DAFTAR HARGA SATUAN UPAH

TAHUN 2018

NO NAMA SATUAN HARGA (Rp)


1 2 3 4

1 Mandor Hari 130,000.00


2 Kepala Tukang Lapangan Hari 115,000.00
3 Kepala Tukang Besi Hari 115,000.00
4 Kepala Tukang Batu Hari 115,000.00
5 Kepala Tukang Kayu Hari 115,000.00
6 Kepala Tukang Cat Hari 115,000.00
7 Kepala Tukang Paras Bali Hari 170,000.00
8 Kepala Tukang Ukir Hari 190,000.00
9 Tukang Aluminium Hari 100,000.00
10 Tukang Batu Hari 100,000.00
11 Tukang Besi Hari 105,000.00
12 Tukang Kayu Hari 110,000.00
13 Tukang Cat Hari 110,000.00
14 Tukang Politur Hari 110,000.00
15 Tukang Ukir Hari 120,000.00
16 Tukang Paras Bali Hari 165,000.00
17 Pekerja Terlatih Hari 95,000.00
18 Pekerja Semi Terlatih Hari 90,000.00
19 Pekerja / Pekerja Tidak Terlatih Hari 80,000.00
20 Tukang Gali Hari 95,000.00
21 Tukang Listrik Hari 105,000.00
22 Kepala Tukang Listrik Hari 110,000.00
23 Tukang Pipa/ Tukang Ledeng Hari 105,000.00
24 Kepala Tukang Pipa/ Tukang Ledeng Hari 100,000.00
25 Tukang Las Konstruksi Hari 100,000.00
26 Tukang Masak Aspal Hari 95,000.00
27 Tukang Cor Aspal Hari 95,000.00
28 Pekerja Pembantu Tukang Aspal Hari 60,000.00
29 Penjaga Api Hari 65,000.00
30 Sopir SIM A Hari 70,000.00
31 Sopir SIM B1 Hari 75,000.00
32 Sopir SIM B2 Hari 80,000.00
33 Operator Hari 100,000.00
34 Operator Semi Terampil Hari 85,000.00
35 Pembantu Operator Hari 80,000.00
36 Pembantu Sopir Hari 60,000.00
37 Mekanik Terampil Hari 95,000.00
38 Masinis Hari 98,000.00
39 Pembantu Masinis Hari 70,000.00
1 2 3 4
40 Ongkos Kerja Pemasangan dan Pengelasan Hari 30,000.00
1 2 3 4
41 Ongkos Potong Besi Hari 30,000.00
42 Ongkos Pemasangan Lampu Ls 285,000.00
43 Ongkos Pemasangan Panel Ls 450,000.00
44 Pembantu Mekanik Hari 80,000.00
45 Pasang Atap Alang-Alang Hari 90,000.00
46 Pasang Bata Gosok Dua Muka m2 380,000.00
47 Pasang Bata Gosok Satu Muka m2 225,000.00
48 Pasang Batu Paras Diukir m2 400,000.00
49 Pasang Patu Paras Siap Diukir m2 350,000.00
50 Ongkos Ngebor O 30 cm m' 75,000.00
51 Ongkos Polis Kaca Tempered Tebal 5mm m' 20,000.00
52 Ongkos Polis Kaca Tempered Tebal 6mm m' 20,000.00
53 Ongkos Polis Kaca Tempered Tebal 8mm m' 30,000.00
54 Ongkos Polis Kaca Tempered Tebal 10mm m' 30,000.00
55 Ongkos Polis Kaca Tempered Tebal 12mm m' 35,000.00
56 Ongkos Polis Kaca Tempered Tebal 19mm m' 95,000.00

UPAH KERJA LAINNYA :


57 Pasangan Bata Gosok 2 Muka m2 350,000.00
58 Pasangan Paras Kerobokan 1 Muka m2 200,000.00
59 Pasangan Bata Press 1 Muka m2 200,000.00
60 Pasangan Paras 1 Muka m2 200,000.00
61 Pasangan Batu Palimanan Tebal 3 cm m2 200,000.00
62 Pasangan Paras + Bata Gosok 1 Muka m2 200,000.00
63 Pasangan Bata Gosok Diukir m2 355,000.00
64 Pasangan Batu Tabas Karangasem Diukir m2 355,000.00
65 Pasangan Paras + Bata Gosok Diukir m2 280,000.00
66 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Ijuk Unit 350,000.00
67 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Genteng Unit 300,000.00
68 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Ijuk Unit 350,000.00
69 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Genteng Unit 300,000.00
70 Membuat Sanggah Pertiwi Batu Hitam Atap Ijuk 190cm x 190cm Unit 750,000.00
71 Membuat Sanggah Pertiwi Batu Hitam Atap Genteng 190cm x 190cm Unit 650,000.00
72 Membuat Sanggah Pertiwi Paras Bata Atap Ijuk 190cm x 190cm Unit 750,000.00
73 Membuat Sanggah Pertiwi Paras Bata Atap Genteng 190cm x 190cm Unit 750,000.00
74 Membuat Sanggah Hyang Ibu Batu Hitam Atap Ijuk 200cm x 200cm Unit 1,500,000.00
75 Membuat Sanggah Hyang Ibu Batu Hitam Atap Genteng 200cm x 200cm Unit 1,500,000.00
76 Membuat Sanggah Hyang Ibu Paras Bata Atap Ijuk 200cm x 200cm Unit 1,500,000.00
77 Membuat Sanggah Hyang Ibu Paras Bata Atap Genteng 200cm x 200cm Unit 1,500,000.00
78 Membuat Sanggah Taksu Batu Hitam Atap Ijuk 40cmx40cm Unit 300,000.00
79 Membuat Sanggah Taksu Batu Hitam Atap Genteng 40cm x 40cm Unit 300,000.00
80 Membuat Sanggah Taksu Paras Bata Atap Ijuk 40cm x 40cm Unit 300,000.00
81 Membuat Sanggah Taksu Paras Bata Atap Genteng 40cm x 40cm Unit 300,000.00
82 1 Titik Instalasi Stop Kontak, Lampu, Exhaust Fan & Ceiling Fan Titik 25,000.00
1 2 3 4
83 1 Titik Instalasi AC Titik 25,000.00
84 1 Titik Instalasi Telephone Titik 25,000.00
85 1 Titik Instalasi MATV Titik 25,000.00
86 Upah Ketam m' 5,000.00

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Denpasar, 2 Januari 2018

Bidang Penataan Ruang Bidang Penataan Bangunan dan Pengembangan


Kawasan Permukiman

I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST.


NIP. 19690426 199803 1 012 NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Sumber Daya Air

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST.


NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003

Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST. Ir. I Gde Made Bhaju Pravita, MM.


NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR HARGA SEWA ALAT BERAT
TAHUN 2018

NO NAMA BARANG KAPASITAS SATUAN HARGA (Rp)

1 2 3 4 5

1 Asphalt Mixing Plant 60 T/Jam Jam 5,046,022.47


2 Asphalt Finisher 6 Ton Jam 507,700.00
3 Asphalt Sprayer 800 Liter Jam 108,378.92
4 Bulldozer 100-150 HP - Jam 430,466.00
5 Compressor 4000-6500 L\M - Jam 167,843.11
6 Concrete Mixer 0.3-0.6 M3 500 Liter Jam 83,573.52
7 Mixer Kyukuto Hino Kapasitas 7 m3 th. 2014 - / 25 hari 60,000,000.00
kerja / 200
jam
8 Mixer Kyukuto Hino Kapasitas 2,5 m3 th. 2014 - / 25 hari 50,000,000.00
kerja / 200
jam
9 Crane 10-15 TON 15 Ton Jam 516,072.38
10 Dump Truck 3-4 M3 6 Ton Jam 248,157.27
11 Dump Truck 8 Ton Jam 388,286.24
12 Excavator 80-140 HP 0.5 M3 Jam 460,000.00
13 Flat Bed Truck 3-4 M3 4 M3 Jam 373,577.89
14 Generator Set 125 KVA Jam 416,800.00
15 Motor Grader >100 HP - - Jam 453,229.95
16 Track Loader 75-100 HP 1.6 M3 Jam 376,324.77
17 Wheel Loader 1.0-1.6 M3 1.5 M3 Jam 330,000.00
18 Loader WA 200-1 - / 25 hari 62,000,000.00
kerja / 200
jam
19 Sift Loader dengan Crane / Hiap Crane 8 ton - / 8 jam 3,500,000.00
20 Sift Loader dengan Crane / Hiap Crane 5 ton - / 8 jam 3,000,000.00
21 Dolly Scania 18 ton - / 8 jam 5,500,000.00
22 Three Wheel Roller 6-8 T 8 Ton Jam 259,037.06
23 Tandem Roller 6-8 T. 8 Ton Jam 318,300.00
24 Tire Roller 8-10 T. 10 Ton Jam 292,100.00
25 Vibratory Roller 5-8 T. 7 Ton Jam 495,000.00
26 Concrete Vibrator - - Jam 49,291.45
27 Stone Crusher 50 T/Jam Jam 734,331.33
28 Water Pump 70-100 mm - Jam 45,649.42
29 Water Tanker 3000-4500 L. 4000 Liter Jam 252,387.09
30 Pedestrian Roller 1 Ton Jam 73,338.01
31 Tamper 0.3 Ton Jam 57,096.01
32 Jack Hammer - Jam 76,832.84
33 Fulvi Mixer - Jam 147,477.18
NO NAMA BARANG KAPASITAS SATUAN HARGA (Rp)

1 2 3 4 5
34 Concrete Pump 8 M3 Jam 307,176.96
35 Concrate Pump Standart IHI IPF 8E 21, 21 m - / 25 hari 65,000,000.00
kerja / 200
jam
NO NAMA BARANG KAPASITAS SATUAN HARGA (Rp)

1 2 3 4 5
36 Concrate Pump Long Boom IHI IPF 8 N 29, 29 m - / 25 hari
kerja / 200 80,000,000.00
jam
37 Concrate Pump Mini IHI IPN4N17, 17 m - / 25 hari
kerja / 200 50,000,000.00
jam
38 Trailer 20 TON 20 Ton Jam 284,292.63
39 Pile Driver + Hammer 2.5 Ton Jam 192,967.43
40 Crane on Track 35 TON 35 Ton Jam 398,664.11
41 Welding Set 250 Amp Jam 164,293.99
42 Bore Pile Machine 2000 Meter Jam 992,707.11
43 Asphalt Liquid Mixer 1000 Liter Jam 84,927.40
44 Trailer 15 Ton Jam 354,040.00
45 Cold Milling - Jam 492,443.81
46 Rock Drill Breaker - Jam 58,810.77
47 Alat Stressing - Jam 12,500.00
48 Alat Grouting - Jam 15,000.00
49 Baro Mixer - Jam 60,000.00
50 Bole Mixer - Jam 60,000.00
51 Prenater - Jam 60,000.00
52 Asphalt Cutter - Jam 61,111.11
53 Concrete Pan Mixer 600 Ltr Jam 455,640.00
54 Truck Mixer 5 M3 Jam 546,172.06
55 Blending Equipment - Jam 230,000.00
56 Asphalt Distributor 4000 Ltr Jam 347,303.82
57 Crane Tadano 50 Ton Bulan 115,000,000.00
58 Crane Tadano 35 Ton Bulan 100,000,000.00
59 Crane Tadano 30 Ton Bulan 90,000,000.00
60 Crane Tadano 25 Ton Bulan 80,000,000.00
61 Crane Tadano 7.5 Ton Bulan 65,000,000.00
62 Crane Tadano 50 Ton Hari 12,000,000.00
63 Crane Tadano 35 Ton Hari 9,000,000.00
64 Crane Tadano 30 Ton Hari 8,000,000.00
65 Crane Tadano 25 Ton Hari 7,000,000.00
66 Crane Tadano 7.5 Ton Hari 5,000,000.00
67 Excavator PC.200-8 / MO th. 2016 UT (breaker) - Jam 550,000.00
68 Excavator PC.200-8 / MO th. 2016 UT (bucket) - Jam 450,000.00
69 Mobilisasi Excavator PC.200-8 (Denpasar, Kuta, Nusa Dua) - LS 3,500,000.00
70 Excavator PC.78 UU (breaker) - Jam 400,000.00
71 Excavator PC.78 UU (bucket) - Jam 300,000.00
72 Mobilisasi Excavator PC.78 UU (Denpasar, Kuta, Nusa Dua) - LS 1,500,000.00
73 Sewa TC Potain MC 205B made in Prancis, jib length 60 m - Bulan 110,000,000.00
kapasitas 2,4 ton
NO NAMA BARANG KAPASITAS SATUAN HARGA (Rp)

1 2 3 4 5
74 Jaminan Angkur TC Potain MC 205B - Set 55,000,000.00
75 Pasang Angkur TC Potain MC 205B - Set 5,000,000.00
76 Erexsion TC Potain MC 205B - Set 45,000,000.00
77 Dismantling Normal TC Potain MC 205B - Set 45,000,000.00
NO NAMA BARANG KAPASITAS SATUAN HARGA (Rp)

1 2 3 4 5
78 Mob-Demob TC Potain MC 205B wilayah Bali - Set 90,000,000.00
79 Gaji Operator TC Potain MC 205B - / bulan 16,000,000.00
80 Sewa Mesin Bor - Jam 50,000.00
81 Alat Bantu Pekerjaan Pengeboran Bored Pile - LS 20,000.00
82 Batching Plant (di luar genset, listrik dan loader) - / 1 bulan / 30 105,000,000.00
Hari

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Denpasar, 2 Januari 2018

Bidang Penataan Ruang Bidang Penataan Bangunan dan Pengembangan


Kawasan Permukiman

I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST.


NIP. 19690426 199803 1 012 NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Sumber Daya Air

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST.


NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003

Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST. Ir. I Gde Made Bhaju Pravita, MM.


NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR BIAYA LANGSUNG PERSONIL DAN BIAYA TIDAK LANGSUNG PERSONIL
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA DENPASAR TAHUN 2018

BIAYA LANGSUNG PERSONIL

NO BIDANG TAHUN TAHUN 2017 TAHUN 2018


AKADEMIK/KEAHLIAN PENGALAMAN PENDIDIKAN
(Rupiah) (Rupiah)
1 2 3 4 5 6
A TENAGA AHLI DENGAN PENDIDIKAN S1
12 S1 14,700,000 14,700,000
11 S1 14,000,000 14,000,000
1 AHLI MADYA
10 S1 13,300,000 13,300,000
9 S1 12,500,000 12,500,000
8 S1 11,800,000 11,800,000
7 S1 11,000,000 11,000,000
2 AHLI MUDA
6 S1 10,700,000 10,700,000
5 S1 9,000,000 9,000,000
4 S1 7,900,000 7,900,000
3 AHLI PRATAMA
3 S1 7,500,000 7,500,000
B SUB PROFESIONAL STAF
ASSISTANT PROFESSIONAL 0-3 S1 4,200,000 4,200,000
1
STAFF 5 - 10 D3 4,200,000 4,200,000
0-3 S1 4,000,000 4,000,000
2 DRAFTER CAD/DRAFTER GIS
5 - 10 D3 4,000,000 4,000,000
0-3 S1 4,000,000 4,000,000
3 LAB. TECHNICIAN
5 - 10 D3 4,000,000 4,000,000
0-3 S1 4,000,000 4,000,000
4 INSPECTOR
5 - 10 D3 4,000,000 4,000,000
0-3 S1 3,500,000 3,500,000
5 SURVEYOR
5 - 10 D3 3,500,000 3,500,000
0-3 S1 - 3,500,000
6 QUANTITY SURVEYOR
5 - 10 D3 - 3,500,000
C TENAGA PENDUKUNG
1 SEKRETARIS 2,200,000 2,400,000
2 TENAGA ADMINISTRASI 2,200,000 2,400,000
3 OPERATOR KOMPUTER 2,200,000 2,400,000
4 SOPIR 2,173,000 2,363,000
5 PEKERJA 2,173,000 2,363,000
6 OFFICE BOY 2,173,000 2,363,000

KETERANGAN
Perhitungan Konversi Minimum Biaya Langsung Personil menurut s
- SBOB
- SBOM SBOB/4,1
- SBOH (SBOB/22) x 1,1
- SBOJ (SBOH/8) x 1,3
BIAYA TAK LANGSUNG PERSONIL
SEWA
1 SEWA KENDARAAN RODA EMPAT Rp. 4,550,000 / BULAN
2 SEWA KENDARAAN RODA DUA Rp. 500,000 / BULAN
3 SEWA KOMPUTER DAN PRINTER Rp. 900,000 / BULAN
4 SEWA SCANNER Rp. 400,000 / BULAN
5 SEWA ALAT UKUR DAN GPS,BB Rp. 500,000 / HARI
6 SEWA ALAT BORING (MEKANIS) Rp. 1,250,000 / HARI
7 SEWA ALAT SPT Rp. 400,000 / HARI
8 SEWA ALAT DCP Rp. 375,000 / HARI
9 SEWA TRUK + BEBAN Rp. 3,500,000 / HARI
10 TEST LABORATORIUM Rp. 2,500,000
BIAYA LAPORAN
1 RAB Rp. 75,000 / BUKU
2 GAMBAR Rp. 100,000 / BUKU
3 SPESIFIKASI Rp. 150,000 / BUKU
4 LAPORAN PENDAHULUAN Rp. 100,000 / BUKU
5 LAPORAN ANTARA Rp. 125,000 / BUKU
6 LAPORAN BULANAN Rp. 75,000 / BUKU
7 LAPORAN TRIWULAN Rp. 75,000 / BUKU
8 LAPORAN AKHIR Rp. 150,000 / BUKU
9 LAPORAN TEKNIS/KHUSUS Rp. 300,000 / BUKU
10 DOKUMENTASI Rp. 200,000 / ALBUM
11 FLASH DISK 8 GB Rp. 141,750 / BUAH
12 HARD DISK EXTERNAL 500 GB Rp. 813,750 / BUAH
LAINNYA
1 ATK MAKSIMUM Rp. 2,500,000

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Denpasar, 2 Januari 2018


Bidang Penataan Ruang Bidang Penataan Bangunan dan
Pengembangan Kawasan Permukiman Bidang Bina Marga

I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST. I Wayan Dirgayasa, ST.
NIP. 19690426 199803 1 012 NIP. 19700907 199903 1 006 NIP. 19680314 199703 1 005

Bidang Jasa Konstruksi dan Bina


Bidang Air Minum Dan PLP Bidang Sumber Daya Air Program

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST. Ir. I Gde Made Bhaju Pravita, MM.
NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003 NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR HARGA BAHAN
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2018

HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
BATU KALI DAN BATU ALAM
1 Batu Kali/batu bulat 15-30 cm m3 425,000.00
2 Batu Pecah Besar 15/30 cm m3 285,000.00
3 Batu Pecah 5/7 cm m3 460,000.00
4 Batu Pecah 3/5 cm m3 294,500.00
5 Batu Pecah 3-4 cm m3 465,000.00
6 Batu Pecah 2/3 cm m3 468,000.00
7 Batu Pecah Mesin 1 - 2 cm m3 253,066.67
8 Batu Pecah 0,5 - 1 Cm m3 450,000.00
9 Batu Alam Andesit Bintik Bakar m2 155,000.00
10 Batu Alam Andesit Alur m2 167,900.00
11 Batu Alam Live Grendia m2 115,000.00
12 Batu Candi 105,000.00
13 Batu Candi Hitam (Ukuran 30 x 30 x 2 Cm) Cirebon m2 105,600.00
14 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) Cirebon m2 156,000.00
15 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) Cirebon m2 228,000.00
16 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) Cirebon m2 90,000.00
17 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) Cirebon m2 216,000.00
18 Batu Putih Jogya / Palimanan (30 x 30 x 2 Cm) m2 96,000.00
19 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2 138,000.00
20 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2 204,000.00
21 Batu Alam Palimanan Putih Super m2 115,000.00
22 Batu hitam Jember 5 x 20 halus m2 83,600.00
23 Batu hitam Jember 20 x 40 halus m2 89,100.00
24 Batu hitam Jember 15 x 30 halus m2 83,600.00
25 Batu hitam Singaraja 15 x 30 halus m2 83,600.00
26 Batu hitam Singaraja 20 x 40 halus m2 89,100.00
27 Batu hitam karangasem/Batu Tabas (20 x 40 x 3) m2 99,000.00
28 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) m2 25,000.00
29 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) m2 33,000.00
30 Batu Paras Bali/Pawon (Abu - Abu Terang) m2 93,500.00
31 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh 13,750.00
32 Batu pilah Singaraja 30 x 30 m2 89,100.00
33 Batu pilah Singaraja 20 x 20 m2 83,600.00
34 Split Kasar m3 425,000.00
35 Split Halus m3 450,000.00
36 Koral Beton diameter 1 - 2 cm m3 650,000.00
37 Batu Sikat Hitam Lokal Super kampil 103,500.00
38 Batu Sikat Akik Merah kampil 25,300.00
39 Batu Sikat Putih Salju kampil 40,250.00
40 Koral Sikat (Lokal) sak 48,000.00
41 Pasir Halus m3 460,000.00
42 Pasir Pasang m3 400,000.00
43 Pasir Cor m3 370,000.00
44 Pasir Urug m3 345,000.00
45 Tanah Urug m3 150,000.00
46 Tanah Lempung 80,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
47 Sirtu m3 320,000.00
48 Batu Karang Bukit m3 210,000.00
49 Limestone m3 170,000.00
50 Batako Lubang bh 2,050.00
51 Batako Buntu bh 2,250.00
52 Batu Bata bh 2,200.00
53 Bata Ringan setara falcon uk. 75 x 200 x 500 mm m3 935,000.00
54 Bata Ringan setara falcon uk. 100 x 200 x 600 mm m3 935,000.00
55 Bata Ringan setara falcon uk. 125 x 200 x 600 mm m3 935,000.00
56 Bata Ringan setara falcon uk. 150 x 200 x 600 mm m3 935,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
57 Bata Merah Klas I bh 2,600.00
58 Bata Merah Klas II bh 2,800.00
59 Bata Merah Klas III bh 1,500.00
60 Bata Merah Super (Pripian) ex tulikup bh 5,850.00
61 Bata Pres 22x10x6cm bh 3,600.00
62 Bata Pres 22x10x5cm bh 3,200.00
63 Batu Gosok bh 8,000.00
64 Filler kg 16,500.00
65 Agregat m3 175,000.00
66 Closeter bh 74,750.00
67 Lis Batu Alam L=7, T=40 bh 25,300.00
68 Lem Batu Alam kaleng 51,750.00
69 Coating (CP.27) kaleng 51,750.00

SEMEN
70 PC. Tiga Roda 50 Kg sak 71,250.00
71 PC Tiga Roda 40 Kg sak 57,000.00
72 PC. Tonasa 50 Kg / Busoa 50 Kg sak 68,750.00
73 PC. Gresik 40 Kg sak 58,000.00
74 PC. Gresik 50 Kg sak 72,500.00
75 PC Tonasa 40 Kg sak 55,000.00
76 PC Holcim 40 Kg sak 49,000.00
77 Semen Setara Gresik kg 1,450.00
78 Semen Setara Tiga Roda kg 1,425.00
79 Semen Setara Tonasa kg 1,375.00
80 Semen Setara Bosowa kg 1,375.00
81 Semen Setara Holcim kg 1,375.00
82 Semen Warna setara MU 408/ Nat kg 25,620.00
83 Semen Tipe V kg 2,250.00
84 Semen Portland kg 1,591.67

Mortar Utama
85 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg sak 140,000.00
86 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg sak 98,000.00
87 Plester premium (MU-100)@ 40 kg sak 91,350.00
88 Finish Plesteran/ Render (MU 290)@ 40 kg sak 160,230.00
89 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) sak 75,000.00
90 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) sak 148,000.00
91 Acian Putih (MU-270)@25 kg sak 152,460.00
92 Perata Lantai (MU-440)@40kg sak 87,360.00
93 Perata Lantai Expose (MU 445) 40 kg sak 169,890.00
94 Self Leveling Floor /Underlayment (MU-410) @25kg sak 270,900.00
95 Primer Self Leveling Floor (MU-L410) @ 5lt Set 302,925.00
96 Floor Hardener (MU 700) 25 kg sak 138,180.00
97 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg sak 117,442.50
98 Cerafix/Perekat Keramik (MU-420)@25 kg sak 82,162.50
99 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg sak 392,070.00
100 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg sak 235,095.00
101 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg sak 299,250.00
102 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg sak 324,660.00
103 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg 11,340.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
104 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg 16,800.00
105 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set 154,875.00
106 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set 82,950.00
107 FixGrout/Perbaikan struktur beton (MU-800)@20kg sak 77,490.00
108 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg sak 249,270.00
109 SkimRep/Perbaikan permukaan acian(MU-840)@25kg sak 308,910.00
110 DryShield/Pelapis kedap air (MU-600)@3kg set 101,535.00
111 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml set 31,500.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
Uzin
112 Beton Instan (UZ K300) 50 kg sak 78,750.00
113 Plester dinding instan (UZ Plester) 50 Kg sak 78,750.00
114 Plester Finish tanpa Aci (UZ Render) 50 kg sak 99,750.00
115 Acian diatas beton (UZ SC100) 40 kg sak 111,300.00
116 Acian dinding instan interior (UZ SC 50) 40 kg sak 102,900.00
117 Acian dinding instan eksterior (UZ SC 75) 40 kg sak 105,000.00
118 Perekat Bata Ringan (UZ TB20) 50 kg sak 112,875.00

Bostik
Perekat Keramik & Batu Alam
119 Fix Crete 25kg sak 133,185.15
120 Fix all 20kg sak 149,694.30
121 Super Fix all 20kg sak 213,064.95
122 Super Fix all trade/white 20kg sak 258,667.50
123 Asaflex 45 kg (15lt +30 kgp) set 1,292,834.55
124 Mortar Fix 100kg set 1,431,696.00
125 Mortar Fix 50 kg set 829,256.40
126 Mortar Fix 5 kg set 87,445.05
127 Grout ( Semen Nat) 20 kg sak 386,742.30
128 Grout ( Semen Nat) 1 kg sak 16,420.95
129 Liquid Grout Adictive (LGA) 20 Lt pail 931,728.00
130 Mega Lastic Acrilic Base 20Lt pail 931,728.00

Wall System
131 Skim Plas 25 Kg sak 111,612.90
132 Skim Crete 25 Kg sak 145,828.20
133 Fix. Plas 40 kg sak 100,101.75
134 Fix T. 40 kg sak 147,909.30

Waterproofing
135 Ultra Coat RC2 20 Lt pail 1,179,487.05
136 Boscosem Slury 33 Kg set 494,182.50
137 Damplix 2 20 kg set 1,541,675.10
138 Damplix 3 45 kg set 2,045,376.90
139 Damplix 3E 35 kg set 1,133,574.75
140 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m rol 897,871.80
141 Indo primer ( lapisan primer WP membran) 20 Lt pail 734,801.55
142 Integral Kristalisasi (Waterproofing kristal) 20 kg pail 1,577,668.05

Sealent
143 No More Nail (320 GR) bh 71,695.05
144 Seal n Flex 1 (600 ML) bh 111,692.70
145 Boscosil 313 (300 ML) bh 57,016.05
146 Boscosil 616 (300 ML) bh 57,862.35
147 Fil A Gap (300 ML) bh 37,076.55
148 Boscosil Mastic (300 ML) khusus R. Pendingin bh 48,769.35
149 Bostik Z Bond 6S (300 ML) bh 139,258.35
150 Bostik Z PU Contrcuction (600 ML) bh 121,796.85
151 Quelyd Super Express (250 GR) bh 35,833.35
152 Expanda Foam (340 GR) bh 171,652.95
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
153 Barel Gun bh 523,805.10
154 Flash Band rol 164,872.05

BAMBU
155 Bambu Ukuran 8"- 10" panjang 4 m btg 10,500.00
156 Bambu Ukuran 3"-6" panjang 4 m btg 9,450.00
157 Gedeg kulit kelas I m2 36,750.00
158 Gedeg kulit kelas II m2 34,125.00
159 Gedeg Biasa m2 35,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
KAYU
160 Kayu jati Balok m3 32,000,000.00
161 Kayu jati papan m3 37,500,000.00
162 Kayu jati Usuk m3 14,500,000.00
163 Kayu jati Reng m3 14,500,000.00
164 Kayu merbau Balok m3 16,800,000.00
165 Kayu merbau papan m3 18,500,000.00
166 Kayu kamper balok m3 9,100,000.00
167 Kayu kamper usuk/reng m3 8,100,000.00
168 Kayu kamper papan m3 10,100,000.00
169 Kayu Profil 4/5 kamper m' 40,500.00
170 List Kayu m' 33,000.00
171 List profil 2/4 kamper m' 35,600.00
172 Kayu kruing balok m3 7,400,000.00
173 Kayu kruing papan m3 7,875,000.00
174 Kayu Usuk Kruing m3 7,400,000.00
175 Kayu Reng Kruing m3 7,400,000.00
176 Kayu Papan Meranti m3 6,930,000.00
177 Kayu Balok Meranti m3 6,750,000.00
178 Kayu Usuk Meranti m3 6,700,000.00
179 Kayu Reng Meranti m3 6,700,000.00
180 Kayu Bangkirai Papan m3 13,825,000.00
181 Kayu Bangkirai Balok m3 11,650,000.00
182 Kayu Seseh Balok m3 3,100,000.00
183 Kayu Seseh Dolken D 20 Panjang 3 m btg 175,900.00
184 Kayu Seseh Dolken D 8-10 Panjang 4m btg 110,000.00
185 Kayu Usuk Albesia 5/7 Panjang 4 m btg 52,500.00
186 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3 4,700,000.00
187 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3 4,700,000.00
188 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3 5,100,000.00
189 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3 5,100,000.00
190 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3 5,400,000.00
191 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3 5,650,000.00
192 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3 6,710,000.00
193 Kayu lokal m3 2,843,000.00
194 Kayu Cempaka lokal m3 2,950,000.00
195 Kayu Bakar m3 700,000.00
196 Papan Bakesting m3 3,306,000.00
197 Papan Kayu Ulin m3 15,000,000.00
198 Balok Kayu Ulin m3 15,000,000.00
199 Lem Aica Aibond kg 53,000.00
200 Lem Kayu setara Fox ltr 18,900.00
201 Minyak bekisting setara Calform NX*R ltr 42,500.00
202 Jaro bubut bh 8,500.00
203 Kayu Perancah m3 3,950,000.00

Flooring/ Lantai
204 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2 220,000.00
205 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2 230,000.00
206 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2 250,000.00
207 Jati Eksport Uk. 1,2 x 5 x 20 cm m2 240,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
208 Jati Eksport Uk. 1,2 x 5 x 25 cm m2 265,000.00
209 Jati Eksport Uk. 1,2 x 5 x 30 cm m2 290,000.00
210 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2 460,000.00
211 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2 625,000.00
212 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2 190,000.00
213 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2 220,000.00
214 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2 450,000.00
215 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2 490,000.00
216 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2 475,000.00
217 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2 440,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
218 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2 450,000.00
219 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2 520,000.00
220 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2 690,000.00

Lambersering
221 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2 420,000.00
222 Lambersering Kruing Uk. 2 x 9 x 200 cm m2 320,000.00

Lis Kayu
223 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg 15,000.00
224 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg 16,000.00
225 Lis Plapond Uk. 0,8 x 5 x 400 cm btg 13,000.00
226 Lis Plapond Uk.1 x 3 x 400 cm btg 11,000.00
227 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg 14,000.00
228 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg 35,500.00
229 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg 40,000.00
230 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg 44,000.00
231 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg 51,500.00
232 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg 63,000.00
233 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg 79,000.00
234 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg 115,000.00
235 Lis Kaca Uk. 1,5 x 3 cm m' 6,500.00
236 Lis Dowel Kecil Uk. 1 x 2 cm m' 3,200.00
237 Lis Dowel Besar Uk. 1,3 x 3 cm m' 4,000.00
238 Lis Kusen m' 3,300.00

CONWOOD
Flooring/Deck Application
239 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 67,100.00
240 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 105,400.00
241 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 140,500.00
242 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 140,900.00
243 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 211,400.00
244 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 281,700.00
245 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 414,700.00

Decorative Stair
246 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs 74,500.00
247 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs 163,200.00
248 Conwood Handrail (85 x 3050 x 30 mm) Pcs 130,200.00

Ceiling Application
249 Celling Border (50 X 3050 X 11 mm) Pcs 33,100.00
250 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs 49,900.00
251 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 61,100.00
252 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs 105,300.00
253 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs 447,700.00

Eave/lisplank
254 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 149,200.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
Wall Application
255 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs 63,900.00
256 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs 83,300.00
257 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs 151,600.00
258 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs 185,400.00

Moulding Application
259 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs 46,900.00
260 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs 55,500.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
261 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs 46,900.00
262 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs 55,500.00

Decorative Application
263 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs 90,300.00
264 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs 34,200.00
265 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs 53,000.00
266 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs 45,300.00
267 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs 28,500.00
268 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs 42,800.00
269 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs 28,500.00
270 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs 42,800.00
271 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs 44,600.00
272 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs 29,500.00

Planks
273 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 47,000.00
274 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 47,000.00

BESI
275 Mour + Bout bh 7,550.00
276 Besi strip kg 11,960.00
277 Besi strip 30x3 mm m' 20,000.00
278 Baja Strip (0,2 x 2) cm / Plat Strip Kg 17,850.00
279 Besi Beton U24 (Polos) Kg 9,750.00
280 Besi Beton Ulir U 32 Kg 9,900.00
281 Besi Ulir 13,0x 12 sni (Ts-40) Kg 8,400.00
282 Besi Ulir 16,0x 12 sni (Ts-40) kg 8,450.00
283 Besi Ø5 (3,8 x 6,0) btg 4,200.00
284 Besi Ø6 (5,0 x 12) btg 11,850.00
285 Besi Ø6 (5,2 x 12) btg 12,450.00
286 Besi Ø6 (5,7 x 12) btg 14,750.00
287 Besi Ø8 (6,5 x 12) btg 19,550.00
288 Besi Ø8 (6,7 x 12) btg 20,700.00
289 Besi Ø8 (6,9 x 12) SNI btg 23,900.00
290 Besi Ø8 (7,1 x 12) SNI btg 24,700.00
291 Besi Ø8 (7,4 x 12) SNI btg 26,500.00
292 Besi Ø8 (7,6 x 12) SNI btg 27,200.00
293 Besi Ø8 (7,7 x 12) SNI btg 27,700.00
294 Besi Ø8 (7,8 x 12) SNI btg 28,400.00
295 Besi Ø8 SNI U 24 btg 28,900.00
296 Besi Ø10 (8,4 x 12) SNI btg 33,600.00
297 Besi Ø10 (8,6 x 12) SNI btg 34,800.00
298 Besi Ø10 (8,9 x 12) SNI btg 37,500.00
299 Besi Ø10 (9,2 x 12) SNI btg 39,400.00
300 Besi Ø10 (9,4 x 12) SNI btg 41,500.00
301 Besi Ø10 (9,6 x 12) SNI btg 43,200.00
302 Besi Ø10 (9,8 x 12) SNI btg 44,400.00
303 Besi Ø10 SNI U 24 btg 45,500.00
304 Besi Ø10 Ulir (9,5 x 12) SNI btg 42,700.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
305 Besi Ø10 Ulir (9,7 x 12) SNI btg 44,400.00
306 Besi Ø12 (11,5 x 12) SNI btg 62,700.00
307 Besi Ø13 Ulir (11,5 x 12) SNI btg 64,300.00
308 Besi Ø13 Ulir (11,7 x 12) SNI btg 66,000.00
309 Besi Ø13 Ulir (12,0 x 12) SNI btg 69,200.00
310 Besi Ø13 Ulir (12,5 x 12) SNI btg 74,300.00
311 Besi Ø13 Ulir (12,7 x 12) SNI btg 76,800.00
312 Besi Ø16 Ulir (14 x 12) SNI btg 94,400.00
313 Besi Ø16 Ulir (14,5 x 12) SNI btg 101,200.00
314 Besi Ø16 Ulir (15,0 x 12) SNI btg 108,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
315 Besi Ø16 Ulir (15,5 x 12) SNI btg 115,300.00
316 Besi Ø16 Ulir (15,7 x 12) SNI btg 117,500.00
317 Wiremesh M6@50m rol 2,610,000.00
318 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr 379,500.00
319 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr 585,500.00
320 Wermes Diameter 8 (U 50) lbr 489,900.00
321 Beugel Besi O8 kg 12,100.00
322 Beugel penguat /plaat kg 70,950.00
323 Kawat Beton RRT kg 15,400.00
324 Kawat berduri kg 99,000.00
325 Kawat Ayak / Kuasa 5 X 5 cm m2 26,400.00
326 Kawat Harmonika 3 X 3 cm m2 33,000.00
327 Kawat Nyamuk m2 24,200.00
328 Kawat Jaring m2 27,500.00
329 Kawat Bronjong kg 44,000.00
330 Besi / Baja profil kg 10,450.00
331 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 kg 13,200.00
332 Baja WF (150 x 12 GG) btg 1,512,000.00
333 Baja WF (200 x 12 GG) btg 2,304,000.00
334 Besi Baja WF 200 x 100 x 4,5 x 7 kg 11,500.00
335 Besi Baja WF 200 x 100 x 5,5x8 kg 12,100.00
336 Besi Baja WF 250 x 125 x 5 x 7 kg 11,500.00
337 Besi Baja C 100 x 50 x 3,2 kg 11,500.00
338 Baja Ringan Type C- 75, 0.8 m' 19,000.00
339 Baja Ringan Type C- 75, 0.6 m' 16,416.67
340 Reng Baja m' 7,700.00
341 Profil Canal "C" Tipe C71.075 btg 16,280.00
342 Profil Canal "C" Tipe C81.075 btg 94,380.00
343 Profil Canal "C" Tipe C81.065 btg 90,750.00
344 Profil "Omega / reng Tipe AA btg 52,800.00
345 Profil "Omega / reng Tipe A btg 49,500.00
346 Profil "Omega / reng Tipe AB btg 46,200.00
347 Profil Aluminium Kaca 3/4 m' 9,900.00
348 Profil Aluminium L 3 cm lis Kaca m' 12,650.00
349 Profil Aluminium 4" m' 66,000.00
350 Besi Plat kg 24,860.00
351 Besi plat 3 X 6 tebal 1,2 mm btg 215,600.00
352 Besi plat 4 X 8 tebal 1,8 mm btg 486,200.00
353 Baja Plat Hitam L = 10 lbr 1,805,000.00
354 Baja Plat Hitam L = 8 lbr 1,449,000.00
355 Baut Galvanis 3/4 x 2 " bh 6,775.00
356 Baut Galvanis 3/4 x 2 1/2 " bh 7,790.00
357 Baut Galvanis 3/4 x 3 " bh 8,475.00
358 Baut Galvanis 3/4 x 3 1/2 " bh 9,475.00
359 Baut Galvanis 3/4 x 4 " bh 10,125.00
360 Baut Galvanis 3/4 x 4 1/2 " bh 11,100.00
361 Baut Galvanis 3/4 x 5 " bh 11,800.00
362 Baut Galvanis 3/4 x 5 1/2 " bh 7,031.25
363 Baut Galvanis 3/4 x 6 " bh 13,800.00
364 Plat Siku Panjang 30 cm bh 24,000.00
365 Plat Siku Panjang 40 cm bh 26,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
366 Plat Siku Panjang 50 cm bh 30,000.00
367 Plat Siku Panjang 60 cm bh 35,000.00
368 Plat Aluminium 2mm m2 275,000.00
369 Besi siku / engsel m' 10,500.00
370 Besi Siku L.30.30.3 mm btg 74,033.33
371 Baut UNC 5/8 x 2" bh 3,000.00
372 Baut UNC 5/8 x 2 1/2" bh 3,200.00
373 Baut UNC 5/8 x 3" bh 3,650.00
374 Baut UNC 5/8 x 3 1/2" bh 3,900.00
375 Baut UNC 5/8 x 4" bh 4,350.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
376 Baut UNC 5/8 x 4 1/2" bh 4,700.00
377 Baut UNC 5/8 x 5" bh 5,075.00
378 Baut UNC 5/8 x 5 1/2" bh 5,440.00
379 Baut UNC 5/8 x 6" bh 5,800.00
380 Baut UNC 3/4 x 2" bh 5,300.00
381 Baut UNC 3/4 x 2 1/2" bh 5,750.00
382 Baut UNC 3/4 x 3" bh 6,300.00
383 Baut UNC 3/4 x 3 1/2" bh 6,900.00
384 Baut UNC 3/4 x 4" bh 7,450.00
385 Baut UNC 3/4 x 4 1/2" bh 8,000.00
386 Baut UNC 3/4 x 5" bh 8,650.00
387 Baut UNC 3/4 x 5 1/2" bh 9,200.00
388 Baut UNC 3/4 x 6" bh 9,800.00
389 Baut CB 3/8 x 5" bh 1,600.00
390 Baut CB 3/8 x 3" bh 1,100.00
391 Baut CB 3/8 x 2" bh 900.00
392 Behel 7/8 bh 119,000.00
393 Baut Baja A325 16 x 50 bh 6,000.00
394 Baut Baja A325 16 x 60 bh 6,700.00
395 Baut Baja A325 16 x 70 bh 7,000.00
396 Baut Baja A325 16 x 80 bh 8,000.00
397 Baut Baja A325 16 x 90 bh 8,750.00
398 Baut Baja A325 16 x 100 bh 9,550.00
399 Baut Baja A325 16 x 110 bh 11,000.00
400 Baut Baja A325 16 x 120 bh 12,000.00
401 Baut Baja A325 16 x 130 bh 13,000.00
402 Baut Baja A325 16 x 140 bh 14,000.00
403 Baut Baja A325 16 x 150 bh 14,500.00
404 Baut Baja A325 19 x 50 bh 9,600.00
405 Baut Baja A325 19 x 60 bh 10,550.00
406 Baut Baja A325 19 x 70 bh 11,425.00
407 Baut Baja A325 19 x 80 bh 12,000.00
408 Baut Baja A325 19 x 90 bh 13,850.00
409 Baut Baja A325 19 x 100 bh 14,700.00
410 Baut Baja A325 19 x 110 bh 16,000.00
411 Baut Baja A325 19 x 120 bh 17,000.00
412 Baut Baja A325 19 x 130 bh 18,850.00
413 Baut Baja A325 19 x 140 bh 18,800.00
414 Baut Baja A325 19 x 150 bh 20,000.00
415 Baut Galvanis 3/8 x 2 " bh 1,300.00
416 Baut Galvanis 3/8 x 2 1/2 " bh 1,400.00
417 Baut Galvanis 3/8 x 3 " bh 1,550.00
418 Baut Galvanis 3/8 x 3 1/2 " bh 1,695.00
419 Baut Galvanis 3/8 x 4 " bh 1,840.00
420 Baut Galvanis 3/8 x 4 1/2 " bh 2,045.00
421 Baut Galvanis 3/8 x 5 " bh 2,150.00
422 Baut Galvanis 3/8 x 5 1/2 " bh 2,400.00
423 Baut Galvanis 3/8 x 6 " bh 2,500.00
424 Baut Galvanis 5/8 x 2 " bh 3,550.00
425 Baut Galvanis 5/8 x 2 1/2 " bh 4,025.00
426 Baut Galvanis 5/8 x 3 " bh 4,375.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
427 Baut Galvanis 5/8 x 3 1/2 " bh 4,900.00
428 Baut Galvanis 5/8 x 4 " bh 5,250.00
429 Baut Galvanis 5/8 x 4 1/2 " bh 5,650.00
430 Baut Galvanis 5/8 x 5 " bh 5,980.00
431 Baut Galvanis 5/8 x 5 1/2 " bh 6,750.00
432 Baut Galvanis 5/8 x 6 " bh 7,100.00
433 Besi Pipa Galvanis lonjor 770,000.00
434 besi tangga D 19, enamel cat bh 15,000.00
435 Handle Besi Ø 12, enamel cat bh 6,500.00
436 Angker diameter 12mm bh 14,800.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
437 Skruf Fixer 5 cm bh 550.00
438 Dynabolt bh 3,675.00
439 Rapidrant gln 22,500.00
440 Sealant tube 36,300.00
441 Silicon kg 73,700.00
442 Elektrode 0,6 % bh 137,500.00
443 Elektrode 2 % bh 203,500.00

