A1 H1 LUAS P JUMLAH


No.
(M') VOLUME (M2)
No Jarak I I

Sta P0 - 5.50 0.270


1.49 50.0 74.25
Sta P1 50.00 5.50 0.270
1.49 50.0 74.25
Sta P2 100.00 5.50 0.270
1.49 50.0 74.25
Sta P3 150.00 5.50 0.270
1.49 50.0 74.25
Sta P4 200.00 5.50 0.270
1.49 30.0 44.55
Sta P5 230.00 5.50 0.270
1.49 50.0 74.25
Sta P6 280.00 5.50 0.270
1.49 50.0 74.25
Sta P7 330.00 5.50 0.270
1.49 50.0 74.25
Sta P8 380.00 5.50 0.270
1.49 40.0 59.40
Sta P9 420.00 5.50 0.270
1.49 50.0 74.25
Sta P10 470.00 5.50 0.270
1.49 50.0 74.25
Sta P11 520.00 5.50 0.270
1.49 50.0 74.25
Sta P12 570.00 5.50 0.270
1.49 50.0 74.25
Sta P13 620.00 5.50 0.270
1.49 50.0 74.25
Sta P14 670.00 5.50 0.270
1.49 50.0 74.25
Sta P15 720.00 5.50 0.270
1.49 50.0 74.25
Sta P16 770.00 5.50 0.270
1.49 50.0 74.25
Sta P17 820.00 5.50 0.270
1.49 40.0 59.40
Sta P18 860.00 5.50 0.270
1.49 40.0 59.40
Sta P19 900.00 5.50 0.270
1.49 46.0 68.31
Sta P20 946.00 5.50 0.270
1.49 54.0 80.19
Sta R1 1,000.00 5.50 0.270
1.49 50.0 74.25
Sta R2 1,050.00 5.50 0.270
1.49 50.0 74.25
Sta R3 1,100.00 5.50 0.270
1.49 50.0 74.25
Sta R4 1,150.00 5.50 0.270
1.49 50.0 74.25
Sta R5 1,200.00 5.50 0.270
1.49 50.0 74.25
Sta R6 1,250.00 5.50 0.270
1.49 50.0 74.25
Sta R7 1,300.00 5.50 0.270
1.49 50.0 74.25
Sta R8 1,350.00 5.50 0.270
1.49 50.0 74.25
Sta R9 1,400.00 5.50 0.270
1.49 50.0 74.25
Sta R10 1,450.00 5.50 0.270
1.49 50.0 74.25
Sta R11 1,500.00 5.50 0.270
1.49 50.0 74.25
Sta R12 1,550.00 5.50 0.270
1.49 50.0 74.25
Sta R13 1,600.00 5.50 0.270
1.49 50.0 74.25
Sta R14 1,650.00 5.50 0.270
1.49 50.0 74.25
1.49 50.0 74.25
Sta R15 1,700.00 5.50 0.270
1.49 50.0 74.25
Sta R16 1,750.00 5.50 0.270
1.49 50.0 74.25
Sta R17 1,800.00 5.50 0.270
1.49 50.0 74.25
Sta R18 1,850.00 5.50 0.270
1.49 50.0 74.25
Sta R19 1,900.00 5.50 0.270
1.49 50.0 74.25
Sta R20 1,950.00 5.50 0.270
1.49 30.0 44.55
Sta R21 1,980.00 5.50 0.270
1.49 20.0 29.70
Sta R22 2,000.00 5.50 0.270
1.49 50.0 74.25
Sta R23 2,050.00 5.50 0.270
1.49 50.0 74.25
Sta R24 2,100.00 5.50 0.270
1.49 50.0 74.25
Sta R25 2,150.00 5.50 0.270
1.49 50.0 74.25
Sta R26 2,200.00 5.50 0.270
1.49 50.0 74.25
Sta R27 2,250.00 5.50 0.270
1.49 50.0 74.25
Sta R28 2,300.00 5.50 0.270
1.49 50.0 74.25
Sta R29 2,350.00 5.50 0.270
1.49 50.0 74.25
Sta R30 2,400.00 5.50 0.270
1.49 50.0 74.25
Sta R31 2,450.00 5.50 0.270
1.49 50.0 74.25
Sta R32 2,500.00 5.50 0.270
1.49 50.0 74.25
Sta R33 2,550.00 5.50 0.270