BESI PAGAR
444 Pagar Setara BRC T.90 diameter 6mm m' 181,500.00
445 Pagar Setara BRC T.120 diameter 6mm m' 225,500.00
446 Pagar Setara BRC T.150 diameter 6mm m' 236,500.00
447 Pagar Setara BRC T.175 diameter 7mm m' 356,400.00
448 Pagar Setara BRC T.190 diameter 7mm m' 533,500.00
449 Pagar HotDip Galvanized T.90 diameter 6mm m' 168,300.00
450 Pagar HotDip Galvanized T.120 diameter 6mm m' 169,400.00
451 Pagar HotDip Galvanized T.150 diameter 7mm m' 231,000.00
452 Pagar HotDip Galvanized T.175 diameter 7mm m' 251,900.00
453 Pagar HotDip Galvanized T.190 diameter 7mm m' 266,200.00

CAT
454 Cat Marka Jalan Kg 43,890.00
455 Glas Bit Kg 27,500.00
456 Cat besi kg 93,170.00
457 Cat Menie besi Kg 49,500.00
458 Cat menie Kayu kg 49,500.00
459 Cat Dasar Tembok Setara Emco Kg 59,400.00
460 Cat Setara weldon biasa Kg 34,000.00
461 Cat Setara weldon warna Kg 34,500.00
462 Cat Setara weldon warna tua Kg 35,500.00
463 Cat Setara emco Lux Biasa kg 59,400.00
464 Cat Setara emco Lux Warna kg 64,460.00
465 Cat Setara emco Lux Warna Tua kg 72,930.00
466 Cat tembok Setara Decolith kg 39,930.00
467 Cat tembok Setara Dulux Exterior kg 126,500.00
468 Cat tembok Setara Dulux Interior kg 93,500.00
469 Cat tembok Setara Vinilex kg 39,930.00
470 Cat Galvanis kg 87,780.00
471 Cat Kayu Emco kg 63,800.00
472 Cat Baja Chromate (anti karat) Kg 110,000.00
473 Cat Kansteen Kg 57,875.00
474 Kalkarium Kg 18,500.00
475 Kapur sirih Kg 22,500.00
476 Amplas lbr 6,600.00
477 Kuas Bh 13,200.00

Cat KCA
478 Cat Natural@25 kg Pail 399,000.00
479 Cat Flakes@25 kg Pail 683,000.00
480 Cat Genteng @25kg Pail 519,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
Stone Coating :
481 Clear gloss air kg 48,000.00
482 Black gloss air kg 46,000.00
483 Clear gloss solvent kg 50,500.00
484 Black gloss solvent kg 54,000.00
485 Clear doft solvent kg 53,000.00
486 Black doft solvent kg 54,000.00
487 Dempul / Plamir ltr 52,800.00
488 Dempul / Plamir Altik ltr 46,530.00
489 Dempul Impra Kayu ltr 49,500.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
490 Kuas untuk mengecat bh 13,200.00
491 Lem Fox (Rajawali Kuning) Gln 159,500.00
492 Lem Wall Paper Kg 27,500.00
493 Mild zak 13,200.00
494 Minyak cat ltr 46,530.00
495 Melamine Lack / Imfra ltr 77,000.00
496 Okear / Veap Kg 82,500.00
497 Plamir kayu kg 49,500.00
498 Plamir tembok setara wall Putty kg 159,500.00
499 Politur ultra ltr 75,130.00
500 Politur Jadi ltr 75,900.00
501 vernis ltr 60,500.00
502 Residu / Teer Ltr 27,500.00
503 Roll Buah 38,500.00
504 Sending Seaker ltr 61,050.00
505 Soda Api Kg 24,200.00
506 Thiner A Spesial ltr 27,500.00
507 Thiner B ltr 27,500.00
508 Teack Oil ltr 66,550.00
509 Wall Paper Setara Silk House m2 660,000.00
510 Wood Filler ltr 60,500.00
511 Cat Scotlight Ltr 166,100.00
512 Mowilex Kg 74,000.00

KACA
513 Bingkai Nako Silver daun 38,500.00
514 Bingkai Nako Coklat daun 33,000.00
515 Glass Block bh 40,700.00
516 Kaca 2 mm bening m2 77,000.00
517 Kaca 3 mm bening m2 82,500.00
518 Kaca 5 mm bening m2 143,000.00
519 Kaca 6 mm bening m2 187,000.00
520 Kaca 8 mm bening m2 317,900.00
521 Kaca 10 mm bening m2 385,000.00
522 Kaca 12 mm bening m2 495,000.00
523 Kaca Cermin 3 mm m2 165,000.00
524 Kaca Cermin 5 mm m2 308,000.00
525 Kaca Es/Kapur 3 mm m2 198,000.00
526 Kaca Es/Kapur 5 mm m2 253,000.00
527 Kaca Nako Bening m2 99,000.00
528 Kaca Nako Rayben m2 132,000.00
529 Kaca ryben 3 mm m2 99,000.00
530 Kaca ryben 5 mm m2 154,000.00
531 Kaca asahi tebal 3 mm polos clear m2 63,000.00
532 Kaca asahi tebal 3 mm ryben dark grey m2 89,000.00
533 Kaca asahi tebal 3 mm cermin mirror m2 140,000.00
534 Kaca asahi tebal 3 mm es mislet m2 145,500.00
535 Kaca asahi tebal 3 mm biru dark blue m2 235,500.00
536 Kaca asahi tebal 3 mm one way m2 350,000.00
537 Kaca asahi tebal 5 mm polos clear m2 92,500.00
538 Kaca asahi tebal 5 mm ryben dark grey m2 113,500.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
539 Kaca asahi tebal 5 mm cermin mirror m2 200,000.00
540 Kaca asahi tebal 5 mm es mislet m2 190,000.00
541 Kaca asahi tebal 6 mm polos clear m2 145,000.00
542 Kaca asahi tebal 8 mm polos clear m2 289,000.00
543 Kaca asahi tebal 10 mm polos clear m2 350,000.00
544 Kaca asahi tebal 12 mm polos clear m2 362,500.00
545 Kaca tempered asahimas tebal 3mm polos clear m2 203,500.00
546 Kaca tempered asahimas tebal 3mm ryben dark grey m2 242,000.00
547 Kaca tempered asahimas tebal 3mm sanergy clear m2 604,000.00
548 Kaca tempered asahimas tebal 4mm polos clear m2 200,500.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
549 Kaca tempered asahimas tebal 4mm sanergy clear m2 692,000.00
550 Kaca tempered asahimas tebal 5mm polos clear m2 224,500.00
551 Kaca tempered asahimas tebal 5mm ryben dark grey m2 278,000.00
552 Kaca tempered asahimas tebal 5mm stopsol m2 436,000.00
553 Kaca tempered asahimas tebal 5mm warna m2 372,000.00
554 Kaca tempered asahimas tebal 5mm sanergy clear m2 812,000.00
555 Kaca tempered asahimas tebal 6mm polos clear m2 299,500.00
556 Kaca tempered asahimas tebal 6mm ryben dark grey m2 406,000.00
557 Kaca tempered asahimas tebal 6mm stopsol m2 825,000.00
558 Kaca tempered asahimas tebal 6mm warna m2 466,500.00
559 Kaca tempered asahimas tebal 6mm diamon m2 621,500.00
560 Kaca tempered asahimas tebal 6mm sanergy clear m2 1,001,000.00
561 Kaca tempered asahimas tebal 8mm polos clear m2 391,500.00
562 Kaca tempered asahimas tebal 8mm stopsol m2 1,132,000.00
563 Kaca tempered asahimas tebal 8mm warna m2 731,500.00
564 Kaca tempered asahimas tebal 8mm diamon m2 1,078,000.00
565 Kaca tempered asahimas tebal 8mm sanergy clear m2 1,375,000.00
566 Kaca tempered asahimas tebal 10mm polos clear m2 482,000.00
567 Kaca tempered asahimas tebal 10mm diamon m2 1,540,000.00
568 Kaca tempered asahimas tebal 12mm polos clear m2 565,000.00
569 Kaca tempered asahimas tebal 12mm diamon m2 1,962,500.00
570 Kaca tempered asahimas tebal 15mm polos clear m2 4,616,500.00
571 Kaca tempered asahimas tebal 15mm diamon m2 6,000,000.00
572 Kaca tempered asahimas tebal 19mm polos clear m2 5,313,000.00
573 Kaca tempered asahimas tebal 19mm diamon m2 7,309,500.00
574 Kaca tebal 3+3 mm laminet biasa m2 345,000.00
575 Kaca tebal 4+4 mm laminet biasa m2 422,000.00
576 Kaca tebal 5+5 mm laminet biasa m2 475,000.00
577 Kaca tebal 6+6 mm laminet biasa m2 566,000.00
578 Kaca tebal 8+8 mm laminet biasa m2 846,000.00
579 Kaca tebal 10+10 mm laminet biasa m2 1,041,000.00
580 Kaca tebal 12+12 mm laminet biasa m2 1,184,000.00
581 Kaca tebal 3+3 mm laminet tempered m2 957,000.00
582 Kaca tebal 4+4 mm laminet tempered m2 1,056,000.00
583 Kaca tebal 5+5 mm laminet tempered m2 1,083,000.00
584 Kaca tebal 6+6 mm laminet tempered m2 1,375,000.00
585 Kaca tebal 8+8 mm laminet tempered m2 1,670,000.00
586 Kaca tebal 10+10 mm laminet tempered m2 1,938,000.00
587 Kaca tebal 12+12 mm laminet tempered m2 2,134,000.00
588 Ongkos polin kaca tempered tebal 5mm m' 15,000.00
589 Ongkos polin kaca tempered tebal 6mm m' 15,000.00
590 Ongkos polin kaca tempered tebal 8mm m' 25,000.00
591 Ongkos polin kaca tempered tebal 10mm m' 25,000.00
592 Ongkos polin kaca tempered tebal 12mm m' 27,500.00
593 Ongkos polin kaca tempered tebal 19mm m' 90,000.00

P I PA
594 Pipa Galvanis 1" m' 55,650.00
595 Pipa Galvanis 1,5 BSA m' 84,000.00
596 Pipa Galvanis 2" m' 118,000.00
597 Pipa Galvanis 3" m' 181,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
598 Pipa Setara Maspion AW 1/2 m' 7,560.00
599 Pipa Setara Maspion AW 3/4 m' 10,000.00
600 Pipa Setara Maspion AW 1 m' 11,550.00
601 Pipa Setara Maspion AW 1-1/2 m' 22,000.00
602 Pipa Setara Maspion AW 1-1/4 m' 17,000.00
603 Pipa Setara Maspion AW 2 m' 32,000.00
604 Pipa Setara Maspion AW 2-1/2 m' 41,000.00
605 Pipa Setara Maspion AW 3 m' 58,275.00
606 Pipa Setara Maspion AW 4 m' 85,000.00
607 Pipa Setara Maspion AW 5 m' 134,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
608 Pipa Setara Maspion AW 6 m' 176,400.00
609 Pipa Setara Maspion AW 8 m' 275,000.00
610 Pipa Setara Maspion AW 10 m' 390,000.00
611 Pipa Setara Maspion AW 12 m' 630,000.00
612 Pipa Setara Maspion AW 14 m' 800,625.00
613 Pipa Setara Maspion AW 16 m' 979,125.00
614 Pipa Setara Maspion C 3/4 m' 3,675.00
615 Pipa Setara Maspion C 5/8 m' 2,100.00
616 Pipa Setara Maspion C 1 m' 7,000.00
617 Pipa Setara Maspion C 1-1/2 m' 9,000.00
618 Pipa Setara Maspion C 1-1/4 m' 10,000.00
619 Pipa Setara Maspion C 2 m' 13,000.00
620 Pipa Setara Maspion C 2-1/2 m' 17,000.00
621 Pipa Setara Maspion C 3 m' 19,000.00
622 Pipa Setara Maspion C 4 m' 25,000.00
623 Pipa Setara Maspion D 1/2 m' 7,000.00
624 Pipa Setara Maspion D 1-1/2 m' 12,000.00
625 Pipa Setara Maspion D 1-1/4 m' 11,000.00
626 Pipa Setara Maspion D 2 m' 15,225.00
627 Pipa Setara Maspion D 2-1/2 m' 23,000.00
628 Pipa Setara Maspion D 3 m' 32,550.00
629 Pipa Setara Maspion D 4 m' 46,000.00
630 Pipa Setara Maspion D 5 m' 75,000.00
631 Pipa Setara Maspion D 6 m' 90,825.00
632 Pipa Setara Maspion D 8 m' 161,000.00
633 Pipa Setara Maspion D 10 m' 280,000.00
634 Pipa Setara Maspion D 12 m' 381,675.00
635 Pipa Setara Maspion D 14 m' 499,800.00
636 Pipa Setara Maspion D 16 m' 646,800.00
637 Pipa / selang spiral sel kran m' 34,650.00
638 Pipa setara langgeng warna abu - abu AW 1/2 m' 6,442.50
639 Pipa setara langgeng warna abu - abu AW 3/4 m' 7,847.50
640 Pipa setara langgeng warna abu - abu AW 1 m' 9,880.00
641 Pipa setara langgeng warna abu - abu AW 1 1/4 m' 13,985.00
642 Pipa setara langgeng warna abu - abu AW 1 1/2 m' 18,212.50
643 Pipa setara langgeng warna abu - abu AW 2 m' 27,047.50
644 Pipa setara langgeng warna abu - abu AW 2 1/2 m' 34,722.50
645 Pipa setara langgeng warna abu - abu AW 3 m' 49,525.00
646 Pipa setara langgeng warna abu - abu AW 4 m' 72,182.50
647 Pipa setara langgeng warna abu - abu AW 5 m' 113,850.00
648 Pipa setara langgeng warna abu - abu AW 6 m' 150,472.50
649 Pipa setara langgeng warna abu - abu AW 8 m' 234,032.50
650 Pipa setara langgeng warna abu - abu AW 10 m' 332,500.00
651 Pipa setara langgeng warna abu - abu AW 12 m' 475,115.00
652 Pipa setara langgeng warna abu - abu AW 16 m' 835,555.00
653 Pipa setara langgeng warna abu - abu D 1 1/4 m' 8,712.50
654 Pipa setara langgeng warna abu - abu D 1 1/2 m' 9,880.00
655 Pipa setara langgeng warna abu - abu D 2 m' 12,912.50
656 Pipa setara langgeng warna abu - abu D 2 1/2 m' 19,125.00
657 Pipa setara langgeng warna abu - abu D 3 m' 27,740.00
658 Pipa setara langgeng warna abu - abu D 4 m' 39,007.50
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
659 Pipa setara langgeng warna abu - abu D 5 m' 63,717.50
660 Pipa setara langgeng warna abu - abu D 6 m' 77,397.50
661 Pipa setara langgeng warna abu - abu D 8 m' 136,877.50
662 Pipa setara langgeng warna abu - abu D 10 m' 238,877.50
663 Pipa setara langgeng warna abu - abu D 12 m' 325,575.00
664 Pipa setara langgeng warna abu - abu D 14 m' 426,405.00
665 Pipa setara langgeng warna abu - abu D 16 m' 551,932.50
666 Pipa setara langgeng warna abu - abu D 20 m' 953,412.50
667 Pipa setara langgeng warna abu - abu C 5/8 m' 1,770.00
668 Pipa setara langgeng warna abu - abu C 1/2 m' 2,965.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
669 Pipa setara langgeng warna abu - abu C 3/4 m' 3,220.00
670 Pipa setara langgeng warna abu - abu C 1 m' 4,505.00
671 Pipa setara langgeng warna abu - abu C 1 1/4 m' 5,980.00
672 Pipa setara langgeng warna abu - abu C 1 1/2 m' 7,170.00
673 Pipa setara langgeng warna abu - abu C 2 m' 10,822.50
674 Pipa setara langgeng warna abu - abu C 2 1/2 m' 13,710.00
675 Pipa setara langgeng warna abu - abu C 3 m' 16,707.50
676 Pipa setara langgeng warna abu - abu C 4 m' 21,525.00
677 Pipa setara langgeng warna abu - abu C 5 m' 29,120.00
678 Pipa setara winlon warna abu - abu AW 1/2 m' 5,527.50
679 Pipa setara winlon warna abu - abu AW 3/4 m' 7,067.50
680 Pipa setara winlon warna abu - abu AW 1 m' 9,212.50
681 Pipa setara winlon warna abu - abu AW 1 1/4 m' 13,475.00
682 Pipa setara winlon warna abu - abu AW 1 1/2 m' 15,867.50
683 Pipa setara winlon warna abu - abu AW 2 m' 22,797.50
684 Pipa setara winlon warna abu - abu AW 2 1/2 m' 29,727.50
685 Pipa setara winlon warna abu - abu AW 3 m' 41,772.50
686 Pipa setara winlon warna abu - abu AW 4 m' 64,322.50
687 Pipa setara winlon warna abu - abu AW 5 m' 102,052.50
688 Pipa setara winlon warna abu - abu AW 6 m' 128,975.00
689 Pipa setara winlon warna abu - abu AW 8 m' 204,737.50
690 Pipa setara winlon warna abu - abu AW 10 m' 291,362.50
691 Pipa setara winlon warna abu - abu AW 12 m' 489,912.50
692 Pipa setara winlon warna abu - abu D 1 1/4 m' 7,782.50
693 Pipa setara winlon warna abu - abu D 1 1/2 m' 8,772.50
694 Pipa setara winlon warna abu - abu D 2 m' 11,467.50
695 Pipa setara winlon warna abu - abu D 2 1/2 m' 16,335.00
696 Pipa setara winlon warna abu - abu D 3 m' 23,732.50
697 Pipa setara winlon warna abu - abu D 4 m' 33,687.50
698 Pipa setara winlon warna abu - abu D 6 m' 66,660.00
699 Pipa setara winlon warna abu - abu D 8 m' 117,727.50
700 Pipa setara winlon warna abu - abu D 10 m' 218,405.00
701 Pipa setara winlon warna abu - abu D 12 m' 297,220.00
702 Pipa setara winlon warna abu - abu C 5/8 m' 1,485.00
703 Pipa setara winlon warna abu - abu C 1/2 m' 2,722.50
704 Pipa setara winlon warna abu - abu C 3/4 m' 2,887.50
705 Pipa setara winlon warna abu - abu C 1 m' 4,042.50
706 Pipa setara winlon warna abu - abu C 1 1/4 m' 5,362.50
707 Pipa setara winlon warna abu - abu C 1 1/2 m' 6,737.50
708 Pipa setara winlon warna abu - abu C 2 m' 9,212.50
709 Pipa setara winlon warna abu - abu C 2 1/2 m' 11,605.00
710 Pipa setara winlon warna abu - abu C 3 m' 14,355.00
711 Pipa setara winlon warna abu - abu C 4 m' 19,855.00
712 Pipa setara wavin warna putih AW 1/2 m' 4,757.50
713 Pipa setara wavin warna putih AW 3/4 m' 6,517.50
714 Pipa setara wavin warna putih AW 1 m' 8,910.00
715 Pipa setara wavin warna putih AW 1 1/4 m' 13,365.00
716 Pipa setara wavin warna putih AW 1 1/2 m' 15,345.00
717 Pipa setara wavin warna putih AW 2 m' 19,635.00
718 Pipa setara wavin warna putih AW 2 1/2 m' 28,655.00
719 Pipa setara wavin warna putih AW 3 m' 38,637.50
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
720 Pipa setara wavin warna putih AW 4 m' 64,020.00
721 Pipa setara wavin warna putih AW 5 m' 106,067.50
722 Pipa setara wavin warna putih AW 6 m' 148,775.00
723 Pipa setara wavin warna putih AW 8 m' 249,700.00
724 Pipa setara wavin warna putih AW 10 m' 386,100.00
725 Pipa setara wavin warna putih AW 12 m' 544,390.00
726 Pipa setara wavin warna putih D 1 1/4 m' 8,387.50
727 Pipa setara wavin warna putih D 1 1/2 m' 9,487.50
728 Pipa setara wavin warna putih D 2 m' 12,155.00
729 Pipa setara wavin warna putih D 2 1/2 m' 16,445.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
730 Pipa setara wavin warna putih D 3 m' 20,872.50
731 Pipa setara wavin warna putih D 4 m' 32,835.00
732 Pipa setara wavin warna putih D 5 m' 52,937.50
733 Pipa setara wavin warna putih D 6 m' 69,822.50
734 Pipa setara wavin warna putih D 8 m' 122,815.00
735 Pipa setara wavin warna putih D 10 m' 202,317.50
736 Pipa setara wavin warna putih D 12 m' 284,020.00
737 Pipa setara langgeng warna putih AW 1/2 m' 4,520.00
738 Pipa setara langgeng warna putih AW 3/4 m' 12,385.00
739 Pipa setara langgeng warna putih AW 1 m' 8,465.00
740 Pipa setara langgeng warna putih AW 1 1/4 m' 12,697.50
741 Pipa setara langgeng warna putih AW 1 1/2 m' 14,697.50
742 Pipa setara langgeng warna putih AW 2 m' 18,655.00
743 Pipa setara langgeng warna putih AW 2 1/2 m' 27,222.50
744 Pipa setara langgeng warna putih AW 3 m' 36,707.50
745 Pipa setara langgeng warna putih AW 4 m' 60,812.50
746 Pipa setara langgeng warna putih AW 5 m' 100,765.00
747 Pipa setara langgeng warna putih AW 6 m' 141,337.50
748 Pipa setara langgeng warna putih AW 8 m' 237,215.00
749 Pipa setara langgeng warna putih AW 10 m' 366,795.00
750 Pipa setara langgeng warna putih AW 12 m' 517,172.50
751 Pipa setara langgeng warna putih AW 14 m' 708,120.00
752 Pipa setara langgeng warna putih AW 16 m' 885,117.50
753 Pipa setara langgeng warna putih D 1 1/4 m' 7,970.00
754 Pipa setara langgeng warna putih D 1 1/2 m' 9,015.00
755 Pipa setara langgeng warna putih D 2 m' 11,547.50
756 Pipa setara langgeng warna putih D 2 1/2 m' 15,625.00
757 Pipa setara langgeng warna putih D 3 m' 19,830.00
758 Pipa setara langgeng warna putih D 4 m' 31,195.00
759 Pipa setara langgeng warna putih D 5 m' 50,292.50
760 Pipa setara langgeng warna putih D 6 m' 66,332.50
761 Pipa setara langgeng warna putih D 8 m' 116,675.00
762 Pipa setara langgeng warna putih D 10 m' 192,202.50
763 Pipa setara langgeng warna putih D 12 m' 269,820.00
764 Pipa setara langgeng warna putih D 14 m' 451,702.50
765 Pipa setara langgeng warna putih D 16 m' 584,677.50
766 Pipa setara langgeng warna putih D 20 m' 925,642.50
767 Pipa setara langgeng warna putih C 5/8 m' 1,770.00
768 Pipa setara langgeng warna putih C 1/2 m' 2,880.00
769 Pipa setara langgeng warna putih C 3/4 m' 3,220.00
770 Pipa setara langgeng warna putih C 1 m' 4,370.00
771 Pipa setara langgeng warna putih C 1 1/4 m' 5,805.00
772 Pipa setara langgeng warna putih C 1 1/2 m' 7,170.00
773 Pipa setara langgeng warna putih C 2 m' 10,507.50
774 Pipa setara langgeng warna putih C 2 1/2 m' 13,310.00
775 Pipa setara langgeng warna putih C 3 m' 16,220.00
776 Pipa setara langgeng warna putih C 4 m' 16,220.00
777 Pipa setara winlon warna putih AW 1/2 m' 3,822.50
778 Pipa setara winlon warna putih AW 3/4 m' 5,142.50
779 Pipa setara winlon warna putih AW 1 m' 7,150.00
780 Pipa setara winlon warna putih AW 1 1/4 m' 9,955.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
781 Pipa setara winlon warna putih AW 1 1/2 m' 12,925.00
782 Pipa setara winlon warna putih AW 2 m' 17,820.00
783 Pipa setara winlon warna putih AW 2 1/2 m' 23,925.00
784 Pipa setara winlon warna putih AW 3 m' 32,972.50
785 Pipa setara winlon warna putih AW 4 m' 54,587.50
786 Pipa setara winlon warna putih AW 5 m' 81,262.50
787 Pipa setara winlon warna putih AW 6 m' 116,792.50
788 Pipa setara winlon warna putih AW 8 m' 183,067.50
789 Pipa setara winlon warna putih AW 10 m' 263,917.50
790 Pipa setara winlon warna putih D 1 1/4 m' 6,160.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
791 Pipa setara winlon warna putih D 1 1/2 m' 7,480.00
792 Pipa setara winlon warna putih D 2 m' 10,065.00
793 Pipa setara winlon warna putih D 2 1/2 m' 13,612.50
794 Pipa setara winlon warna putih D 3 m' 16,967.50
795 Pipa setara winlon warna putih D 4 m' 27,610.00
796 Pipa setara winlon warna putih D 5 m' 40,590.00
797 Pipa setara winlon warna putih D 6 m' 57,945.00
798 Pipa setara winlon warna putih D 8 m' 98,945.00
799 Pipa setara winlon warna putih D 10 m' 186,367.50
800 Pipa setara winlon warna putih C 5/8 m' 1,402.50
801 Pipa setara winlon warna putih C 1/2 m' 2,612.50
802 Pipa setara winlon warna putih C 3/4 m' 2,832.50
803 Pipa setara winlon warna putih C 1 m' 4,207.50
804 Pipa setara winlon warna putih C 1 1/4 m' 4,922.50
805 Pipa setara winlon warna putih C 1 1/2 m' 6,160.00
806 Pipa setara winlon warna putih C 2 m' 8,662.50
807 Pipa setara winlon warna putih C 2 1/2 m' 10,917.50
808 Pipa setara winlon warna putih C 3 m' 13,585.00
809 Pipa setara winlon warna putih C 4 m' 18,122.50
810 Pipa setara vilano warna putih AW 1/2 m' 3,482.50
811 Pipa setara vilano warna putih AW 3/4 m' 4,870.00
812 Pipa setara vilano warna putih AW 1 m' 6,382.50
813 Pipa setara vilano warna putih AW 1 1/4 m' 9,287.50
814 Pipa setara vilano warna putih AW 3 m' 29,035.00
815 Pipa setara vilano warna putih AW 4 m' 41,785.00
816 Pipa setara vilano warna putih AW 5 m' 69,670.00
817 Pipa setara vilano warna putih AW 6 m' 99,282.50
818 Pipa setara vilano warna putih D 1 1/4 m' 5,805.00
819 Pipa setara vilano warna putih D 1 1/2 m' 6,967.50
820 Pipa setara vilano warna putih D 2 m' 8,707.50
821 Pipa setara vilano warna putih D 2 1/2 m' 12,190.00
822 Pipa setara vilano warna putih D 3 m' 15,675.00
823 Pipa setara vilano warna putih D 4 m' 24,382.50
824 Pipa setara vilano warna putih D 5 m' 31,930.00
825 Pipa setara vilano warna putih D 6 m' 55,157.50

826 Pipa PVC (class VU)


PVC Pipe dia. 150 mm m 153,950.00
Elbow 900̊, dia 150 mm bh 143,250.00
Elbow 45, dia 150 mm bh 125,000.00
Sochet dia. 150 bh 66,000.00
shortpipe ke HI dan pipa bh 275,000.00
saddle branch bh 330,000.00
solvent cement kg 45,000.00
PVC Pipe dia. 200 mm m 217,800.00
Sochet dia. 200 bh 137,500.00
Tee dia 200 x 150 mm bh 530,200.00

827 Pipa PVC ( class D ) dia 150 mm m' 76,200.00


Bend dia 150, 90 (DV) bh 33,000.00
Bend dia 150, 45 (DV) bh 33,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
sochet dia 150 mm (DV) bh 26,500.00

828 Pipa PVC ( class D ) dia 4"


dia 100 mm, length = 4 m M 35,175.00
Sochet dia. 100 mm bh 11,880.00
Bend dia 100, 90 bh 37,560.00
Bend dia 100, 45 bh 18,830.00
Tee Y 45 ; 4" x 2" bh 26,120.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
Tee Y 45 ; 4" x 3" bh 35,880.00
Tee Y 45 ; 4" x 4" bh 40,430.00
Dop PVC 4" bh 14,920.00

829 Pipa PVC ( class D ) dia 3"


dia 75 mm, length = 4 m m 22,462.00
Bend dia 75, 90 bh 18,060.00
Bend dia 75, 45 bh 10,470.00
Sochet dia. 75 mm bh 6,530.00
Dop PVC 3" bh 7,930.00

830 Pipa PVC ( class D ) dia 2" m 13,400.00


Sochet dia. 50 mm bh 4,550.00
Bend dia 50, 90 bh 7,960.00
Bend dia 50, 45 bh 4,690.00
Dop PVC 2" bh 7,000.00
Sifon Crom Leher Angsa bh 132,860.00
831 Pipa PVC Ø 6" M 210,850.00
832 Pipa PVC Ø 4" M 98,700.00
833 Pipa PVC Ø 3" M 67,450.00
834 Pipa PVC Ø 2" M 31,600.00
835 Pipa GI Ø 4" M 399,600.00
836 Pipa GI Ø 3" M 290,000.00
837 Pipa GI Ø 2" M 182,300.00
838 PVC Tee R-R Ø 10" x 3" bh 5,184,700.00
839 PVC Tee R-R Ø 6" x 4" bh 1,230,000.00
840 PVC Tee R-R Ø 6" x 3" bh 1,300,000.00
841 PVC Tee R-R Ø 4" x 4" bh 680,000.00
842 PVC Tee R-R Ø 4" x 3" bh 595,000.00
843 PVC Tee R-R Ø 3" x 3" bh 301,800.00
844 PVC Tee R-R Ø 2" x 3" bh 315,000.00
845 PVC Tee R-SC Ø 4" x 2" bh 475,000.00
846 PVC Tee R-SC Ø 3" x 2" bh 300,000.00
847 PVC Tee SC-SC Ø 2" x 2" bh 66,000.00
848 CI Giboult Joint Std Jis Ø 10" bh 1,588,290.00
849 CI Giboult Joint Std SII Ø 6" bh 699,000.00
850 CI Giboult Joint Std SII Ø 4" bh 545,000.00
851 CI Giboult Joint Std SII Ø 3" bh 396,000.00
852 CI Gate Valve FL- FL Ø 4" bh 4,200,000.00
853 CI Plat Cap Ø 4" bh 201,250.00
854 PVC Tapper Core Ø 4" bh 605,000.00
855 PVC Tapper Core Ø 3" bh 460,000.00
856 BS Bend FL- FL Ø 4" x 45 0̊ bh 719,000.00
857 BS Bend FL- FL Ø 3" x 45 0̊ bh 518,000.00
858 BS Flenge Ø 4" bh 155,400.00
859 BS Flange Ø 3" bh 124,800.00
860 Karet Packing Ø 4" bh 21,000.00
861 Karet Packing Ø 3" bh 18,000.00
862 Bronze Gate Valve Ø 3" bh 1,400,000.00
863 Bronze Gate Valve Ø 2" bh 511,000.00
864 PVC Valve Sochet Ø 3" bh 41,600.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
865 PVC Valve Sochet Ø 2" bh 19,300.00
866 GI Cap Ø 3" bh 66,200.00
867 GI Cap Ø 2" bh 23,650.00
868 GI Elbow Ø 2" bh 35,650.00
869 PVC Bend R- R Ø 4" x 90 0̊ bh 205,200.00
870 PVC Bend R- R Ø 4" x 45 0̊ bh 129,100.00
871 PVC Bend R- R Ø 3" x 45 0̊ bh 93,900.00
872 PVC Bend R- R Ø 3" x 90 0̊ bh 99,700.00
873 PVC Elbow Ø 2" bh 37,000.00
874 PVC Reducer R-R Ø 4" x 3" bh 98,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
875 PVC Reducer R-R Ø 3" x 2" bh 47,000.00
876 Beton Path box bh 275,000.00
877 Beton KS bh 49,610.00
878 Pipa Selubung Valve M 70,725.00
879 Penutup Pipa bh 15,700.00
880 Patok UP bh 2,500.00
881 Beton Penahan Ø 10" bh 668,660.00
882 Beton Penahan Ø 6" bh 143,290.00
883 Beton Penahan Ø 4" bh 49,760.00
884 Beton Penahan Ø 3" bh 114,600.00
885 Beton Penahan Ø 2" bh 19,105.00
886 Baut Dynabol bh 40,000.00

BAHAN LISTRIK
887 Coaxial cable 5C - 75 ohm commscof m1 18,700.00
888 Box Panel (3 mm) (400 x 600) Bh 598,400.00
889 Figting lampu Broco Bh 22,000.00
890 Inbow dos plastik clipsal E 157 P OB bj 11,935.00
891 Kabel NYM 2 x 1.5 mm Suprime NYM m1 11,000.00
892 Kabel NYY 2 x 1.5 mm m1 15,950.00
893 Kabel NYM 2 x 2.5 mm m1 16,500.00
894 Kabel NYY 3 x 1.5 mm m1 19,800.00
895 Kabel NYM 3 x 2.5 mm m1 20,900.00
896 Kabel NYY 3 x 2.5 mm m1 27,500.00
897 Kabel NYM 4 mm m1 39,900.00
898 Kabel NYY 2 x 2,5 mm m1 21,450.00
899 Kabel Twisteed 2 x 16 mm m1 16,500.00
900 Kabel telephone m1 17,482.50
901 Klem clipsal 20 mm bj 11,025.00
902 Casing Lampu Bawah Air bh 64,000.00
903 Casing Lampu Tangga bh 66,500.00
904 Kap Lampu 14 Inchi Aluminium bh 90,000.00
905 Fitting Gantung E27 bh 15,000.00
906 Lampu Son 150 Watt Setara Philips Set 1,438,500.00
907 Lampu Mercury (halaman) bh 462,000.00
908 Lampu Mercury 125 Watt Setara Philips Set 1,403,850.00
909 Lampu Mercury 250 Watt Setara Philips Set 2,977,800.00
910 Lampu Mercury 400 Watt Setara Philips Set 11,118,450.00
911 Lampu pijar 10 Watt Setara Philips bh 7,150.00
912 Lampu pijar 15 Watt Setara Philips bh 7,700.00
913 Lampu pijar 25 Watt Setara Philips bh 8,030.00
914 Lampu pijar 40 Watt Setara Philips bh 9,130.00
915 Lampu TL 20 Watt Komplit (Ballast Philips) bh 115,500.00
916 Lampu TL 25 Watt Komplit (Ballast Philips) bh 126,000.00
917 Lampu LED (5 Watt) Setara Philips Bh 55,000.00
918 Lampu LED (7 Watt) Setara Philips Bh 82,500.00
919 Lampu LED (10) Setara Philips Bh 113,850.00
920 Lampu LED (13 Watt) Setara Philips Bh 148,500.00
921 Lampu Sorot LED (5 Watt) Setara Philips Bh 209,000.00
922 Lampu Sorot LED (7 Watt) Setara Philips Bh 239,800.00
923 Lampu Sorot LED (10 Watt) Setara Philips Bh 278,250.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
924 Lampu Sorot LED (13 Watt) Setara Philips Bh 363,000.00
925 Lampu Sorot LED (25 Watt) Setara Philips Bh 757,000.00
926 Lampu Sorot LED (100 Watt) Setara Philips (ip65) Bh 1,450,000.00
927 Lampu Sorot Cahaya RGB (LED) 100 watt setara Philips (ip65) Bh 2,400,000.00
928 Lampu Sorot Bawah Cahaya Warm White (bolam) 400 watt setara Philips Bh 3,200,000.00
929 Lampu Sorot Bawah Cahaya Warm White (LED) 10 watt setara Philips (ip65) Bh 275,000.00
930 Lampu Sorot Bawah Cahaya Warm White (LED) 30 watt setara Philips (ip65) Bh 380,000.00
931 Lampu Esensial (5 Watt) Setara Philips Bh 30,800.00
932 Lampu Esensial (8 Watt) Setara Philips Bh 38,500.00
933 Lampu Esensial (11 Watt) Setara Philips Bh 44,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
934 Lampu Esensial (14 Watt) Setara Philips Bh 52,800.00
935 Lampu Esensial (18 Watt) Setara Philips Bh 58,300.00
936 Scot Light m2 89,000.00
937 Magnet Contactor 80 A SN - 50 Bh 1,225,224.00
938 MCB 3 phase 40 A MG Bh 347,550.00
939 MCB 3 phase 63 A MG Bh 660,450.00
940 Panel MDP Unit 33,206,250.00
941 Panel SDP Unit 14,437,500.00
942 Pipa clipsal 20 mm bt 15,400.00
943 Pipa flexible clipsal 20 mm m1 11,000.00
944 Saklar ganda Setara Broco Bh 30,800.00
945 Saklar tunggal Setara Broco Bh 19,800.00
946 SL 18 Watt Komplit bh 81,675.00
947 Sock clipsal 20 mm bj 3,300.00
948 Steker bh 14,740.00
949 Stop Kontak bh 27,500.00
950 Stop Kontak Khusus (Kedap Air) bh 49,500.00
951 Travo max 50 watt bh 750,000.00
952 Tee dos clipsal 20 mm bh 7,480.00
953 Time Switch Bh 472,500.00
954 T Foring Bh 46,200.00

MARMER / GRANIT
955 Marmer (30 x 30) m2 308,000.00
956 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 715,000.00
957 Batu Andesit (30 x 30 x 5 cm) m2 385,000.00
958 Roster Keramik (12 x 11 x 24) bh 46,200.00

GRANIT TILE
959 Setara Essenza 40 x 40 m2 315,150.00
960 Setara Essenza 60 x 60 m2 387,200.00
961 Setara Granito 40 x 40 cm m2 348,150.00
962 Setara Nero Granito 30 x 60 cm m2 305,800.00
963 Setara Nero Granito 40 x 40 cm m2 348,150.00
964 Setara Nero Granito 60 x 60 cm m2 345,950.00
965 Setara Ex Cina 60 x 60 cm m2 181,500.00
966 Setara Ex Cina 80 x 80 cm m2 231,000.00

KERAMIK
967 Keramik Setara Asia Tile 20 x 20 kelas I warna muda m2 71,500.00
968 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 74,800.00
969 Keramik Setara Asia Tile 20 x 25 kelas I m2 77,000.00
970 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 55,000.00
971 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 57,200.00
972 Keramik Setara Asia Tile 40 x 40 kelas I m2 74,800.00
973 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 126,500.00
974 Keramik Setara ARWANA ( warna putih) M2 51,700.00
975 Keramik Setara ARWANA ( warna tua) M2 66,000.00
976 Keramik Setara Diamond 10/20 cm (Warna Muda) M2 66,000.00
977 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) M2 60,500.00
978 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) M2 66,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
979 Keramik Setara Diamond 10/20 cm (Warna tua) M2 82,500.00
980 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) M2 66,000.00
981 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) M2 66,000.00
982 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) M2 66,000.00
983 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) M2 82,500.00
984 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) m2 63,800.00
985 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) m2 63,800.00
986 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 68,200.00
987 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 77,000.00
988 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 88,550.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
989 Keramik Setara KIA 20/20 cm warna muda m2 71,500.00
990 Keramik Setara KIA 30/30 cm warna muda m2 72,600.00
991 Keramik Setara KIA 20/20 cm warna tua m2 77,550.00
992 Keramik Setara KIA 30/30 cm warna tua m2 77,550.00
993 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 51,700.00
994 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 48,950.00
995 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 47,410.00
996 Keramik Setara Mulia 30 x 30 Warna Marbel m2 55,550.00
997 Keramik Setara Mulia 30 x 30 Warna Impresso m2 57,090.00
998 Keramik Setara Mulia 40 x 40 cm kelas I m2 69,850.00
999 Keramik Setara ROMAN 20/20 cm m2 102,850.00
1000 Keramik Setara ROMAN 30/30 cm m2 143,000.00
1001 Tegel PC abu - abu 20/20 cm m2 86,350.00
1002 Tegel PC Warna 20/20 cm m2 86,350.00
1003 Tegel PC Warna 30/30 cm m2 86,350.00
1004 Tegel 30 x 30 TB PC m2 86,350.00
1005 Tegel 30 x 30 TB PC Kuning m2 86,350.00
1006 Tegel 30 x 30 Warna Merah m2 86,350.00
1007 Tegel Bata 20 x 20 Merah m2 86,350.00
1008 Tegel Bata 20 x 20 PC m2 86,350.00
1009 Tegel B/TB 20 x 20 Kuning m2 86,350.00
1010 Tegel Mozaik Porselint 30/30 cm m2 82,500.00
1011 Tegel Wafel 20/20 cm Warna m2 77,000.00
1012 Ubin PC Warna bh 7,000.00
1013 Ubin PC Warna 20 / 20 Cm m2 82,500.00
1014 Batu Lahar 30/30 bh 27,500.00
1015 Porselint 11/11 cm bh 49,500.00
1016 Porselen m2 75,000.00