1.49 50.0 74.25
Sta R34 2,600.00 5.50 0.270
1.49 50.0 74.25
Sta R35 2,650.00 5.50 0.270
1.49 50.0 74.25
Sta R36 2,700.00 5.50 0.270
1.49 50.0 74.25
Sta R37 2,750.00 5.50 0.270
1.49 50.0 74.25
Sta R38 2,800.00 5.50 0.270
1.49 50.0 74.25
Sta R39 2,850.00 5.50 0.270
1.49 50.0 74.25
Sta R40 2,900.00 5.50 0.270
1.49 50.0 74.25
Sta R41 2,950.00 5.50 0.270
1.49 50.0 74.25
Sta R42 3,000.00 5.50 0.270
1.49 50.0 74.25
Sta R43 3,050.00 5.50 0.270
1.49 50.0 74.25
Sta R44 3,100.00 5.50 0.270
1.49 50.0 74.25
Sta R45 3,150.00 5.50 0.270
1.49 50.0 74.25
Sta R46 3,200.00 5.50 0.270
1.49 50.0 74.25
Sta R47 3,250.00 5.50 0.270
1.49 50.0 74.25
Sta R48 3,300.00 5.50 0.270
1.49 50.0 74.25
Sta R49 3,350.00 5.50 0.270
1.49 50.0 74.25
Sta R50 3,400.00 5.50 0.270
1.49 50.0 74.25
Sta R51 3,450.00 5.50 0.270
1.49 50.0 74.25
Sta R52 3,500.00 5.50 0.270
1.49 50.0 74.25
Sta R53 3,550.00 5.50 0.270
1.49 50.0 74.25
Sta R54 3,600.00 5.50 0.270
1.49 50.0 74.25
Sta R55 3,650.00 5.50 0.270
1.49 50.0 74.25
Sta R56 3,700.00 5.50 0.270
1.49 50.0 74.25
Sta R57 3,750.00 5.50 0.270
1.49 50.0 74.25
1.49 50.0 74.25
Sta R58 3,800.00 5.50 0.270
1.49 50.0 74.25
Sta R59 3,850.00 5.50 0.270
1.49 45.0 66.83
Sta R60 3,895.00 5.50 0.270
1.54 55.0 84.70
Sta K1 3,950.00 5.50 0.290
1.60 50.0 79.75
Sta K2 4,000.00 5.50 0.290
1.60 50.0 79.75
Sta K3 4,050.00 5.50 0.290
1.60 50.0 79.75
Sta K4 4,100.00 5.50 0.290
1.60 50.0 79.75
Sta K5 4,150.00 5.50 0.290
1.60 50.0 79.75
Sta K6 4,200.00 5.50 0.290
1.60 50.0 79.75
Sta K7 4,250.00 5.50 0.290
1.60 50.0 79.75
Sta K8 4,300.00 5.50 0.290
1.60 50.0 79.75
Sta K9 4,350.00 5.50 0.290
1.60 50.0 79.75
Sta K10 4,400.00 5.50 0.290
1.60 50.0 79.75
Sta K11 4,450.00 5.50 0.290
1.60 50.0 79.75
Sta K12 4,500.00 5.50 0.290
1.60 50.0 79.75
Sta K13 4,550.00 5.50 0.290
1.60 50.0 79.75
Sta K14 4,600.00 5.50 0.290
1.62 50.0 81.12
Sta K15 4,650.00 5.50 0.300
1.65 50.0 82.50
Sta K16 4,700.00 5.50 0.300
1.65 50.0 82.50
Sta K17 4,750.00 5.50 0.300
1.65 50.0 82.50
Sta K18 4,800.00 5.50 0.300
1.65 50.0 82.50
Sta K19 4,850.00 5.50 0.300
1.65 50.0 82.50
Sta K20 4,900.00 5.50 0.300
1.65 50.0 82.50
Sta K21 4,950.00 5.50 0.300
1.65 50.0 82.50
Sta K22 5,000.00 5.50 0.300
1.65 50.0 82.50
Sta K23 5,050.00 5.50 0.300
1.65 50.0 82.50
Sta K24 5,100.00 5.50 0.300
1.69 21.0 35.52
Sta K25 5,121.00 5.50 0.315
JUMLAH VOLUME ( I ) 7,764.67
BACK UP DATA PLAT DUICKER