ATAP
1017 Alang-alang panjang 2,4 meter lbr 16,500.00
1018 Alluminium foil M2 Double rol 245,300.00
1019 Akustik 60 cm x 120 cm lbr 54,450.00
1020 Asbes Bubungan lbr 49,000.00
1021 Asbes Gelombang 1,80 m x 0,80 m lbr 38,500.00
1022 Asbes Gelombang 1,80 m x 1,05 m lbr 41,800.00
1023 Asbes Gelombang 2,10 m x 1,05 m lbr 45,100.00
1024 Asbes Gelombang 2,4 m x 1,05 m lbr 53,900.00
1025 Asbes Rata 2 m x 1 m x 4 mm lbr 60,500.00
1026 Bentala tanah liat Ex Pejaten bh 93,500.00
1027 Bentala Ex Kapal 70,500.00
1028 Bentala Besar polos Lubang 25 cm bh 82,500.00
1029 Bentala Besar Warna Lubang 25 cm bh 110,000.00
1030 Bentala Besar polos Lubang 90 cm bh 143,000.00
1031 Bentala Besar Warna Lubang 90 cm bh 165,000.00
1032 Bubungan Besar bh 17,600.00
1033 Bubungan Kecil bh 13,200.00
1034 Bubungan Bambe Kecil bh 19,250.00
1035 Bubungan Bulat Karang Pilang bh 19,250.00
1036 Bubungan Bulat Jati Wangi bh 17,050.00
1037 Bubungan Bulat Ngalayur isi 3,5/m bh 9,900.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1038 Bubungan Besar Good Year bh 17,600.00
1039 Bubungan Beton Cisangkan bh 21,450.00
1040 Bubungan Gerard lbr 68,500.00
1041 Bubungan Karang Pilang isi 3,5/m bh 19,250.00
1042 Bubungan Pletong Jatiwangi bh 16,500.00
1043 Bubungan SL Utama bh 16,500.00
1044 Bubungan SL Ngalayur bh 9,350.00
1045 Bubungan Segi Tiga Karang Pilang bh 19,250.00
1046 Bubungan Utama isi 3,5/m bh 16,500.00
1047 Genteng Bambe bh 5,390.00
1048 Genteng Bambe Karang Pilang bh 5,390.00
1049 Genteng Bambe Kecil bh 5,170.00
1050 Genteng Beton Cisangkan bh 13,750.00
1051 Genteng Gemini bh 6,600.00
1052 Genteng Gerard Polos m2 254,500.00
1053 Genteng Good Year m2 5,500.00
1054 Genteng Kanmuri (glazur) isi 14/m2 bh 11,550.00
1055 Genteng Kodok Lokal bh 3,740.00
1056 Genteng Kodok Kamulan bh 3,850.00
1057 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bh 5,500.00
1058 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bh 5,170.00
1059 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bh 5,500.00
1060 Genteng Kodok Karang Pilang (Surabaya) bh 7,000.00
1061 Genteng Kodok Soka bh 2,420.00
1062 Genteng Lestari bh 3,080.00
1063 Genteng Metal 80 x 77,6 (Polos) lbr 40,590.00
1064 Genteng Metal 80 x 77,6 (Pasir) lbr 65,340.00
1065 Genteng Morando Abadi isi 18/m2 bh 9,240.00
1066 Genteng Morando Jatiwangi isi 18/m2 bh 4,950.00
1067 Genteng Morando Ngalayur isi 20/m2 bh 4,070.00
1068 Genteng Morando Metal bh 63,800.00
1069 Genteng Pejaten Mini bh 3,080.00
1070 Genteng Plentong bh 2,200.00
1071 Genteng plentong dicat bh 2,420.00
1072 Genteng Plentong Mantili bh 2,200.00
1073 Genteng Plentong Pejaten / Darmasaba bh 4,000.00
1074 Genteng Plentong Jatiwangi / Surabaya bh 6,500.00
1075 Genteng Portugis bh 6,500.00
1076 Genteng Pres Besar bh 1,980.00
1077 Genteng Pres Besar Cat bh 2,090.00
1078 Genteng Pres Mini bh 1,760.00
1079 Genteng Pres Mini Cat bh 1,980.00
1080 Genteng Terreal bh 8,000.00
1081 Genteng T. Romana bh 8,000.00
1082 Genteng Besar polos Lubang 35 cm bh 1,980.00
1083 Genteng Besar Warna Lubang 35 cm bh 2,090.00
1084 Fiberglas (1.80 x 0.80) M2 lbr 1,760.00
1085 Ijuk kg 1,980.00
1086 Ikut Celedu Besar Polos bh 88,000.00
1087 Ikut Celedu Besar Warna bh 99,000.00
1088 Ikut Celedu Kecil Polos bh 66,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1089 Ikut Celedu Kecil Warna bh 88,000.00
1090 Kawat las kg 80,300.00
1091 Kawat Diameter 4 mm kg 88,000.00
1092 Murda / Puntal Paras bh 220,000.00
1093 Murda tanah liat Ex Pejaten bh 121,000.00
1094 Murda Kecil Polos Lubang 25 cm bh 88,000.00
1095 Murda Kecil Warna Lubang 25 cm bh 104,500.00
1096 Profil Aluminium "T" m3 219,450.00
1097 Seng BJLS 0,18 gelombang lbr 99,770.00
1098 Seng BJLS 0,22 gelombang lbr 106,480.00
1099 Seng BJLS 0,30 gelombang lbr 119,790.00
1100 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr 93,500.00
1101 Seng Plat Lebar 0,90 M lbr 53,240.00
1102 Seng Plat 3" x 6" BJLS 28 lbr 66,550.00
1103 Seng Plat Aluminium lbr 53,240.00
1104 Sirap lbr 4,950.00
1105 Subeng Besar Polos lbr 9,240.00
1106 Subeng Besar Warna lbr 5,390.00
1107 Subeng Kecil Polos lbr 6,600.00
1108 Subeng Kecil Warna bh 4,180.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4

TALI
1109 Tali Ijuk kg 5,390.00
1110 Tali pengikat ikat 16,500.00
1111 Tali pengikat alang-alang ikat 19,800.00
1112 Tali Rafia Gulung 3,000.00

SANITAIR
1113 Bak mandi fibre glass 70x70x66 cm bh 306,130.00
1114 Bak mandi porselin/ keramik bh 242,500.00
1115 Bak mandi keramik 50x50 bh 187,000.00
1116 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 341,000.00
1117 Floor drain plastik Setara Alianco bh 27,500.00
1118 Floor drain stainless Setara Wasser bh 49,500.00
1119 Kloset duduk INA Komplit bh 1,650,000.00
1120 closet duduk INA (putih) STD bh 1,100,000.00
1121 closet duduk INA (warna) bh 1,320,000.00
1122 Kloset duduk Amerika Standar Winplus bh 1,430,000.00
1123 closet duduk TOTO (putih) STD bh 1,100,000.00
1124 closet duduk TOTO (warna) bh 1,705,000.00
1125 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 1,815,000.00
1126 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 5,699,100.00
1127 Kloset duduk " TOTO Type AVANTE CW 823 J bh 8,457,900.00
1128 Kloset duduk " TOTO Type CW 660J bh 738,100.00
1129 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,925,000.00
1130 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 2,589,400.00
1131 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 810,700.00
1132 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 3,388,000.00
1133 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 3,763,100.00
1134 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 3,908,300.00
1135 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 469,150.00
1136 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 246,950.00
1137 closet jongkok porselin/ keramik bh 275,000.00
1138 Kloset porselin jongkok TOTO (standar) bh 374,000.00
1139 Kloset porselin jongkok Ina (standar) bh 175,450.00
1140 Kran biasa Setara Onda bh 55,000.00
1141 Kran SunEi PI/3 JHR bh 76,000.00
1142 Kran TOTO T 205 LCSC bh 242,550.00
1143 Kran TOTO T 205 MC bh 330,000.00
1144 Kran TOTO T 23 B13 bh 271,700.00
1145 Kran TOTO T 23 B13V7NB bh 280,500.00
1146 Kran TOTO T 26 - 13 bh 367,400.00
1147 Kran TOTO TX 109 LH bh 775,500.00
1148 Penyekat Urinoir " TOTO " Type A 100 " bh 1,364,000.00
1149 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 459,800.00
1150 Soap holder " TOTO " Type S 6 N " bh 121,000.00
1151 Seal tape bh 3,300.00
1152 Urinoir TOTO (STD) bh 2,640,000.00
1153 Urinoir " TOTO U 57 M bh 2,874,960.00
1154 Urinoir " TOTO U 57 M BODI bh 1,414,600.00
1155 Urinoir INA (STD) bh 2,530,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1156 Wastagel KIA Standard bh 203,500.00
1157 Wastagel KIA Warna bh 258,500.00
1158 Wastafel TOTO (putih) bh 594,000.00
1159 Wastafel TOTO (warna) bh 1,135,000.00
1160 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,248,500.00
1161 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 808,500.00
1162 Wastafel INA (putih) bh 770,000.00
1163 Wastafel INA (warna) bh 770,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
KUNCI DAN PENGGANTUNG
1164 Engsel H ( 80 x 50) Ps 11,000.00
1165 Engsel kupu-kupu Rafes 4' 304 ps 64,900.00
1166 Engsel pintu Setara ECOLING Ps 73,150.00
1167 Engsel jendela Setara ECOLING Ps 46,310.00
1168 Engsel jendela Setara CAMEL Ps 39,600.00
1169 Espagnoleth Setara Rafes 60 cm Ps 51,700.00
1170 Grendel Setara ESBELA Bh 133,100.00
1171 Grendel tanam Setara CAMEL Bh 218,350.00
1172 Kait angin biasa Setara CAMEL Bh 55,000.00
1173 Kait angin diameter 10 mm Bh 92,000.00
1174 Kait angin lipat Setara ESBELA Bh 86,460.00
1175 Kait angin tarik Setara ESBELA Bh 59,950.00
1176 Kunci kuda 2 x putar Bh 81,600.00
1177 Kunci lif 1 x putar Setara BELLEZA Bh 146,300.00
1178 Kunci lif 2 x putar Bh 166,100.00
1179 Kunci pintu TOP Setara ESBELA bh 330,000.00
1180 Kunci pintu Vanesa Setara CAMEL bh 199,650.00
1181 Kunci pintu Setara ESBELLA bh 286,000.00
1182 Kunci Pintu 2 x putar Setara SES Bh 226,270.00
1183 Kunci pintu Setara DELWIN) bh 198,000.00
1184 Kunci shang hae 2 x putar Bh 185,900.00
1185 Kunci slot / Grendel Pintu Setara DELLWYN bh 244,200.00
1186 Kunci tanam 2 slag Setara Dexon bh 291,500.00
1187 Kunci silinder bh 135,000.00
1188 Door holder bh 48,000.00
1189 Rel pintu sorong m' 235,000.00
1190 Rolling door plaat M2 133,100.00
1191 Rolling Door Aluminium M2 650,000.00

PAKU
1192 Paku Beton Kg 33,000.00
1193 Paku Usuk Kg 14,625.00
1194 Paku Reng Kg 14,250.00
1195 Paku List Kg 21,191.67
1196 Paku Seng Ulir bh 900.00
1197 Paku 2-4 cm kg 15,271.67
1198 Paku Pancing 60 x 230 Kg 16,500.00
1199 Paku 5-12 cm kg 17,297.78
1200 Paku 2 cm (30 kg) 3/4 inch SQ dus 471,800.00
1201 Paku 2,5 cm (30 kg) 1 inch SQ dus 466,200.00
1202 Paku 3 cm (30 kg) 1 1/4 inch SQ dus 457,800.00
1203 Paku 4 cm (30 kg) 1 1/2 inch SQ dus 436,800.00
1204 Paku 5 cm (30 kg) 2 inch SQ dus 393,400.00
1205 Paku 7,10,12 cm (3,4,5) inch SQ dus 389,200.00
1206 Paku 5 -12 cm (27kg) 2,3,4,5 inch dus 306,600.00
1207 Paku skrup 1/2" Kg 24,500.00
1208 Paku skrup 2" Kg 28,500.00
1209 Paku skrup 3.5" Kg 32,000.00
1210 Bendrat 20 kg rol 250,600.00
1211 Sekrup Kalisiboard buah 220.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4

BETON CETAK
1212 Paving Arahan 30 x 30 tebal 6 cm (K225) m2 157,500.00
1213 Paving Arahan 20 x 20 tebal 6 cm (K225) m2 157,500.00
1214 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2 82,583
1215 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2 131,670
1216 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2 82,583
1217 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2 131,670
1218 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2 90,750.00
1219 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2 136,400.00
1220 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2 95,288
1221 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2 143,220
1222 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2 95,288
1223 Paving 10 x 20 cm tebal 8 cm K225 (Warna) m2 143,798
1224 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2 95,288
1225 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2 144,144
1226 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2 104,528
1227 Paving 10 x 20 cm tebal 8 cm K350 (Warna) m2 154,193
1228 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2 104,759
1229 Paving 20 x 20 cm tebal 8 cm K350 (Warna) m2 153,615
1230 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2 123,585
1231 Paving 20 x 20 cm tebal 8 cm K400 (Warna) m2 161,010
1232 Paving Tiga Berlian tebal 6 Cm K225 (Polos) m2 79,233
1233 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2 128,205
1234 Paving segi enam xexagon 6 cm K225 pc m2 92,000.00
1235 Paving segi enam xexagon 6 cm K225 merah m2 120,000.00
1236 Paving segi enam xexagon 6 cm K225 hitam m2 117,000.00
1237 Paving segi enam xexagon 6 cm K300 pc m2 95,000.00
1238 Paving segi enam xexagon 6 cm K300 merah m2 128,000.00
1239 Paving segi enam xexagon 6 cm K300 hitam m2 126,000.00
1240 Paving segi enam xexagon 6 cm K350 pc m2 100,000.00
1241 Paving segi enam xexagon 6 cm K350 merah m2 132,000.00
1242 Paving segi enam xexagon 6 cm K350 hitam m2 130,000.00
1243 Paving segi enam xexagon 6 cm K400 pc m2 110,000.00
1244 Paving segi enam xexagon 6 cm K400 merah m2 142,000.00
1245 Paving segi enam xexagon 6 cm K400 hitam m2 140,000.00
1246 Paving bujur sangkar tanpa tias 6 cm K225 pc m2 86,000.00
1247 Paving bujur sangkar tanpa tias 6 cm K225 merah m2 116,000.00
1248 Paving bujur sangkar tanpa tias 6 cm K225 hitam m2 113,000.00
1249 Paving bujur sangkar tanpa tias 8 cm K225 pc m2 94,000.00
1250 Paving bujur sangkar tanpa tias 8 cm K225 merah m2 138,000.00
1251 Paving bujur sangkar tanpa tias 8 cm K225 hitam m2 135,000.00
1252 Box Culvert Type 600x600x1200 K 350 Bh 2,949,933
1253 Box Culvert Type 800x800x1200 K 350 Bh 3,676,667
1254 Box Culvert Type 1000x1000X1200 K 350 Bh 4,531,188
1255 Box Culvert Type 1200x1200X1200 K 350 Bh 4,720,800
1256 Box Culvert Type 1500x1500x1200 K 350 Bh 10,452,000
1257 Box Culvert Type 2000x2000x1200 K 350 Bh 15,048,250
1258 Box Culvert Type 3000x2000x1200 K 350 Bh 15,414,000
1259 Box Culvert Type 3000x2500x1200 K 350 Bh 16,723,875
1260 Box Culvert Type 3000x3000x1200 K 350 Bh 18,081,525
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1261 Saluran Berbentuk U Type 300x300x1200 K350 Bh 422,000
1262 Saluran Berbentuk U Type 300x400x1200 K350 Bh 502,500
1263 Saluran Berbentuk U Type 300x500x1200 K350 Bh 583,000
1264 Saluran Berbentuk U Type 400x400x1200 K350 Bh 584,500
1265 Saluran Berbentuk U Type 400x600x1200 K350 Bh 815,500
1266 Saluran Berbentuk U Type 400x700x1200 K350 Bh 1,200,000
1267 Saluran Berbentuk U Type 500x500x1200 K350 Bh 1,200,000
1268 Saluran Berbentuk U Type 500x600x1200 K350 Bh 1,300,000
1269 Saluran Berbentuk U Type 500x700x1200 K350 Bh 1,400,000
1270 Saluran Berbentuk U Type 600x600x1200 K350 Bh 1,389,033
1271 Saluran Berbentuk U Type 600x700x1200 K350 Bh 1,151,325
1272 Saluran Berbentuk U Type 700x700x1200 K350 Bh 1,733,508
1273 Saluran Berbentuk U Type 600x800x1200 K350 Bh 1,226,000
1274 Saluran Berbentuk U Type 800x800x1200 K350 Bh 1,992,100
1275 Saluran Berbentuk U Type 800x1000x1200 K350 Bh 1,840,125
1276 Saluran Berbentuk U Type 1000x1000x1200 K350 Bh 1,932,000
1277 Bentala Exs Kapal (Paras) bh 71,400
1278 Bentala Exs Kapal (Terakota) bh 71,400
1279 Kanstein Segi Lima P40 bh 30,608
1280 Kanstein Segi Lima P50 bh 37,538
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1281 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) m' 25,000.00
1282 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) m' 20,000.00
1283 Kansteen K.250 Bh 63,000
1284 Kansteen Pendek K.250 Bh 26,250
1285 Kansteen Jalan Masuk K.250 Bh 68,250
1286 Kansteen Jalan Masuk 15x40x50 K.300 Bh 86,100
1287 Kansteen Segilima P.50, T.20, L.15 K.250 Bh 37,538
1288 Kansteen Bulat P.50, T.30, LA.10 LB.15 K.250 Bh 63,000
1289 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m' 35,000.00
1290 Kansteen Jumbo P.50, T.30, L.15 K.250 Bh 47,250
1291 Kansteen Jumbo 15x30x50 K.300 Bh 98,700
1292 Kansteen Jumbo Mini 15x20x50 K.300 Bh 91,350
1293 Kansteen Persegi T 15, P50, L 20 K 225 Bh 57,750
1294 Kansteen kotak (P:50,t.20,La.10,Lb.16cm) K225 m' 27,000.00
1295 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) m' 49,500.00
1296 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) m' 46,000.00
1297 Tutup Got (Grill) (P:45, L:24, T:9 cm) Bh 63,000
1298 Tutup Got (Grill) (P:30, L:24, T:9 cm) Bh 63,000
1299 Plat Penutup 600 x 1200 Bh 597,975
1300 Plat Penutup 800 x 1200 Bh 830,550
1301 Plat Penutup 1000 x 1200 Bh 982,850
1302 Frame Manhole 600x600 Bh 735,000
1303 Frame Manhole 800x800 Bh 592,000
1304 Frame Manhole 1000x1000 Bh 733,000
1305 Cover manhole 600x600 Bh 879,900
1306 Cover manhole 800x800 Bh 1,032,500
1307 Cover manhole 1000x1000 Bh 1,260,000
1308 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 82,357
1309 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2 64,050
1310 Grass Block K.250 bh 15,750

PLAFOND & TIRPLEK


1311 Acustik 30/30 lbr 84,700.00
1312 Celling teak (0,62 x 2,40) m2 lbr 105,600.00
1313 Eternit lbr 18,150.00
1314 Playwood 3 mm Lbr 54,708.33
1315 Playwood 4 mm Setara Meranti Lbr 69,575.00
1316 Plywood 5 mm lbr 122,100.00
1317 Playwood 9 mm Setara Meranti lbr 148,500.00
1318 Playwood aluminium lbr 118,800.00
1319 Gypsum Board (120x240x9) lbr 79,200.00
1320 Kalsiboard (4,5 x 1220 x 2420) mm lbr 113,080.00
1321 Hard board MDF lbr 141,900.00
1322 Multiplek 6 mm lbr 74,800.00
1323 Multiplek 9mm lbr 115,500.00
1324 Triplek tebal 3mm (2,7mm) kayu sengon lbr 44,300.00
1325 Triplek tebal 3mm (2,7mm) kayu semi meranti lbr 52,500.00
1326 Triplek tebal 4mm (3,6mm) kayu sengon lbr 54,000.00
1327 Triplek tebal 4mm (3,6mm) kayu semi meranti lbr 64,500.00
1328 Triplek tebal 6mm (5,2mm) kayu sengon I lbr 65,800.00
1329 Triplek tebal 6mm (5,2mm) kayu sengon II lbr 59,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1330 Triplek tebal 6mm (5,2mm) kayu semi meranti lbr 76,500.00
1331 Triplek tebal 6mm (5,2mm) kayu semi meranti II lbr 61,500.00
1332 Triplek tebal 8,0mm kayu sengon I lbr 97,000.00
1333 Triplek tebal 8,0mm kayu sengon II lbr 89,000.00
1334 Triplek tebal 8,0mm kayu semi meranti lbr 107,500.00
1335 Triplek tebal 9,0mm kayu semi meranti II lbr 94,500.00
1336 Triplek tebal 12 mm kayu sengon I lbr 129,500.00
1337 Triplek tebal 12 mm kayu semi meranti lbr 178,000.00
1338 Triplek tebal 15 mm kayu semi meranti lbr 210,000.00
1339 Triplek tebal 18 mm kayu semi meranti lbr 232,000.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1340 Teakwood 122 x 244 x 2,7 mm lbr 72,500.00
1341 Melamine Putih/Biru 2,7 lbr 87,500.00
1342 Triplek aluminium jruk asli lbr 106,500.00
1343 Triplek aluminium jruk standar lbr 69,500.00
1344 Block board 18 mm sengon lbr 167,500.00
1345 Block board 18 mm meranti super lbr 205,000.00
1346 Teak block 18mm lbr 207,500.00
1347 Rangka Aluminium m1 19,360.00
1348 Rangka Metal Furing (2 x 4 cm) panjang 4 m btg 22,000.00
1349 Rangka Metal Furing (4 x 4 cm) panjang 4 m btg 27,500.00
1350 Teak wood (1,20x2,40x 0,4) lbr 84,700.00
1351 Teak wood (0,90x2,00 x 0,4) lbr 72,600.00
1352 Jabar Wood 4 mm lbr 106,000.00

BUIS BETON
1353 Buis beton Diameter 25 x 75 bh 56,650.00
1354 Buis beton Diameter 30 x 75 bh 72,600.00
1355 Buis beton Diameter 50 x 75 bh 99,000.00
1356 Buis Beton diameter 80 cm Bj 113,066.67
1357 Buis Beton diameter 25 cm Bj 55,166.67
1358 Buis Beton diameter 1/2 50 cm Bj 50,333.33

BETON READY MIX


1359 Beton Ready Mix K-175 TM Kap 7 m3 m3 1,045,000.00
1360 Beton Ready Mix K-225 TM Kap 7 m3 m3 1,364,000.00
1361 Beton Ready Mix K-250 TM Kap 7 m3 m3 1,475,000.00
1362 Beton Ready Mix K-275 TM Kap 7 m3 m3 1,515,000.00
1363 Beton Ready Mix K-300 TM Kap 7 m3 m3 1,551,000.00
1364 Beton Ready Mix K-350 TM Kap 7 m3 m3 1,630,000.00
1365 Sewa Concrete pump/M3 ls 35,000.00
1366 Formite/penjaga jarak bekisting/spacer bh 2,500.00

TALANG
1367 Talang Karet L = 0.50 m' 99,000.00
1368 Talang Karet L = 0.90 m' 126,500.00
1369 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m' 71,500.00
1370 Pipa Talang PVC Setara Maspion 6" Kotak m' 93,500.00

ASPAL, BBM DAN PELUMAS


1371 Aspal Penetrasi 60/70 Kg 12,600.00
1372 Aspal Curah Kg 12,600.00
1373 Aspal RC Kg 10,500.00
1374 Aspal Emulsi ltr 14,910.00
1375 Aspal Emulsi CRS 1 ltr 10,815.00
1376 Aspal Emulsi CRS 1 Modif 11,445.00
1377 Aspal Emulsi CRS 2 ltr 12,233.00
1378 Aspal Emulsi CSS 1 h Modif ltr 10,920.00
1379 Aspal Emulsi CSS 1 h ltr 10,133.00
1380 Aspal Emulsi CSS 1 / PCE ltr 10,710.00
1381 Minyak Aspal ( fluck oil ) Ltr 14,018.00
1382 Minyak Tanah Ltr 3,150.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1383 Minyak Tanah Industri Ltr 8,006.00
1384 Solar Ltr 7,875.00
1385 Solar Industri Ltr 8,250.00
1386 Premium Ltr 6,600.00
1387 Premium (industri) Ltr 7,260.00
1388 Pelumas ( olie ) Ltr 29,768.00
1389 Kayu Api M3 404,250.00
1390 Gas elpiji Kg 7,350.00
1391 Minyak Begesting ( B 115 ) Ltr 32,200.00
1392 Aspal Cold Mix (Readymix) Kg 2,363.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4

ALAT PEMADAM KEBAKARAN


1393 Instalasi pipa induk BS 3" Sch M' 203,500.00
1394 Intalasi pipa distribusi BS 2" Sch M' 137,500.00
1395 Seamesi conection Bh 1,980,000.00
1396 Box hidran dengan kelengkapannya Bh 2,750,000.00
1397 Selang pemadam 30 m Bh 3,520,000.00
1398 Pemadam api ringan 6 kg Bh 121,000.00

TANAMAN
1399 Pohon Lianglio / Salix Babylonica pohon 520,000.00
1400 Palem Ekor Tupai / Wodyetia Bifurcata pohon 1,550,000.00
1401 Pohon Jepun / Plumeria Rubra pohon 1,500,000.00
1402 Pohon Pudak / Pandanus Tectorius pohon 2,000,000.00
1403 Pohon Ketapag Kencana / Terminalia Molineti pohon 1,600,000.00
1404 Pohon Sente Batang Hitam / Alokasia 'black' pohon 70,000.00
1405 Pohon Dadap Merah / Erythrina Crista Galli pohon 1,400,000.00
1406 Pohon Jepun Pagoda / Plumeria 'pagoda' pohon 1,600,000.00
1407 Pohon Tabebuya / Chrysotricha sp pohon 1,300,000.00
1408 Semak Jempiring / Gardenia Jasminioides polybag 8,500.00
1409 Semak Spathyphilum / Spathyphylum sp polybag 9,000.00
1410 Semak Reulia Besar / Reulia Malacosperma Giant polybag 4,000.00
1411 Semak Anturium Bunga / Anthurium Andreanum polybag 40,000.00
1412 Semak Hemigrapis / Hemigrapis sp polybag 5,000.00
1413 Semak Puring / Codeaium variegatum polybag 9,000.00
1414 Semak Pakis Bulu / Nephrolepis biserrata polybag 13,000.00
1415 Lili Bangkok / Hymenocalis litoralis polybag 9,000.00
1416 Jempiring / Gardenia jasminioides polybag 7,000.00
1417 Kaki Laba-laba / Oxmosilum Liniare Yellow polybag 16,000.00
1418 Semak Bawang-bawangan / Ornithogalum umbrellatum polybag 4,700.00
1419 Semak Kebang Kertas Daun Kecil / Bogenvile small leave polybag 16,000.00
1420 Semak Lily Paris / Hymenocallis Speciosa polybag 4,000.00
1421 Semak Daun Philodendron / Philodendron sp polybag 13,000.00
1422 Semak Bunga Yolanda / Yolanda white flower polybag 10,000.00
1423 Semak Karembusa Putih / Tebermontana carembusa 'white' polybag 15,000.00
1424 Semak Simbang Darah / Excoecaria Cochinechinensis polybag 8,000.00
1425 Semak Bromelia / Bromelia sp polybag 150,000.00
1426 Tanaman rumput mutiara/jepang m2 25,000.00
1427 Pupuk Kandang m3 162,000.00

LAIN - LAIN
1428 Air Bersih Ltr 30.00
1429 Bak Cuci Aluminium 2 Lubang Bh 225,500.00
1430 Cangkul Bh 72,600.00
1431 Cangkul Gigi Bh 159,500.00
1432 Ember Bh 26,400.00
1433 Gerinding bh 506,000.00
1434 Helm Proyek Bh 80,300.00
1435 Hammer 3 kg Bh 92,950.00
1436 Instalasi Tata Suara Titik 399,300.00
1437 Kapi Bh 8,800.00
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 2 3 4
1438 Keni 2" Bh 15,950.00
1439 Keranjang Sampah Bh 39,600.00
1440 Linggis bh 79,200.00
1441 Masker Bh 52,800.00
1442 Ompreng Besar (bak Adonan) Bh 485,100.00
1443 Panyong Bh 88,000.00
1444 Pengelasan cm 14,520.00
1445 Sabit Bh 66,000.00
1446 Sapu lidi Ikat 6,600.00
1447 Sepatu Karet Bh 133,100.00
1448 Sikat baja Bh 33,220.00
1449 Skop Bh 59,950.00
1450 Water mur Bh 35,000.00
1451 Pipa Tremi dan Casing pelindung Ls 121,000.00
1452 Ramset m' 14,520.00
1453 Pembuangan lumpur eks. Bor m3 95,000.00
1454 Mobilisasi dan demobilisasi alat bor auger ZKL28 unit 135,000,000.00
1455 Service Crane kapasitas 50 ton bln 132,500,000.00
1456 Excavator PC200 bln 93,500,000.00
1457 Pengadaan rail beam untuk pemancangan ls 17,000,000.00
1458 Pemotongan kepala tiang pancang turap m' 95,000.00
1459 Galian tanah untuk capping beam m3 105,000.00
1460 Pembuangan tanah galian m3 95,000.00
1461 Pekerjaan Cetakan/Tutup Kepala Kolom bh 250,000.00
1462 Pek. Pembuatan papan nama proyek ls 750,000.00
1463 Sabun Kg 13,500.00

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Denpasar, 2 Januari 2018


Bidang Penataan Ruang Bidang Penataan Ruang dan Bangkim

I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST.


NIP. 19690426 199803 1 012 NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Sumber Daya Air

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST.


NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003

Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST. Ir. I Gde Made Bhaju Pravita, MM.


NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003
Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program
HARGA
NO NAMA BAHAN SAT KESEPAKATAN
(RP)
1 I Wayan Dirgayasa, ST. 2 Ir. I Gde Made Bhaju
3 Pravita, MM.
4
NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2017

NO URAIAN PEKERJAAN HARGA


1 2 3
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 707,474.37
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp. 150,055.96
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 2,463,112.61
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 2,006,764.33
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 2,351,893.44
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN Rp. 8,650.00
7 1 M2 PEMBUATAN BEDENG BURUH Rp. 2,016,221.83
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp. 374,403.82
9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 41,577.50
10 1 M2 PEMBUATAN STEGGER DENGAN SCAFHOLDING Rp. 142,739.56
11 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 595,650.00
12 1 M3 BONGKARAN BETON BERTULANG Rp. 576,650.00

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 63,250.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 77,850.00
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 92,710.00
4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 84,160.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 127,800.00
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 101,850.00
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 4,650.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp. 27,700.00
9 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 46,500.00
10 1 M3 URUGAN PASIR Rp. 439,300.00
11 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 25,830.00
12 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 407,250.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU BELAH CAMP. 1 PC : 3 PS Rp. 1,240,275.00
2 1 M3 BATU BELAH CAMP. 1 PC : 4 PS Rp. 1,197,725.00
3 1 M3 BATU BELAH CAMP. 1 PC : 5 PS Rp. 1,168,175.00
4 1 M3 BATU BELAH CAMP. 1 PC : 6 PS Rp. 1,147,425.00
5 1 M3 BATU BELAH CAMP. 1 PC : 8 PS Rp. 1,118,925.00
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU BELAH Rp. 2,562,035.00
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp. 1,200,110.00
8 1 M3 PASANGAN BATU KOSONG Rp. 799,995.00
9 1 M' PONDASI BORED PILE DIAMETER 30 CM Rp. 401,980.89

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 184,777.50
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 178,936.50
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 174,136.00
4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 173,764.00
5 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 3 ps Rp. 101,997.00
6 1 M2 PASANGAN DINDING BATA RINGAN Rp. 147,330.00
7 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps Rp. 1,456,200.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp. 71,555.80
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 65,499.80
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 63,150.20
4 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 60,591.80
NO URAIAN PEKERJAAN HARGA
1 2 3
5 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 59,878.20
6 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 59,286.20
7 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp. 87,726.40
8 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 83,423.60
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 81,182.40
10 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 80,097.60
11 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp. 57,445.00
12 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 45,764.00
13 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH Rp. 25,966.60
14 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE Rp. 12,400.00
15 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 56,668.00
16 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM Rp. 106,160.00
17 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM Rp. 70,110.00
18 1 M2 PEKERJAAN ACIAN Rp. 34,162.50

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 38,397,522.22
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III Rp. 11,626,522.22
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 562,779.89
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 473,779.89
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II Rp. 864,450.00
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II Rp. 608,870.00
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II Rp. 1,106,850.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) Rp. 647,743.93
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II Rp. 698,903.93
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II Rp. 948,744.67
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 1,389,188.93
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II Rp. 778,603.93
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M' Rp. 12,090,267.56
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 41,697,967.56
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 11,323,693.33
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 148,084.44
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 177,244.44
18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER Rp. 110,174.44
19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER Rp. 54,284.44
20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 1,529,919.56
21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II Rp. 164,839.56
22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II Rp. 167,284.44
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II Rp. 143,759.78
24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II Rp. 144,914.89
25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II Rp. 325,109.67
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 408,535.67
27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 418,013.17
28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO Rp. 186,735.67
29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO Rp. 196,213.17
30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 345,624.44
31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm) Rp. 256,463.58
32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 39,893.58

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87 Rp. 1,248,774.29
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78 Rp. 1,286,247.83
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72 Rp. 1,314,340.95
4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66 Rp. 1,348,961.59
5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61 Rp. 1,379,960.26
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58 Rp. 1,406,492.54
NO URAIAN PEKERJAAN HARGA
1 2 3
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56 Rp. 1,419,904.97
8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53 Rp. 1,443,431.43
9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52 Rp. 1,450,381.16
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49 Rp. 1,525,116.80
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48 Rp. 1,534,485.05
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 118,960.00
PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 11,896.00
13 1 M2 PEMBESIAN DENGAN WIRE MESH M6 Rp. 45,585.00
14 1 M2 PEMBESIAN DENGAN WIRE MESH M7 Rp. 54,535.00
15 1 M2 PEMBESIAN DENGAN WIRE MESH M8 Rp. 75,135.00
16 Beton Readymix K-175 Rp. 1,045,000.00
17 Beton Readymix K-225 Rp. 1,364,000.00
18 Beton Readymix K-250 Rp. 1,475,000.00
19 Beton Readymix K-275 Rp. 1,515,000.00
20 Beton Readymix K-300 Rp. 1,551,000.00
21 Beton Readymix K-350 Rp. 1,630,000.00
22 Sewa concrete pump/m3 Rp. 35,000.00
23 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 210,009.33
24 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 377,984.33
25 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 410,079.11
26 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 430,179.11
27 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI Rp. 452,079.11
28 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 433,079.11
29 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 376,954.11
30 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 116,583.67
31 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 79,183.98
32 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 111,551.56

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 77,210.00
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 82,710.00
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 167,520.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 78,695.00
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 206,085.00
6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL Rp. 276,705.00
7 1 M1 PASANG NOK SENG GELOMBANG Rp. 41,975.87
8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU Rp. 128,268.85

IX PEKERJAAN PLAFOND / LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 31,542.72
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM Rp. 67,045.65
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 318,052.72
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 53,142.72
5 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM Rp. 1,001,641.00
6 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 245,531.30
7 1 M2 PLAFOND GYPSUM, RANGKA KAYU Rp. 271,474.43
8 1 M2 PLAFOND GYPSUM, RANGKA HOLO Rp. 120,983.68
9 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU Rp. 283,806.75
10 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO Rp. 133,316.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 2,435,415.00
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 611,450.00
3 MEMASANG 1 BUAH URINOIR Rp. 3,954,648.00
4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 511,870.00
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 851,633.40
NO URAIAN PEKERJAAN HARGA
1 2 3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 148,515.00
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 310,862.00
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 44,204.00
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 64,756.00
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4" Rp. 154,490.50
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 66,732.50

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG MEMASANG RANGKA BAJA IWF Rp. 19,526.50
2 1 M2 PASANG ROLLING DOOR ALLUMINIUM Rp. 848,000.00
3 1 M2 MEMASANG RANGKA KUDA - KUDA BAJA RINGAN C 75 Rp. 205,290.00
4 1 M' PASANG KUSEN PINTU ALLUMINIUM Rp. 84,385.50
5 1 M2 PASANG PINTU KACA RANGKA ALLUMINIUM Rp. 361,736.00
6 1 M2 PASANG TERALI BESI STRIP (2 x 3 ) mm Rp. 834,056.05
7 1 M2 KAWAT NYAMUK Rp. 238,367.80
8 1 M2 PASANG JENDELA NAKO & TRALIS Rp. 317,216.67
9 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 322,181.58

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA Rp. 221,850.00
2 1 PS PASANG ENGSEL PINTU Rp. 87,145.00
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 76,050.00
4 1 BH PASANG KAIT ANGIN Rp. 65,115.00
5 1 BH PASANG KUNCI SLOT Rp. 272,075.00
6 1 M2 PASANG KACA, TEBAL5 MM Rp. 205,540.00
7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM Rp. 295,190.00
8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM Rp. 377,690.00
9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM Rp. 669,740.00

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM Rp. 485,906.75
2 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. 232,229.00
3 1 M2 PASANG LANTAI KERAMIK 60 X 60 CM Rp. 267,136.94
4 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 249,949.40
5 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp. 48,938.50
6 1 M1 PASANG PLIN KERAMIK 10 X 20 CM Rp. 36,536.50
7 1 M2 PASANG LANTAI MARMER 30 X 30 CM Rp. 472,583.50
8 MEMASANG 1 M2 LANTAI KAYU BANGKIRAI Rp. 727,574.44
9 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp. 274,202.80
10 1 M2 PASANG DINDING MARMER 30 X 30 CM Rp. 556,096.00
11 1 M2 PASANG DINDING BATA PELAPIS UKURAN (3 x 7 x 24) cm Rp. 609,293.00
12 1 M2 PASANG DINDING BATU PARAS (30 X 15) Rp. 158,112.50
13 1 M2 PASANG DINDING BATU PARAS (30 X 15) Rp. 229,612.50

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL Rp. 13,480.00
2 1 M2 PEKERJAAN LAPIS PLAMIR Rp. 25,065.00
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp. 50,431.30
4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS Rp. 21,046.20
5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL Rp. 26,257.10
6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR Rp. 43,681.20
7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL Rp. 48,892.10
8 1 M2 WATERPROOFING Rp. 41,513.77
9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE Rp. 745,100.00
10 1 M2 PEKERJAAN MELAPIS MENI KAYU Rp. 19,588.00
11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU Rp. 32,637.00
NO URAIAN PEKERJAAN HARGA
1 2 3
12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU Rp. 29,036.00
13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU Rp. 55,685.00
14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API Rp. 32,121.00
15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA Rp. 19,621.00
16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL Rp. 58,182.00
17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT Rp. 66,998.00
18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL Rp. 35,613.00
19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS Rp. 80,159.00
20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS Rp. 33,864.00
21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER Rp. 22,129.00

XV PEKERJAAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp. 758,180.00
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp. 401,242.50
3 1 M2 PASANGAN BATA PRESS 1 MUKA Rp. 404,090.00
4 1 M2 PASANGAN PARAS 1 MUKA Rp. 420,360.83
5 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM Rp. 349,840.00
6 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp. 458,108.85
7 1 M2 PASANGAN BATA GOSOK DIUKIR Rp. 559,090.00
8 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR Rp. 562,756.67
9 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 538,108.85
10 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK Rp. 3,717,650.00
11 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG Rp. 3,282,650.00
12 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK Rp. 6,813,990.00
13 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG Rp. 5,821,250.00
14 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm Rp. 7,476,440.00
15 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm Rp. 6,219,440.00
16 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm Rp. 13,955,690.00
17 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm Rp. 12,796,950.00
18 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM Rp. 14,271,400.00
19 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200CMX200CM Rp. 14,167,300.00
20 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM Rp. 23,817,825.00
21 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200CMX200CM Rp. 23,713,725.00
22 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm Rp. 2,506,087.50
23 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm Rp. 2,760,187.50
24 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm Rp. 4,723,982.50
25 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm Rp. 4,911,832.50

XVI PEKERJAAN HARDDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 189,462.15
2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350 Rp. 198,037.50
3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225 Rp. 202,802.40
4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350 Rp. 212,504.40
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 Rp. 202,802.40
6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 Rp. 202,802.40
7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 Rp. 212,746.95
8 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc Rp. 199,350.00
9 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah Rp. 228,750.00
10 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam Rp. 225,600.00
11 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc Rp. 202,500.00
12 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah Rp. 237,150.00
13 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam Rp. 235,050.00
14 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc Rp. 207,750.00
15 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah Rp. 241,350.00
16 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam Rp. 239,250.00
17 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc Rp. 218,250.00
NO URAIAN PEKERJAAN HARGA
1 2 3
18 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah Rp. 251,850.00
19 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam Rp. 249,750.00
20 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc Rp. 193,050.00
21 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah Rp. 224,550.00
22 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam Rp. 221,400.00
23 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc Rp. 201,450.00
24 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah Rp. 247,650.00
25 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam Rp. 244,500.00
26 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc Rp. 185,944.65
27 1 M2 PASANGAN GRASS BLOCK Rp. 230,105.00
28 1 M2 PASANGAN KORAL SIKAT Rp. 231,236.00
29 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 179,437.00
30 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 188,221.00
31 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 Rp. 172,221.00
32 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) Rp. 210,221.00
33 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) Rp. 217,221.00
34 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) Rp. 168,221.00
35 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) Rp. 158,221.00
36 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 193,297.00
37 1 M2 PENGECATAN KANSTEIN Rp. 37,854.14

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 325,070.00
2 1 TITIK INSTALASI AC Rp. 353,890.00
3 1 TITIK INSTALASI TELEPHONE Rp. 800,002.50
4 1 TITIK INSTALASI MATV Rp. 685,995.00
DAFTAR ANALISA PEKERJAAN
TAHUN 2017

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)


1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 58,900.00
B. BAHAN
Bambu Sedang btg 1.2500 9,450.00 11,812.50
Semen Portland kg 2.5000 1,450.00 3,625.00
Seng gelombang 3" - 5" lbr 1.2000 99,770.00 119,724.00
Pasir Beton m3 0.0050 370,000.00 1,850.00
Koral beton m3 0.0090 650,000.00 5,850.00
Kayu Meranti Usuk 5/7 m3 0.0720 6,700,000.00 482,400.00
Paku biasa 2" - 5" kg 0.0600 17,297.78 1,037.87
Meni Besi kg 0.4500 49,500.00 22,275.00
JUMLAH HARGA BAHAN 648,574.37
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 707,474.37
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 707,474.37

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 0.1000 110,000.00 11,000.00
Pekerja OH 0.1000 80,000.00 8,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
Kayu Usuk Meranti 5/7 m3 0.0120 6,700,000.00 80,400.00
Paku Biasa 2" - 5" kg 0.0200 17,297.78 345.96
Kayu Papan Meranti 3/20 m3 0.0070 6,930,000.00 48,510.00
JUMLAH HARGA BAHAN 129,255.96
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 150,055.96
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 150,055.96
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 2.0000 110,000.00 220,000.00
Tukang Batu OH 1.0000 100,000.00 100,000.00
Pekerja OH 2.0000 80,000.00 160,000.00
Kepala Tukang OH 0.3000 115,000.00 34,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 521,000.00
B. BAHAN
Dolken Kayu Ø 8 - 10/4m btg 1.2500 175,900.00 219,875.00
Kayu Meranti m3 0.1800 6,750,000.00 1,215,000.00
Paku Biasa 2" - 5" kg 0.8500 17,297.78 14,703.11
Besi Strip kg 1.1000 11,960.00 13,156.00
Semen Portland kg 35.0000 1,450.00 50,750.00
Pasir Pasang m3 0.1500 400,000.00 60,000.00
Pasir Beton m3 0.1000 370,000.00 37,000.00
Koral Beton m3 0.1500 650,000.00 97,500.00
Bata Merah bh 30.0000 2,600.00 78,000.00
Seng Plat lbr 0.2500 66,550.00 16,637.50
Jendela Nako bh 2.0000 38,500.00 77,000.00
Kaca Polos m2 0.0800 143,000.00 11,440.00
Kunci Tanam bh 0.1500 291,500.00 43,725.00
Plywood 4 mm lbr 0.0600 122,100.00 7,326.00
JUMLAH HARGA BAHAN 1,942,112.61
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,463,112.61
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,463,112.61

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 2.0000 110,000.00 220,000.00
Pekerja OH 1.0000 80,000.00 80,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 329,500.00
B. BAHAN
Bambu Sedang btg 1.7000 9,450.00 16,065.00
Kayu Meranti m3 0.2100 6,750,000.00 1,417,500.00
Paku Biasa 2" - 5" kg 0.3000 17,297.78 5,189.33
Semen Portland kg 10.5000 1,450.00 15,225.00
Pasir Beton m3 0.0300 370,000.00 11,100.00
Koral Beton m3 0.0500 650,000.00 32,500.00
Seng gelombang BJLS 30 lbr 1.5000 119,790.00 179,685.00
JUMLAH HARGA BAHAN 1,677,264.33
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,006,764.33
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,006,764.33

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 1.5000 110,000.00 165,000.00
Pekerja OH 1.0000 80,000.00 80,000.00
Kepala Tukang OH 0.1500 115,000.00 17,250.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 268,750.00
B. BAHAN
Bambu Sedang btg 3.0000 9,450.00 28,350.00
Kayu Meranti m3 0.2760 6,750,000.00 1,863,000.00
Paku biasa 2" - 5" kg 0.7000 17,297.78 12,108.44
Seng gelombang BJLS 28 lbr 1.5000 119,790.00 179,685.00
JUMLAH HARGA BAHAN 2,083,143.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,351,893.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,351,893.44

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 8,650.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 8,650.00

7 1 M2 PEMBUATAN BEDENG BURUH


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 2.0000 110,000.00 220,000.00
Pekerja OH 1.0000 80,000.00 80,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 329,500.00
B. BAHAN
Bambu Sedang btg 1.2500 9,450.00 11,812.50
Kayu Meranti m3 0.1860 6,750,000.00 1,255,500.00
Paku Biasa 2" - 5" kg 0.3000 17,297.78 5,189.33
Semen Portland kg 18.0000 1,450.00 26,100.00
Pasir Beton m3 0.0300 370,000.00 11,100.00
Koral Beton m3 0.0500 650,000.00 32,500.00
Seng gelombang BJLS 28 lbr 1.5000 119,790.00 179,685.00
Plywood 4 mm lbr 1.3500 122,100.00 164,835.00
JUMLAH HARGA BAHAN 1,686,721.83
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,016,221.83
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,016,221.83

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 0.3000 110,000.00 33,000.00
JUMLAH TENAGA KERJA 33,000.00
B. BAHAN
Kayu Terentang m3 0.0360 6,750,000.00 243,000.00
Paku Biasa 2" - 5" kg 0.0800 17,297.78 1,383.82
Kaso 5/7 btg 1.0000 97,020.00 97,020.00
JUMLAH HARGA BAHAN 341,403.82
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 374,403.82
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 374,403.82

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 0.2500 110,000.00 27,500.00
Pekerja OH 0.0170 80,000.00 1,360.00
Kepala Tukang OH 0.0020 115,000.00 230.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 30,780.00
B. BAHAN
Bambu btg 1.0000 9,450.00 9,450.00
Tali Ijuk kg 0.2500 5,390.00 1,347.50
JUMLAH HARGA BAHAN 10,797.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,577.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,577.50
10 1 M2 PEMBUATAN STEGGER DENGAN SCAFHOLDING
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0170 80,000.00 1,360.00
Kepala Tukang OH 0.0020 115,000.00 230.00
Tukang Kayu OH 0.2500 110,000.00 27,500.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 30,780.00
B. BAHAN
Kayu Balok Seseh btg 0.0350 3,100,000.00 108,500.00
Paku 10 kg 0.2000 17,297.78 3,459.56
JUMLAH HARGA BAHAN 111,959.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 142,739.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 142,739.56

11 1 M2 PEMBUATAN JALAN SEMENTARA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 86,500.00
B. BAHAN
Batu Kali m3 0.1500 425,000.00 63,750.00
Batu Pecah 5 - 7 m3 0.0900 460,000.00 41,400.00
Pasir Pasang m3 1.0100 400,000.00 404,000.00
JUMLAH HARGA BAHAN 509,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 595,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 595,650.00

12 1 M3 BONGKARAN BETON BERTULANG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.6670 80,000.00 533,360.00
Mandor OH 0.3330 130,000.00 43,290.00
JUMLAH TENAGA KERJA 576,650.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 576,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 576,650.00

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7500 80,000.00 60,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 63,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 63,250.00

2 1 M3 GALIAN TANAH BIASA DALAM 2 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.9000 80,000.00 72,000.00
Mandor OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 77,850.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 77,850.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0500 80,000.00 84,000.00
Mandor OH 0.0670 130,000.00 8,710.00
JUMLAH TENAGA KERJA 92,710.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 92,710.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 92,710.00
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Mandor OH 0.0320 130,000.00 4,160.00
JUMLAH TENAGA KERJA 84,160.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 84,160.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,160.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Mandor OH 0.0600 130,000.00 7,800.00
JUMLAH TENAGA KERJA 127,800.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 127,800.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 127,800.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.2000 80,000.00 96,000.00
Mandor OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 101,850.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 101,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 101,850.00
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 80,000.00 4,000.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 4,650.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 4,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,650.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3300 80,000.00 26,400.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 27,700.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,700.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 27,700.00

9 1 M3 PEMADATAN TANAH ( Per 20 Cm )


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 46,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 46,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 46,500.00
10 1 M3 URUGAN PASIR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 25,300.00
B. BAHAN
Pasur Urug m3 1.2000 345,000.00 414,000.00
JUMLAH HARGA BAHAN 414,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 439,300.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 439,300.00

11 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 13,950.00
B. BAHAN
Ijuk M1 6.0000 1,980.00 11,880.00
JUMLAH HARGA BAHAN 11,880.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,830.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 25,830.00

12 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 80,000.00 20,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 23,250.00
B. BAHAN
Sirtu m3 1.2000 320,000.00 384,000.00
JUMLAH HARGA BAHAN 384,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 407,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 407,250.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU BELAH CAMP. 1 PC : 3 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Tukang Batu OH 0.7500 100,000.00 75,000.00
Kepala Tukang OH 0.0750 115,000.00 8,625.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 213,375.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Semen Portland kg 202.0000 1,450.00 292,900.00
Pasir Pasang m3 0.4850 400,000.00 194,000.00
JUMLAH HARGA BAHAN 1,026,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,240,275.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,240,275.00

2 1 M3 BATU BELAH CAMP. 1 PC : 4 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Tukang Batu OH 0.7500 100,000.00 75,000.00
Kepala Tukang OH 0.0750 115,000.00 8,625.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 213,375.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Semen Portland kg 163.0000 1,450.00 236,350.00
Pasir Pasang m3 0.5200 400,000.00 208,000.00
JUMLAH HARGA BAHAN 984,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,197,725.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,197,725.00

3 1 M3 BATU BELAH CAMP. 1 PC : 5 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Tukang Batu OH 0.7500 100,000.00 75,000.00
Kepala Tukang OH 0.0750 115,000.00 8,625.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 213,375.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Semen Portland kg 136.0000 1,450.00 197,200.00
Pasir Pasang m3 0.5440 400,000.00 217,600.00
JUMLAH HARGA BAHAN 954,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,168,175.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,168,175.00

4 1 M3 BATU BELAH CAMP. 1 PC : 6 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Tukang Batu OH 0.7500 100,000.00 75,000.00
Kepala Tukang OH 0.0750 115,000.00 8,625.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 213,375.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Semen Portland kg 117.0000 1,450.00 169,650.00
Pasir Pasang m3 0.5610 400,000.00 224,400.00
JUMLAH HARGA BAHAN 934,050.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,147,425.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,147,425.00

5 1 M3 BATU BELAH CAMP. 1 PC : 8 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.5000 80,000.00 120,000.00
Tukang Batu OH 0.7500 100,000.00 75,000.00
Kepala Tukang OH 0.0750 115,000.00 8,625.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 213,375.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Semen Portland kg 91.0000 1,450.00 131,950.00
Pasir Pasang m3 0.5840 400,000.00 233,600.00
JUMLAH HARGA BAHAN 905,550.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,118,925.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,118,925.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU BELAH


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.4000 80,000.00 272,000.00
Tukang Batu OH 0.8500 100,000.00 85,000.00
Kepala Tukang OH 0.0850 115,000.00 9,775.00
Mandor OH 0.1700 130,000.00 22,100.00
JUMLAH TENAGA KERJA 388,875.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 0.4800 450,000.00 216,000.00
Semen Portland kg 194.0000 1,450.00 281,300.00
Pasir Beton m3 0.3120 370,000.00 115,440.00
Koral Beton m3 0.4680 650,000.00 304,200.00
Besi Beton kg 126.0000 9,750.00 1,228,500.00
Kawat Beton kg 1.8000 15,400.00 27,720.00
JUMLAH HARGA BAHAN 2,173,160.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 2,562,035.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,562,035.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.4000 80,000.00 192,000.00
Tukang Batu OH 0.8000 100,000.00 80,000.00
Kepala Tukang OH 0.0800 115,000.00 9,200.00
Mandor OH 0.1190 130,000.00 15,470.00
JUMLAH TENAGA KERJA 296,670.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 0.4500 450,000.00 202,500.00
Semen Portland kg 194.0000 1,450.00 281,300.00
Pasir Beton m3 0.3120 370,000.00 115,440.00
Koral Beton m3 0.4680 650,000.00 304,200.00
JUMLAH HARGA BAHAN 903,440.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,200,110.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,200,110.00

8 1 M3 PASANGAN BATU KOSONG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.7800 80,000.00 62,400.00
Tukang Batu OH 0.3900 100,000.00 39,000.00
Kepala Tukang OH 0.0390 115,000.00 4,485.00
Mandor OH 0.0390 130,000.00 5,070.00
JUMLAH TENAGA KERJA 110,955.00
B. BAHAN
Batu Belah 15 cm / 20 cm m3 1.2000 450,000.00 540,000.00
Pasir Urug m3 0.4320 345,000.00 149,040.00
JUMLAH HARGA BAHAN 689,040.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 799,995.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 799,995.00

9 1 M' PONDASI BORED PILE DIAMETER 30 CM


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
A. Pengeboran O 13/m' Bored pile
Crawler Crane Jam 0.1550 -
Mesin Bor Jam 0.1550 50,000.00 7,750.00
Tukang Gali OH 0.1800 100,000.00 18,000.00
Mandor OH 0.0090 130,000.00 1,170.00
Oli + Solar Ls 1.0000 35,850.00 35,850.00
Alat Bantu 0.2200 20,000.00 4,400.00
TOTAL A 67,170.00
B. Beton K-300, Bored Pile
Beton K-300 m3 0.0707 1,096,156.30 77,498.25
Tukang batu OH 0.4250 100,000.00 42,500.00
Mandor OH 0.0210 130,000.00 2,730.00
Pipa Tremi dan Casing pelindung Ls 1.0000 121,000.00 121,000.00
TOTAL B 243,728.25
C. Pembesian 6 O 13 Beugel O 8 Spiral
Besi Ulir u23 Kg 7.2936 9,900.00 72,206.64
Beugel Besi O8 Kg 1.5600 12,100.00 18,876.00
TOTAL C 91,082.64

D. Jumlah (A + B + C) 401,980.89
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 401,980.89

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
SATUAN KOEFISIEN HARGA SATUAN
NO. SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.0000 1,500.00 105,000.00
Semen Portland kg 18.9500 1,450.00 27,477.50
Pasir Pasang m3 0.0380 400,000.00 15,200.00
JUMLAH HARGA BAHAN 147,677.50
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 184,777.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 184,777.50

2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.0000 1,500.00 105,000.00
Semen Portland kg 14.3700 1,450.00 20,836.50
Pasir Pasang m3 0.0400 400,000.00 16,000.00
JUMLAH HARGA BAHAN 141,836.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 178,936.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 178,936.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.0000 1,500.00 105,000.00
Semen Portland kg 9.6800 1,450.00 14,036.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
JUMLAH HARGA BAHAN 137,036.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 174,136.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 174,136.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.0000 1,500.00 105,000.00
Semen Portland kg 8.3200 1,450.00 12,064.00
Pasir Pasang m3 0.0490 400,000.00 19,600.00
JUMLAH HARGA BAHAN 136,664.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 173,764.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 173,764.00

5 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 3 ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Batako Lubang bh 12.5000 2,050.00 25,625.00
Semen Portland kg 15.1600 1,450.00 21,982.00
Pasir Pasang m3 0.0364 400,000.00 14,560.00
Besi Beton 8 mm kg 0.2800 9,750.00 2,730.00
JUMLAH HARGA BAHAN 64,897.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 101,997.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 101,997.00

6 1 M2 PASANGAN DINDING BATA RINGAN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Bata Ringan m3 0.1000 935,000.00 93,500.00
Perekat Bata ringan/ Dry mix Zak 0.1000 140,000.00 14,000.00
Besi Beton 8 mm kg 0.2800 9,750.00 2,730.00
JUMLAH HARGA BAHAN 110,230.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 147,330.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 147,330.00

7 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Roster Keramik bh 30.0000 46,200.00 1,386,000.00
Semen Portland kg 14.0000 1,450.00 20,300.00
Pasir Pasang m3 0.0320 400,000.00 12,800.00
JUMLAH HARGA BAHAN 1,419,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,456,200.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,456,200.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 15.5040 1,450.00 22,480.80
Pasir Pasang m3 0.0160 400,000.00 6,400.00
JUMLAH HARGA BAHAN 28,880.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,555.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,555.80

2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 10.2240 1,450.00 14,824.80
Pasir Pasang m3 0.0200 400,000.00 8,000.00
JUMLAH HARGA BAHAN 22,824.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,499.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 65,499.80

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 7.7760 1,450.00 11,275.20
Pasir Pasang m3 0.0230 400,000.00 9,200.00
JUMLAH HARGA BAHAN 20,475.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,150.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 63,150.20
4 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 5.1840 1,450.00 7,516.80
Pasir Pasang m3 0.0260 400,000.00 10,400.00
JUMLAH HARGA BAHAN 17,916.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 60,591.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 60,591.80

5 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 4.4160 1,450.00 6,403.20
Pasir Pasang m3 0.0270 400,000.00 10,800.00
JUMLAH HARGA BAHAN 17,203.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 59,878.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 59,878.20

6 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 3.4560 1,450.00 5,011.20
Pasir Pasang m3 0.0290 400,000.00 11,600.00
JUMLAH HARGA BAHAN 16,611.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 59,286.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 59,286.20

7 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 57,160.00
B. BAHAN
Semen Portland kg 13.6320 1,450.00 19,766.40
Pasir Pasang m3 0.0270 400,000.00 10,800.00
JUMLAH HARGA BAHAN 30,566.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 87,726.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 87,726.40

8 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 55,990.00
B. BAHAN
Semen Portland kg 10.3680 1,450.00 15,033.60
Pasir Pasang m3 0.0310 400,000.00 12,400.00
JUMLAH HARGA BAHAN 27,433.60
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 83,423.60
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 83,423.60
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 57,160.00
B. BAHAN
Semen Portland kg 6.9120 1,450.00 10,022.40
Pasir Pasang m3 0.0350 400,000.00 14,000.00
JUMLAH HARGA BAHAN 24,022.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 81,182.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 81,182.40

10 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 57,160.00
B. BAHAN
Semen Portland kg 5.8880 1,450.00 8,537.60
Pasir Pasang m3 0.0360 400,000.00 14,400.00
JUMLAH HARGA BAHAN 22,937.60
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 80,097.60
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 80,097.60

11 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0800 80,000.00 6,400.00
Tukang Batu OH 0.4000 100,000.00 40,000.00
Kepala Tukang OH 0.0400 115,000.00 4,600.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 51,520.00
B. BAHAN
Semen Portland kg 0.5000 1,450.00 725.00
Pasir Pasang m3 0.0130 400,000.00 5,200.00
JUMLAH HARGA BAHAN 5,925.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 57,445.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 57,445.00

12 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,100.00
B. BAHAN
Semen Portland kg 4.3200 1,450.00 6,264.00
Pasir Pasang m3 0.0060 400,000.00 2,400.00
JUMLAH HARGA BAHAN 8,664.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,764.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 45,764.00

13 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Batu OH 0.0750 100,000.00 7,500.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 21,460.00
B. BAHAN
Semen Portland kg 3.1080 1,450.00 4,506.60
JUMLAH HARGA BAHAN 4,506.60
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,966.60
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 25,966.60

14 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 80,000.00 5,600.00
Tukang Batu OH 0.0350 100,000.00 3,500.00
Kepala Tukang OH 0.0040 115,000.00 460.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 10,080.00
B. BAHAN
Semen Portland kg 1.6000 1,450.00 2,320.00
JUMLAH HARGA BAHAN 2,320.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,400.00

15 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Batu OH 0.1500 100,000.00 15,000.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 42,675.00
B. BAHAN
Semen Portland kg 6.3400 1,450.00 9,193.00
Pasir Pasang m3 0.0120 400,000.00 4,800.00
JUMLAH HARGA BAHAN 13,993.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 56,668.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 56,668.00

16 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 57,160.00
B. BAHAN
Semen MU-301 kg 20.0000 2,450.00 49,000.00
JUMLAH HARGA BAHAN 49,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 106,160.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 106,160.00

17 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 57,160.00
B. BAHAN
Semen MU-200 kg 3.5000 3,700.00 12,950.00
JUMLAH HARGA BAHAN 12,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 70,110.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 70,110.00

18 1 M2 PEKERJAAN ACIAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang Labur/Cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.01 115,000.00 1,150.00
Mandor OH 0.01 130,000.00 1,300.00
JUMLAH TENAGA KERJA 29,450.00
B. BAHAN
Semen Portland 50 Kg zak 3.25 1,450.00 4,712.50
JUMLAH HARGA BAHAN 4,712.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 34,162.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 34,162.50
VI PEKERJAAN KAYU (SNI 3434 : 2008)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.0000 80,000.00 560,000.00
Tukang kayu OH 21.0000 110,000.00 2,310,000.00
Kepala Tukang OH 2.1000 115,000.00 241,500.00
Mandor OH 0.3500 130,000.00 45,500.00
JUMLAH TENAGA KERJA 3,157,000.00
B. BAHAN
Balok Kayu Jati m3 1.1000 32,000,000.00 35,200,000.00
Paku 10 Cm Kg 1.2500 17,297.78 21,622.22
Lem Kayu Kg 1.0000 18,900.00 18,900.00
JUMLAH HARGA BAHAN 35,240,522.22
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,397,522.22
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,397,522.22

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.0000 80,000.00 480,000.00
Tukang kayu OH 18.0000 110,000.00 1,980,000.00
Kepala Tukang OH 1.8000 115,000.00 207,000.00
Mandor OH 0.3000 130,000.00 39,000.00
JUMLAH TENAGA KERJA 2,706,000.00
B. BAHAN
Balok Kayu Kruing m3 1.2000 7,400,000.00 8,880,000.00
Paku 10 Cm Kg 1.2500 17,297.78 21,622.22
Lem Kayu Kg 1.0000 18,900.00 18,900.00
JUMLAH HARGA BAHAN 8,920,522.22
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,626,522.22
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,626,522.22

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 80,000.00 28,000.00
Tukang kayu OH 1.0500 110,000.00 115,500.00
Kepala Tukang OH 0.1050 115,000.00 12,075.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 157,915.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 10,100,000.00 404,000.00
Paku 5-7 Cm Kg 0.0500 17,297.78 864.89
JUMLAH HARGA BAHAN 404,864.89
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 562,779.89
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 562,779.89

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 80,000.00 28,000.00
Tukang kayu OH 1.0500 110,000.00 115,500.00
Kepala Tukang OH 0.1050 115,000.00 12,075.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 157,915.00
B. BAHAN
Papan Kayu Kruing m3 0.0400 7,875,000.00 315,000.00
Paku 5-7 Cm Kg 0.0500 17,297.78 864.89
JUMLAH HARGA BAHAN 315,864.89
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 473,779.89
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 473,779.89

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang kayu OH 3.0000 110,000.00 330,000.00
Kepala Tukang OH 0.3000 115,000.00 34,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 451,000.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 10,100,000.00 404,000.00
Lem Kayu Kg 0.5000 18,900.00 9,450.00
JUMLAH HARGA BAHAN 413,450.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 864,450.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 864,450.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 80,000.00 64,000.00
Tukang kayu OH 2.4000 110,000.00 264,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 360,800.00
B. BAHAN
Papan Kayu Kamper m3 0.0240 10,100,000.00 242,400.00
Lem Kayu Kg 0.3000 18,900.00 5,670.00
JUMLAH HARGA BAHAN 248,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 608,870.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 608,870.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang kayu OH 3.0000 110,000.00 330,000.00
Kepala Tukang OH 0.3000 115,000.00 34,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 451,000.00
B. BAHAN
Papan Kayu Kamper m3 0.0640 10,100,000.00 646,400.00
Lem Kayu Kg 0.5000 18,900.00 9,450.00
JUMLAH HARGA BAHAN 655,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,106,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,106,850.00

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang kayu OH 2.1000 110,000.00 231,000.00
Kepala Tukang OH 0.2100 115,000.00 24,150.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 315,700.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 10,100,000.00 252,500.00
Paku 1-2,5 Cm Kg 0.0300 17,297.78 518.93
Lem Kayu Kg 0.5000 18,900.00 9,450.00
Plywood 4 mm Lbr 1.0000 69,575.00 69,575.00
JUMLAH HARGA BAHAN 332,043.93
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 647,743.93
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 647,743.93

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 80,000.00 64,000.00
Tukang kayu OH 2.4000 110,000.00 264,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 360,800.00
B. BAHAN
Papan Kayu Kamper m3 0.0256 10,100,000.00 258,560.00
Paku 1-2,5 Cm Kg 0.0300 17,297.78 518.93
Lem Kayu Kg 0.5000 18,900.00 9,450.00
Plywood 4 mm Lbr 1.0000 69,575.00 69,575.00
JUMLAH HARGA BAHAN 338,103.93
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 698,903.93
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 698,903.93

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6700 80,000.00 53,600.00
Tukang kayu OH 2.0000 110,000.00 220,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 340,150.00
B. BAHAN
Papan Kayu Kamper m3 0.0600 10,100,000.00 606,000.00
Paku 1-2,5 Cm Kg 0.1500 17,297.78 2,594.67
JUMLAH HARGA BAHAN 608,594.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 948,744.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 948,744.67

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 80,000.00 64,000.00
Tukang kayu OH 2.4000 110,000.00 264,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 360,800.00
B. BAHAN
Papan Kayu Jati m3 0.0250 37,500,000.00 937,500.00
Paku 1-2,5 Cm Kg 0.0300 17,297.78 518.93
Lem Kayu Kg 0.3000 18,900.00 5,670.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 84,700.00 84,700.00
JUMLAH HARGA BAHAN 1,028,388.93
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,389,188.93
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,389,188.93

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8500 80,000.00 68,000.00
Tukang kayu OH 2.5500 110,000.00 280,500.00
Kepala Tukang OH 0.2550 115,000.00 29,325.00
Mandor OH 0.0430 130,000.00 5,590.00
JUMLAH TENAGA KERJA 383,415.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 10,100,000.00 252,500.00
Paku 1-2,5 Cm Kg 0.0300 17,297.78 518.93
Lem Kayu Kg 0.8000 18,900.00 15,120.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 84,700.00 84,700.00
Formika Lbr 0.5000 84,700.00 42,350.00
JUMLAH HARGA BAHAN 395,188.93
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 778,603.93
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 778,603.93

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M'


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 4.0000 80,000.00 320,000.00
Tukang kayu OH 12.0000 110,000.00 1,320,000.00
Kepala Tukang OH 1.2000 115,000.00 138,000.00
Mandor OH 0.2000 130,000.00 26,000.00
JUMLAH TENAGA KERJA 1,804,000.00
B. BAHAN
Balok Kayu Kamper m3 1.1000 9,100,000.00 10,010,000.00
Besi Strip Tebal 5 cm Kg 15.0000 11,960.00 179,400.00
Paku 12 Cm Kg 5.6000 17,297.78 96,867.56
JUMLAH HARGA BAHAN 10,286,267.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,090,267.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,090,267.56

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.7000 80,000.00 536,000.00
Tukang kayu OH 20.1000 110,000.00 2,211,000.00
Kepala Tukang OH 2.0100 115,000.00 231,150.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 3,021,700.00
B. BAHAN
Balok Kayu Jati m3 1.2000 32,000,000.00 38,400,000.00
Besi Strip Tebal 5 cm Kg 15.0000 11,960.00 179,400.00
Paku 12 Cm Kg 5.6000 17,297.78 96,867.56
JUMLAH HARGA BAHAN 38,676,267.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,697,967.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,697,967.56

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.4000 80,000.00 192,000.00
Tukang kayu OH 7.2000 110,000.00 792,000.00
Kepala Tukang OH 0.7200 115,000.00 82,800.00
Mandor OH 0.1200 130,000.00 15,600.00
JUMLAH TENAGA KERJA 1,082,400.00
B. BAHAN
Balok Kayu Jati m3 1.1000 9,100,000.00 10,010,000.00
Besi Strip Tebal 5 cm Kg 15.0000 11,960.00 179,400.00
Paku 12 Cm Kg 3.0000 17,297.78 51,893.33
JUMLAH HARGA BAHAN 10,241,293.33
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,323,693.33
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,323,693.33

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 6,700,000.00 93,800.00
Reng ( 2 x 3 ) Cm Kg 0.0036 8,100,000.00 29,160.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78 4,324.44
JUMLAH HARGA BAHAN 127,284.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 148,084.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 148,084.44

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 6,700,000.00 93,800.00
Reng ( 2 x 3 ) Cm Kg 0.0072 8,100,000.00 58,320.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78 4,324.44
JUMLAH HARGA BAHAN 156,444.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 177,244.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 177,244.44

18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
Usuk ( 5 x 7 ) Cm m3 0.0105 8,100,000.00 85,050.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78 4,324.44
JUMLAH HARGA BAHAN 89,374.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 110,174.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 110,174.44

19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
Reng ( 2 x 3 ) Cm m3 0.0036 8,100,000.00 29,160.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78 4,324.44
JUMLAH HARGA BAHAN 33,484.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,284.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 54,284.44

20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1200 80,000.00 9,600.00
Tukang kayu OH 0.1200 110,000.00 13,200.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 24,960.00
B. BAHAN
Balok Kayu Kamper m3 0.1650 9,100,000.00 1,501,500.00
Paku 5 Cm dan 10 Cm Kg 0.2000 17,297.78 3,459.56
JUMLAH HARGA BAHAN 1,504,959.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,529,919.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,529,919.56

21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang kayu OH 0.3000 110,000.00 33,000.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 58,200.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0154 6,700,000.00 103,180.00
Paku 7 Cm dan 10 Cm Kg 0.2000 17,297.78 3,459.56
JUMLAH HARGA BAHAN 106,639.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 164,839.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 164,839.56

22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang kayu OH 0.3000 110,000.00 33,000.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 53,750.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0163 6,700,000.00 109,210.00
Paku 7 Cm dan 10 Cm Kg 0.2500 17,297.78 4,324.44
JUMLAH HARGA BAHAN 113,534.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 167,284.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 167,284.44

23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 32,950.00
B. BAHAN
Papan Kayu Kamper m3 0.0108 10,100,000.00 109,080.00
Paku 7 Cm dan 10 Cm Kg 0.1000 17,297.78 1,729.78
JUMLAH HARGA BAHAN 110,809.78
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 143,759.78
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 143,759.78

24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 32,950.00
B. BAHAN
Papan Kayu Kamper m3 0.0110 10,100,000.00 111,100.00
Paku 7 Cm dan 10 Cm Kg 0.0500 17,297.78 864.89
JUMLAH HARGA BAHAN 111,964.89
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 144,914.89
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 144,914.89

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang kayu OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 67,715.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 9,100,000.00 254,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 17,297.78 2,594.67
JUMLAH HARGA BAHAN 257,394.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 325,109.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 325,109.67

26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang kayu OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 67,715.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 9,100,000.00 254,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 17,297.78 2,594.67
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 84,700.00 72,842.00
Lem Kayu Kg 0.5600 18,900.00 10,584.00
JUMLAH HARGA BAHAN 340,820.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 408,535.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 408,535.67

27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang kayu OH 0.6000 110,000.00 66,000.00
Kepala Tukang OH 0.0600 115,000.00 6,900.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 90,200.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 9,100,000.00 254,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 17,297.78 2,594.67
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 69,575.00 59,834.50
Lem Kayu Kg 0.5600 18,900.00 10,584.00
JUMLAH HARGA BAHAN 327,813.17
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 418,013.17
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 418,013.17

28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang kayu OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 67,715.00
B. BAHAN
Rangka Holo Btg 1.5000 22,000.00 33,000.00
Paku 5 Cm dan 7 Cm Kg 0.1500 17,297.78 2,594.67
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 84,700.00 72,842.00
Lem Kayu Kg 0.5600 18,900.00 10,584.00
JUMLAH HARGA BAHAN 119,020.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 186,735.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 186,735.67

29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang kayu OH 0.6000 110,000.00 66,000.00
Kepala Tukang OH 0.0600 115,000.00 6,900.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 90,200.00
B. BAHAN
Rangka Holo Btg 1.5000 22,000.00 33,000.00
Paku 5 Cm dan 7 Cm Kg 0.1500 17,297.78 2,594.67
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 69,575.00 59,834.50
Lem Kayu Kg 0.5600 18,900.00 10,584.00
JUMLAH HARGA BAHAN 106,013.17
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 196,213.17
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 196,213.17

30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 80,000.00 48,000.00
Tukang kayu OH 1.8000 110,000.00 198,000.00
Kepala Tukang OH 0.1800 115,000.00 20,700.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 270,600.00
B. BAHAN
Papan Kayu Kamper m3 0.0070 10,100,000.00 70,700.00
Paku 5 Cm dan 10 Cm Kg 0.1000 17,297.78 1,729.78
Paku Skrup 10 cm Kg 0.1500 17,297.78 2,594.67
JUMLAH HARGA BAHAN 75,024.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 345,624.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 345,624.44

31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 80,000.00 2,000.00
Tukang kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 11,300.00
B. BAHAN
Conwood Lath 4" Cut (100 x 3050 x 11 mm) m3 4.0000 61,100.00 244,400.00
Paku 1 Cm dan 2.5 Cm Kg 0.0500 15,271.67 763.58
JUMLAH HARGA BAHAN 245,163.58
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 256,463.58
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 256,463.58

32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 80,000.00 2,000.00
Tukang kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 11,300.00
B. BAHAN
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.4000 69,575.00 27,830.00
Paku 1 Cm dan 2.5 Cm Kg 0.0500 15,271.67 763.58
JUMLAH HARGA BAHAN 28,593.58
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 39,893.58
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 39,893.58

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 247.0000 1,450.00 358,150.00
Pasir Beton m3 0.6207 370,000.00 229,664.29
Koral Beton m3 0.7400 650,000.00 481,000.00
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,075,264.29
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,248,774.29
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,248,774.29
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 276.0000 1,450.00 400,200.00
Pasir Beton m3 0.5914 370,000.00 218,828.57
Koral Beton m3 0.7496 650,000.00 487,259.26
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,112,737.83
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,286,247.83
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,286,247.83

3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 299.0000 1,450.00 433,550.00
Pasir Beton m3 0.5707 370,000.00 211,164.29
Koral Beton m3 0.7533 650,000.00 489,666.67
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,140,830.95
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,314,340.95
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,314,340.95

4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 326.0000 1,450.00 472,700.00
Pasir Beton m3 0.5429 370,000.00 200,857.14
Koral Beton m3 0.7622 650,000.00 495,444.44
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,175,451.59
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,348,961.59
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,348,961.59

5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 352.0000 1,450.00 510,400.00
Pasir Beton m3 0.5221 370,000.00 193,192.86
Koral Beton m3 0.7637 650,000.00 496,407.41
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,206,450.26
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,379,960.26
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,379,960.26

6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 371.0000 1,450.00 537,950.00
Pasir Beton m3 0.4986 370,000.00 184,471.43
Koral Beton m3 0.7756 650,000.00 504,111.11
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,232,982.54
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,406,492.54
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,406,492.54

7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 384.0000 1,450.00 556,800.00
Pasir Beton m3 0.4943 370,000.00 182,885.71
Koral Beton m3 0.7696 650,000.00 500,259.26
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,246,394.97
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,419,904.97
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,419,904.97

8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 406.0000 1,450.00 588,700.00
Pasir Beton m3 0.4886 370,000.00 180,771.43
Koral Beton m3 0.7600 650,000.00 494,000.00
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,269,921.43
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 1,443,431.43
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,443,431.43

9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang Batu OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 173,510.00
B. BAHAN
Semen Portland kg 413.0000 1,450.00 598,850.00
Pasir Beton m3 0.4864 370,000.00 179,978.57
Koral Beton m3 0.7563 650,000.00 491,592.59
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,276,871.16
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,450,381.16
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,450,381.16

10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.1000 80,000.00 168,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.1050 130,000.00 13,650.00
JUMLAH TENAGA KERJA 220,675.00
B. BAHAN
Semen Portland kg 439.0000 1,450.00 636,550.00
Pasir Beton m3 0.4786 370,000.00 177,071.43
Koral Beton m3 0.7452 650,000.00 484,370.37
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,304,441.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,525,116.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,525,116.80
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.1000 80,000.00 168,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.1050 130,000.00 13,650.00
JUMLAH TENAGA KERJA 220,675.00
B. BAHAN
Semen Portland kg 448.0000 1,450.00 649,600.00
Pasir Beton m3 0.4764 370,000.00 176,278.57
Koral Beton m3 0.7407 650,000.00 481,481.48
Air lt 215.0000 30.00 6,450.00
JUMLAH HARGA BAHAN 1,313,810.05
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,534,485.05
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,534,485.05

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 80,000.00 5,600.00
Tukang Besi OH 0.0700 105,000.00 7,350.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 14,275.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.5000 9,750.00 102,375.00
Kawat Beton m3 0.1500 15,400.00 2,310.00
JUMLAH HARGA BAHAN 104,685.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 118,960.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 118,960.00
Harga Satuan Pekerjaan untuk 1 Kg 11,896.00

13 1 M2 PEMBESIAN DENGAN WIRE MESH M6


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 80,000.00 5,600.00
Tukang Besi OH 0.0700 105,000.00 7,350.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 14,275.00
B. BAHAN
Besi Wire mesh M6 lbr 0.1000 290,000.00 29,000.00
Kawat Beton m3 0.1500 15,400.00 2,310.00
JUMLAH HARGA BAHAN 31,310.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,585.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 45,585.00

14 1 M2 PEMBESIAN DENGAN WIRE MESH M7


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 80,000.00 5,600.00
Tukang Besi OH 0.0700 105,000.00 7,350.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 14,275.00
B. BAHAN
Besi Wire mesh M7 lbr 0.1000 379,500.00 37,950.00
Kawat Beton m3 0.1500 15,400.00 2,310.00
JUMLAH HARGA BAHAN 40,260.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,535.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 54,535.00

15 1 M2 PEMBESIAN DENGAN WIRE MESH M8


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 80,000.00 5,600.00
Tukang Besi OH 0.0700 105,000.00 7,350.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 14,275.00
B. BAHAN
Besi Wire mesh M8 lbr 0.1000 585,500.00 58,550.00
Kawat Beton m3 0.1500 15,400.00 2,310.00
JUMLAH HARGA BAHAN 60,860.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 75,135.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 75,135.00

16 Beton Readymix K-175 M3 1,045,000.00


17 Beton Readymix K-225 M3 1,364,000.00
18 Beton Readymix K-250 M3 1,475,000.00
19 Beton Readymix K-275 M3 1,515,000.00
20 Beton Readymix K-300 M3 1,551,000.00
21 Beton Readymix K-350 M3 1,630,000.00
22 Sewa concrete pump/m3 Ls 35,000.00

23 1 M2 PASANG BEKISTING UNTUK PONDASI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5200 80,000.00 41,600.00
Tukang Kayu OH 0.2600 110,000.00 28,600.00
Kepala Tukang OH 0.0260 115,000.00 2,990.00
Mandor OH 0.0260 130,000.00 3,380.00
JUMLAH TENAGA KERJA 76,570.00
B. BAHAN
Kayu Kelas III m3 0.0400 3,100,000.00 124,000.00
Paku Biasa 5' - 10' kg 0.3000 17,297.78 5,189.33
Minyak Bekisting ltr 0.1000 42,500.00 4,250.00
JUMLAH HARGA BAHAN 133,439.33
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 210,009.33
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 210,009.33

24 1 M2 PASANG BEKISTING UNTUK SLOOF


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5200 80,000.00 41,600.00
Tukang Kayu OH 0.2600 110,000.00 28,600.00
Kepala Tukang OH 0.0260 115,000.00 2,990.00
Mandor OH 0.0260 130,000.00 3,380.00
JUMLAH TENAGA KERJA 76,570.00
B. BAHAN
Kayu Kelas III m3 0.0450 3,100,000.00 139,500.00
Paku Biasa 5' - 10' kg 0.3000 17,297.78 5,189.33
Minyak Bekisting ltr 0.1000 42,500.00 4,250.00
Kayu Usuk 4/6 m3 0.0150 6,700,000.00 100,500.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
JUMLAH HARGA BAHAN 301,414.33
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 377,984.33
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 377,984.33

25 1 M2 PASANG BEKISTING UNTUK KOLOM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 80,000.00 52,800.00
Tukang Kayu OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,185.00
B. BAHAN
Kayu Kelas III m3 0.0400 3,100,000.00 124,000.00
Paku Biasa 5' - 10' kg 0.4000 17,297.78 6,919.11
Minyak Bekisting ltr 0.2000 42,500.00 8,500.00
Kayu Usuk 4/6 m3 0.0150 6,700,000.00 100,500.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 2.0000 10,500.00 21,000.00
JUMLAH HARGA BAHAN 312,894.11
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 410,079.11
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 410,079.11

26 1 M2 PASANG BEKISTING UNTUK BALOK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 80,000.00 52,800.00
Tukang Kayu OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,185.00
B. BAHAN
Kayu Kelas III m3 0.0400 3,100,000.00 124,000.00
Paku Biasa 5' - 10' kg 0.4000 17,297.78 6,919.11
Minyak Bekisting ltr 0.2000 42,500.00 8,500.00
Kayu Usuk 4/6 m3 0.0180 6,700,000.00 120,600.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 2.0000 10,500.00 21,000.00
JUMLAH HARGA BAHAN 332,994.11
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 430,179.11
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 430,179.11

27 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 80,000.00 52,800.00
Tukang Kayu OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,185.00
B. BAHAN
Kayu Kelas III m3 0.0400 3,100,000.00 124,000.00
Paku Biasa 5' - 10' kg 0.4000 17,297.78 6,919.11
Minyak Bekisting ltr 0.2000 42,500.00 8,500.00
Kayu Usuk 4/6 m3 0.0150 6,700,000.00 100,500.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 6.0000 10,500.00 63,000.00
JUMLAH HARGA BAHAN 354,894.11
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 452,079.11
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 452,079.11

28 1 M2 PASANG BEKISTING UNTUK DINDING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 80,000.00 52,800.00
Tukang Kayu OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,185.00
B. BAHAN
Kayu Kelas III m3 0.0300 3,100,000.00 93,000.00
Paku Biasa 5' - 10' kg 0.4000 17,297.78 6,919.11
Minyak Bekisting ltr 0.2000 42,500.00 8,500.00
Kayu Usuk 4/6 m3 0.0200 6,700,000.00 134,000.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 3.0000 10,500.00 31,500.00
Formite/penjaga jarak bekisting/spacer Bh 4.0000 2,500.00 10,000.00
JUMLAH HARGA BAHAN 335,894.11
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 433,079.11
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 433,079.11

29 1 M2 PASANG BEKISTING UNTUK TANGGA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 80,000.00 52,800.00
Tukang Kayu OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,185.00
B. BAHAN
Kayu Kelas III m3 0.0300 3,100,000.00 93,000.00
Paku Biasa 5' - 10' kg 0.4000 17,297.78 6,919.11
Minyak Bekisting ltr 0.1500 42,500.00 6,375.00
Kayu Usuk 4/6 m3 0.0150 6,700,000.00 100,500.00
Plywood 9 mm lbr 0.3500 148,500.00 51,975.00
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 2.0000 10,500.00 21,000.00
JUMLAH HARGA BAHAN 279,769.11
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 376,954.11
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 376,954.11

30 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 19,115.00
B. BAHAN
Kayu Kelas III m3 0.0264 3,100,000.00 81,840.00
Paku Biasa 5' - 10' kg 0.6000 17,297.78 10,378.67
Dolken Kayu 8" - 10"/4 m / Bambu Besar Ukuran 4 m btg 0.5000 10,500.00 5,250.00
JUMLAH HARGA BAHAN 97,468.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 116,583.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,583.67

31 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1800 80,000.00 14,400.00
Tukang Batu OH 0.0200 100,000.00 2,000.00
Tukang Kayu OH 0.0200 110,000.00 2,200.00
Tukang Besi OH 0.0200 105,000.00 2,100.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0090 130,000.00 1,170.00
JUMLAH TENAGA KERJA 22,560.00
B. BAHAN
Kayu Kelas III m3 0.0020 3,100,000.00 6,200.00
Paku Biasa 5' - 12' kg 0.0100 17,297.78 172.98
Besi Beton kg 3.0000 11,896.00 35,688.00
Kawat Beton kg 0.0450 15,400.00 693.00
Semen Portland kg 4.0000 1,450.00 5,800.00
Pasir Beton m3 0.0060 370,000.00 2,220.00
Koral Beton m3 0.0090 650,000.00 5,850.00
JUMLAH HARGA BAHAN 56,623.98
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 79,183.98
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 79,183.98

32 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2970 80,000.00 23,760.00
Tukang Batu OH 0.0330 100,000.00 3,300.00
Tukang Kayu OH 0.0330 110,000.00 3,630.00
Tukang Besi OH 0.0330 105,000.00 3,465.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 37,255.00
B. BAHAN
Kayu Kelas III m3 0.0030 3,100,000.00 9,300.00
Paku Biasa 5' - 12' kg 0.0200 17,297.78 345.96
Besi Beton kg 3.6000 11,896.00 42,825.60
Kawat Beton kg 0.0500 15,400.00 770.00
Semen Portland kg 5.5000 1,450.00 7,975.00
Pasir Beton m3 0.0090 370,000.00 3,330.00
Koral Beton m3 0.0150 650,000.00 9,750.00
JUMLAH HARGA BAHAN 74,296.56
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 111,551.56
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 111,551.56
VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,210.00
B. BAHAN
Genteng Plentong bh 25.0000 2,200.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,210.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 77,210.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,210.00
B. BAHAN
Genteng Plentong dicat bh 25.0000 2,420.00 60,500.00
JUMLAH HARGA BAHAN 60,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 82,710.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 82,710.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Bubungan Plentong bh 5.0000 16,500.00 82,500.00
Semen Portland kg 10.8000 1,450.00 15,660.00
Pasir Pasang m3 0.0320 400,000.00 12,800.00
JUMLAH HARGA BAHAN 110,960.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 167,520.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 167,520.00

4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1400 80,000.00 11,200.00
Tukang Kayu OH 0.0670 110,000.00 7,370.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0070 130,000.00 910.00
JUMLAH TENAGA KERJA 20,285.00
B. BAHAN
Asbes Gelombang 1.8 mx0.92mx5mm lbr 0.6600 38,500.00 25,410.00
Paku Pancing 60 x 230 kg 2.0000 16,500.00 33,000.00
JUMLAH HARGA BAHAN 58,410.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 78,695.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 78,695.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0840 80,000.00 6,720.00
Tukang Kayu OH 0.1250 110,000.00 13,750.00
Kepala Tukang OH 0.0130 115,000.00 1,495.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 22,485.00
B. BAHAN
Bubungan Stel Gelombang lbr 2.4000 49,000.00 117,600.00
Paku Skrup 3,5" kg 4.0000 16,500.00 66,000.00
JUMLAH HARGA BAHAN 183,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 206,085.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 206,085.00

6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0330 80,000.00 2,640.00
Tukang Kayu OH 0.0330 110,000.00 3,630.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 6,875.00
B. BAHAN
Aluminium Foil m2 1.1000 245,300.00 269,830.00
JUMLAH HARGA BAHAN 269,830.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 276,705.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 276,705.00