#REF! #REF!
#REF! #REF!
#REF! #REF!

GALIAN TANAH Lebar Atas Lebar Bawah Tinggi PANJANG VOL


2.20 2.20 0.55 11.60 14.04

14.04 M3

PAS.PONDASI

PONDASI SISI KIRI Lebar Atas Lebar Bawah Tinggi PANJANG VOL
0.38 0.70 0.55 10.00 2.97
0.70 0.70 0.50 10.00 3.50
6.47 M3

PONDASI SISI KANAN Lebar Atas Lebar Bawah Tinggi PANJANG VOL
0.38 0.70 0.55 13.00 3.86
0.70 0.70 0.50 13.00 4.55
8.41 M3

LANTAI Lebar Atas Lebar Bawah Tinggi PANJANG VOL


0.80 0.80 0.15 12.30 1.48
-
1.48 M3

TOTAL PONDASI BATU KALI = 16.36

PEMBESIAN U 24
SIMBOL PANJANG JML KOEF BERAT
J1 Ø14 J1 1.81 17.00 1.21 37.16
J2 Ø14 J2 1.64 17.00 1.21 33.67
J3 Ø14 J3 1.24 17.00 1.21 25.46
J4 Ø12 J4 5.04 11.00 1.21 66.96
J5 Ø12 J5 5.04 11.00 1.21 66.96
B1 Ø12 B1 5.04 16.00 1.21 97.39
B2 Ø6 B2 1.04 68.00 0.39 27.89
VOL. 355.49 KG

PEK.BETON MUTU SEDANG


LEBAR TEBAL PANJANG JML VOL.
PLAT 1.20 0.25 5.00 1.00 1.50
BANTALAN 0.35 0.20 5.00 2.00 0.35
1.85 M3
BACK UP DATA KANSTEEN

PEMBESIAN U 24 19,459.47 KG
SIMBOL PANJANG JML KOEF VOL
Pokok D8 5,110.00 6.00 0.39 12,091.32
Begel D6 1.30 25,550.00 0.22 7,368.15
VOL. 19,459.47

BETON 511.00 M3
PANJANG LEBAR TINGGI VOL
5,110.00 0.25 0.40 511.00
VOLUME TEREALISASI

#REF! #REF!
#REF! #REF!
#REF! #REF!

VOLUME VOLUME
NO. ITEM KERJA
KONTRAK REALISASI

DIVISI 3.PEKERJAAN TANAH

1.00 Galian Biasa 228.50 49.91


2.00 Timbunan Pilihan dari sumber galian 62.42 336.30
3.00 Penyiapan Badan Jalan 3,607.50 5,879.10
4.00 Pemotongan Pohon Pilihan diameter 15 – 30 cm 1.00 1.00

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN

1.00 Lapis Pondasi Agregat Kelas S 453.12 294.98

DIVISI 5. PERKERASAN BERBUTIR

1.00 Lapis Pondasi Agregat Kelas B 449.26 #REF!


2.00 Perkerasan Beton Semen 1,630.00 269.04
3.00 Lapis Pondasi bawah Beton Kurus 456.40 831.64

DIVISI 7. STRUKTUR

1.00 Beton mutu sedang fc’20 MPa 1.85 1.85


2.00 Baja Tulangan U 24 Polos 355.49 355.49
3.00 Pasangan Batu 19.46 #VALUE!

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

1.00 Marka Jalan Termoplastik 232.32 1,459.49


KET.

Lebih
Lebih
Lebih
Tetap

Lebih

Lebih
Lebih
Lebih

Tetap
Tetap
Lebih

Lebih
BACK UP DATA PEMBESIAN
PEMBESIAN / 5 m3 94.59 KG

Panjang Rencana 5.00 m


Panjang Keliling Dowel 13.00 m

tulangan pokok Dia. PANJANG JML(5/0.3)+1 KOEF BERAT


Dowel Ø22 0.46 27.67 2.98 37.96
Tea Bar Ø19 0.46 17.67 2.22 18.07
VOL. 56.02

Bar U Tengah Dia. PANJANG JML KOEF BERAT


HOR.
U Ø8 0.40 21.00 0.39 3.31
Log. Ø8 5.00 3.00 0.39 5.92
VER.
U Ø8 0.40 66.00 0.39 10.41
Log. Ø8 8.00 6.00 0.39 18.93
VOL. 38.57

Untuk pembesian/m
= 94.59 / 5.00 = 18.92 kg/m

Untuk pembesian/m3
= panjang pasangan un. 1 m3 adalah 50 cm jadi untuk 1m3 pembesian permeter dibagi 2
= 9.46 g/m3