7 1 M1 PASANG NOK SENG GELOMBANG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Kayu OH 0.0700 110,000.00 7,700.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 21,400.00
B. BAHAN
Seng Plat 3" x 6" BJLS 28 lbr 0.3000 66,550.00 19,965.00
Paku biasa 1/2" - 1" kg 0.0400 15,271.67 610.87
JUMLAH HARGA BAHAN 20,575.87
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,975.87
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,975.87

8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 80,000.00 4,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 7,250.00
B. BAHAN
Murda / Puntal Paras lbr 1.0000 121,000.00 121,000.00
Semen kg 0.0130 1,450.00 18.85
JUMLAH HARGA BAHAN 121,018.85
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 128,268.85
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 128,268.85

IX PEKERJAAN PLAFOND / LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0300 80,000.00 2,400.00
Tukang Kayu OH 0.0700 110,000.00 7,700.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 11,425.00
B. BAHAN
Asbes Semen lbr 1.1000 18,150.00 19,965.00
Paku biasa 1/2" - 1" kg 0.0100 15,271.67 152.72
JUMLAH HARGA BAHAN 20,117.72
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,542.72
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 31,542.72

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,800.00
B. BAHAN
TRIIPLEKS lbr 0.3750 122,100.00 45,787.50
Paku biasa 1/2" - 1" kg 0.0300 15,271.67 458.15
JUMLAH HARGA BAHAN 46,245.65
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,045.65
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 67,045.65

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 80,000.00 64,000.00
Tukang Kayu OH 0.8000 110,000.00 88,000.00
Kepala Tukang OH 0.0800 115,000.00 9,200.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 166,400.00
B. BAHAN
Kayu Papan Kamper m3 0.0150 10,100,000.00 151,500.00
Paku biasa 1/2" - 1" kg 0.0100 15,271.67 152.72
JUMLAH HARGA BAHAN 151,652.72
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 318,052.72
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 318,052.72

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 80,000.00 4,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 10,465.00
B. BAHAN
List Kayu Profil 4/5 cm m3 1.0500 40,500.00 42,525.00
Paku list kg 0.0100 15,271.67 152.72
JUMLAH HARGA BAHAN 42,677.72
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 53,142.72
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 53,142.72

5 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 80,000.00 40,000.00
Tukang Besi OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 101,500.00
B. BAHAN
Profil Aluminium "T" m1 3.6000 219,450.00 790,020.00
Kawat Diameter 4 mm kg 0.1500 88,000.00 13,200.00
Ramset m1 1.0500 14,520.00 15,246.00
Akustik 60 cm x 120 cm lbr 1.5000 54,450.00 81,675.00
JUMLAH HARGA BAHAN 900,141.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,001,641.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,001,641.00

6 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1800 80,000.00 14,400.00
Tukang Kayu OH 0.3200 110,000.00 35,200.00
Kepala Tukang OH 0.0320 115,000.00 3,680.00
Mandor OH 0.0090 130,000.00 1,170.00
JUMLAH TENAGA KERJA 54,450.00
B. BAHAN
Kamper Usuk 4/6 cm m3 0.0230 7,400,000.00 170,200.00
Paku Biasa 2" - 5" kg 0.0600 15,271.67 916.30
Asbes lbr 1.1000 18,150.00 19,965.00
JUMLAH HARGA BAHAN 191,081.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 245,531.30
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 245,531.30

7 1 M2 PLAFOND GYPSUM, RANGKA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Kayu OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 68,475.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 79,200.00 28,828.80
Kayu Kruing Usuk M3 0.0230 7,400,000.00 170,200.00
Paku Kalsiboard Kg 0.2600 15,271.67 3,970.63
JUMLAH HARGA BAHAN 202,999.43
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 271,474.43
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 271,474.43

8 1 M2 PLAFOND GYPSUM, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Kayu OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 68,475.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 79,200.00 28,828.80
Rangka Metal Furing (2 x 4 cm) panjang 4 m Btg 1.0000 22,000.00 22,000.00
Paku Kalsiboard Kg 0.1100 15,271.67 1,679.88
JUMLAH HARGA BAHAN 52,508.68
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 120,983.68
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 120,983.68

9 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Kayu OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 68,475.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 113,080.00 41,161.12
Kayu Kruing Usuk M3 0.0230 7,400,000.00 170,200.00
Paku Kalsiboard Kg 0.2600 15,271.67 3,970.63
JUMLAH HARGA BAHAN 215,331.75
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 283,806.75
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 283,806.75
10 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang Kayu OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 68,475.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 113,080.00 41,161.12
Rangka Metal Furing (2 x 4 cm) panjang 4 m M3 1.0000 22,000.00 22,000.00
Paku Kalsiboard Kg 0.1100 15,271.67 1,679.88
JUMLAH HARGA BAHAN 64,841.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 133,316.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 133,316.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.3000 80,000.00 264,000.00
Tukang Batu OH 1.1000 100,000.00 110,000.00
Kepala Tukang OH 0.0010 115,000.00 115.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 394,915.00
B. BAHAN
Kloset duduk/ monoblok bh 1.0000 1,925,000.00 1,925,000.00
Perlengkapan 6% x harga kloset 115,500.00 115,500.00
JUMLAH HARGA BAHAN 2,040,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,435,415.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,435,415.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang Batu OH 1.5000 100,000.00 150,000.00
Kepala Tukang OH 1.5000 115,000.00 172,500.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 423,300.00
B. BAHAN
Kloset jongkok porselen bh 1.0000 175,450.00 175,450.00
Semen Portland kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 400,000.00 4,000.00
JUMLAH HARGA BAHAN 188,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 611,450.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 611,450.00

3 MEMASANG 1 BUAH URINOIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang Batu OH 1.0000 100,000.00 100,000.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 204,500.00
B. BAHAN
Urinoir bh 1.0000 2,874,960.00 2,874,960.00
Perlengkapan 30% x harga Urinoir 862,488.00 862,488.00
Semen Portland kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 400,000.00 4,000.00
JUMLAH HARGA BAHAN 3,750,148.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,954,648.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,954,648.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.2000 80,000.00 96,000.00
Tukang Batu OH 1.4500 100,000.00 145,000.00
Kepala Tukang OH 0.1500 115,000.00 17,250.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 271,250.00
B. BAHAN
Wastafel bh 1.0000 203,500.00 203,500.00
Perlengkapan 12% x harga wast 24,420.00 24,420.00
Semen Portland kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 400,000.00 4,000.00
JUMLAH HARGA BAHAN 240,620.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 511,870.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 511,870.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.8000 80,000.00 144,000.00
Tukang Batu OH 2.7000 100,000.00 270,000.00
Kepala Tukang OH 0.5400 115,000.00 62,100.00
Mandor OH 0.1100 130,000.00 14,300.00
JUMLAH TENAGA KERJA 490,400.00
B. BAHAN
Bak Fibreglass bh 1.0000 306,130.00 306,130.00
Perlengkapan 18% x harga bak 55,103.40 55,103.40
JUMLAH HARGA BAHAN 361,233.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 851,633.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 851,633.40

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 80,000.00 4,320.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 18,315.00
B. BAHAN
Pipa Galvanis bh 1.2000 84,000.00 100,800.00
Perlengkapan 35% x harga pipa 29,400.00 29,400.00
JUMLAH HARGA BAHAN 130,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 148,515.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 148,515.00
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1080 80,000.00 8,640.00
Tukang Pipa OH 0.1800 105,000.00 18,900.00
Kepala Tukang OH 0.0180 115,000.00 2,070.00
Mandor OH 0.0054 130,000.00 702.00
JUMLAH TENAGA KERJA 30,312.00
B. BAHAN
Pipa Galvanis bh 1.2000 181,000.00 217,200.00
Perlengkapan 35% x harga pipa 63,350.00 63,350.00
JUMLAH HARGA BAHAN 280,550.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 310,862.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 310,862.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0360 80,000.00 2,880.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0018 130,000.00 234.00
JUMLAH TENAGA KERJA 10,104.00
B. BAHAN
Pipa PVC bh 1.2000 22,000.00 26,400.00
Perlengkapan 35% x harga pipa 7,700.00 7,700.00
JUMLAH HARGA BAHAN 34,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 44,204.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 44,204.00

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 80,000.00 4,320.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0027 130,000.00 351.00
JUMLAH TENAGA KERJA 15,156.00
B. BAHAN
Pipa PVC bh 1.2000 32,000.00 38,400.00
Perlengkapan 35% x harga pipa 11,200.00 11,200.00
JUMLAH HARGA BAHAN 49,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,756.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 64,756.00

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0810 80,000.00 6,480.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 115,000.00 1,552.50
Mandor OH 0.0041 130,000.00 533.00
JUMLAH TENAGA KERJA 22,740.50
B. BAHAN
Pipa PVC bh 1.2000 85,000.00 102,000.00
Perlengkapan 35% x harga pipa 29,750.00 29,750.00
JUMLAH HARGA BAHAN 131,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 154,490.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 154,490.50

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Pipa OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 11,650.00
B. BAHAN
Kran air bh 1.0000 55,000.00 55,000.00
Seal tape bh 0.0250 3,300.00 82.50
JUMLAH HARGA BAHAN 55,082.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,732.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 66,732.50
XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)
1 1 KG MEMASANG RANGKA BAJA IWF
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0060 80,000.00 480.00
Tukang besi OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0003 130,000.00 39.00
JUMLAH TENAGA KERJA 7,509.00
B. BAHAN
Besi Baja WF kg 1.1500 10,450.00 12,017.50
JUMLAH HARGA BAHAN 12,017.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 19,526.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 19,526.50

2 1 M2 PASANG ROLLING DOOR ALLUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang Aluminium OH 1.0000 100,000.00 100,000.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 198,000.00
B. BAHAN
Rolling Door Aluminium m2 1.0000 650,000.00 650,000.00
JUMLAH HARGA BAHAN 650,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 848,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 848,000.00

3 1 M2 MEMASANG RANGKA KUDA - KUDA BAJA RINGAN C 75


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang Besi OH 0.4500 100,000.00 45,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 68,650.00
B. BAHAN
C-75, 0.8 m' 1.4880 19,000.00 28,272.00
C-75, 0.6 m' 2.2320 16,416.67 36,642.00
Baut bh 28.0000 550.00 15,400.00
Dynabolt bh 1.6000 3,675.00 5,880.00
Reng m' 5.4000 7,700.00 41,580.00
Talang Jurai m' 0.1240 71,500.00 8,866.00
JUMLAH HARGA BAHAN 136,640.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 205,290.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 205,290.00

4 1 M' PASANG KUSEN PINTU ALLUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0430 80,000.00 3,440.00
Tukang Aluminium OH 0.0430 100,000.00 4,300.00
Kepala Tukang OH 0.0043 115,000.00 494.50
Mandor OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 8,507.50
B. BAHAN
Profil Aluminium 4" m 1.1000 66,000.00 72,600.00
Sekruf fixer bh 2.0000 550.00 1,100.00
Sealant Tube 0.0600 36,300.00 2,178.00
JUMLAH HARGA BAHAN 75,878.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 84,385.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,385.50

5 1 M2 PASANG PINTU KACA RANGKA ALLUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0850 80,000.00 6,800.00
Tukang Aluminium OH 0.0850 100,000.00 8,500.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 16,985.00
B. BAHAN
Profil Aluminium 4" m 4.4000 66,000.00 290,400.00
Profil Kaca bh 4.5000 9,900.00 44,550.00
Sealant Tube 0.2700 36,300.00 9,801.00
JUMLAH HARGA BAHAN 344,751.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 361,736.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 361,736.00

6 1 M2 PASANG TERALI BESI STRIP (2 x 3 ) mm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6700 80,000.00 133,600.00
Tukang Las OH 1.6700 100,000.00 167,000.00
Kepala Tukang OH 0.1670 115,000.00 19,205.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 330,595.00
B. BAHAN
Besi Strip m 6.1770 17,850.00 110,259.45
Pengelasan cm 27.0800 14,520.00 393,201.60
JUMLAH HARGA BAHAN 503,461.05
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 834,056.05
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 834,056.05

7 1 M2 KAWAT NYAMUK
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Besi OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 19,800.00
B. BAHAN
Kawat Nyamuk m2 1.1000 24,200.00 26,620.00
Pengelasan cm 11.1100 14,520.00 161,317.20
Baja Strip (0,2 x 2) cm kg 1.7160 17,850.00 30,630.60
JUMLAH HARGA BAHAN 218,567.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 238,367.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 238,367.80

8 1 M2 PASANG JENDELA NAKO & TRALIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang Besi OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 38,430.00
B. BAHAN
Rangka + Kaca Nako m2 1.1000 38,500.00 42,350.00
Paku biasa 1 cm - 2,5 cm bh 10.0000 15,271.67 152,716.67
Besi strip m' 7.0000 11,960.00 83,720.00
JUMLAH HARGA BAHAN 278,786.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 317,216.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 317,216.67

9 1 M1 PASANG TALANG DATAR, SENG BJLS 28


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 80,000.00 16,000.00
Tukang Besi OH 0.4000 100,000.00 40,000.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 60,175.00
B. BAHAN
Seng plat lbr 1.0500 66,550.00 69,877.50
Paku biasa 0,5" - 1" kg 0.0150 15,271.67 229.08
Kayu papan kelas II/III m3 0.0190 10,100,000.00 191,900.00
JUMLAH HARGA BAHAN 262,006.58
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 322,181.58
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 322,181.58

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 80,000.00 -
Tukang Besi OH 0.5000 100,000.00 50,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 130,000.00 -
JUMLAH TENAGA KERJA 55,750.00
B. BAHAN
Kunci Tanam Biasa bh 1.0000 166,100.00 166,100.00
JUMLAH HARGA BAHAN 166,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 221,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 221,850.00

2 1 PS PASANG ENGSEL PINTU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 80,000.00 -
Tukang Besi OH 0.1250 100,000.00 12,500.00
Kepala Tukang OH 0.0130 115,000.00 1,495.00
Mandor OH 130,000.00 -
JUMLAH TENAGA KERJA 13,995.00
B. BAHAN
Engsel Pintu ps 1.0000 73,150.00 73,150.00
JUMLAH HARGA BAHAN 73,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 87,145.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 87,145.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 80,000.00 -
Tukang Besi OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 130,000.00 -
JUMLAH TENAGA KERJA 11,150.00
B. BAHAN
Engsel Jendela ps 1.0000 64,900.00 64,900.00
JUMLAH HARGA BAHAN 64,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 76,050.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 76,050.00

4 1 BH PASANG KAIT ANGIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 80,000.00 -
Tukang Besi OH 0.1000 100,000.00 10,000.00
Kepala Tukang OH 0.0010 115,000.00 115.00
Mandor OH 130,000.00 -
JUMLAH TENAGA KERJA 10,115.00
B. BAHAN
Kait Angin ps 1.0000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,115.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 65,115.00

5 1 BH PASANG KUNCI SLOT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 80,000.00 -
Tukang Besi OH 0.2500 100,000.00 25,000.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 130,000.00 -
JUMLAH TENAGA KERJA 27,875.00
B. BAHAN
Kunci Slot bh 1.0000 244,200.00 244,200.00
JUMLAH HARGA BAHAN 244,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 272,075.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 272,075.00

6 1 M2 PASANG KACA, TEBAL5 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 80,000.00 12,800.00
Tukang Besi OH 0.1600 100,000.00 16,000.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Kaca bh 1.1000 143,000.00 157,300.00
JUMLAH HARGA BAHAN 157,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 205,540.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 205,540.00

7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 80,000.00 12,800.00
Tukang Besi OH 0.1600 100,000.00 16,000.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Kaca bh 1.1000 224,500.00 246,950.00
JUMLAH HARGA BAHAN 246,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 295,190.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 295,190.00

8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 80,000.00 12,800.00
Tukang Besi OH 0.1600 100,000.00 16,000.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Kaca bh 1.1000 299,500.00 329,450.00
JUMLAH HARGA BAHAN 329,450.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 377,690.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 377,690.00

9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 80,000.00 12,800.00
Tukang Besi OH 0.1600 100,000.00 16,000.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Kaca bh 1.1000 565,000.00 621,500.00
JUMLAH HARGA BAHAN 621,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 669,740.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 669,740.00

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 80,000.00 20,000.00
Tukang Batu OH 0.1250 100,000.00 12,500.00
Kepala Tukang OH 0.0130 115,000.00 1,495.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 35,685.00
B. BAHAN
Ubin Granit bh 6.6300 58,025.00 384,705.75
Semen Portland kg 9.8000 1,450.00 14,210.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.3000 25,620.00 33,306.00
JUMLAH HARGA BAHAN 450,221.75
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 485,906.75
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 485,906.75

2 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Keramik 30 x 30 bh 11.8700 5,200.00 61,724.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.5000 25,620.00 38,430.00
JUMLAH HARGA BAHAN 132,654.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 232,229.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 232,229.00

3 1 M2 PASANG LANTAI KERAMIK 60 X 60 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Keramik 60 x 60 bh 3.0556 31,625.00 96,631.94
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.5000 25,620.00 38,430.00
JUMLAH HARGA BAHAN 167,561.94
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 267,136.94
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 267,136.94

4 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Keramik 20 x 20 bh 26.5000 2,860.00 75,790.00
Semen Portland kg 10.4000 1,450.00 15,080.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.6200 25,620.00 41,504.40
JUMLAH HARGA BAHAN 150,374.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 249,949.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 249,949.40

5 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0900 80,000.00 7,200.00
Tukang Batu OH 0.0900 100,000.00 9,000.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 17,885.00
B. BAHAN
Keramik 30 x 30 bh 5.3000 5,200.00 27,560.00
Semen Portland kg 1.1400 1,450.00 1,653.00
Pasir Pasang m3 0.0030 400,000.00 1,200.00
Semen warna/semen grouting kg 0.0250 25,620.00 640.50
JUMLAH HARGA BAHAN 31,053.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 48,938.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 48,938.50

6 1 M1 PASANG PLIN KERAMIK 10 X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0900 80,000.00 7,200.00
Tukang Batu OH 0.0900 100,000.00 9,000.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 17,885.00
B. BAHAN
Plint Keramik 10 x 20 cm bh 5.3000 2,860.00 15,158.00
Semen Portland kg 1.1400 1,450.00 1,653.00
Pasir Pasang m3 0.0030 400,000.00 1,200.00
Semen warna/semen grouting kg 0.0250 25,620.00 640.50
JUMLAH HARGA BAHAN 18,651.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 36,536.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 36,536.50

7 1 M2 PASANG LANTAI MARMER 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Marmer m2 1.0600 308,000.00 326,480.00
Semen Portland kg 8.1900 1,450.00 11,875.50
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 0.6500 25,620.00 16,653.00
JUMLAH HARGA BAHAN 373,008.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 472,583.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 472,583.50

8 MEMASANG 1 M2 LANTAI KAYU BANGKIRAI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 80,000.00 48,000.00
Tukang Kayu OH 1.8000 110,000.00 198,000.00
Kepala Tukang OH 0.1800 115,000.00 20,700.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 270,600.00
B. BAHAN
Papan Kayu Bangkirai m2 0.0260 13,825,000.00 359,450.00
Kayu Kaso Bangkirai 4/6 kg 0.0080 11,650,000.00 93,200.00
Paku 5 Cm dan 10 Cm m3 0.1000 17,297.78 1,729.78
Paku Skrup 10 cm kg 0.1500 17,297.78 2,594.67
JUMLAH HARGA BAHAN 456,974.44
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 727,574.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 727,574.44

9 1 M2 PASANG DINDING KERAMIK 20 X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.9000 80,000.00 72,000.00
Tukang batu OH 0.4500 100,000.00 45,000.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 128,025.00
B. BAHAN
Keramik 20 x 20 cm m2 26.5000 2,860.00 75,790.00
Semen Portland kg 9.3000 1,450.00 13,485.00
Pasir Pasang m3 0.0180 400,000.00 7,200.00
Semen warna/semen grouting kg 1.9400 25,620.00 49,702.80
JUMLAH HARGA BAHAN 146,177.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 274,202.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 274,202.80

10 1 M2 PASANG DINDING MARMER 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.3000 80,000.00 104,000.00
Tukang batu OH 0.6500 100,000.00 65,000.00
Kepala Tukang OH 0.0650 115,000.00 7,475.00
Mandor OH 0.0650 130,000.00 8,450.00
JUMLAH TENAGA KERJA 184,925.00
B. BAHAN
Marmer m2 1.0600 308,000.00 326,480.00
Paku 10 cm bh 3.0030 17,297.78
Semen Portland kg 12.4400 1,450.00 18,038.00
Pasir Pasang m3 0.0250 400,000.00 10,000.00
Semen warna/semen grouting kg 0.6500 25,620.00 16,653.00
JUMLAH HARGA BAHAN 371,171.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 556,096.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 556,096.00

11 1 M2 PASANG DINDING BATA PELAPIS UKURAN (3 x 7 x 24) cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang batu OH 0.5000 100,000.00 50,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 142,250.00
B. BAHAN
Bata Pelapis Dinding m2 63.0000 5,850.00 368,550.00
Semen Portland kg 12.4400 1,450.00 18,038.00
Pasir Pasang m3 0.0250 400,000.00 10,000.00
Semen warna/semen grouting kg 2.7500 25,620.00 70,455.00
JUMLAH HARGA BAHAN 467,043.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 609,293.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 609,293.00

12 1 M2 PASANG DINDING BATU PARAS (30 X 15)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Batu Paras m2 1.1000 25,000.00 27,500.00
Semen Portland kg 11.7500 1,450.00 17,037.50
Pasir Pasang m3 0.0350 400,000.00 14,000.00
JUMLAH HARGA BAHAN 58,537.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 158,112.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 158,112.50

13 1 M2 PASANG DINDING BATU PARAS (30 X 15)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Batu Candi Hitam (20 x 20 x 3 Cm) m2 1.1000 90,000.00 99,000.00
Semen Portland kg 11.7500 1,450.00 17,037.50
Pasir Pasang m3 0.0350 400,000.00 14,000.00
JUMLAH HARGA BAHAN 130,037.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 229,612.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 229,612.50

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 13,040.00
B. BAHAN
Kapi bh 0.0500 8,800.00 440.00
JUMLAH HARGA BAHAN 440.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,480.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 13,480.00

2 1 M2 PEKERJAAN LAPIS PLAMIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 80,000.00 1,600.00
Tukang cat OH 0.0300 110,000.00 3,300.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 5,375.00
B. BAHAN
Plamir Tembok kg 0.1000 159,500.00 15,950.00
Amplas Lbr 0.5000 6,600.00 3,300.00
Kapi bh 0.0500 8,800.00 440.00
JUMLAH HARGA BAHAN 19,690.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,065.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 25,065.00

3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 80,000.00 1,600.00
Tukang cat OH 0.0630 110,000.00 6,930.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 9,579.50
B. BAHAN
Plamir kg 0.1000 159,500.00 15,950.00
Cat dasar kg 0.1000 59,400.00 5,940.00
Cat Penutup 2x kg 0.2600 72,930.00 18,961.80
JUMLAH HARGA BAHAN 40,851.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,431.30
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 50,431.30

4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 80,000.00 4,800.00
Tukang cat OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 11,265.00
B. BAHAN
Cat Tembok Vinilex kg 0.2400 39,930.00 9,583.20
Kuas Bh 0.0150 13,200.00 198.00
JUMLAH HARGA BAHAN 9,781.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 21,046.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 21,046.20

5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0400 80,000.00 3,200.00
Tukang cat OH 0.0300 110,000.00 3,300.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 7,105.00
B. BAHAN
Cat Tembok Vinilex kg 0.4700 39,930.00 18,767.10
Roll Bh 0.0100 38,500.00 385.00
JUMLAH HARGA BAHAN 19,152.10
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 26,257.10
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 26,257.10

6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0800 80,000.00 6,400.00
Tukang cat OH 0.0600 110,000.00 6,600.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 14,210.00
B. BAHAN
Plamir Tembok kg 0.1000 159,500.00 15,950.00
Cat Tembok Vinilex Kg 0.2400 39,930.00 9,583.20
Amplas Lbr 0.5000 6,600.00 3,300.00
Kuas Bh 0.0150 13,200.00 198.00
Kapi Bh 0.0500 8,800.00 440.00
JUMLAH HARGA BAHAN 29,471.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 43,681.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 43,681.20

7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 80,000.00 4,800.00
Tukang cat OH 0.0400 110,000.00 4,400.00
Kepala Tukang OH 0.0040 115,000.00 460.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 10,050.00
B. BAHAN
Plamir Tembok kg 0.1000 159,500.00 15,950.00
Cat Tembok Vinilex Kg 0.4700 39,930.00 18,767.10
Amplas Lbr 0.5000 6,600.00 3,300.00
Roll Bh 0.0100 38,500.00 385.00
Kapi Bh 0.0500 8,800.00 440.00
JUMLAH HARGA BAHAN 38,842.10
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 48,892.10
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 48,892.10
8 1 M2 WATERPROOFING
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang cat OH 0.1600 110,000.00 17,600.00
Kepala Tukang OH 0.0140 115,000.00 1,610.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 21,060.00
B. BAHAN
Waterprofing dumplix 3 kg 0.4500 45,452.82 20,453.77
JUMLAH HARGA BAHAN 20,453.77
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,513.77
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,513.77

9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 80,000.00 800.00
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 13,600.00
B. BAHAN
Wall Paper m2 1.1000 660,000.00 726,000.00
Perekat Kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 731,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 745,100.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 745,100.00

10 1 M2 PEKERJAAN MELAPIS MENI KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 80,000.00 6,000.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 6,520.00
B. BAHAN
Meni kg 0.1700 49,500.00 8,415.00
Minyak Cat ltr 0.1000 46,530.00 4,653.00
Kuas bh 0.0150 13,200.00
JUMLAH HARGA BAHAN 13,068.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 19,588.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 19,588.00

11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1100 110,000.00 12,100.00
Kepala Tukang OH 0.0110 115,000.00 1,265.00
JUMLAH TENAGA KERJA 13,365.00
B. BAHAN
Dempul kayu kg 0.1500 49,500.00 7,425.00
Plamir Kayu Kg 0.0080 49,500.00 396.00
Minyak Cat Ltr 0.1000 46,530.00 4,653.00
Amplas Lbr 1.0000 6,600.00 6,600.00
Kuas Bh 0.0150 13,200.00 198.00
JUMLAH HARGA BAHAN 19,272.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 32,637.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 32,637.00

12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
JUMLAH TENAGA KERJA 9,170.00
B. BAHAN
Cat Dasar Kg 0.1700 49,500.00 8,415.00
Minyak Cat Ltr 0.1000 46,530.00 4,653.00
Amplas Lbr 1.0000 6,600.00 6,600.00
Kuas Bh 0.0150 13,200.00 198.00
JUMLAH HARGA BAHAN 19,866.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,036.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 29,036.00
13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang cat OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 31,265.00
B. BAHAN
Cat Tembok Vinilex kg 0.3000 49,500.00 14,850.00
Minyak Cat Ltr 0.2000 46,530.00 9,306.00
Kuas Bh 0.0200 13,200.00 264.00
JUMLAH HARGA BAHAN 24,420.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,685.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 55,685.00

14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 25,950.00
B. BAHAN
Amplas Lbr 0.5000 6,600.00 3,300.00
Sikat Baja Bh 0.0500 33,220.00 1,661.00
Soda Api Kg 0.0500 24,200.00 1,210.00
JUMLAH HARGA BAHAN 6,171.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 32,121.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 32,121.00

15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 80,000.00 6,000.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 6,520.00
B. BAHAN
Meni kg 0.1000 49,500.00 4,950.00
Minyak Cat Kg 0.1000 46,530.00 4,653.00
Amplas Bh 0.5000 6,600.00 3,300.00
Kuas Bh 0.0150 13,200.00 198.00
JUMLAH HARGA BAHAN 13,101.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 19,621.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 19,621.00

16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang cat OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 31,265.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.2000 110,000.00 22,000.00
Minyak Cat Kg 0.1000 46,530.00 4,653.00
Kuas Bh 0.0200 13,200.00 264.00
JUMLAH HARGA BAHAN 26,917.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 58,182.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 58,182.00

17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 80,000.00 1,600.00
Tukang cat OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0010 115,000.00 115.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 18,345.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.4000 110,000.00 44,000.00
Minyak Cat Kg 0.1000 46,530.00 4,653.00
JUMLAH HARGA BAHAN 48,653.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 66,998.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 66,998.00

18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,150.00
B. BAHAN
Teak Oil Ltr 0.3000 66,550.00 19,965.00
Amplas Lbr 0.5000 6,600.00 3,300.00
Kuas Bh 0.0150 13,200.00 198.00
JUMLAH HARGA BAHAN 23,463.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 35,613.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 35,613.00

19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 80,000.00 20,000.00
Tukang cat OH 0.2500 110,000.00 27,500.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 52,065.00
B. BAHAN
Wood Filler Kg 0.1000 60,500.00 6,050.00
Politur Jadi Ltr 0.2000 75,900.00 15,180.00
Amplas Lbr 1.0000 6,600.00 6,600.00
Kuas Bh 0.0200 13,200.00 264.00
JUMLAH HARGA BAHAN 28,094.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 80,159.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 80,159.00

20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,150.00
B. BAHAN
Vernis Ltr 0.3000 60,500.00 18,150.00
Amplas Lbr 0.5000 6,600.00 3,300.00
Kuas Bh 0.0200 13,200.00 264.00
JUMLAH HARGA BAHAN 21,714.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 33,864.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 33,864.00

21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA K ` 12,150.00
B. BAHAN
Residu/ter Ltr 0.3500 27,500.00 9,625.00
Minyak Tanah Ltr 0.0300 3,000.00 90.00
Kuas Bh 0.0200 13,200.00 264.00
JUMLAH HARGA BAHAN 9,979.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 22,129.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 22,129.00

XV PEKERJAAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 350,000.00 350,000.00
JUMLAH TENAGA K ` 350,000.00
B. BAHAN
Bata Gosok bh 110.0000 3,600.00 396,000.00
Semen 50 Kg kg 8.4000 1,450.00 12,180.00
JUMLAH HARGA BAHAN 408,180.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 758,180.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 758,180.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 200,000.00 200,000.00
JUMLAH TENAGA K ` 200,000.00
B. BAHAN
Paras Kerobokan bh 13.7500 13,750.00 189,062.50
Semen 50 Kg kg 8.4000 1,450.00 12,180.00
JUMLAH HARGA BAHAN 201,242.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 401,242.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 401,242.50

3 1 M2 PASANGAN BATA PRESS 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 200,000.00 200,000.00
JUMLAH TENAGA K ` 200,000.00
B. BAHAN
Bata Press bh 55.0000 3,600.00 198,000.00
Semen 50 Kg kg 4.2000 1,450.00 6,090.00
JUMLAH HARGA BAHAN 204,090.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 404,090.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 404,090.00

4 1 M2 PASANGAN PARAS 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 200,000.00 200,000.00
JUMLAH TENAGA K ` 200,000.00
B. BAHAN
Batu Paras bh 18.3333 11,687.50 214,270.83
Semen 50 Kg kg 4.2000 1,450.00 6,090.00
JUMLAH HARGA BAHAN 220,360.83
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 420,360.83
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 420,360.83

5 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 200,000.00 200,000.00
JUMLAH TENAGA K ` 200,000.00
B. BAHAN
Batu Palimanan bh 12.5000 11,500.00 143,750.00
Semen 50 Kg kg 4.2000 1,450.00 6,090.00
JUMLAH HARGA BAHAN 149,840.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 349,840.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 349,840.00

6 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 200,000.00 200,000.00
JUMLAH TENAGA K ` 200,000.00
B. BAHAN
Bata Gosok bh 55.0000 3,600.00 198,000.00
Batu Paras bh 4.4917 11,687.50 52,496.35
Semen 50 Kg kg 5.2500 1,450.00 7,612.50
JUMLAH HARGA BAHAN 258,108.85
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 458,108.85
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 458,108.85

7 1 M2 PASANGAN BATA GOSOK DIUKIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 355,000.00 355,000.00
JUMLAH TENAGA K ` 355,000.00
B. BAHAN
Bata Gosok bh 55.0000 3,600.00 198,000.00
Semen 50 Kg kg 4.2000 1,450.00 6,090.00
JUMLAH HARGA BAHAN 204,090.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 559,090.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 559,090.00

8 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 355,000.00 355,000.00
JUMLAH TENAGA K ` 355,000.00
B. BAHAN
Batu Tabas bh 18.3333 11,000.00 201,666.67
Semen 50 Kg kg 4.2000 1,450.00 6,090.00
JUMLAH HARGA BAHAN 207,756.67
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 562,756.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 562,756.67

9 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 280,000.00 280,000.00
JUMLAH TENAGA K ` 280,000.00
B. BAHAN
Bata Gosok bh 55.0000 3,600.00 198,000.00
Batu Paras bh 4.4917 11,687.50 52,496.35
Semen 50 Kg kg 5.2500 1,450.00 7,612.50
JUMLAH HARGA BAHAN 258,108.85
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 538,108.85
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 538,108.85

10 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja (Lumpsum) 350,000.00 350,000.00
JUMLAH TENAGA K ` 350,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 30.0000 9,900.00 297,000.00
Semen 40 kg gresik kg 1.0000 1,450.00 1,450.00
kayu cempaka m3 0.9800 2,950,000.00 2,891,000.00
ijuk kg 90.0000 1,980.00 178,200.00
JUMLAH HARGA BAHAN 3,367,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,717,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,717,650.00

11 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 26.0000 9,900.00 257,400.00
Semen 40 kg gresik kg 1.0000 1,450.00 1,450.00
kayu cempaka m3 0.7600 2,950,000.00 2,242,000.00
genteng plentong bh 90.0000 2,420.00 217,800.00
bubungan mini bh 20.0000 13,200.00 264,000.00
JUMLAH HARGA BAHAN 2,982,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,282,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,282,650.00

12 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 350,000.00 350,000.00
JUMLAH TENAGA K ` 350,000.00
B. BAHAN
Bata gosok ex tulikup bh 150.0000 5,850.00 877,500.00
paras silakarang bh 100.0000 25,000.00 2,500,000.00
Semen 40 kg gresik sak 1.0000 1,450.00 1,450.00
kayu cempaka m3 0.9800 2,950,000.00 2,891,000.00
ijuk kg 98.0000 1,980.00 194,040.00
JUMLAH HARGA BAHAN 6,463,990.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,813,990.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,813,990.00

13 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 125.0000 5,850.00 731,250.00
paras silakarang bh 82.0000 25,000.00 2,050,000.00
kayu cempaka m3 0.7650 2,950,000.00 2,256,750.00
Semen 40 kg gresik sak 1.0000 1,450.00 1,450.00
genteng plentong bh 90.0000 2,420.00 217,800.00
bubungan mini bh 20.0000 13,200.00 264,000.00
JUMLAH HARGA BAHAN 5,521,250.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 5,821,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 5,821,250.00

14 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 750,000.00 750,000.00
JUMLAH TENAGA K ` 750,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 65.0000 9,900.00 643,500.00
Semen 40 kg gresik sak 1.2000 1,450.00 1,740.00
kayu cempaka m3 1.8500 2,950,000.00 5,457,500.00
ijuk kg 315.0000 1,980.00 623,700.00
JUMLAH HARGA BAHAN 6,726,440.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 7,476,440.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 7,476,440.00

15 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja (Lumpsum) 650,000.00 650,000.00
JUMLAH TENAGA K ` 650,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 65.0000 9,900.00 643,500.00
Semen 40 kg gresik sak 1.2000 1,450.00 1,740.00
kayu cempaka m3 1.4000 2,950,000.00 4,130,000.00
genteng plentong bh 110.0000 2,420.00 266,200.00
bubungan mini bh 40.0000 13,200.00 528,000.00
JUMLAH HARGA BAHAN 5,569,440.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,219,440.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,219,440.00

16 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 750,000.00 750,000.00
JUMLAH TENAGA K ` 750,000.00
B. BAHAN
Bata ex tulikup bh 305.0000 5,850.00 1,784,250.00
paras silakarang bh 210.0000 25,000.00 5,250,000.00
Semen 40 kg gresik sak 1.2000 1,450.00 1,740.00
kayu cempaka m3 1.8800 2,950,000.00 5,546,000.00
ijuk kg 315.0000 1,980.00 623,700.00
JUMLAH HARGA BAHAN 13,205,690.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,955,690.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 13,955,690.00

17 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 750,000.00 750,000.00
JUMLAH TENAGA K ` 750,000.00
B. BAHAN
Bata ex tulikup bh 305.0000 5,850.00 1,784,250.00
paras silakarang bh 210.0000 25,000.00 5,250,000.00
kayu cempaka sak 1.4300 2,950,000.00 4,218,500.00
genteng plentong m3 110.0000 2,420.00 266,200.00
bubungan mini kg 40.0000 13,200.00 528,000.00
JUMLAH HARGA BAHAN 12,046,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,796,950.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,796,950.00

18 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 1,500,000.00 1,500,000.00
JUMLAH TENAGA K ` 1,500,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 230.0000 9,900.00 2,277,000.00
Semen 40 kg gresik sak 4.0000 1,450.00 5,800.00
kayu cempaka m3 3.2400 2,950,000.00 9,558,000.00
ijuk kg 470.0000 1,980.00 930,600.00
JUMLAH HARGA BAHAN 12,771,400.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,271,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 14,271,400.00

19 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 1,500,000.00 1,500,000.00
JUMLAH TENAGA K ` 1,500,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 230.0000 9,900.00 2,277,000.00
Semen 40 kg gresik sak 4.0000 1,450.00 5,800.00
kayu cempaka m3 3.0000 2,950,000.00 8,850,000.00
genteng plentong bh 225.0000 2,420.00 544,500.00
bubungan mini bh 75.0000 13,200.00 990,000.00
JUMLAH HARGA BAHAN 12,667,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,167,300.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 14,167,300.00

20 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 1,500,000.00 1,500,000.00
JUMLAH TENAGA K ` 1,500,000.00
B. BAHAN
Bata ex tulikup bh 525.0000 5,850.00 3,071,250.00
paras silakarang bh 350.0000 25,000.00 8,750,000.00
Semen 40 kg gresik sak 5.5000 1,450.00 7,975.00
kayu cempaka m3 3.2400 2,950,000.00 9,558,000.00
ijuk kg 470.0000 1,980.00 930,600.00
JUMLAH HARGA BAHAN 22,317,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 23,817,825.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 23,817,825.00

21 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 1,500,000.00 1,500,000.00
JUMLAH TENAGA K ` 1,500,000.00
B. BAHAN
Bata ex tulikup bh 525.0000 5,850.00 3,071,250.00
paras silakarang bh 350.0000 25,000.00 8,750,000.00
Semen 40 kg gresik sak 5.5000 1,450.00 7,975.00
kayu cempaka m3 3.0000 2,950,000.00 8,850,000.00
genteng plentong bh 225.0000 2,420.00 544,500.00
bubungan mini bh 75.0000 13,200.00 990,000.00
JUMLAH HARGA BAHAN 22,213,725.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 23,713,725.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 23,713,725.00

22 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 20.0000 9,900.00 198,000.00
Semen 40 kg gresik sak 0.7500 1,450.00 1,087.50
kayu cempaka m3 0.6300 2,950,000.00 1,858,500.00
ijuk kg 75.0000 1,980.00 148,500.00
JUMLAH HARGA BAHAN 2,206,087.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,506,087.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,506,087.50

23 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 21.0000 9,900.00 207,900.00
Semen 40 kg gresik sak 0.7500 1,450.00 1,087.50
kayu cempaka m3 0.6300 2,950,000.00 1,858,500.00
genteng plentong bh 75.0000 2,420.00 181,500.00
bubungan mini bh 16.0000 13,200.00 211,200.00
JUMLAH HARGA BAHAN 2,460,187.50
C. PERALATAN \
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,760,187.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,760,187.50

24 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 100.0000 5,850.00 585,000.00
paras silakarang bh 75.0000 25,000.00 1,875,000.00
Semen 40 kg gresik sak 0.8500 1,450.00 1,232.50
kayu cempaka m3 0.6150 2,950,000.00 1,814,250.00
ijuk kg 75.0000 1,980.00 148,500.00
JUMLAH HARGA BAHAN 4,423,982.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 4,723,982.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,723,982.50
25 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) 300,000.00 300,000.00
JUMLAH TENAGA K ` 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 100.0000 5,850.00 585,000.00
paras silakarang bh 75.0000 25,000.00 1,875,000.00
Semen 40 kg gresik sak 0.8500 1,450.00 1,232.50
kayu cempaka m3 0.6000 2,950,000.00 1,770,000.00
genteng plentong bh 70.0000 2,420.00 169,400.00
bubungan mini bh 16.0000 13,200.00 211,200.00
JUMLAH HARGA BAHAN 4,611,832.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 4,911,832.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,911,832.50

XVI PEKERJAAN HARDDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
Paving 10 x 20 cm tebal 6 cm K225 m2 1.0500 82,583.00 86,712.15
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 121,212.15
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 189,462.15
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 189,462.15

2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350 m2 1.0500 90,750.00 95,287.50
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 129,787.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 198,037.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 198,037.50

3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225 m2 1.0500 95,288.00 100,052.40
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 134,552.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 202,802.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 202,802.40

4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350 m2 1.0500 104,528.00 109,754.40
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 144,254.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 212,504.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 212,504.40
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 m2 1.0500 95,288.00 100,052.40
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 134,552.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 202,802.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 202,802.40

6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 m2 1.0500 95,288.00 100,052.40
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 134,552.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 202,802.40
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 202,802.40

7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 m2 1.0500 104,759.00 109,996.95
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 144,496.95
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 212,746.95
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 212,746.95

8 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc m2 1.0500 92,000.00 96,600.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 131,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 199,350.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 199,350.00

9 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah m2 1.0500 120,000.00 126,000.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 160,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 228,750.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 228,750.00

10 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam m2 1.0500 117,000.00 122,850.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 157,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 225,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 225,600.00

11 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc m2 1.0500 95,000.00 99,750.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 134,250.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 202,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 202,500.00

12 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah m2 1.0500 128,000.00 134,400.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 168,900.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 237,150.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 237,150.00

13 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah m2 1.0500 126,000.00 132,300.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 166,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 235,050.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 235,050.00

14 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc m2 1.0500 100,000.00 105,000.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 139,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 207,750.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 207,750.00

15 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah m2 1.0500 132,000.00 138,600.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 173,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 241,350.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 241,350.00

16 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam m2 1.0500 130,000.00 136,500.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 171,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 239,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 239,250.00

17 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc m2 1.0500 110,000.00 115,500.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 150,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 218,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 218,250.00

18 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah m2 1.0500 142,000.00 149,100.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 183,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 251,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 251,850.00

19 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam m2 1.0500 140,000.00 147,000.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 181,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 249,750.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 249,750.00

20 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc m2 1.0500 86,000.00 90,300.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 124,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 193,050.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 193,050.00

21 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 me m2 1.0500 116,000.00 121,800.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 156,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 224,550.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 224,550.00

22 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hit m2 1.0500 113,000.00 118,650.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 153,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 221,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 221,400.00
23 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc m2 1.0500 94,000.00 98,700.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 133,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 201,450.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 201,450.00

24 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 me m2 1.0500 138,000.00 144,900.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 179,400.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 247,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 247,650.00

25 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hit m2 1.0500 135,000.00 141,750.00
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 176,250.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 244,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 244,500.00

26 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA K ` 68,250.00
B. BAHAN
1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc m2 1.0500 79,233.00 83,194.65
Pasir Urug m3 0.1000 345,000.00 34,500.00
JUMLAH HARGA BAHAN 117,694.65
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 185,944.65
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 185,944.65

27 1 M2 PASANGAN GRASS BLOCK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 100,000.00 50,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Pekerja OH 1.0000 80,000.00 80,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA K ` 142,250.00
B. BAHAN
Grass Block m2 1.0000 64,050.00 64,050.00
Pasir Urug m3 0.0690 345,000.00 23,805.00
JUMLAH HARGA BAHAN 87,855.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 230,105.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 230,105.00

28 1 M2 PASANGAN KORAL SIKAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 100,000.00 25,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Pekerja OH 0.6250 80,000.00 50,000.00
Mandor OH 0.0310 130,000.00 4,030.00
JUMLAH TENAGA K ` 80,180.00
B. BAHAN
Koral Sikat zak 1.2000 48,000.00 57,600.00
Semen zak 9.2800 1,450.00 13,456.00
Pasir pasang m3 0.2000 400,000.00 80,000.00
JUMLAH HARGA BAHAN 151,056.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 231,236.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 231,236.00

29 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 bh 2.0000 30,608.00 61,216.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 66,331.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 179,437.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 179,437.00

30 Kanstein Jumbo (P:50,L:15,T:30 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein Jumbo (P:50,L:15,T:30 cm K225) bh 2.0000 35,000.00 70,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 75,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 188,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 188,221.00

31 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 bh 2.0000 27,000.00 54,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 59,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 172,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 172,221.00

32 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 )


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) bh 2.0000 46,000.00 92,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 97,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 210,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 210,221.00
33 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 )
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) bh 2.0000 49,500.00 99,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 104,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 217,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 217,221.00

34 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) bh 2.0000 25,000.00 50,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 55,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 168,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 168,221.00

35 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) bh 2.0000 20,000.00 40,000.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 45,115.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 158,221.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 158,221.00

36 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 100,000.00 35,000.00
Pekerja OH 0.9500 80,000.00 76,000.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 113,106.00
B. BAHAN
1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm bh 2.0000 37,538.00 75,076.00
Semen 50 Kg zak 2.1000 1,450.00 3,045.00
Pasir Urug m3 0.0060 345,000.00 2,070.00
JUMLAH HARGA BAHAN 80,191.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 193,297.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 193,297.00

37 1 M2 PENGECATAN KANSTEIN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Cat OH 0.0300 110,000.00 3,300.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Pekerja OH 0.1500 80,000.00 12,000.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA K ` 17,595.00
B. BAHAN
Cat kg 0.2840 64,460.00 18,306.64
Thiner kg 0.0710 27,500.00 1,952.50
JUMLAH HARGA BAHAN 20,259.14
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,854.14
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,854.14

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 25,000.00 25,000.00
JUMLAH TENAGA K ` 25,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 8.0000 11,000.00 88,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 3,300.00 9,900.00
Tee dos clipsal 20 mm hitam bh 2.0000 7,480.00 14,960.00
Klem clipsal 20 mm hitam bj 15.0000 11,025.00 165,375.00
Sock clipsal 20 mm hitam bj 3.0000 3,300.00 9,900.00
Inbow dos plastik clipsal E 157 P bj 1.0000 11,935.00 11,935.00
JUMLAH HARGA BAHAN 300,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 325,070.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 325,070.00

2 1 TITIK INSTALASI AC
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 25,000.00 25,000.00
JUMLAH TENAGA K ` 25,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 10.0000 11,000.00 110,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 3,300.00 9,900.00
Tee dos clipsal 20 mm hitam bh 1.0000 7,480.00 7,480.00
Klem clipsal 20 mm hitam bj 15.0000 11,025.00 165,375.00
Sock clipsal 20 mm hitam bj 4.0000 3,300.00 13,200.00
Inbow dos plastik clipsal E 157 P bj 1.0000 11,935.00 11,935.00
Pipa flexible clipsal 20 mm hitam m1 1.0000 11,000.00 11,000.00
JUMLAH HARGA BAHAN 328,890.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 353,890.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 353,890.00

3 1 TITIK INSTALASI TELEPHONE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Biaya Pasang ttk 1.0000 25,000.00 25,000.00
JUMLAH TENAGA K ` 25,000.00
B. BAHAN
Kabel Telephone m1 25.0000 17,482.50 437,062.50
Pipa Clipsal 20 mm hitam bt 8.0000 3,300.00 26,400.00
Tee dos clipsal 20 mm hitam bh 1.0000 7,480.00 7,480.00
Klem clipsal 20 mm hitam bj 25.0000 11,025.00 275,625.00
Sock clipsal 20 mm hitam bj 5.0000 3,300.00 16,500.00
Inbow dos plastik clipsal E 157 P bj 1.0000 11,935.00 11,935.00
JUMLAH HARGA BAHAN 775,002.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 800,002.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 800,002.50

4 1 TITIK INSTALASI MATV


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 25,000.00 25,000.00
JUMLAH TENAGA K ` 25,000.00
B. BAHAN
Coaxial cable 5C-75 ohm commscof m1 20.0000 18,700.00 374,000.00
Pipa Clipsal 20 mm hitam bt 6.0000 3,300.00 19,800.00
Tee dos clipsal 20 mm hitam bh 2.0000 7,480.00 14,960.00
Klem clipsal 20 mm hitam bj 20.0000 11,025.00 220,500.00
Sock clipsal 20 mm hitam bj 6.0000 3,300.00 19,800.00
Inbow dos plastik clipsal E 157 P bj 1.0000 11,935.00 11,935.00
JUMLAH HARGA BAHAN 660,995.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 685,995.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 685,995.00
DAFTAR ANALISA PEKERJAAN TAMBAHAN
TAHUN 2017
1 1 M2 Finishing lantai Epoxy Floor Coating Setara Polyfloor PU Concrete PFT - 253 MF Propan Multipox (3000 Micron)
SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1200 80,000.00 9,600.00
Tukang Cat OH 0.1200 110,000.00 13,200.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 24,960.00
B. BAHAN
Primer Coat - Polyfloor PU Concrete PFT - 253 MF (1000 Micron) m2 1.0000 132,000.00 132,000.00
Top Coat - Polyfloor PU Concrete PFT - 253 MF (2000 Micron) m2 1.0000 270,000.00 270,000.00
JUMLAH HARGA BAHAN 402,000.00

C. PERALATAN
Alat Bantu ls 1.0000 5,000.00 5,000.00
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 431,960.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 431,960.00

2 1 M2 Finishing lantai Epoxy Floor Coating Setara Polyfloor PFT - 253 MF Propan Multipox (2000 Micron)
SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1200 80,000.00 9,600.00
Tukang Cat OH 0.1200 110,000.00 13,200.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 24,960.00
B. BAHAN
Primer Coat - Polyfloor Epoxy Primer PFP 241 (50 Micron) m2 1.0000 9,800.00 9,800.00
First Coat - Polyfloor PFT - 253 (500 Micron) m2 1.0000 98,000.00 98,000.00
Top Coat - Polyfloor PFT - 253 (1500 Micron) m2 1.0000 294,000.00 294,000.00
JUMLAH HARGA BAHAN 401,800.00

C. PERALATAN
Alat Bantu ls 1.0000 5,000.00 5,000.00
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 431,760.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 431,760.00

3 1 M2 Finishing lantai Epoxy Floor Coating + Pasir Silica Setara Polyfloor PFT - 253 Propan Multipox (2000 Micron)
SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1200 80,000.00 9,600.00
Tukang Cat OH 0.1200 110,000.00 13,200.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 24,960.00
B. BAHAN
Primer Coat - Polyfloor Epoxy Primer PFP 241 (50 Micron) m2 1.0000 9,185.00 9,185.00
First Coat - Polyfloor PFT - 253 (500 Micron) m2 1.0000 91,850.00 91,850.00
Broadcast Layer (Tabur Pasir Silica)
Top Coat - Polyfloor PFT - 253 (1500 Micron) m2 1.0000 275,550.00 275,550.00
JUMLAH HARGA BAHAN 376,585.00

C. PERALATAN
Alat Bantu ls 1.0000 5,000.00 5,000.00
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 406,545.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 406,545.00

4 1 M2 Finishing lantai Floor Hardener Setara Propan Multipox


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1200 80,000.00 9,600.00
Tukang Cat OH 0.1200 110,000.00 13,200.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 24,960.00
B. BAHAN
First Layer - Silikat Penetran LD-201 m2 1.0000 85,000.00 85,000.00
Second Layer - Silikat Toping CC-203 m2 1.0000 91,900.00 91,900.00
JUMLAH HARGA BAHAN 176,900.00

C. PERALATAN
Alat Bantu ls 1.0000 5,000.00 5,000.00
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 206,860.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 206,860.00

5 1 M2 Semen Base Setara Sika Top Seal 107


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 21,450.00
B. BAHAN
Waterproofing sika kg 1.1000 17,500.00 19,250.00
JUMLAH HARGA BAHAN 19,250.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,700.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 40,700.00

6 1 M2 Pasangan Granite Tile 60x60 Setara Niro Granite Regal GMR81 Series Polished
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Granite Tile 60x60 m2 1.1000 345,000.00 379,500.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.0000 25,620.00 25,620.00
JUMLAH HARGA BAHAN 437,620.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 537,195.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 537,195.00

7 1 M2 Pasangan Granite Tile 30x30 Setara Niro Granite Nordik Stone GSN02 Series Structured
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Granite Tile 30x30 m2 1.1000 180,000.00 198,000.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.3000 25,620.00 33,306.00
JUMLAH HARGA BAHAN 263,806.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 363,381.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 363,381.00

8 1 M2 Pasangan Lantai Keramik 30x30 Setara Platinum


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Keramik 30x30 m2 1.1000 65,000.00 71,500.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.3000 25,620.00 33,306.00
JUMLAH HARGA BAHAN 137,306.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 236,881.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 236,881.00

9 1 M2 Pasangan Lantai Keramik 30x30 Setara Platinum, Anti Slip


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.7000 80,000.00 56,000.00
Tukang Batu OH 0.3500 100,000.00 35,000.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 99,575.00
B. BAHAN
Keramik 30x30 m2 1.1000 70,000.00 77,000.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir Pasang m3 0.0450 400,000.00 18,000.00
Semen warna/semen grouting kg 1.3000 25,620.00 33,306.00
JUMLAH HARGA BAHAN 142,806.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 242,381.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 242,381.00

10 1 M1 Pasangan Plint Granit Tile 10 X 60 CM Setara Niro Granite Regal GMR81 Series Polished
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0900 80,000.00 7,200.00
Tukang Batu OH 0.0900 100,000.00 9,000.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 17,885.00
B. BAHAN
Grinte Tile 10 x 60 cm bh 1.6667 115,000.00 191,666.67
Semen Portland kg 1.1400 1,450.00 1,653.00
Pasir Pasang m3 0.0030 400,000.00 1,200.00
Semen warna/semen grouting kg 0.1000 25,620.00 2,562.00
JUMLAH HARGA BAHAN 197,081.67

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 214,966.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 214,966.67

11 1 M1 Pasangan Plint Keramik 10x30 cm Setara Platinum


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0900 80,000.00 7,200.00
Tukang Batu OH 0.0900 100,000.00 9,000.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 17,885.00
B. BAHAN
Keramik 10 x 30 cm bh 3.3333 5,909.09 19,696.97
Semen Portland kg 1.1400 1,450.00 1,653.00
Pasir Pasang m3 0.0030 400,000.00 1,200.00
Semen warna/semen grouting kg 0.1000 25,620.00 2,562.00
JUMLAH HARGA BAHAN 25,111.97
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 42,996.97
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 42,996.97

12 1 M2 Pasangan Granit Tile Dinding 30x60 Setara Niro Granite Nordik Stone GSN02 Series Structured
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.9000 80,000.00 72,000.00
Tukang Batu OH 0.4500 100,000.00 45,000.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 128,025.00
B. BAHAN
Keramik 20x25 m2 1.1000 315,000.00 346,500.00
Semen Portland kg 9.3000 1,450.00 13,485.00
Pasir Pasang m3 0.0180 400,000.00 7,200.00
Semen warna/semen grouting kg 1.9400 25,620.00 49,702.80
JUMLAH HARGA BAHAN 416,887.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 544,912.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 544,912.80

13 1 M2 Pasangan Keramik Dinding 30x30 Setara Platinum


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.9000 80,000.00 72,000.00
Tukang Batu OH 0.4500 100,000.00 45,000.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 128,025.00
B. BAHAN
Keramik 20x25 m2 1.1000 65,000.00 71,500.00
Semen Portland kg 9.3000 1,450.00 13,485.00
Pasir Pasang m3 0.0180 400,000.00 7,200.00
Semen warna/semen grouting kg 1.9400 25,620.00 49,702.80
JUMLAH HARGA BAHAN 141,887.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 269,912.80
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 269,912.80

14 1 M1 Pasang List Gypsum 7 cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.0250 110,000.00 2,750.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 10,350.00
B. BAHAN
List gypsum 7cm m2 1.1000 22,800.00 25,080.00
Cornice kg 1.0000 3,250.00 3,250.00
JUMLAH HARGA BAHAN 28,330.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,680.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,680.00

15 1 M1 Kusen Aluminium 4'' Motif Kayu


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 80,000.00 4,800.00
Tukang Aluminium OH 0.0700 100,000.00 7,000.00
Kepala Tukang OH 0.0043 115,000.00 494.50
Mandor OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 12,567.50
B. BAHAN
Kusen aluminium 4" motif kayu m1 1.1000 185,000.00 203,500.00
Material bantu ls 1.0000 10,000.00 10,000.00
JUMLAH HARGA BAHAN 213,500.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 226,067.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 226,067.50

16 1 UnitPasang Engsel Pivot Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 29,600.00
B. BAHAN
Engsel Pivot BH 1.0000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 479,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 479,600.00

17 1 PS Pasang Handel Pintu Kaca Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 29,600.00
B. BAHAN
Handle Pintu Kaca BH 1.0000 620,000.00 620,000.00
JUMLAH HARGA BAHAN 620,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 649,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 649,600.00

18 1 PS Pasang Handel Pintu Biasa Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 29,600.00
B. BAHAN
Handle Pintu BH 1.0000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 279,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 279,600.00

19 1 PS Pasang Door Closer Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Kayu OH 0.7000 110,000.00 77,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 134,600.00
B. BAHAN
Door Closer BH 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 484,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 484,600.00

20 1 PS Pasang Door Stopper Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 29,600.00
B. BAHAN
Door stoper BH 1.0000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 114,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 114,600.00

21 1 BH Pasang Grendel Setara Solid


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 80,000.00 1,200.00
Tukang Kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 18,600.00
B. BAHAN
Grendel BH 1.0000 135,000.00 135,000.00
JUMLAH HARGA BAHAN 135,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 153,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 153,600.00

22 1 M1 Railing Tangga Pipa Bulat Stainless Steel SS 304 Dia. 2" Tebal 0,8 mm
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 80,000.00 48,000.00
Tukang besi OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 178,600.00
B. BAHAN
Pipa Bulat Stainless Steel SS 304 Dia. 2" Tebal 0,8 mm Btg 0.1833 276,276.00 50,650.60
Bahan Las ls 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 100,650.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 279,250.60
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 279,250.60

23 1 M1 Railing Tangga Besi Hollow Galvanis Kom. 40x40x2mm Dan 20x20x1,7mm


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 80,000.00 48,000.00
Tukang besi OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 178,600.00
B. BAHAN
Besi hollow Galvanis 40x40x2mm Btg 0.9167 149,860.00 137,371.67
Besi hollow Galvanis 20x20x1,7mm Btg 0.8750 67,200.00 58,800.00
Bahan Las ls 1.0000 50,000.00 50,000.00
Cat Chromate Kg 0.4000 110,000.00 44,000.00
Thinner ltr 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 295,671.67

C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 474,271.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 474,271.67

24 1 M1 Grill Kios Besi Hollow Galvanis Kom. 40x40x2mm Dan 20x20x1,7mm


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang besi OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 89,300.00
B. BAHAN
Besi hollow Galvanis 40x40x2mm Btg 0.4583 149,860.00 68,685.83
Besi hollow Galvanis 20x20x1,7mm Btg 0.2917 67,200.00 19,600.00
Bahan las ls 0.5000 50,000.00 25,000.00
Cat Chromate Kg 0.2000 110,000.00 22,000.00
Thinner ltr 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 138,035.83

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 227,335.83
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 227,335.83

25 1 M1 Grill Besi Drainase


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang besi OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 78,930.00
B. BAHAN
Besi Siku 50x50x5 mm Btg 0.5333 195,000.00 104,000.00
Besi Strip 5 x 50 mm Btg 1.0000 114,000.00 114,000.00
Bahan las ls 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 268,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 346,930.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 346,930.00

26 1 M2 Pemasangan Plat Stainless Steel 304 Tebal 1,5 mm


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Tukang besi OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 89,300.00
B. BAHAN
Plat Stainless Steel 304 Tebal 1,5 mm lbr 0.3701 1,188,910.00 440,052.26
Bahan las ls 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 490,052.26
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 579,352.26
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 579,352.26

27 1 M2 Pengecatan Tembok Eksterior Setara Dulux Weathershield


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.0630 110,000.00 6,930.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 15,979.50
B. BAHAN
Plamir kg 0.1000 159,500.00 15,950.00
Cat Penutup 2x kg 0.5000 126,500.00 63,250.00
JUMLAH HARGA BAHAN 79,200.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 95,179.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 95,179.50

28 1 M2 Pengecatan Tembok Interior Setara Dulux


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.0630 110,000.00 6,930.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 15,979.50
B. BAHAN
Plamir kg 0.1000 159,500.00 15,950.00
Cat Penutup 2x kg 0.5000 93,500.00 46,750.00
JUMLAH HARGA BAHAN 62,700.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 78,679.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 78,679.50

29 1 M2 Pengecatan Tembok Dengan Waterproofing Setara Aquaproof


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 21,450.00
B. BAHAN
Plamir kg 0.1000 159,500.00 15,950.00
Cat Penutup 2x kg 0.8000 42,500.00 34,000.00
JUMLAH HARGA BAHAN 49,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,400.00

30 1 M2 Coating Batu Alam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.0630 110,000.00 6,930.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 15,979.50
B. BAHAN
Coaitng ltr 0.3000 53,000.00 15,900.00
Tinner ltr 0.3000 27,500.00 8,250.00
JUMLAH HARGA BAHAN 24,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,129.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 40,129.50

31 1 M2 Pasangan Kaca 8 mm
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0630 80,000.00 5,040.00
Tukang besi OH 0.0730 105,000.00 7,665.00
Kepala Tukang OH 0.0650 115,000.00 7,475.00
Mandor OH 0.0800 130,000.00 10,400.00
JUMLAH TENAGA KERJA 30,580.00
B. BAHAN
Kaca bening 8mm M2 1.1000 317,900.00 349,690.00
Sealant Btl 3.5000 36,300.00 127,050.00
JUMLAH HARGA BAHAN 476,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 507,320.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 507,320.00

32 1 M2 Pasangan Partisi Toilet Setara Toilet Archi Cubicle Partition


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang besi OH 0.4500 105,000.00 47,250.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 65,465.00
B. BAHAN
- PanelPenolid Board Thick 12 mm, Hight 1,95 m M2 1.1000 1,510,000.00 1,661,000.00
- Finishing High Pressure Laminates (HPL)
- Pedestal A201 SS Adjustable Support
- Lock P166 Thum Turn Indicator Latch
- Hinge P150 Gravity Hinge
- Door Handle P155 Door Knops
- Dress Hook P152 Coat Hook
JUMLAH HARGA BAHAN 1,661,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,726,465.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,726,465.00

33 1 M2 Pemasangan Pembatas Los Besi Hollow Galvanis 40x40x2mm Kombinasi Kawat Besi Kotak
SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Besi OH 0.4500 105,000.00 47,250.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 65,465.00
B. BAHAN
Besi hollow Galvanis 40x40x2mm Btg 0.3500 149,860.00 52,451.00
Stainless Steel Wire Mesh M5 m2 1.1000 220,000.00 242,000.00
Cat Chromate Kg 0.1250 110,000.00 13,750.00
Thinner ltr 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 310,951.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 376,416.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 376,416.00

34 1 UNIT Wastafel Setara TOTO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 80,000.00 40,000.00
Tukang Batu OH 1.0000 100,000.00 100,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 165,600.00
B. BAHAN
Wastafel Toto unit 1.0000 1,248,500.00 1,248,500.00
JUMLAH HARGA BAHAN 1,248,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,414,100.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,414,100.00

35 1 UNIT Floor Drain Setara TOTO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0800 80,000.00 6,400.00
Tukang Batu OH 0.3000 100,000.00 30,000.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 40,240.00
B. BAHAN
Floor drainToto unit 1.0000 341,000.00 341,000.00
JUMLAH HARGA BAHAN 341,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 381,240.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 381,240.00

36 1 UNIT Bak Zink Setara Modena


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Batu OH 0.2000 100,000.00 20,000.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 39,825.00
B. BAHAN
Zink Satainless Steel unit 1.0000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 489,825.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 489,825.00

37 1 M2 Pemasangan Atap Genteng Kodok Setara Goodyear


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang Kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,210.00
B. BAHAN
Genteng Kodok bh 25.0000 5,500.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 159,710.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 159,710.00

38 1 M1 Pemasangan Bubungan Genteng Kodok Setara Goodyear


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 80,000.00 32,000.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Bubungan Kodok bh 5.0000 17,600.00 88,000.00
Semen Portland kg 10.0000 1,450.00 14,500.00
Pasir pasang m3 0.0320 400,000.00 12,800.00
JUMLAH HARGA BAHAN 115,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 171,860.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 171,860.00

39 1 M1 Pemasangan Listplank Kayu Kamper Double


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Tukang kayu OH 0.3000 110,000.00 33,000.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 49,100.00
B. BAHAN
Kayu Kamper m3 0.0198 10,100,000.00 199,980.00
Paku kg 0.1000 17,297.78 1,729.78
JUMLAH HARGA BAHAN 201,709.78
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 250,809.78
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 250,809.78

40 1 M1 Pemasangan Tatab
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang kayu OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 26,300.00
B. BAHAN
Kayu Kamper m3 0.0050 10,100,000.00 49,995.00
Paku Kg 0.0500 17,297.78 864.89
JUMLAH HARGA BAHAN 50,859.89
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,159.89
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 77,159.89

41 1 BH Pekerjaan Pasangan Murda Dan Ikut Celedu GRC


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja / Pekerja Tak Terlatih OH 1.0000 80,000.00 80,000.00
Mandor OH 0.5000 130,000.00 65,000.00
JUMLAH TENAGA KERJA 145,000.00
B. BAHAN
Murda / Puntal GRC Bh 1.0000 3,500,000.00 3,500,000.00
Alat Bantu Ls 1.0000 500,000.00 500,000.00
JUMLAH HARGA BAHAN 4,000,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 4,145,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,145,000.00
42 1 BH Pekerjaan Pasangan Delineator Steel Pipa 3 ''
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja / Pekerja Tak Terlatih OH 0.0500 80,000.00 4,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 7,250.00
B. BAHAN
- Delineator Steel Pipa 3 '' BH 1.0000 290,000.00 290,000.00
- Tinggi 1100 mm
- Diameter 100 mm
- Reflector : Sticker standard ASTM Tipe IV
- Uk. Reflektor : 181 x 50 mm
- Finishing : Cat Duco Oven
JUMLAH HARGA BAHAN 290,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 297,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 297,250.00

43 1 Unit Swing Fire Door Double


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00 24,000.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 37,000.00
B. BAHAN
Swing Fire Door Double Unit 1.0000 36,549,331.00 36,549,331.00
- Uk. Clear Opening : L: 1400 mm, T:2150 mm
Consist of :
- Kusen : Steel Plate 2mm
- Pintu : Steel Plate 1,6 mm (Tebal 55 mm)
- Isolasi : Rockwool Density 100kg/m3
- 3 Prs : Hinge
- 2 Set : Panic Device Palmo + Mortise Iseo
- 1 Set : Door Closer
- 1 Set : Flush Bolt FB SQ 501 - 270mm & 370mm
JUMLAH HARGA BAHAN 36,549,331.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 36,586,331.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 36,586,331.00

44 1 M3 Waterproofing Integral Crystallin Setara Pentent T-308


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 21,450.00
B. BAHAN
Waterproofing Integral Crystallin Setara Pentent T-308 m3 1.0000 140,000.00 140,000.00
JUMLAH HARGA BAHAN 140,000.00

C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 161,450.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 161,450.00

45 1 M2 Waterproofing Membrane Bakar Profextorcseal 3pv Setara Fosroc


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang cat OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 21,450.00
B. BAHAN
Waterproofing Membrane Bakar Profextorcseal 3pv Setara Fosroc m3 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 121,450.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 121,450.00

46 1 BH Pemasangan Huruf Stainless Steel 304 T=1,5mm, Tinggi Huruf 1 m, Tebal huruf 10 cm
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5300 80,000.00 42,400.00
Tukang Besi OH 0.5300 105,000.00 55,650.00
Kepala Tukang OH 0.5300 115,000.00 60,950.00
Mandor OH 0.0530 130,000.00 6,890.00
JUMLAH TENAGA KERJA 165,890.00
B. BAHAN
Stainless Steel 304 T=1,5 mm cm2 125.0000 15,000.00 1,875,000.00
Asesoris dan kelengkapan Ls 1.0000 500,000.00 500,000.00
JUMLAH HARGA BAHAN 2,375,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,540,890.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,540,890.00

47 1 M1 Tiang Sarana Upacara Besi Hollow Galvanis Kom. 40x40x2mm


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 80,000.00 6,000.00
Tukang besi OH 0.1250 105,000.00 13,125.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 22,325.00
B. BAHAN
Besi hollow Galvanis 40x40x2mm Btg 0.1833 149,860.00 27,474.33
Bahan las ls 1.0000 50,000.00 50,000.00
Cat Chromate Kg 0.1250 110,000.00 13,750.00
Thinner ltr 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 93,974.33

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 116,299.33
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,299.33

48 1 M1 Pekerjaan Pasangan List Stepnosing Karet Tangga


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja / Pekerja Tak Terlatih OH 0.0500 80,000.00 4,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 7,250.00
B. BAHAN
List Stepnosing Karet Tangga m1 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,250.00

49 1 M2 Pekerjaan Pasangan Usuk Profil C 75


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 31,250.00
B. BAHAN
Baja ringan profil C 75 m' 3.5000 19,000.00 66,500.00
Sekrup Pcs 80.0000 135.00 10,800.00
JUMLAH HARGA BAHAN 77,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 108,550.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 108,550.00

50 1 M2 Pekerjaan Pasangan Reng Baja Ringan


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 31,250.00
B. BAHAN
Baja ringan profil Uk m' 5.5452 7,700.00 42,698.04
Sekrup Pcs 80.0000 135.00 10,800.00
JUMLAH HARGA BAHAN 53,498.04
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 84,748.04
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,748.04

51 1 BH Pemasangan Angkur Diameter 16


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.0100 80,000.00 800.00
Tukang kayu OH 0.0080 110,000.00 880.00
Kepala Tukang OH 0.0020 115,000.00 230.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 2,170.00
B. BAHAN
Angkur diameter 16 bh 1.0000 55,000.00 55,000.00
Alat dan material bantu ls 1.0000 1,000.00 1,000.00
JUMLAH HARGA BAHAN 56,000.00

C. PERALATAN -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 58,170.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 58,170.00

52 1 BH Pemasangan Baut Diameter 16


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 80,000.00 800.00
Tukang kayu OH 0.0080 110,000.00 880.00
Kepala Tukang OH 0.0020 115,000.00 230.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 2,170.00
B. BAHAN
Baut diameter 16 bh 1.0000 9,000.00 9,000.00
Alat dan material bantu ls 1.0000 1,000.00 1,000.00
JUMLAH HARGA BAHAN 10,000.00

C. PERALATAN -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 12,170.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,170.00

53 1 KG Cat Zincromate
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 80,000.00 800.00
Tukang Cat OH 0.0080 110,000.00 880.00
Kepala Tukang OH 0.0020 115,000.00 230.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 2,170.00
B. BAHAN
Cat Chromate kg 1.0000 110,000.00 110,000.00
Alat dan material bantu ls 1.0000 1,000.00 1,000.00
JUMLAH HARGA BAHAN 111,000.00

C. PERALATAN -

JUMLAH HARGA ALAT -


D. Jumlah (A + B + C) 113,170.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 113,170.00

54 1 M2 Pemasangan Kaca Tempered T=12 mm Lapis Kaca Film Setara Llumar BM 20 + Spider Fitting
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2400 80,000.00 19,200.00
Tukang Besi OH 0.2400 105,000.00 25,200.00
Kepala Tukang OH 0.1950 115,000.00 22,425.00
Mandor OH 0.2400 130,000.00 31,200.00
JUMLAH TENAGA KERJA 98,025.00
B. BAHAN
Kaca Tempered 12 mm m2 1.1000 565,000.00 621,500.00
Lapis Kaca Film m2 1.1000 1,248,000.00 1,372,800.00
Sipder Fitting Bh 0.5000 2,050,000.00 1,025,000.00
Sealent btl 3.5000 36,300.00 127,050.00
JUMLAH HARGA BAHAN 3,146,350.00

C. PERALATAN -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 3,244,375.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,244,375.00

55 1 M3 Pekerjaan Beton K300


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja Hari 0.3515 80,000.00 28,116.00
Tukang Batu Hari 1.4157 100,000.00 141,570.00
Kepala Tukang Hari 0.0299 115,000.00 3,438.27
Mandor Hari 0.0166 130,000.00 2,162.16
JUMLAH TENAGA KERJA 175,286.43
B. BAHAN
Beton Ready Mix K 300, Slump 12 +/- 2 cm M3 1.0500 1,551,000.00 1,628,550.00
Additive/Bonding Agent Ltr 0.2500 132,950.00 33,237.50
JUMLAH HARGA BAHAN 1,661,787.50

C. PERALATAN
Concrete Pump Lot 1.0000 46,700.00 46,700.00
Alat Alat lain Lot 1.0000 33,236.45 33,236.45
JUMLAH HARGA ALAT 79,936.45

D. Jumlah (A + B + C) 1,917,010.38
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,917,010.38

56 1 M' SCAFOLDING Penahan BALOK PRESTRESS, Tinggi kl..3,00 Mt (Sewa)


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja Hari 0.0799 80,000.00 6,390.00
Tukang Batu Hari 0.3218 100,000.00 32,175.00
Kepala Tukang Hari 0.0068 115,000.00 781.43
Mandor Hari 0.0038 130,000.00 491.40
JUMLAH TENAGA KERJA 39,837.83
B. BAHAN Per 6,00 Mtr.
Main Frame MF 170 Bh 6.0000 9,310.00 55,860.00
End Frame EF 90 Bh 6.0000 6,650.00 39,900.00
Bracing 193 Bh 12.0000 4,330.00 51,960.00
Bracing 185 Bh 12.0000 4,330.00 51,960.00
Base Plate Bh 12.0000 3,990.00 47,880.00
Joint Pin Bh 12.0000 5,320.00 63,840.00
U Head Jack Bh 12.0000 5,320.00 63,840.00
Main Beam (Gelagar) 5 Mtr Bh 2.0000 13,300.00 26,600.00
Rail Beam (Suri-Suri) Bh 10.0000 13,300.00 133,000.00
JUMLAH HARGA BAHAN 534,840.00
JUMLAH HARGA PER METER 89,140.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 128,977.83
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 128,977.83

57 1 Kg Pemasangan Besi WIRE MESH (M6-150)


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja Hari 0.0027 80,000.00 213.00
Tukang Besi Hari 0.0143 105,000.00 1,501.50
Kepala Tukang Hari 0.0030 115,000.00 347.30
Mandor Hari 0.0017 130,000.00 218.40
JUMLAH TENAGA KERJA 2,280.20
B. BAHAN
Wire Mesh U50 m2 1.1000 11,170.00 12,287.00
Kawat Beton Kg 0.0150 15,400.00 231.00
JUMLAH HARGA BAHAN 12,518.00

C. PERALATAN
Alat Kerja Lot 1.0000 1,100.00 1,100.00
JUMLAH HARGA ALAT 1,100.00

D. Jumlah (A + B + C) 15,898.20
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 15,898.20

58 1 Kg Pemasangan Besi Ulir U40


SATUAN KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja Hari 0.0043 80,000.00 340.80
Tukang Besi Hari 0.0172 105,000.00 1,801.80
Kepala Tukang Hari 0.0036 115,000.00 416.76
Mandor Hari 0.0020 130,000.00 262.08
JUMLAH TENAGA KERJA 2,821.44
B. BAHAN
Besi Beton Kg 1.1000 9,900.00 10,890.00
Kawat Beton Kg 0.0150 15,400.00 231.00
JUMLAH HARGA BAHAN 11,121.00

C. PERALATAN
Alat Kerja Lot 1.0000 1,100.00 1,100.00
JUMLAH HARGA ALAT 1,100.00

D. Jumlah (A + B + C) 15,042.44
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 15,042.44

59 1 UNIT Sewa TC KAP 2,5 TON LENGTH 60 M1 Selama 6 Bulan


KOEFISIEN HARGA SATUAN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa TC Kap 2,5 Ton Length 60 m/Bulan/ 200 jam Bulan 6.0000 120,000,000.00 720,000,000.00
Jaminan Angkur Set 1.0000 65,000,000.00 65,000,000.00
Pasang Angkur Set 1.0000 7,500,000.00 7,500,000.00
Erexsion Set 1.0000 55,000,000.00 55,000,000.00
Dismantling Normal Set 1.0000 55,000,000.00 55,000,000.00
Mob-Demob TC Set 1.0000 175,000,000.00 175,000,000.00
Transportasi Crew TC 6 Orang Ls 1.0000 25,000,000.00 25,000,000.00
Gaji Operator Set 1.0000 7,500,000.00 7,500,000.00
Mess Crew dan Operator Ditanggung Penyewa
Genzet/ Power Listrik Ditanggung Penyewa
Alat bantu Bongkar Pasang Ditanggung Penyewa
Asuransi Ditanggung Penyewa
JUMLAH HARGA ALAT 1,110,000,000.00

D. Jumlah (A + B + C) 1,110,000,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,110,000,000.00

60 1 M3 Urugan Tanah Subur


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 80,000.00 40,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 46,500.00
B. BAHAN
Tanah Subur M3 1.2000 80,000.00 96,000.00
JUMLAH HARGA BAHAN 96,000.00

C. PERALATAN -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 142,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 142,500.00

61 1 M2 Penanaman Tanaman Hias Kacang Kacangan


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 80,000.00 12,000.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 13,950.00
B. BAHAN
Tanaman Hias Btg 50.0000 500.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C. PERALATAN -

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 38,950.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,950.00

62 1 Ton Pekerjaan Lapisan Aspal


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1406 80,000.00 11,248.00
Mandor OH 0.0201 130,000.00 2,613.00
JUMLAH TENAGA KERJA 13,861.00
B. BAHAN
Pasir Kasar m3 0.0139 345,000.00 4,795.50
Pasir Halus m3 0.0139 460,000.00 6,394.00
Semen kg 31.5000 1,450.00 45,675.00
Aspal kg 92.7000 12,600.00 1,168,020.00
JUMLAH HARGA BAHAN 1,224,884.50
C. PERALATAN
Wheel Loader Jam 0.0096 330,000.00 3,168.00
AMP Jam 0.0201 5,018,600.00 100,873.86
Genzet Jam 0.0201 416,800.00 8,377.68
Dump Truck Jam 0.0384 248,157.27 9,529.24
Asphalt Finishir Jam 0.0290 507,700.00 14,723.30
Tandem Roller Jam 0.0238 318,300.00 7,575.54
P. Tyre Roller Jam 0.0082 292,100.00 2,395.22
Alat Bantu Ls 1.0000 20,000.00 20,000.00
JUMLAH HARGA ALAT 166,642.84

D. Jumlah (A + B + C) 1,405,388.34
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,405,388.34

63 1 M3 Pekerjaan Beton K-450


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1815 87,550.00 15,890.33
Tukang Cor/Batu OH 0.7260 105,060.00 76,273.56
Kepala Tukang OH 0.0145 128,410.00 1,864.51
Mandor OH 0.0073 175,100.00 1,271.23
JUMLAH TENAGA KERJA 95,299.62
B. BAHAN
Beton Ready Mix K 450 m3 1.0500 1,579,400.00 1,658,370.00
Additive m3 2.5000 17,510.00 43,775.00
JUMLAH HARGA BAHAN 1,702,145.00
C. PERALATAN
Concrete Pump Lot 1.0000 46,700.00 46,700.00
Alat Alat lain Lot 1.0000 58,366.44 58,366.44
JUMLAH HARGA ALAT 105,066.44

D. Jumlah (A + B + C) 1,902,511.06
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,902,511.06
64 1 M3 Beton Balok Precast Prestress B1, B2, BR1 dan BS1
SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

Ukuran m 0.4000 1.5240 2.9839


m 0.5000 1.4319 1.5782
m 5.5600

A. TENAGA
Pekerja erection Hari 2.0000 96,305.00 192,610.00
Tukang erection Hari 1.5000 115,566.00 173,349.00
Kepala Tukang erection Hari 0.5000 141,251.00 70,625.50
Mandor erection Hari 0.2500 192,610.00 48,152.50
JUMLAH TENAGA KERJA 484,737.00
B. BAHAN
Beton Ready Mix K-450 M3 1.0500 1,902,511.06 1,997,636.62
Pembesian PC Strand Kg 35.7967 24,310.00 870,217.84
Pembesian U40 Kg 197.6418 15,720.05 3,106,939.15
Cetakan/Formwork M2 5.0000 131,250.00 656,250.00
JUMLAH HARGA BAHAN 6,631,043.61
C. ALAT PRODUKSI DAN FINISHING
Upah Jacking Strands dll m3 1.0000 1,700,000.00 1,700,000.00
Peralatan Gantry Crane dll m3 1.0000 275,000.00 275,000.00
Aksesoris Produksi Ls 1.0000 750,000.00 750,000.00
Material testing m3 1.0000 130,000.00 130,000.00
QC,Grouting/finshing Lot 1.0000 175,000.00 175,000.00
JUMLAH HARGA ALAT 3,030,000.00
D. STOCKING, LOADING TRUCKING & UNLOADING
Upah Curing & Stocking m3 1.0000 275,000.00 275,000.00
Loading di Pabrik Kg 2,500.0000 20.00 50,000.00
Biaya Transport Pabrik (Bandung) - Site (Dps) Kg 2,500.0000 825.00 2,062,500.00
Turunkan di Site Proyek ( Crane ) Ls 2,500.0000 20.00 50,000.00
Bahan bantu ( kayu ) landasan m3 1.0000 55,000.00 55,000.00
JUMLAH HARGA ALAT 2,492,500.00

D. Jumlah (A + B + C) 12,638,280.61
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,638,280.61
G. Harga per balok B1, B2, BR1 dan BS1 14,053,768.04

65 1 M3 Beton Balok Precast Prestress B3 dan B4


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

Ukuran m 0.4000 1.5240 2.9839


m 0.4000 1.4319 1.5782
m 5.5600

A. TENAGA
Pekerja erection Hari 2.0000 96,305.00 192,610.00
Tukang erection Hari 1.5000 115,566.00 173,349.00
Kepala Tukang erection Hari 0.5000 141,251.00 70,625.50
Mandor erection Hari 0.2500 192,610.00 48,152.50
JUMLAH TENAGA KERJA 484,737.00
B. BAHAN
Beton Ready Mix K-450 M3 1.0500 1,902,511.06 1,997,636.62
Pembesian PC Strand Kg 35.7967 24,310.00 870,217.84
Pembesian U40 Kg 206.0139 15,720.05 3,238,548.74
Cetakan/Formwork M2 5.0000 131,250.00 656,250.00
JUMLAH HARGA BAHAN 6,762,653.19
C. ALAT PRODUKSI DAN FINISHING
Upah Jacking Strands dll m3 1.0000 1,700,000.00 1,700,000.00
Peralatan Gantry Crane dll m3 1.0000 275,000.00 275,000.00
Aksesoris Produksi Ls 1.0000 750,000.00 750,000.00
Material testing m3 1.0000 130,000.00 130,000.00
QC,Grouting/finshing Lot 1.0000 175,000.00 175,000.00
JUMLAH HARGA ALAT 3,030,000.00
D. STOCKING, LOADING TRUCKING & UNLOADING
Upah Curing & Stocking m3 1.0000 275,000.00 275,000.00
Loading di Pabrik Kg 2,500.0000 20.00 50,000.00
Biaya Transport Pabrik (Bandung) - Site (Dps) Kg 2,500.0000 825.00 2,062,500.00
Turunkan di Site Proyek ( Crane ) Ls 2,500.0000 20.00 50,000.00
Bahan bantu ( kayu ) landasan m3 1.0000 55,000.00 55,000.00
JUMLAH HARGA ALAT 2,492,500.00

D. Jumlah (A + B + C) 12,769,890.19
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,769,890.19
G. Harga per balok B3 dan B4 11,360,094.32

66 1 M3 Beton Balok Precast Prestress RB1 dan RB2


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

Ukuran m 0.3000 1.5240 1.5782


m 0.5000 1.4319 0.6165
m 5.5600

A. TENAGA
Pekerja erection Hari 2.0000 96,305.00 192,610.00
Tukang erection Hari 1.5000 115,566.00 173,349.00
Kepala Tukang erection Hari 0.5000 141,251.00 70,625.50
Mandor erection Hari 0.2500 192,610.00 48,152.50
JUMLAH TENAGA KERJA 484,737.00
B. BAHAN
Beton Ready Mix K-450 M3 1.0500 1,902,511.06 1,997,636.62
Pembesian PC Strand Kg 23.7054 24,310.00 576,277.59
Pembesian U40 Kg 143.6478 15,720.05 2,258,149.83
Cetakan/Formwork M2 5.0000 131,250.00 656,250.00
JUMLAH HARGA BAHAN 5,488,314.04
C. ALAT PRODUKSI DAN FINISHING
Upah Jacking Strands dll m3 1.0000 1,700,000.00 1,700,000.00
Peralatan Gantry Crane dll m3 1.0000 275,000.00 275,000.00
Aksesoris Produksi Ls 1.0000 750,000.00 750,000.00
Material testing m3 1.0000 130,000.00 130,000.00
QC,Grouting/finshing Lot 1.0000 175,000.00 175,000.00
JUMLAH HARGA ALAT 3,030,000.00
D. STOCKING, LOADING TRUCKING & UNLOADING
Upah Curing & Stocking m3 1.0000 275,000.00 275,000.00
Loading di Pabrik Kg 2,500.0000 20.00 50,000.00
Biaya Transport Pabrik (Bandung) - Site (Dps) Kg 2,500.0000 825.00 2,062,500.00
Turunkan di Site Proyek ( Crane ) Ls 2,500.0000 20.00 50,000.00
Bahan bantu ( kayu ) landasan m3 1.0000 55,000.00 55,000.00
JUMLAH HARGA ALAT 2,492,500.00

D. Jumlah (A + B + C) 11,495,551.04
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,495,551.04
G. Harga per Balok RB1 dan RB2 9,587,289.56

67 1 M2 Beton Plat Lantai HCS TYPE 200.07.14


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)
A. TENAGA
Pekerja erection Hari 0.2000 96,305.00 19,261.00
Tukang erection Hari 0.2000 115,566.00 23,113.20
Kepala Tukang erection Hari 0.1000 141,251.00 14,125.10
Mandor erection Hari 0.0500 192,610.00 9,630.50
JUMLAH TENAGA KERJA 66,129.80
B. BAHAN
Beton Ready Mix K-450 M3 0.1385 1,902,511.06 263,497.78
Pembesian PC Wire Kg 5.6800 22,310.00 126,720.80
Cetakan/Formwork M2 0.9960 131,250.00 130,725.00
JUMLAH HARGA BAHAN 520,943.58
C. STOCKING, LOADING TRUCKING & UNLOADING
Upah Curing & Stocking m3 0.0600 275,000.00 16,500.00
Loading di Pabrik Kg 334.1700 20.00 6,683.40
Biaya Transport Pabrik (Bandung) - Site (Dps) Kg 334.1700 825.00 275,690.25
Turunkan di Site Proyek ( Crane ) Ls 334.1700 20.00 6,683.40
Bahan bantu ( kayu ) landasan m3 0.1385 55,000.00 7,617.50
JUMLAH HARGA ALAT 313,174.55

D. Jumlah (A + B + C) 900,247.93
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 900,247.93

68 1 M2 Beton Plat Lantai HCS TYPE 150.07.14


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja erection Hari 0.2000 96,305.00 19,261.00
Tukang erection Hari 0.2000 115,566.00 23,113.20
Kepala Tukang erection Hari 0.1000 141,251.00 14,125.10
Mandor erection Hari 0.0500 192,610.00 9,630.50
JUMLAH TENAGA KERJA 66,129.80
B. BAHAN
Beton Ready Mix K-450 M3 0.1100 1,902,511.06 209,276.22
Pembesian PC Wire Kg 5.6800 22,310.00 126,720.80
Cetakan/Formwork M2 0.9960 131,250.00 130,725.00
JUMLAH HARGA BAHAN 466,722.02
C. STOCKING, LOADING TRUCKING & UNLOADING
Upah Curing & Stocking m3 0.0549 275,000.00 15,097.50
Loading di Pabrik Kg 314.4000 20.00 6,288.00
Biaya Transport Pabrik (Bandung) - Site (Dps) Kg 314.4000 825.00 259,380.00
Turunkan di Site Proyek ( Crane ) Ls 314.4000 20.00 6,288.00
Bahan bantu ( kayu ) landasan m3 0.1100 55,000.00 6,050.00
JUMLAH HARGA ALAT 293,103.50

D. Jumlah (A + B + C) 825,955.32
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 825,955.32

69 1 M1 Pemasangan Besi Hollow Galvanis Kom. 40x40x2mm


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 80,000.00 4,000.00
Tukang besi OH 0.0833 105,000.00 8,750.00
Kepala Tukang OH 0.0167 115,000.00 1,916.67
Mandor OH 0.0017 130,000.00 216.67
JUMLAH TENAGA KERJA 14,883.33
B. BAHAN
Besi hollow Galvanis 40x40x2mm Btg 0.1833 149,860.00 27,474.33
Cat Chromate Kg 0.0196 110,000.00 2,151.11
Thinner ltr 0.0098 27,500.00 268.89
JUMLAH HARGA BAHAN 29,894.33

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 44,777.67
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 44,777.67

70 1 M2 Pemasangan Triplek tebal 18 mm kayu semi meranti


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 80,000.00 2,000.00
Tukang Kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 11,300.00
B. BAHAN
Triplek tebal 18 mm kayu semi meranti Lbr 0.3695 232,000.00 85,729.64
Paku Kg 0.0500 15,271.67 763.58
JUMLAH HARGA BAHAN 86,493.23

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 97,793.23
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 97,793.23

71 1 m2 Pemasangan HPL Motif Kayu Ex. Taco


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 80,000.00 2,000.00
Tukang Kayu OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 11,300.00
B. BAHAN
Lapisan HPL Lbr 0.3695 227,680.50 84,133.48
Lem Kayu kg 0.1833 53,000.00 9,716.67
JUMLAH HARGA BAHAN 93,850.15

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 105,150.15
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 105,150.15

72 1 M3 Pekerjaan Lapisan Agregat Kelas A (Agregat 5-10, 10-20 & 20-30)


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0630 80,000.00 5,040.00
Mandor OH 0.0315 130,000.00 4,095.00
JUMLAH TENAGA KERJA 9,135.00
B. BAHAN
Agregat 20-30 m3 0.2940 450,000.00 132,300.00
Agregat 5-10 & 10-20 m3 0.4410 450,000.00 198,450.00
Pasir Urug kg 0.3150 345,000.00 108,675.00
JUMLAH HARGA BAHAN 439,425.00
C. PERALATAN
Wheel Loader Jam 0.0315 330,000.00 10,395.00
Blending Equpment Jam 0.0482 230,000.00 11,086.00
Alat Bantu Ls 1.0000 20,000.00 20,000.00
JUMLAH HARGA ALAT 41,481.00

D. Jumlah (A + B + C) 490,041.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 490,041.00

73 1 M3 Pekerjaan Lapisan Agregat Kelas B (Agregat 5-10, 10-20 & 20-30)


SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0630 80,000.00 5,040.00
Mandor OH 0.0315 130,000.00 4,095.00
JUMLAH TENAGA KERJA 9,135.00
B. BAHAN
Agregat 20-30 m3 0.1890 450,000.00 85,050.00
Agregat 5-10 & 10-20 m3 0.1890 450,000.00 85,050.00
Sirtu kg 0.6720 320,000.00 215,040.00
JUMLAH HARGA BAHAN 385,140.00
C. PERALATAN
Wheel Loader Jam 0.0315 330,000.00 10,395.00
Blending Equpment Jam 0.0482 230,000.00 11,086.00
Alat Bantu Ls 1.0000 20,000.00 20,000.00
JUMLAH HARGA ALAT 41,481.00

D. Jumlah (A + B + C) 435,756.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 435,756.00
DAFTAR HARGA SATUAN BAHAN
TAHUN 2017
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

BATU, PASIR DAN TANAH


1 Batu Kali/batu bulat 15-30 cm m3 425,000.00
2 Batu Karang Bukit m3 210,000.00
3 Batu Belah Diameter 1-0,50 cm m3 450,000.00
4 Batu Pecah diameter 5-7 cm m3 460,000.00
5 Batu Pecah diameter 3-4cm m3 465,000.00
6 Batu Pecah diameter 2-3 cm m3 468,000.00
7 Koral Beton diameter 1 - 2 cm m3 650,000.00
8 Koral Sikat (Lokal) zak 48,000.00
9 Batu Candi Hitam (Ukuran 30 x 30 x 2 Cm) Cirebon m2 105,600.00
10 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) Cirebon m2 156,000.00
11 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) Cirebon m2 228,000.00
12 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) Cirebon m2 90,000.00
13 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) Cirebon m2 216,000.00
14 Batu Putih Jogya / Palimanan (30 x 30 x 2 Cm) m2 96,000.00
15 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2 138,000.00
16 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2 204,000.00
17 Batu pilah Singaraja 30 x 30 m2 89,100.00
18 Batu pilah Singaraja 20 x 20 m2 83,600.00
19 Batu hitam Jember 5 x 20 halus m2 83,600.00
20 Batu hitam Jember 20 x 40 halus m2 89,100.00
21 Batu hitam Jember 15 x 30 halus m2 83,600.00
22 Batu hitam Singaraja 15 x 30 halus m2 83,600.00
23 Batu hitam Singaraja 20 x 40 halus m2 89,100.00
24 Batu hitam karangasem/Batu Tabas m2 99,000.00
25 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) m2 25,000.00
26 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) m2 33,000.00
27 Batu Paras Bali/Pawon (Abu - Abu Terang) m2 93,500.00
28 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh 13,750.00
29 Batako Lubang bj 2,050.00
30 Batako Buntu bj 2,250.00
32 Bata Ringan setara falcon uk. 75 x 200 x 500 mm m3 935,000.00
33 Bata Ringan setara falcon uk. 100 x 200 x 600 mm m3 935,000.00
34 Bata Ringan setara falcon uk. 125 x 200 x 600 mm m3 935,000.00
35 Bata Ringan setara falcon uk. 150 x 200 x 600 mm m3 935,000.00
36 Bata Merah Klas I bj 2,600.00
37 Bata Merah Klas II bj 2,800.00
38 Bata Merah Klas III bj 1,500.00
39 Bata Merah Super (Pripian) ex tulikup bj 5,850.00
40 Bata Pres 22x10x6cm bj 3,600.00
41 Bata Pres 22x10x5cm bj 3,200.00
42 Limestone m3 170,000.00
43 Pasir Halus m3 460,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
44 Pasir pasang m3 400,000.00
45 Pasir cor m3 370,000.00
46 Pasir urug m3 345,000.00
47 Sirtu m3 320,000.00
48 Split Kasar M3 425,000.00
49 Split Halus M3 450,000.00
50 Tanah urug m3 150,000.00

SEMEN & PEREKAT


51 Semen Setara Gresik kg 1,450.00
52 Semen Setara Tiga Roda kg 1,425.00
53 Semen Setara Tonasa kg 1,375.00
54 Semen Setara Bosowa kg 1,375.00
55 Semen Setara Holcim kg 1,375.00
56 Semen warna setara MU 408/ Nat kg 25,620.00

Mortar Utama
57 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg Zak 140,000.00
58 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg Zak 98,000.00
59 Plester premium (MU-100)@ 40 kg Zak 91,350.00
60 Finish Plesteran/ Render (MU 290)@ 40 kg Zak 160,230.00
61 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) Zak 75,000.00
62 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) Zak 148,000.00
63 Acian Putih (MU-270)@25 kg Zak 152,460.00
64 Perata Lantai (MU-440)@40kg Zak 87,360.00
65 Perata Lantai Expose (MU 445) 40 kg Zak 169,890.00
66 Self Leveling Floor /Underlayment (MU-410) @25kg Zak 270,900.00
67 Primer Self Leveling Floor (MU-L410) @ 5lt Set 302,925.00
68 Floor Hardener (MU 700) 25 kg Zak 138,180.00
69 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg Zak 117,442.50
70 Cerafix/Perekat Keramik (MU-420)@25 kg Zak 82,162.50
71 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg Zak 392,070.00
72 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg Zak 235,095.00
73 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg Zak 299,250.00
74 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg Zak 324,660.00
75 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg 11,340.00
76 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg 16,800.00
77 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set 154,875.00
78 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set 82,950.00
79 FixGrout/Perbaikan struktur beton (MU-800)@20kg Zak 77,490.00
80 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg Zak 249,270.00
81 SkimRep/Perbaikan permukaan acian(MU-840)@25kg Zak 308,910.00
82 DryShield/Pelapis kedap air (MU-600)@3kg Set 101,535.00
83 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml Set 31,500.00

Uzin
84 Beton Instan (UZ K300) 50 kg Zak 78,750.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
85 Plester dinding instan (UZ Plester) 50 Kg Zak 78,750.00
86 Plester Finish tanpa Aci (UZ Render) 50 kg Zak 99,750.00
87 Acian diatas beton (UZ SC100) 40 kg Zak 111,300.00
88 Acian dinding instan interior (UZ SC 50) 40 kg Zak 102,900.00
89 Acian dinding instan eksterior (UZ SC 75) 40 kg Zak 105,000.00
90 Perekat Bata Ringan (UZ TB20) 50 kg Zak 112,875.00

Bostik
Perekat Keramik & Batu Alam
91 Fix Crete Zak 133,185.15
92 Fix all Zak 149,694.30
93 Super Fix all Zak 213,064.95
94 Super Fix all trade/white Zak 258,667.50
95 Asaflex 45 kg (15lt +30 kgp) Set 1,292,834.55
96 Mortar Fix 100kg Set 1,431,696.00
97 Mortar Fix 50 kg Set 829,256.40
98 Mortar Fix 5 kg Set 87,445.05
99 Grout ( Semen Nat) 20 kg Zak 386,742.30
100 Grout ( Semen Nat) 1 kg Zak 16,420.95
101 Liquid Grout Adictive (LGA) 20 Lt Pail 931,728.00
102 Mega Lastic Acrilic Base 20Lt Pail 931,728.00

Wall System
103 Skim Plas 25 Kg Zak 111,612.90
104 Skim Crete 25 Kg Zak 145,828.20
105 Fix. Plas 40 kg Zak 100,101.75
106 Fix T. 40 kg Zak 147,909.30

Waterproofing
107 Ultra Coat RC2 20 Lt Pail 1,179,487.05
108 Boscosem Slury 33 Kg Set 494,182.50
109 Damplix 2 20 kg Set 1,541,675.10
110 Damplix 3 45 kg Set 2,045,376.90
111 Damplix 3E 35 kg Set 1,133,574.75
112 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m Rol 897,871.80
113 Indo primer ( lapisan primer WP membran) 20 Lt Pail 734,801.55
114 Integral Kristalisasi (Waterproofing kristal) 20 kg Pail 1,577,668.05

Sealent
115 No More Nail (320 GR) Pcs 71,695.05
116 Seal n Flex 1 (600 ML) Pcs 111,692.70
117 Boscosil 313 (300 ML) Pcs 57,016.05
118 Boscosil 616 (300 ML) Pcs 57,862.35
119 Fil A Gap (300 ML) Pcs 37,076.55
120 Boscosil Mastic (300 ML) khusus R. Pendingin Pcs 48,769.35
121 Bostik Z Bond 6S (300 ML) Pcs 139,258.35
122 Bostik Z PU Contrcuction (600 ML) Pcs 121,796.85
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
123 Quelyd Super Express (250 GR) Pcs 35,833.35
124 Expanda Foam (340 GR) Pcs 171,652.95
125 Barel Gun Bh 523,805.10
126 Flash Band Rol 164,872.05

BAMBU
127 Bambu Ukuran 8"- 10" panjang 4 m btg 10,500.00
128 Bambu Ukuran 3"-6" panjang 4 m btg 9,450.00
129 Gedeg kulit kelas I m2 36,750.00
130 Gedeg kulit kelas II m2 34,125.00
131 Gedeg Biasa m2 35,000.00
`
KAYU
132 Kayu bingkirai Balok m3 11,650,000.00
133 Kayu bingkirai papan m3 13,825,000.00
134 Kayu Cempaka lokal m3 2,950,000.00
135 Kayu jati Balok Ex Bojonegoro m3 32,000,000.00
136 Kayu jati papan Ex. Bojonegoro m3 37,500,000.00
137 Kayu kamper balok m3 9,100,000.00
138 Kayu kamper usuk/reng m3 8,100,000.00
139 Kayu kamper papan m3 10,100,000.00
140 Kayu kruing balok m3 7,400,000.00
141 Kayu kruing usuk/reng m3 7,400,000.00
142 Kayu kruing papan m3 7,875,000.00
143 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3 4,700,000.00
144 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3 4,700,000.00
145 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3 5,100,000.00
146 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3 5,100,000.00
147 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3 5,400,000.00
148 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3 5,650,000.00
149 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3 6,710,000.00
150 Kayu meranti balok m3 6,750,000.00
151 Kayu meranti usuk/reng m3 6,700,000.00
152 Kayu meranti papan m3 6,930,000.00
153 Kayu merbau Balok m3 16,800,000.00
154 Kayu merbau papan m3 18,500,000.00
155 Kayu Profil 4/5 kamper m1 40,500.00
156 List profil 2/4 kamper M1 35,600.00
157 Kayu seseh balok m3 3,100,000.00
158 Kayu seseh dolken D 20 Panjang 3 m Batang 175,900.00
159 Kayu seseh dolken D 10 Panjang 4 m Batang 110,000.00
160 Kayu Usuk Albesia 5/7 Panjang 4 m Batang 52,500.00
161 Lem Aica Aibond kg 53,000.00
162 Lem Kayu setara Fox ltr 18,900.00
163 Minyak bekisting setara Calform NX*R ltr 42,500.00

Flooring/ Lantai
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
164 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2 220,000.00
165 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2 230,000.00
166 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2 250,000.00
167 Jati Eksport Uk. 1,2 x 5 x 20 cm m2 240,000.00
168 Jati Eksport Uk. 1,2 x 5 x 25 cm m2 265,000.00
169 Jati Eksport Uk. 1,2 x 5 x 30 cm m2 290,000.00
170 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2 460,000.00
171 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2 625,000.00
172 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2 190,000.00
173 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2 220,000.00
174 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2 450,000.00
175 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2 490,000.00
176 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2 475,000.00
177 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2 440,000.00
178 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2 450,000.00
179 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2 520,000.00
180 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2 690,000.00

Lambersering
181 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2 420,000.00
182 Lambersering Kruing Uk. 2 x 9 x 200 cm m2 320,000.00

Lis Kayu
183 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg 15,000.00
184 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg 16,000.00
185 Lis Plapond Uk. 0,8 x 5 x 400 cm btg 13,000.00
186 Lis Plapond Uk.1 x 3 x 400 cm btg 11,000.00
187 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg 14,000.00
188 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg 35,500.00
189 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg 40,000.00
190 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg 44,000.00
191 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg 51,500.00
192 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg 63,000.00
193 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg 79,000.00
194 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg 115,000.00
195 Lis Kaca Uk. 1,5 x 3 cm m' 6,500.00
196 Lis Dowel Kecil Uk. 1 x 2 cm m' 3,200.00
197 Lis Dowel Besar Uk. 1,3 x 3 cm m' 4,000.00
198 Lis Kusen m' 3,300.00

CONWOOD
Flooring/Deck Application
199 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 67,100.00
200 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 105,400.00
201 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 140,500.00
202 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 140,900.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
203 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 211,400.00
204 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 281,700.00
205 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 414,700.00

Decorative Stair
206 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs 74,500.00
207 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs 163,200.00
208 Conwood Handrail (85 x 3050 x 30 mm) Pcs 130,200.00

Ceiling Application
209 Celling Border (50 X 3050 X 11 mm) Pcs 33,100.00
210 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs 49,900.00
211 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 61,100.00
212 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs 105,300.00
213 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs 447,700.00

Eave/lisplank
214 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 149,200.00

Wall Application
215 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs 63,900.00
216 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs 83,300.00
217 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs 151,600.00
218 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs 185,400.00

Moulding Application
219 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs 46,900.00
220 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs 55,500.00
221 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs 46,900.00
222 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs 55,500.00

Decorative Application
223 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs 90,300.00
224 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs 34,200.00
225 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs 53,000.00
226 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs 45,300.00
227 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs 28,500.00
228 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs 42,800.00
229 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs 28,500.00
230 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs 42,800.00
231 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs 44,600.00
232 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs 29,500.00

Planks
233 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 47,000.00
234 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 47,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
BESI BETON DAN PAGAR
235 Baja Strip (0,2 x 2) cm / Plat Strip Kg 17,850.00
236 Besi Beton U 24 (Polos) kg 9,750.00
237 Besi Beton U 32 (Ulir) Kg 9,900.00

238 Besi Ø5 (3,8 x 6,0) btg 4,200.00


239 Besi Ø6 (5,0 x 12) btg 11,850.00
240 Besi Ø6 (5,2 x 12) btg 12,450.00
241 Besi Ø6 (5,7 x 12) btg 14,750.00
242 Besi Ø8 (6,5 x 12) btg 19,550.00
243 Besi Ø8 (6,7 x 12) btg 20,700.00
244 Besi Ø8 (6,9 x 12) SNI btg 23,900.00
245 Besi Ø8 (7,1 x 12) SNI btg 24,700.00
246 Besi Ø8 (7,4 x 12) SNI btg 26,500.00
247 Besi Ø8 (7,6 x 12) SNI btg 27,200.00
248 Besi Ø8 (7,7 x 12) SNI btg 27,700.00
249 Besi Ø8 (7,8 x 12) SNI btg 28,400.00
250 Besi Ø8 SNI U 24 btg 28,900.00
251 Besi Ø10 (8,4 x 12) SNI btg 33,600.00
252 Besi Ø10 (8,6 x 12) SNI btg 34,800.00
253 Besi Ø10 (8,9 x 12) SNI btg 37,500.00
254 Besi Ø10 (9,2 x 12) SNI btg 39,400.00
255 Besi Ø10 (9,4 x 12) SNI btg 41,500.00
256 Besi Ø10 (9,6 x 12) SNI btg 43,200.00
257 Besi Ø10 (9,8 x 12) SNI btg 44,400.00
258 Besi Ø10 SNI U 24 btg 45,500.00
259 Besi Ø10 Ulir (9,5 x 12) SNI btg 42,700.00
260 Besi Ø10 Ulir (9,7 x 12) SNI btg 44,400.00
261 Besi Ø12 (11,5 x 12) SNI btg 62,700.00
262 Besi Ø13 Ulir (11,5 x 12) SNI btg 64,300.00
263 Besi Ø13 Ulir (11,7 x 12) SNI btg 66,000.00
264 Besi Ø13 Ulir (12,0 x 12) SNI btg 69,200.00
265 Besi Ø13 Ulir (12,5 x 12) SNI btg 74,300.00
266 Besi Ø13 Ulir (12,7 x 12) SNI btg 76,800.00
267 Besi Ø16 Ulir (14 x 12) SNI btg 94,400.00
268 Besi Ø16 Ulir (14,5 x 12) SNI btg 101,200.00
269 Besi Ø16 Ulir (15,0 x 12) SNI btg 108,000.00
270 Besi Ø16 Ulir (15,5 x 12) SNI btg 115,300.00
271 Besi Ø16 Ulir (15,7 x 12) SNI btg 117,500.00
272 Wiremesh M6@50m Rol 2,610,000.00
273 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr 379,500.00
274 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr 585,500.00
275 Beugel Besi O8 Kg 12,100.00
276 Beugel penguat /plaat Buah 70,950.00
277 Besi / Baja profil Kg 10,450.00
278 Besi Baja WF 200 x 100 x 4,5 x 7 Kg 11,500.00
279 Besi Baja WF 250 x 125 x 5 x 7 Kg 11,500.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
280 Besi Baja C 100 x 50 x 3,2 Kg 11,500.00
281 Baja Ringan Type C- 75, 0.8 m' 19,000.00
282 Baja Ringan Type C- 75, 0.6 m' 16,416.67
283 Reng Baja m' 7,700.00
284 Profil Canal "C" Tipe C71.075 Batang 16,280.00
285 Profil Canal "C" Tipe C81.075 Batang 94,380.00
286 Profil Canal "C" Tipe C81.065 Batang 90,750.00
287 Profil "Omega / reng Tipe AA Batang 52,800.00
288 Profil "Omega / reng Tipe A Batang 49,500.00
289 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 Kg 13,200.00
290 Profil "Omega / reng Tipe AB Batang 46,200.00
291 Besi Siku L.30.30.3 mm Batang 74,033.33
292 Besi Plat Kg 24,860.00
293 Besi plat 3 X 6 tebal 1,2 mm Bt 215,600.00
294 Besi plat 4 X 8 tebal 1,8 mm Bt 486,200.00
295 Elektrode 2 % Bh 203,500.00
296 Kawat berduri kg 99,000.00
297 Kawat beton RRT kg 15,400.00
298 Kawat Ayak /Kuasa 5 X 5 cm M2 26,400.00
299 Kawat Harmonika 3 X 3 cm M2 33,000.00
300 Kawat Nyamuk M2 24,200.00
301 Pagar Setara BRC T.90 diameter 6mm m' 181,500.00
302 Pagar Setara BRC T.120 diameter 6mm m' 225,500.00
303 Pagar Setara BRC T.150 diameter 6mm m' 236,500.00
304 Pagar Setara BRC T.175 diameter 7mm m' 356,400.00
305 Pagar Setara BRC T.190 diameter 7mm m' 533,500.00
306 Pagar HotDip Galvanized T.90 diameter 6mm m' 168,300.00
307 Pagar HotDip Galvanized T.120 diameter 6mm m' 169,400.00
308 Pagar HotDip Galvanized T.150 diameter 7mm m' 231,000.00
309 Pagar HotDip Galvanized T.175 diameter 7mm m' 251,900.00
310 Pagar HotDip Galvanized T.190 diameter 7mm m' 266,200.00
312 Profil Aluminium Kaca 3/4 m 9,900.00
313 Profil Aluminium L 3 cm lis Kaca m 12,650.00
314 Profil Aluminium 4" m 66,000.00
315 Skruf Fixer 5 cm bh 550.00
316 Dynabolt bh 3,675.00
317 Sealant Tube 36,300.00
318 Rolling Door Aluminium M2 650,000.00
319 Silicon Kg 73,700.00

FINISHING
320 Amplas lbr 6,600.00
321 Cat besi kg 93,170.00
322 Cat dasar Tembok Setara Emco kg 59,400.00
323 Cat Setara emco Lux Biasa kg 59,400.00
324 Cat Setara emco Lux Warna kg 64,460.00
325 Cat Setara emco Lux Warna Tua kg 72,930.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
326 Cat Galvanis kg 87,780.00
327 Cat Kayu Emco kg 63,800.00
328 Cat Baja Chromate (anti karat) Kg 110,000.00
329 Cat Marka Jalan kg 43,890.00
330 Cat menie besi kg 49,500.00
331 Cat menie Kayu kg 49,500.00
332 Cat tembok Setara Decolith kg 39,930.00
333 Cat tembok Setara Dulux Exterior kg 126,500.00
334 Cat tembok Setara Dulux Interior kg 93,500.00
335 Cat tembok Setara Vinilex kg 39,930.00

Cat KCA
336 Cat Natural@25 kg Pail 399,000.00
337 Cat Flakes@25 kg Pail 683,000.00
338 Cat Genteng @25kg Pail 519,000.00
339 Stone Coating :
340 Clear gloss air kg 48,000.00
341 Black gloss air kg 46,000.00
342 Clear gloss solvent kg 50,500.00
343 Black gloss solvent kg 54,000.00
344 Clear doft solvent kg 53,000.00
345 Black doft solvent kg 54,000.00
346 Dempul / Plamir ltr 52,800.00
347 Dempul / Plamir Altik ltr 46,530.00
348 Dempul Impra Kayu ltr 49,500.00
349 Kuas untuk mengecat bh 13,200.00
350 Lem Fox (Rajawali Kuning) Gln 159,500.00
351 Lem Wall Paper Kg 27,500.00
352 Mild zak 13,200.00
353 Minyak cat ltr 46,530.00
354 Melamine Lack / Imfra ltr 77,000.00
355 Okear / Veap Kg 82,500.00
356 Plamir kayu kg 49,500.00
357 Plamir tembok setara wall Putty kg 159,500.00
358 Politur ultra ltr 75,130.00
359 Politur Jadi ltr 75,900.00
360 vernis ltr 60,500.00
361 Residu / Teer Ltr 27,500.00
362 Roll Buah 38,500.00
363 Sending Seaker ltr 61,050.00
364 Soda Api Kg 24,200.00
365 Thiner A Spesial ltr 27,500.00
366 Thiner B ltr 27,500.00
367 Teack Oil ltr 66,550.00
368 Wall Paper Setara Silk House m2 660,000.00
369 Wood Filler ltr 60,500.00
370 Cat Scotlight Ltr 166,100.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

KACA
371 Bingkai Nako Silver daun 38,500.00
372 Bingkai Nako Coklat daun 33,000.00
373 Glass Block bh 40,700.00
374 Kaca 3 mm bening m2 82,500.00
375 Kaca 5 mm bening m2 143,000.00
376 Kaca 6 mm bening m2 187,000.00
377 Kaca 8 mm bening m2 317,900.00
378 Kaca 10 mm bening m2 385,000.00
379 Kaca 12 mm bening m2 495,000.00
380 Kaca Cermin 3 mm m2 165,000.00
381 Kaca Cermin 5 mm m2 308,000.00
382 Kaca Es/Kapur 3 mm m2 198,000.00
383 Kaca Es/Kapur 5 mm m2 253,000.00
384 Kaca ryben 3 mm m2 99,000.00
385 Kaca ryben 5 mm m2 154,000.00
386 Kaca asahi tebal 3 mm polos clear m2 63,000.00
387 Kaca asahi tebal 3 mm ryben dark grey m2 89,000.00
388 Kaca asahi tebal 3 mm cermin mirror m2 140,000.00
389 Kaca asahi tebal 3 mm es mislet m2 145,500.00
390 Kaca asahi tebal 3 mm biru dark blue m2 235,500.00
391 Kaca asahi tebal 3 mm one way m2 350,000.00
392 Kaca asahi tebal 5 mm polos clear m2 92,500.00
393 Kaca asahi tebal 5 mm ryben dark grey m2 113,500.00
394 Kaca asahi tebal 5 mm cermin mirror m2 200,000.00
395 Kaca asahi tebal 5 mm es mislet m2 190,000.00
396 Kaca asahi tebal 6 mm polos clear m2 145,000.00
397 Kaca asahi tebal 8 mm polos clear m2 289,000.00
398 Kaca asahi tebal 10 mm polos clear m2 350,000.00
399 Kaca asahi tebal 12 mm polos clear m2 362,500.00
400 Kaca tempered asahimas tebal 3mm polos clear m2 203,500.00
401 Kaca tempered asahimas tebal 3mm ryben dark grey m2 242,000.00
402 Kaca tempered asahimas tebal 3mm sanergy clear m2 604,000.00
403 Kaca tempered asahimas tebal 4mm polos clear m2 200,500.00
404 Kaca tempered asahimas tebal 4mm sanergy clear m2 692,000.00
405 Kaca tempered asahimas tebal 5mm polos clear m2 224,500.00
406 Kaca tempered asahimas tebal 5mm ryben dark grey m2 278,000.00
407 Kaca tempered asahimas tebal 5mm stopsol m2 436,000.00
408 Kaca tempered asahimas tebal 5mm warna m2 372,000.00
409 Kaca tempered asahimas tebal 5mm sanergy clear m2 812,000.00
410 Kaca tempered asahimas tebal 6mm polos clear m2 299,500.00
411 Kaca tempered asahimas tebal 6mm ryben dark grey m2 406,000.00
412 Kaca tempered asahimas tebal 6mm stopsol m2 825,000.00
413 Kaca tempered asahimas tebal 6mm warna m2 466,500.00
414 Kaca tempered asahimas tebal 6mm diamon m2 621,500.00
415 Kaca tempered asahimas tebal 6mm sanergy clear m2 1,001,000.00
416 Kaca tempered asahimas tebal 8mm polos clear m2 391,500.00
417 Kaca tempered asahimas tebal 8mm stopsol m2 1,132,000.00
418 Kaca tempered asahimas tebal 8mm warna m2 731,500.00
419 Kaca tempered asahimas tebal 8mm diamon m2 1,078,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
420 Kaca tempered asahimas tebal 8mm sanergy clear m2 1,375,000.00
421 Kaca tempered asahimas tebal 10mm polos clear m2 482,000.00
422 Kaca tempered asahimas tebal 10mm diamon m2 1,540,000.00
423 Kaca tempered asahimas tebal 12mm polos clear m2 565,000.00
424 Kaca tempered asahimas tebal 12mm diamon m2 1,962,500.00
425 Kaca tempered asahimas tebal 15mm polos clear m2 4,616,500.00
426 Kaca tempered asahimas tebal 15mm diamon m2 6,000,000.00
427 Kaca tempered asahimas tebal 19mm polos clear m2 5,313,000.00
428 Kaca tempered asahimas tebal 19mm diamon m2 7,309,500.00
429 Kaca tebal 3+3 mm laminet biasa m2 345,000.00
430 Kaca tebal 4+4 mm laminet biasa m2 422,000.00
431 Kaca tebal 5+5 mm laminet biasa m2 475,000.00
432 Kaca tebal 6+6 mm laminet biasa m2 566,000.00
433 Kaca tebal 8+8 mm laminet biasa m2 846,000.00
434 Kaca tebal 10+10 mm laminet biasa m2 1,041,000.00
435 Kaca tebal 12+12 mm laminet biasa m2 1,184,000.00
436 Kaca tebal 3+3 mm laminet tempered m2 957,000.00
437 Kaca tebal 4+4 mm laminet tempered m2 1,056,000.00
438 Kaca tebal 5+5 mm laminet tempered m2 1,083,000.00
439 Kaca tebal 6+6 mm laminet tempered m2 1,375,000.00
440 Kaca tebal 8+8 mm laminet tempered m2 1,670,000.00
441 Kaca tebal 10+10 mm laminet tempered m2 1,938,000.00
442 Kaca tebal 12+12 mm laminet tempered m2 2,134,000.00
443 Ongkos polin kaca tempered tebal 5mm m' 15,000.00
444 Ongkos polin kaca tempered tebal 6mm m' 15,000.00
445 Ongkos polin kaca tempered tebal 8mm m' 25,000.00
446 Ongkos polin kaca tempered tebal 10mm m' 25,000.00
447 Ongkos polin kaca tempered tebal 12mm m' 27,500.00
448 Ongkos polin kaca tempered tebal 19mm m' 90,000.00

PIPA
449 Pipa Galvanis 1" M1 55,650.00
450 Pipa Galvanis 1,5 BSA M1 84,000.00
451 Pipa Galvanis 2" M1 118,000.00
452 Pipa Galvanis 3" M1 181,000.00
453 Pipa Setara Maspion AW 1/2 M1 7,560.00
454 Pipa Setara Maspion AW 3/4 M1 10,000.00
455 Pipa Setara Maspion AW 1 M1 11,550.00
456 Pipa Setara Maspion AW 1-1/2 M1 22,000.00
457 Pipa Setara Maspion AW 1-1/4 M1 17,000.00
458 Pipa Setara Maspion AW 2 M1 32,000.00
459 Pipa Setara Maspion AW 2-1/2 M1 41,000.00
460 Pipa Setara Maspion AW 3 M1 58,275.00
461 Pipa Setara Maspion AW 4 M1 85,000.00
462 Pipa Setara Maspion AW 5 M1 134,000.00
463 Pipa Setara Maspion AW 6 M1 176,400.00
464 Pipa Setara Maspion AW 8 M1 275,000.00
465 Pipa Setara Maspion AW 10 M1 390,000.00
466 Pipa Setara Maspion AW 12 M1 630,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
467 Pipa Setara Maspion AW 14 M1 800,625.00
468 Pipa Setara Maspion AW 16 M1 979,125.00
469 Pipa Setara Maspion C 3/4 M1 3,675.00
470 Pipa Setara Maspion C 5/8 M1 2,100.00
471 Pipa Setara Maspion C 1 M1 7,000.00
472 Pipa Setara Maspion C 1-1/2 M1 9,000.00
473 Pipa Setara Maspion C 1-1/4 M1 10,000.00
474 Pipa Setara Maspion C 2 M1 13,000.00
475 Pipa Setara Maspion C 2-1/2 M1 17,000.00
476 Pipa Setara Maspion C 3 M1 19,000.00
477 Pipa Setara Maspion C 4 M1 25,000.00
478 Pipa Setara Maspion D 1/2 M1 7,000.00
479 Pipa Setara Maspion D 1-1/2 M1 12,000.00
480 Pipa Setara Maspion D 1-1/4 M1 11,000.00
481 Pipa Setara Maspion D 2 M1 15,225.00
482 Pipa Setara Maspion D 2-1/2 M1 23,000.00
483 Pipa Setara Maspion D 3 M1 32,550.00
484 Pipa Setara Maspion D 4 M1 46,000.00
485 Pipa Setara Maspion D 5 M1 75,000.00
486 Pipa Setara Maspion D 6 M1 90,825.00
487 Pipa Setara Maspion D 8 M1 161,000.00
488 Pipa Setara Maspion D 10 M1 280,000.00
489 Pipa Setara Maspion D 12 M1 381,675.00
490 Pipa Setara Maspion D 14 M1 499,800.00
491 Pipa Setara Maspion D 16 M1 646,800.00
492 Pipa / selang spiral sel kran M1 34,650.00
490 Pipa setara langgeng warna abu - abu AW 1/2 M1 6,442.50
491 Pipa setara langgeng warna abu - abu AW 3/4 M1 7,847.50
492 Pipa setara langgeng warna abu - abu AW 1 M1 9,880.00
493 Pipa setara langgeng warna abu - abu AW 1 1/4 M1 13,985.00
494 Pipa setara langgeng warna abu - abu AW 1 1/2 M1 18,212.50
493 Pipa setara langgeng warna abu - abu AW 2 M1 27,047.50
490 Pipa setara langgeng warna abu - abu AW 2 1/2 M1 34,722.50
491 Pipa setara langgeng warna abu - abu AW 3 M1 49,525.00
492 Pipa setara langgeng warna abu - abu AW 4 M1 72,182.50
493 Pipa setara langgeng warna abu - abu AW 5 M1 113,850.00
494 Pipa setara langgeng warna abu - abu AW 6 M1 150,472.50
495 Pipa setara langgeng warna abu - abu AW 8 M1 234,032.50
494 Pipa setara langgeng warna abu - abu AW 10 M1 332,500.00
491 Pipa setara langgeng warna abu - abu AW 12 M1 475,115.00
492 Pipa setara langgeng warna abu - abu AW 16 M1 835,555.00
493 Pipa setara langgeng warna abu - abu D 1 1/4 M1 8,712.50
494 Pipa setara langgeng warna abu - abu D 1 1/2 M1 9,880.00
495 Pipa setara langgeng warna abu - abu D 2 M1 12,912.50
496 Pipa setara langgeng warna abu - abu D 2 1/2 M1 19,125.00
495 Pipa setara langgeng warna abu - abu D 3 M1 27,740.00
492 Pipa setara langgeng warna abu - abu D 4 M1 39,007.50
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
493 Pipa setara langgeng warna abu - abu D 5 M1 63,717.50
494 Pipa setara langgeng warna abu - abu D 6 M1 77,397.50
495 Pipa setara langgeng warna abu - abu D 8 M1 136,877.50
496 Pipa setara langgeng warna abu - abu D 10 M1 238,877.50
497 Pipa setara langgeng warna abu - abu D 12 M1 325,575.00
496 Pipa setara langgeng warna abu - abu D 14 M1 426,405.00
493 Pipa setara langgeng warna abu - abu D 16 M1 551,932.50
494 Pipa setara langgeng warna abu - abu D 20 M1 953,412.50
495 Pipa setara langgeng warna abu - abu C 5/8 M1 1,770.00

496 Pipa setara langgeng warna abu - abu C 1/2 M1 2,965.00


497 Pipa setara langgeng warna abu - abu C 3/4 M1 3,220.00
498 Pipa setara langgeng warna abu - abu C 1 M1 4,505.00
497 Pipa setara langgeng warna abu - abu C 1 1/4 M1 5,980.00
494 Pipa setara langgeng warna abu - abu C 1 1/2 M1 7,170.00
495 Pipa setara langgeng warna abu - abu C 2 M1 10,822.50
496 Pipa setara langgeng warna abu - abu C 2 1/2 M1 13,710.00
497 Pipa setara langgeng warna abu - abu C 3 M1 16,707.50
498 Pipa setara langgeng warna abu - abu C 4 M1 21,525.00
499 Pipa setara langgeng warna abu - abu C 5 M1 29,120.00
498 Pipa setara winlon warna abu - abu AW 1/2 M1 5,527.50
495 Pipa setara winlon warna abu - abu AW 3/4 M1 7,067.50
496 Pipa setara winlon warna abu - abu AW 1 M1 9,212.50
497 Pipa setara winlon warna abu - abu AW 1 1/4 M1 13,475.00
498 Pipa setara winlon warna abu - abu AW 1 1/2 M1 15,867.50
499 Pipa setara winlon warna abu - abu AW 2 M1 22,797.50
500 Pipa setara winlon warna abu - abu AW 2 1/2 M1 29,727.50
499 Pipa setara winlon warna abu - abu AW 3 M1 41,772.50
496 Pipa setara winlon warna abu - abu AW 4 M1 64,322.50
497 Pipa setara winlon warna abu - abu AW 5 M1 102,052.50
498 Pipa setara winlon warna abu - abu AW 6 M1 128,975.00
499 Pipa setara winlon warna abu - abu AW 8 M1 204,737.50
500 Pipa setara winlon warna abu - abu AW 10 M1 291,362.50
501 Pipa setara winlon warna abu - abu AW 12 M1 489,912.50
500 Pipa setara winlon warna abu - abu D 1 1/4 M1 7,782.50
497 Pipa setara winlon warna abu - abu D 1 1/2 M1 8,772.50
498 Pipa setara winlon warna abu - abu D 2 M1 11,467.50
499 Pipa setara winlon warna abu - abu D 2 1/2 M1 16,335.00
500 Pipa setara winlon warna abu - abu D 3 M1 23,732.50
501 Pipa setara winlon warna abu - abu D 4 M1 33,687.50
502 Pipa setara winlon warna abu - abu D 6 M1 66,660.00
501 Pipa setara winlon warna abu - abu D 8 M1 117,727.50
498 Pipa setara winlon warna abu - abu D 10 M1 218,405.00
499 Pipa setara winlon warna abu - abu D 12 M1 297,220.00
500 Pipa setara winlon warna abu - abu C 5/8 M1 1,485.00
501 Pipa setara winlon warna abu - abu C 1/2 M1 2,722.50
502 Pipa setara winlon warna abu - abu C 3/4 M1 2,887.50
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
503 Pipa setara winlon warna abu - abu C 1 M1 4,042.50
502 Pipa setara winlon warna abu - abu C 1 1/4 M1 5,362.50
499 Pipa setara winlon warna abu - abu C 1 1/2 M1 6,737.50
500 Pipa setara winlon warna abu - abu C 2 M1 9,212.50
501 Pipa setara winlon warna abu - abu C 2 1/2 M1 11,605.00
502 Pipa setara winlon warna abu - abu C 3 M1 14,355.00
503 Pipa setara winlon warna abu - abu C 4 M1 19,855.00
504 Pipa setara wavin warna putih AW 1/2 M1 4,757.50
503 Pipa setara wavin warna putih AW 3/4 M1 6,517.50
500 Pipa setara wavin warna putih AW 1 M1 8,910.00
501 Pipa setara wavin warna putih AW 1 1/4 M1 13,365.00
502 Pipa setara wavin warna putih AW 1 1/2 M1 15,345.00
503 Pipa setara wavin warna putih AW 2 M1 19,635.00
504 Pipa setara wavin warna putih AW 2 1/2 M1 28,655.00
505 Pipa setara wavin warna putih AW 3 M1 38,637.50
504 Pipa setara wavin warna putih AW 4 M1 64,020.00
501 Pipa setara wavin warna putih AW 5 M1 106,067.50
502 Pipa setara wavin warna putih AW 6 M1 148,775.00
503 Pipa setara wavin warna putih AW 8 M1 249,700.00
504 Pipa setara wavin warna putih AW 10 M1 386,100.00
505 Pipa setara wavin warna putih AW 12 M1 544,390.00
506 Pipa setara wavin warna putih D 1 1/4 M1 8,387.50
505 Pipa setara wavin warna putih D 1 1/2 M1 9,487.50
502 Pipa setara wavin warna putih D 2 M1 12,155.00
503 Pipa setara wavin warna putih D 2 1/2 M1 16,445.00
504 Pipa setara wavin warna putih D 3 M1 20,872.50
505 Pipa setara wavin warna putih D 4 M1 32,835.00
506 Pipa setara wavin warna putih D 5 M1 52,937.50
507 Pipa setara wavin warna putih D 6 M1 69,822.50
506 Pipa setara wavin warna putih D 8 M1 122,815.00
503 Pipa setara wavin warna putih D 10 M1 202,317.50
504 Pipa setara wavin warna putih D 12 M1 284,020.00
505 Pipa setara langgeng warna putih AW 1/2 M1 4,520.00
506 Pipa setara langgeng warna putih AW 3/4 M1 12,385.00
507 Pipa setara langgeng warna putih AW 1 M1 8,465.00
508 Pipa setara langgeng warna putih AW 1 1/4 M1 12,697.50
507 Pipa setara langgeng warna putih AW 1 1/2 M1 14,697.50
504 Pipa setara langgeng warna putih AW 2 M1 18,655.00
505 Pipa setara langgeng warna putih AW 2 1/2 M1 27,222.50
506 Pipa setara langgeng warna putih AW 3 M1 36,707.50
507 Pipa setara langgeng warna putih AW 4 M1 60,812.50
508 Pipa setara langgeng warna putih AW 5 M1 100,765.00
509 Pipa setara langgeng warna putih AW 6 M1 141,337.50
508 Pipa setara langgeng warna putih AW 8 M1 237,215.00
505 Pipa setara langgeng warna putih AW 10 M1 366,795.00
506 Pipa setara langgeng warna putih AW 12 M1 517,172.50
507 Pipa setara langgeng warna putih AW 14 M1 708,120.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
508 Pipa setara langgeng warna putih AW 16 M1 885,117.50
509 Pipa setara langgeng warna putih D 1 1/4 M1 7,970.00
510 Pipa setara langgeng warna putih D 1 1/2 M1 9,015.00
509 Pipa setara langgeng warna putih D 2 M1 11,547.50
506 Pipa setara langgeng warna putih D 2 1/2 M1 15,625.00
507 Pipa setara langgeng warna putih D 3 M1 19,830.00
508 Pipa setara langgeng warna putih D 4 M1 31,195.00
509 Pipa setara langgeng warna putih D 5 M1 50,292.50
510 Pipa setara langgeng warna putih D 6 M1 66,332.50
511 Pipa setara langgeng warna putih D 8 M1 116,675.00
510 Pipa setara langgeng warna putih D 10 M1 192,202.50
507 Pipa setara langgeng warna putih D 12 M1 269,820.00
508 Pipa setara langgeng warna putih D 14 M1 451,702.50
509 Pipa setara langgeng warna putih D 16 M1 584,677.50
510 Pipa setara langgeng warna putih D 20 M1 925,642.50
511 Pipa setara langgeng warna putih C 5/8 M1 1,770.00
512 Pipa setara langgeng warna putih C 1/2 M1 2,880.00
511 Pipa setara langgeng warna putih C 3/4 M1 3,220.00
508 Pipa setara langgeng warna putih C 1 M1 4,370.00
509 Pipa setara langgeng warna putih C 1 1/4 M1 5,805.00
510 Pipa setara langgeng warna putih C 1 1/2 M1 7,170.00
511 Pipa setara langgeng warna putih C 2 M1 10,507.50
512 Pipa setara langgeng warna putih C 2 1/2 M1 13,310.00
513 Pipa setara langgeng warna putih C 3 M1 16,220.00
512 Pipa setara langgeng warna putih C 4 M1 16,220.00
509 Pipa setara winlon warna putih AW 1/2 M1 3,822.50
510 Pipa setara winlon warna putih AW 3/4 M1 5,142.50
511 Pipa setara winlon warna putih AW 1 M1 7,150.00
512 Pipa setara winlon warna putih AW 1 1/4 M1 9,955.00
513 Pipa setara winlon warna putih AW 1 1/2 M1 12,925.00
514 Pipa setara winlon warna putih AW 2 M1 17,820.00
513 Pipa setara winlon warna putih AW 2 1/2 M1 23,925.00
510 Pipa setara winlon warna putih AW 3 M1 32,972.50
511 Pipa setara winlon warna putih AW 4 M1 54,587.50
512 Pipa setara winlon warna putih AW 5 M1 81,262.50
513 Pipa setara winlon warna putih AW 6 M1 116,792.50
514 Pipa setara winlon warna putih AW 8 M1 183,067.50
515 Pipa setara winlon warna putih AW 10 M1 263,917.50
514 Pipa setara winlon warna putih D 1 1/4 M1 6,160.00
511 Pipa setara winlon warna putih D 1 1/2 M1 7,480.00
512 Pipa setara winlon warna putih D 2 M1 10,065.00
513 Pipa setara winlon warna putih D 2 1/2 M1 13,612.50
514 Pipa setara winlon warna putih D 3 M1 16,967.50
515 Pipa setara winlon warna putih D 4 M1 27,610.00
516 Pipa setara winlon warna putih D 5 M1 40,590.00
515 Pipa setara winlon warna putih D 6 M1 57,945.00
512 Pipa setara winlon warna putih D 8 M1 98,945.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
513 Pipa setara winlon warna putih D 10 M1 186,367.50
514 Pipa setara winlon warna putih C 5/8 M1 1,402.50
515 Pipa setara winlon warna putih C 1/2 M1 2,612.50
516 Pipa setara winlon warna putih C 3/4 M1 2,832.50
517 Pipa setara winlon warna putih C 1 M1 4,207.50
516 Pipa setara winlon warna putih C 1 1/4 M1 4,922.50
513 Pipa setara winlon warna putih C 1 1/2 M1 6,160.00
514 Pipa setara winlon warna putih C 2 M1 8,662.50
515 Pipa setara winlon warna putih C 2 1/2 M1 10,917.50
516 Pipa setara winlon warna putih C 3 M1 13,585.00
517 Pipa setara winlon warna putih C 4 M1 18,122.50
518 Pipa setara vilano warna putih AW 1/2 M1 3,482.50
517 Pipa setara vilano warna putih AW 3/4 M1 4,870.00
514 Pipa setara vilano warna putih AW 1 M1 6,382.50
515 Pipa setara vilano warna putih AW 1 1/4 M1 9,287.50
516 Pipa setara vilano warna putih AW 3 M1 29,035.00
517 Pipa setara vilano warna putih AW 4 M1 41,785.00
518 Pipa setara vilano warna putih AW 5 M1 69,670.00
519 Pipa setara vilano warna putih AW 6 M1 99,282.50
518 Pipa setara vilano warna putih D 1 1/4 M1 5,805.00
515 Pipa setara vilano warna putih D 1 1/2 M1 6,967.50
516 Pipa setara vilano warna putih D 2 M1 8,707.50
517 Pipa setara vilano warna putih D 2 1/2 M1 12,190.00
518 Pipa setara vilano warna putih D 3 M1 15,675.00
519 Pipa setara vilano warna putih D 4 M1 24,382.50
520 Pipa setara vilano warna putih D 5 M1 31,930.00
519 Pipa setara vilano warna putih D 6 M1 55,157.50

BAHAN LISTRIK
520 Coaxial cable 5C - 75 ohm commscof m1 18,700.00
521 Box Panel (3 mm) (400 x 600) Bh 598,400.00
522 Figting lampu Broco Bh 22,000.00
523 Inbow dos plastik clipsal E 157 P OB bj 11,935.00
524 Kabel NYM 2 x 1.5 mm Suprime NYM m1 11,000.00
525 Kabel NYY 2 x 1.5 mm m1 15,950.00
526 Kabel NYM 2 x 2.5 mm m1 16,500.00
527 Kabel NYY 3 x 1.5 mm m1 19,800.00
528 Kabel NYM 3 x 2.5 mm m1 20,900.00
529 Kabel NYY 3 x 2.5 mm m1 27,500.00
530 Kabel NYM 4 mm m1 39,900.00
531 Kabel NYY 2 x 2,5 mm m1 21,450.00
532 Kabel Twisteed 2 x 16 mm m1 16,500.00
533 Kabel telephone m1 17,482.50
534 Klem clipsal 20 mm bj 11,025.00
535 Lampu Son 150 Watt Setara Philips Set 1,438,500.00
536 Lampu Mercury 125 Watt Setara Philips Set 1,403,850.00
537 Lampu Mercury 250 Watt Setara Philips Set 2,977,800.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
538 Lampu Mercury 400 Watt Setara Philips Set 11,118,450.00
539 Lampu pijar 10 Watt Setara Philips bh 7,150.00
540 Lampu pijar 15 Watt Setara Philips bh 7,700.00
541 Lampu pijar 25 Watt Setara Philips bh 8,030.00
542 Lampu pijar 40 Watt Setara Philips bh 9,130.00
543 Lampu TL 20 Watt Komplit (Ballast Philips) bh 115,500.00
544 Lampu TL 25 Watt Komplit (Ballast Philips) bh 126,000.00
545 Lampu LED (5 Watt) Setara Philips Bh 55,000.00
546 Lampu LED (7 Watt) Setara Philips Bh 82,500.00
547 Lampu LED (10 Setara Philips Bh 113,850.00
548 Lampu LED (13 Watt) Setara Philips Bh 148,500.00
549 Lampu Sorot LED (5 Watt) Setara Philips Bh 209,000.00
550 Lampu Sorot LED (7 Watt) Setara Philips Bh 239,800.00
551 Lampu Sorot LED (10 Watt) Setara Philips Bh 278,250.00
552 Lampu Sorot LED (13 Watt) Setara Philips Bh 363,000.00
553 Lampu Esensial (5 Watt) Setara Philips Bh 30,800.00
554 Lampu Esensial (8 Watt) Setara Philips Bh 38,500.00
555 Lampu Esensial (11 Watt) Setara Philips Bh 44,000.00
556 Lampu Esensial (14 Watt) Setara Philips Bh 52,800.00
557 Lampu Esensial (18 Watt) Setara Philips Bh 58,300.00
558 Magnet Contactor 80 A SN - 50 Bh 1,225,224.00
559 MCB 3 phase 40 A MG Bh 347,550.00
560 MCB 3 phase 63 A MG Bh 660,450.00
561 Panel MDP Unit 33,206,250.00
562 Panel SDP Unit 14,437,500.00
563 Pipa clipsal 20 mm bt 15,400.00
564 Pipa flexible clipsal 20 mm m1 11,000.00
565 Saklar ganda Setara Broco Bh 30,800.00
566 Saklar tunggal Setara Broco Bh 19,800.00
567 SL 18 Watt Komplit bh 81,675.00
568 Sock clipsal 20 mm bj 3,300.00
569 Steker bh 14,740.00
570 Stop Kontak bh 27,500.00
571 Stop Kontak Khusus (Kedap Air) bh 49,500.00
572 Tee dos clipsal 20 mm bh 7,480.00
573 Time Switch Bh 472,500.00
574 T Foring Bh 46,200.00

MARMER / GRANIT
575 Marmer (30 x 30) m2 308,000.00
576 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 715,000.00
577 Batu Andesit (30 x 30 x 5 cm) m2 385,000.00
578 Roster Keramik (12 x 11 x 24) bh 46,200.00

GRANIT TILE
579 Setara Essenza 40 x 40 m2 315,150.00
580 Setara Essenza 60 x 60 m2 387,200.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
581 Setara Granito 40 x 40 cm m2 348,150.00
582 Setara Nero Granito 30 x 60 cm m2 305,800.00
583 Setara Nero Granito 40 x 40 cm m2 348,150.00
584 Setara Nero Granito 60 x 60 cm m2 345,950.00
585 Setara Ex Cina 60 x 60 cm m2 181,500.00
586 Setara Ex Cina 80 x 80 cm m2 231,000.00

KERAMIK
587 Keramik Setara Asia Tile 20 x 20 kelas I warna muda m2 71,500.00
588 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 74,800.00
589 Keramik Setara Asia Tile 20 x 25 kelas I m2 77,000.00
590 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 55,000.00
591 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 57,200.00
592 Keramik Setara Asia Tile 40 x 40 kelas I m2 74,800.00
593 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 126,500.00
594 Keramik Setara ARWANA ( warna putih) 40 X 40 M2 51,700.00
595 Keramik Setara ARWANA ( warna tua) M2 66,000.00
587 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm m2 63,800.00
588 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 68,200.00
589 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 77,000.00
590 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 88,550.00
591 Keramik Setara KIA 20/20 cm warna muda m2 71,500.00
592 Keramik Setara KIA 30/30 cm warna muda m2 72,600.00
593 Keramik Setara KIA 20/20 cm warna tua m2 77,550.00
594 Keramik Setara KIA 30/30 cm warna tua m2 77,550.00
595 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 51,700.00
596 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 48,950.00
597 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 47,410.00
598 Keramik Setara Mulia 30 x 30 Warna Marbel m2 55,550.00
599 Keramik Setara Mulia 30 x 30 Warna Impresso m2 57,090.00
600 Keramik Setara Mulia 40 x 40 cm kelas I m2 69,850.00
601 Keramik Setara ROMAN 20/20 cm m2 102,850.00
602 Keramik Setara ROMAN 30/30 cm m2 143,000.00
603 Tegel Bata 20 x 20 Pc m2 86,350.00
604 Tegel B/TB 20 x 20 Kuning m2 86,350.00
605 Tegel 20 x 20 TB Merah m2 86,350.00
606 Tegel 30 x 30 TB PC m2 86,350.00
607 Tegel 30 x 30 TB PC Kuning m2 86,350.00
608 Tegel 30 x 30 Warna Merah m2 86,350.00
609 Tegel PC Abu - Abu 20/20 cm m2 86,350.00
610 Tegel PC Warna 20/20 cm m2 86,350.00
611 Tegel PC Warna 30/30 cm m2 86,350.00

ATAP
612 Alang-alang panjang 2,4 meter lbr 16,500.00
613 Alluminium foil M2 Double Roll 245,300.00
614 Akustik 60 cm x 120 cm lembar 54,450.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
615 Asbes Bubungan lbr 49,000.00
616 Asbes Gelombang 1,80 m x 0,80 m lbr 38,500.00
617 Asbes Gelombang 1,80 m x 1,05 m lbr 41,800.00
618 Asbes Gelombang 2,10 m x 1,05 m lbr 45,100.00
619 Asbes Gelombang 2,4 m x 1,05 m lbr 53,900.00
620 Asbes Rata 2 m x 1 m x 4 mm lbr 60,500.00
621 Bentala tanah liat Ex Pejaten bh 93,500.00
622 Bentala Besar polos Lubang 25 cm bj 82,500.00
623 Bentala Besar Warna Lubang 25 cm bj 110,000.00
624 Bentala Besar polos Lubang 90 cm bj 143,000.00
625 Bentala Besar Warna Lubang 90 cm bj 165,000.00
626 Bubungan Besar bj 17,600.00
627 Bubungan Kecil bj 13,200.00
628 Bubungan Bambe Kecil bj 19,250.00
629 Bubungan Bulat Karang Pilang bj 19,250.00
630 Bubungan Bulat Jati Wangi bj 17,050.00
631 Bubungan Bulat Ngalayur isi 3,5/m bj 9,900.00
632 Bubungan Besar Good Year bj 17,600.00
633 Bubungan Beton Cisangkan bj 21,450.00
634 Bubungan Karang Pilang isi 3,5/m bj 19,250.00
635 Bubungan Pletong Jatiwangi bj 16,500.00
636 Bubungan SL Utama Bj 16,500.00
637 Bubungan SL Ngalayur bj 9,350.00
638 Bubungan Segi Tiga Karang Pilang bj 19,250.00
639 Bubungan Utama isi 3,5/m bj 16,500.00
640 Genteng Bambe bj 5,390.00
641 Genteng Bambe Karang Pilang bj 5,390.00
642 Genteng Bambe Kecil bj 5,170.00
643 Genteng Beton Cisangkan bj 13,750.00
644 Genteng Gemini bj 6,600.00
645 Genteng Kanmuri (glazur) isi 14/m2 bj 11,550.00
646 Genteng Kodok Lokal bj 3,740.00
647 Genteng Kodok Kamulan bj 3,850.00
648 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj 5,500.00
649 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj 5,170.00
650 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj 5,500.00
651 Genteng Kodok Soka bj 2,420.00
652 Genteng Lestari bj 3,080.00
653 Genteng Metal 80 x 77,6 (Polos) lembar 40,590.00
654 Genteng Metal 80 x 77,6 (Pasir) lembar 65,340.00
655 Genteng Morando Abadi isi 18/m2 bj 9,240.00
656 Genteng Morando Jatiwangi isi 18/m2 bj 4,950.00
657 Genteng Morando Ngalayur isi 20/m2 bj 4,070.00
658 Genteng Morando Metal bj 63,800.00
659 Genteng Pejaten Mini bj 3,080.00
660 Genteng Plentong bj 2,200.00
661 Genteng plentong dicat bj 2,420.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
662 Genteng Plentong Mantili bj 2,200.00
663 Genteng Pres Besar bj 1,980.00
664 Genteng Pres Besar Cat bj 2,090.00
665 Genteng Pres Mini bj 1,760.00
666 Genteng Pres Mini Cat bj 1,980.00
667 Genteng Besar polos Lubang 35 cm bj 1,980.00
668 Genteng Besar Warna Lubang 35 cm bj 2,090.00
669 Fiberglas (1.80 x 0.80) M2 lbr 1,760.00
670 Ijuk kg 1,980.00
671 Ikut Celedu Besar Polos bh 88,000.00
672 Ikut Celedu Besar Warna bh 99,000.00
673 Ikut Celedu Kecil Polos bh 66,000.00
674 Ikut Celedu Kecil Warna bh 88,000.00
675 Kawat las Kg 80,300.00
676 Kawat Diameter 4 mm Kg 88,000.00
677 Murda tanah liat Ex Pejaten bh 121,000.00
678 Murda Kecil Polos Lubang 25 cm bh 88,000.00
679 Murda Kecil Warna Lubang 25 cm bh 104,500.00
680 Profil Aluminium "T" m3 219,450.00
681 Seng BJLS 0,18 gelombang lbr 99,770.00
682 Seng BJLS 0,22 gelombang lbr 106,480.00
683 Seng BJLS 0,30 gelombang lbr 119,790.00
684 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr 93,500.00
685 Seng Plat Lebar 0,90 M lbr 53,240.00
686 Seng Plat 3" x 6" BJLS 28 lbr 66,550.00
687 Seng Plat Aluminium lbr 53,240.00
688 Sirap Lbr 4,950.00
689 Subeng Besar Polos lbr 9,240.00
690 Subeng Besar Warna lbr 5,390.00
691 Subeng Kecil Polos lbr 6,600.00
692 Subeng Kecil Warna bh 4,180.00
693 Tali Ijuk kg 5,390.00
694 Tali pengikat alang-alang ikat 19,800.00
495 Besi strip kg 11,960.00

SANITAIR
695 Bak mandi fibre glass 70x70x66 cm bh 306,130.00
696 Bak mandi keramik 50x50 bh 187,000.00
697 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 341,000.00
698 Floor drain plastik Setara Alianco bh 27,500.00
699 Floor drain stainless Setara Wasser bh 49,500.00
700 Kloset duduk INA Komplit bh 1,650,000.00
701 Kloset duduk Amerika Standar Winplus bh 1,430,000.00
702 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 1,815,000.00
703 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 5,699,100.00
704 Kloset duduk " TOTO Type AVANTE CW 823 J bh 8,457,900.00
705 Kloset duduk " TOTO Type CW 660J bh 738,100.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
706 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,925,000.00
707 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 2,589,400.00
708 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 810,700.00
709 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 3,388,000.00
710 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 3,763,100.00
711 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 3,908,300.00
712 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 469,150.00
713 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 246,950.00
714 Kloset porselin jongkok TOTO (standar) bh 374,000.00
715 Kloset porselin jongkok Ina (standar) bh 175,450.00
716 Kran biasa Setara Onda bh 55,000.00
717 Kran SunEi PI/3 JHR bh 76,000.00
718 Kran TOTO T 205 LCSC bh 242,550.00
719 Kran TOTO T 205 MC bh 330,000.00
720 Kran TOTO T 23 B13 bh 271,700.00
721 Kran TOTO T 23 B13V7NB bh 280,500.00
722 Kran TOTO T 26 - 13 bh 367,400.00
723 Kran TOTO TX 109 LH bh 775,500.00
724 Penyekat Urinoir " TOTO " Type A 100 " bh 1,364,000.00
725 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 459,800.00
726 Soap holder " TOTO " Type S 6 N " bh 121,000.00
727 Seal tape bh 3,300.00
728 Urinoir " TOTO U 57 M bh 2,874,960.00
729 Urinoir " TOTO U 57 M BODI bh 1,414,600.00
730 Wastagel KIA Standard bh 203,500.00
731 Wastagel KIA Warna bh 258,500.00
732 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,248,500.00
733 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 808,500.00

KUNCI DAN PENGGANTUNG


734 Engsel H ( 80 x 50) Ps 11,000.00
735 Engsel kupu-kupu Rafes 4' 304 ps 64,900.00
736 Engsel pintu Setara ECOLING Ps 73,150.00
737 Engsel jendela Setara ECOLING Ps 46,310.00
738 Engsel jendela Setara CAMEL Ps 39,600.00
739 Espagnoleth Setara Rafes 60 cm Ps 51,700.00
740 Grendel Setara ESBELA Bh 133,100.00
741 Grendel tanam Setara CAMEL Bh 218,350.00
742 Kait angin biasa Setara CAMEL Bh 55,000.00
743 Kait angin diameter 10 mm Bh 92,000.00
744 Kait angin tarik Setara ESBELA Bh 59,950.00
745 Kunci lif 1 x putar Setara BELLEZA Bh 146,300.00
746 Kunci lif 2 x putar Bh 166,100.00
747 Kunci pintu TOP Setara ESBELA bh 330,000.00
748 Kunci pintu Vanesa Setara CAMEL bh 199,650.00
749 Kunci pintu Setara ESBELLA bh 286,000.00
750 Kunci Pintu 2 x putar Setara SES Bh 226,270.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
751 Kunci pintu Setara DELWIN) bh 198,000.00
752 Kunci shang hae 2 x putar Bh 185,900.00
753 Kunci slot / Grendel Pintu Setara DELLWYN bh 244,200.00
754 Kunci tanam 2 slag Setara Dexon bh 291,500.00
755 Rolling door plaat M2 133,100.00

PAKU
756 Paku Beton Kg 33,000.00
757 Paku 2-4 cm kg 15,271.67
758 Paku Pancing 60 x 230 Kg 16,500.00
759 Paku 5-12 cm kg 17,297.78
760 Paku 2 cm (30 kg) 3/4 inch SQ dus 471,800.00
761 Paku 2,5 cm (30 kg) 1 inch SQ dus 466,200.00
762 Paku 3 cm (30 kg) 1 1/4 inch SQ dus 457,800.00
763 Paku 4 cm (30 kg) 1 1/2 inch SQ dus 436,800.00
764 Paku 5 cm (30 kg) 2 inch SQ dus 393,400.00
765 Paku 7,10,12 cm (3,4,5) inch SQ dus 389,200.00
766 Paku 5 -12 cm (27kg) 2,3,4,5 inch dus 306,600.00
767 Bendrat 20 kg rol 250,600.00
768 Sekrup Kalisiboard buah 220.00

PAVING
769 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2 82,583
770 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2 131,670
771 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2 82,583
772 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2 131,670
773 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2 90,750.00
774 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2 136,400.00
775 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2 95,288
776 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2 143,220
777 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2 95,288
778 Paving 10 x 20 cm tebal 8 cm K225 (Warna)) m2 143,798
779 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2 95,288
780 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2 144,144
781 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2 104,528
782 Paving 10 x 20 cm tebal 8 cm K350 (Warna)) m2 154,193
783 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2 104,759
784 Paving 20 x 20 cm tebal 8 cm K350 (Warna)) m2 153,615
785 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2 123,585
786 Paving 20 x 20 cm tebal 8 cm K400 (Warna)) m2 161,010
787 Paving Tiga Berlian tebal 6 cm K225 (Polos) m2 79,233
788 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2 128,205
789 Kanstein Segi Lima P40 Buah 30,608
790 Kanstein Segi Lima P50 Buah 37,538
791 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 82,357
792 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2 64,050
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
PLAFOND & TIRPLEK
793 Acustik 30/30 lbr 84,700.00
794 Celling teak (0,62 x 2,40) m2 lbr 105,600.00
795 Eternit lbr 18,150.00
796 Plywood 4 mm Setara Meranti lbr 69,575.00
797 Plywood 5 mm lbr 122,100.00
798 Plywood 9 mm Setara Meranti lbr 148,500.00
799 Plywood aluminium lbr 118,800.00
800 Gypsum Board (120x240x9) lbr 79,200.00
801 Kalsiboard (4,5 x 1220 x 2420) mm lbr 113,080.00
802 Hard board MDF lbr 141,900.00
803 Multiplek 6 mm lbr 74,800.00
804 Multiplek 9 mm lbr 115,500.00
805 Triplek tebal 3mm (2,7mm) kayu sengon lbr 44,300.00
806 Triplek tebal 3mm (2,7mm) kayu semi meranti lbr 52,500.00
807 Triplek tebal 4mm (3,6mm) kayu sengon lbr 54,000.00
808 Triplek tebal 4mm (3,6mm) kayu semi meranti lbr 64,500.00
809 Triplek tebal 6mm (5,2mm) kayu sengon I lbr 65,800.00
810 Triplek tebal 6mm (5,2mm) kayu sengon II lbr 59,000.00
811 Triplek tebal 6mm (5,2mm) kayu semi meranti lbr 76,500.00
812 Triplek tebal 6mm (5,2mm) kayu semi meranti II lbr 61,500.00
813 Triplek tebal 8,0mm kayu sengon I lbr 97,000.00
814 Triplek tebal 8,0mm kayu sengon II lbr 89,000.00
815 Triplek tebal 8,0mm kayu semi meranti lbr 107,500.00
816 Triplek tebal 9,0mm kayu semi meranti II lbr 94,500.00
817 Triplek tebal 12 mm kayu sengon I lbr 129,500.00
818 Triplek tebal 12 mm kayu semi meranti lbr 178,000.00
819 Triplek tebal 15 mm kayu semi meranti lbr 210,000.00
820 Triplek tebal 18 mm kayu semi meranti lbr 232,000.00
821 Teakwood 122 x 244 x 2,7 mm lbr 72,500.00
822 Melamine Putih/Biru 2,7 lbr 87,500.00
823 Triplek aluminium jruk asli lbr 106,500.00
824 Triplek aluminium jruk standar lbr 69,500.00
825 Blocbord 18 mm sengon lbr 167,500.00
826 Blocbord 18 mm meranti super lbr 205,000.00
827 Teak block lbr 207,500.00
805 Rangka Aluminium m1 19,360.00
806 Rangka Metal Furing (2 x 4 cm) panjang 4 m Batang 22,000.00
807 Rangka Metal Furing (4 x 4 cm) panjang 4 m Batang 27,500.00
808 Teak wood (1,20x2,40x 0,4) lbr 84,700.00
809 Teak wood (0,90x2,00 x 0,4) lbr 72,600.00

BUIS BETON
810 Buis beton Diameter 25 x 75 bh 56,650.00
811 Buis beton Diameter 30 x 75 bh 72,600.00
812 Buis beton Diameter 50 x 75 bh 99,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
TALANG
813 Talang Karet L = 0.50 m' 99,000.00
814 Talang Karet L = 0.90 m' 126,500.00
815 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m' 71,500.00
816 Pipa Talang PVC Setara Maspion 6" Kotak m' 93,500.00

LAIN-LAIN
817 Air Bersih Ltr 30.00
818 Bak Cuci Aluminium Bh 225,500.00
819 Cangkul Bh 72,600.00
820 Cangkul Gigi Bh 159,500.00
821 Ember Bh 26,400.00
822 Gerinding bh 506,000.00
823 Helm Proyek Bh 80,300.00
824 Hammer 3 kg Bh 92,950.00
825 Instalasi Tata Suara Titik 399,300.00
826 Kapi Bh 8,800.00
827 Keni 2" Bh 15,950.00
828 Keranjang Sampah Bh 39,600.00
829 Linggis bh 79,200.00
830 Masker Bh 52,800.00
831 Ompreng Besar (bak Adonan) Bh 485,100.00
832 Panyong Bh 88,000.00
833 Pengelasan cm 14,520.00
834 Sabit Bh 66,000.00
835 Sapu lidi Ikat 6,600.00
836 Sepatu Karet Bh 133,100.00
837 Sikat baja Bh 33,220.00
838 Skop Bh 59,950.00
839 Water mur Bh 35,000.00
840 Pipa Tremi dan Casing pelindung Ls 121,000.00
841 Pelumas (olie) Ltr 28,350.00
842 Solar Ltr 7,500.00
843 Ramset M' 14,520.00
844 Minyak Tanah Ltr 3,000.00
845 Pembuatana papan Nama Proyek Ls 750,000.00

ALAT PEMADAM KEBAKARAN


846 Instalasi pipa induk BS 3" Sch M' 203,500.00
847 Intalasi pipa distribusi BS 2" Sch M' 137,500.00
848 Seamesi conection Bh 1,980,000.00
849 Box hidran dengan kelengkapannya Bh 2,750,000.00
850 Selang pemadam 30 m Bh 3,520,000.00
851 Pemadam api ringan 6 kg Bh 121,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
ASPAL, BBM DAN PELUMAS
852 Aspal Penetrasi 60/70 kg 12,600.00
853 Aspal Curah kg 12,600.00
854 Aspal RC kg 10,500.00
855 Aspal Emulsi ltr 14,910.00
856 Aspal Emulsi CRS 1 ltr 10,815.00
857 Aspal Emulsi CRS 1 Modif ltr 11,445.00
858 Aspal Emulsi CRS 2 ltr 12,233.00
859 Aspal Emulsi CSS 1 h Modif ltr 10,920.00
860 Aspal Emulsi CSS 1 h ltr 10,133.00
861 Aspal Emulsi CSS 1 / PCE ltr 10,710.00
862 Minyak Aspal ( fluck oil ) ltr 14,018.00
863 Minyak Tanah Industri ltr 8,006.00
864 Solar Industri ltr 8,250.00
865 Premium ltr 6,600.00
866 Premium (industri) ltr 7,260.00
867 Kayu Api M3 404,250.00
868 Gas elpiji Kg 7,350.00
869 Minyak Begesting ( B 115 ) Ltr 32,200.00
870 Aspal Cold Mix (Readymix) Kg 2,363.00

BETON READY MIX


871 Beton Ready Mix K-175 M3 1,045,000.00
872 Beton Ready Mix K-225 M3 1,364,000.00
873 Beton Ready Mix K-250 M3 1,475,000.00
874 Beton Ready Mix K-275 M3 1,515,000.00
875 Beton Ready Mix K-300 M3 1,551,000.00
876 Beton Ready Mix K-350 M3 1,630,000.00
877 Sewa Concrete pump/M3 Ls 35,000.00

878 Formite/penjaga jarak bekisting/spacer Bh 2,500.00

879 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc M2 92,000.00


880 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah M2 120,000.00
881 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam M2 117,000.00
882 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc M2 95,000.00
883 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah M2 128,000.00
884 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam M2 126,000.00
885 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc M2 100,000.00
886 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah M2 132,000.00
887 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam M2 130,000.00
888 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc M2 110,000.00
889 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah M2 142,000.00
890 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam M2 140,000.00
891 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc M2 86,000.00
NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4
892 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah M2 116,000.00
893 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam M2 113,000.00
894 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc M2 94,000.00
895 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah M2 138,000.00
896 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam M2 135,000.00

897 Kanstein Jumbo (P:50,L:15,T:30 cm K225) M1 35,000.00


898 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 M1 27,000.00
899 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) M1 46,000.00
900 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) M1 49,500.00
901 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) M1 25,000.00
902 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) M1 20,000.00
DAFTAR HARGA BAHAN, UPAH DAN ALAT - TAMBAHAN
TAHUN 2017
Untuk analisa tambahan
HARGA SATUAN
NO NAMA BARANG SATUAN
(Rp)
1 2 3 4
HARGA SATUAN BAHAN
1 Primer Coat - PolyFloor PU Concrete PFT - 253 MF (1000 Micron) M2 132,000.00
2 Top Coat - PolyFloor PU Concrete PFT - 253 MF (2000 Micron) M2 270,000.00
3 Primer Coat - PolyFloor Epoxy Primer PFP 241 (50 Micron) M2 9,800.00
4 Primer Coat - PolyFloor Epoxy Primer PFP 241 (50 Micron) + Pasir Silika M2 9,185.00
5 First Layer - Silikat Penetran LD-201 M2 85,000.00
6 Second Layer - Silikat Toping CC-203 M2 91,900.00
7 Waterproofing Semen Base Kg 17,500.00
8 Granite Tile 60 x 60 cm M2 345,000.00
9 Granite Tile 30 x 30 cm M2 180,000.00
10 Keramik 30 x 30 cm M2 65,000.00
11 Keramik 30 x 30 cm Anti Slip M2 70,000.00
12 Plint Grinte Tile 10 x 60 cm M2 115,000.00
13 Plint Keramik 10 x 30 cm Bh 5,909.09
14 Granite Tile Dinding 30 x 60 cm M2 315,000.00
15 Keramik Dinding 20 x 25 cm M2 78,000.00
16 List Gypsum 7 cm M2 22,800.00
17 Cornice Kg 3,250.00
18 Kusen Aluminium 4" Motif Kayu M1 185,000.00
19 HPL ( 2440mm x 1220mm x 1mm ) Lbr 227,680.50
20 Engsel Pivot Bh 450,000.00
21 Handle Pintu Kaca Bh 620,000.00
22 Handle Pintu Bh 250,000.00
23 Door Closer Bh 350,000.00
24 Door Stoper Bh 85,000.00
25 Grendel Bh 135,000.00
26 Pipa Bulat Stainless Steel SS 304 Dia. 2" Tebal 0,8 mm Btg 276,276.00
27 Besi hollow Galvanis 40x40x2mm Btg 149,860.00
28 Besi hollow Galvanis 20x20x1,7mm Btg 67,200.00
29 Besi Siku 50x50x5 mm Btg 195,000.00
30 Besi Strip 5x50 mm Btg 114,000.00
31 Plat Stainless Steel 304 Tebal 1,5 mm Lbr 1,188,910.00
32 Cat Waterproofing Kg 850,000.00
33 Panel Penolid Board Thick 12 mm, Hight 1,95 m M2 1,510,000.00
34 Stainless Steel Wire Mesh M5 M2 220,000.00
35 Zink Satainless Steel Unit 450,000.00
36 Murda / Puntal GRC Bh 3,500,000.00
37 Delineator Steel Pipa 3 '' Bh 290,000.00
38 Swing Fire Door Double Unit 36,549,331.00
39 Waterproofing Integral Crystallin Setara Pentent T-308 M2 140,000.00
40 Waterproofing Membrane Bakar Profextorcseal 3pv Setara Fosroc M2 100,000.00
41 Stainless Steel 304 T=1,5 mm Cm2 15,000.00
42 Aksesoris Pasangan Huruf Stainless Steel Ls 500,000.00
43 List Stepnosing Karet Tangga M1 120,000.00
44 Angkur diameter 16 Bh 55,000.00
HARGA SATUAN
NO NAMA BARANG SATUAN
(Rp)
1 2 3 4
45 Baut diameter 16 Bh 9,000.00
46 Spider Fitting Bh 2,050,000.00
47 Additive/Bonding Agent Ltr 132,950.00
48 Main Frame MF 170 Bh 9,310.00
49 End Frame EF 90 Bh 6,650.00
50 Bracing 193 Bh 4,330.00
51 Bracing 185 Bh 4,330.00
52 Base Plate Bh 3,990.00
53 Joint Pin Bh 5,320.00
54 U Head Jack Bh 5,320.00
55 Main Beam (Gelagar) 5 Mtr Bh 13,300.00
56 Rail Beam (Suri-Suri) Bh 13,300.00
57 Wire Mesh U50 M2 11,170.00
58 Beton Ready Mix B-0 Kg 897,390.00
59 Additive/PLasticicer Kg 19,950.00
60 Sewa TC Kap 2,5 Ton Length 60 m/Bulan/ 200 jam Bulan 120,000,000.00
61 Jaminan Angkur Set 65,000,000.00
62 Pasang Angkur Set 7,500,000.00
63 Erexsion Set 55,000,000.00
64 Dismantling Normal Set 55,000,000.00
65 Mob-Demob TC Set 175,000,000.00
66 Transportasi Crew TC 6 Orang Ls 25,000,000.00
67 Gaji Operator Set 7,500,000.00
68 Tanah Subur M3 80,000.00
69 Tanaman Hias Btg 500.00
70 Wheel Loader Jam 330,000.00
71 AMP Jam 5,018,600.00
72 Genzet Jam 416,800.00
73 Dump Truck Jam 248,157.27
74 Asphalt Finishir Jam 507,700.00
75 Tandem Roller Jam 318,300.00
76 P. Tyre Roller Jam 292,100.00
77 Beton Ready Mix K 500 M3 1,579,400.00
78 Additive Beton K-500 M3 17,510.00
79 Beton Ready Mix K-450 M3 1,534,801.06
80 Pembesian PC Strand Kg 24,310.00
81 Pembesian U40 Kg 15,720.05
82 Cetakan/Formwork M2 131,250.00
83 Pembesian PC Strand Kg 24,310.00
84 Cetakan/Formwork M2 131,250.00
85 Upah Jacking Strands dll m3 1,700,000.00
86 Peralatan Gantry Crane dll m3 275,000.00
87 Material testing m3 130,000.00
88 Pembesian PC Wire Kg 22,310.00
89 Pembesian U 50 Kg 13,970.05
90 Pelinggih Tugu Bata Merah Press Uk. 100x100 cm Unit 7,500,000.00
91 Lapis Kaca Film Setara Llumar BM 20 m2 1,248,000.00
92 Skrup Pcs 135.00
HARGA SATUAN
NO NAMA BARANG SATUAN
(Rp)
1 2 3 4

ALAT BANTU
1 Alat Bantu Finishing Lantai Epoxy Floor coating Setara PolyFloor Ls 5,000.00
2 Alat Bantu Finishing Lantai Floor Hardener Setara Propan Multiplox Ls 5,000.00
3 Alat Bantu Kusen Aluminium 4" Motif Kayu Ls 10,000.00
4 Bahan Las railling tangga pipa schedule sch 2" Ls 50,000.00
5 Bahan Las railling tangga besi hollow Ls 100,000.00
6 Bahan Las grill besi drainase Ls 25,000.00
7 Bahan Las pasang plat stainless 304 - 15 mm Ls 50,000.00
8 Pemasangan angkur diameter 16 Ls 1,000.00
9 Alat dan material cat zincromate Ls 1,000.00
10 Concrete Pump Lot 46,700.00
11 Alat Alat lain Pek. Beton K-300 Lot 33,236.45
12 Alat kerja pasang besi wire mesh Lot 1,100.00
13 Alat bantu pekerjaan lapisan aspal Ls 20,000.00
14 Concrete Pump Pek. Beton K-500 Lot 46,700.00
15 Alat Alat lain Pek. Beton K-500 Lot 58,366.44
16 Upah Jacking Strands dll (Balok Prestress) m3 1,700,000.00
17 Peralatan Gantry Crane dll (Balok Prestress) m3 275,000.00
18 Aksesoris Produksi (Balok Prestress) Ls 750,000.00
19 Material testing (Balok Prestress) m3 130,000.00
20 QC,Grouting/finshing (Balok Prestress) Lot 175,000.00
21 Upah Curing & Stocking (Balok Prestress) m3 275,000.00
22 Loading di Pabrik (Balok Prestress) Kg 20.00
23 Biaya Transport Pabrik (Balok Prestress) Kg 825.00
24 Turunkan di Site Proyek ( Crane ) (Balok Prestress) Ls 20.00
25 Bahan bantu ( kayu ) landasan (Balok Prestress) m3 55,000.00
26 Aksesoris Produksi (Balok Prestress) B1, B2, BR1 dan BS1 Ls 750,000.00
27 Alat Bantu GRC Ls 500,000.00

UPAH KERJA
1 Pekerja Pek. Beton K-450 OH 87,550.00
2 Tukang Cor/Batu Pek. Beton K-450 OH 105,060.00
3 Kepala Tukang Pek. Beton K-450 OH 128,410.00
4 Mandor Pek. Beton K-450 OH 175,100.00
5 Pekerja Erection OH 96,305.00
6 Tukang Erection OH 115,566.00
7 Kepala Tukang Erection OH 141,251.00
8 Mandor Erection OH 192,610.00
9 Bahan Las Ls 50,000.00
DAFTAR HARGA SATUAN UPAH
TAHUN 2017

NO NAMA BARANG SATUAN HARGA (Rp)

1 2 3 4

1 Mandor Hari 130,000.00


2 Kepala Tukang Lapangan Hari 115,000.00
3 Kepala Tukang Besi Hari 115,000.00
4 Kepala Tukang Batu Hari 115,000.00
5 Kepala Tukang Kayu Hari 115,000.00
6 Kepala Tukang Cat Hari 115,000.00
7 Kepala Tukang Paras Bali Hari 170,000.00
8 Kepala Tukang Ukir Hari 190,000.00
9 Tukang Aluminium Hari 100,000.00
10 Tukang Batu Hari 100,000.00
11 Tukang Besi Hari 105,000.00
12 Tukang Kayu Hari 110,000.00
13 Tukang Cat Hari 110,000.00
14 Tukang Politur Hari 110,000.00
15 Tukang Ukir Hari 120,000.00
16 Tukang Paras Bali Hari 165,000.00
17 Pekerja Terlatih Hari 95,000.00
18 Pekerja Semi Terlatih Hari 90,000.00
19 Pekerja / Pekerja Tidak Terlatih Hari 80,000.00
21 Tukang Listrik Hari 105,000.00
22 Tukang Pipa/ Tukang Ledeng Hari 105,000.00
23 Kepala Tukang Pipa/ Tukang Ledeng Hari 100,000.00
24 Tukang Las Hari 100,000.00
25 Tukang Masak Aspal Hari 95,000.00
26 Tukang Cor Aspal Hari 95,000.00
27 Pekerja Pembantu Tukang Aspal Hari 60,000.00
28 Penjaga Api Hari 65,000.00
29 Sopir SIM A Hari 70,000.00
30 Sopir SIM B1 Hari 75,000.00
31 Sopir SIM B2 Hari 80,000.00
32 Operator Hari 100,000.00
33 Operator Semi Terampil Hari 85,000.00
34 Pembantu Operator Hari 80,000.00
35 Pembantu Sopir Hari 60,000.00
NO NAMA BARANG SATUAN HARGA (Rp)

1 2 3 4
36 Mekanik Terampil Hari 95,000.00
39 Sewa Wales Jam 495,000.00
42 Sewa Wheel Loader Jam 330,000.00
43 Sewa Dump Truck Jam 80,000.00
44 Sewa Aspal Apayer Jam 80,000.00
45 Sewa Alat Bantu Set 55,000.00
54 Sewa Mesin Bor Jam 50,000.00
55 Alat Bantu Ls 20,000.00
56 Ongkos Ngebor O 30 cm m' 75,000.00
57 Blending Equpment Jam 230,000.00

UPAH KERJA UNTUK :


57 1 M2 PASANGAN BATA GOSOK 2 MUKA Ls 350,000.00
58 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Ls 200,000.00
59 1 M2 PASANGAN BATA PRESS 1 MUKA Ls 200,000.00
60 1 M2 PASANGAN PARAS 1 MUKA Ls 200,000.00
61 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM Ls 200,000.00
62 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Ls 200,000.00
63 1 M2 PASANGAN BATA GOSOK DIUKIR Ls 355,000.00
64 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR Ls 355,000.00
65 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Ls 280,000.00
66 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK Ls 350,000.00
67 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG Ls 300,000.00
68 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK Ls 350,000.00
69 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG Ls 300,000.00
70 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm Ls 750,000.00
71 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm Ls 650,000.00
72 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm Ls 750,000.00
73 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm Ls 750,000.00
74 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM Ls 1,500,000.00
75 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200X200 Ls 1,500,000.00
76 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM Ls 1,500,000.00
77 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200X200 Ls 1,500,000.00
78 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm Ls 300,000.00
79 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm Ls 300,000.00
80 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm Ls 300,000.00
81 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm Ls 300,000.00
NO NAMA BARANG SATUAN HARGA (Rp)

1 2 3 4
82 1 TTK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN & CEILING FAN Titik 25,000.00
83 1 TITIK INSTALASI AC Titik 25,000.00
84 1 TITIK INSTALASI TELEPHONE Titik 25,000.00
85 1 TITIK INSTALASI MATV Titik 25,000.00