Company Profile

By
BANPONG ENGINEERING CO.,LTD.
ISO 9001 certified.

DESIGN FABRICATION ERECTION BOILER - POWER PLANT - MACHINE


ºÃÔ É Ñ · ºé Ò ¹â»è § àÍç ¹ ¨Ô à ¹Õ Â ÃÔ è § ¨Ó¡Ñ ´ ä´é à ÃÔ è Á
¡è Í µÑ é § ¢Ö é ¹ àÁ× è Í ÇÑ ¹ ·Õ è 28 ÊÔ § ËÒ¤Á 2534 ·Ó¡ÒüÅÔ µ
Í͡ẺáÅÐµÔ ´ µÑ é § à¤Ã× è Í §¨Ñ ¡ ÃÍØ µ ÊÒË¡ÃÃÁ·Ñ è Ç ä»
µè Í ÁÒä´é · Ó¡ÒûÃÑ º »ÃØ § áÅдÓà¹Ô ¹ ¡ÒÃà»Ô ´ ºÃÔ É Ñ ·
ÍÂè Ò §à»ç ¹ ·Ò§¡Òà àÁ× è Í ÇÑ ¹ ·Õ è 27 Á¡ÃÒ¤Á 2537

·Ø ¹ ¨´·ÐàºÕ  ¹ 20,000,000.00 ºÒ·


·Õ è Í ÂÙ è â ç§Ò¹áÅÐÊÓ¹Ñ ¡ §Ò¹ 21/1 ËÁÙ è 1 ¶¹¹ ËÑ Ç â¾
- ºé Ò ¹ÊÔ § Ëì µÓºÅ
ËÑ Ç â¾ ÍÓàÀÍ ºÒ§á¾ ¨Ñ § ËÇÑ ´ ÃÒªºØ à Õ
70160
¾× é ¹ ·Õ è · Ñ é § ËÁ´ 65 äÃè
¾× é ¹ ·Õ è â ç§Ò¹¼ÅÔ µ 1, 2 1,440 áÅÐ 4,320 µÒÃÒ§àÁµÃ
¨Ó¹Ç¹¾¹Ñ ¡ §Ò¹ 300 ¤¹
ÁÙ Å ¤è Ò §Ò¹·Õ è Ã Ñ º 100-400 Åé Ò ¹ºÒ·/»Õ

BANPONG ENGINEERING CO.,LTD. Was


established in 28 AUGUST 1991 for full
service and supply in fabrication, design and
construction of the machine for general
industry. The business always having to
develop and have been opening as the
official company limited since 27 January
1994

REGISTERED CAPITAL 20,000,000.00 Baht.


ADDRESS 21/1 MOO 1 HUAPHO-BANSING RD.
HUAPHO BANGPHAE RATCHABURI 70160
TOTAL AREA 104,000 square metres
FACTORY 1, 2 AREA 1,440 and 4,320 square metres
STAFF 300 peoples
PROJECT VALUE 100-400 MILLION BAHT PER YEA R
CO-TECHNICAL COMPANY
ÈÑ ¡ ÂÀÒ¾¤ÇÒÁÁÑ è ¹ ¤§.....

´é Ç Â¡ÒûÃÐÊÒ¹¾ÅÑ § ·Ò§¸Ø à ¡Ô ¨ ÇÔ È Ç¡ÃÃÁ


â´Â¡ÒÃÃè Ç Á·Ø ¹ ¢Í§ºÃÔ É Ñ · Ï«Ö è § ä´é Ã Ñ º ¡ÒÃÂÍÁÃÑ º ·Ò§´é Ò ¹§Ò¹ÇÔ È Ç¡ÃÃÁà»ç ¹ ÍÂè Ò §ÊÙ § .....

1.ºÃÔ É Ñ · ºØ ­ àÂÕ è  Á áÅÐ ÊËÒ ¨Ó¡Ñ ´


¨Ó˹è Ò Â PACKAGED BOILER “CLEAVER BROOKS”
2.ºÃÔ É Ñ · ͺҴҹ ¨Ó¡Ñ ´
Í͡Ẻ áÅкÃÔ ¡ Òçҹ INSTRUMENT CONTROL
3.ºÃÔ É Ñ · ÂÙ à áé Ò àÍç ¹ ¨Ô à ¹Õ Â ÃÔ è § ¨Ó¡Ñ ´
Í͡Ẻ áÅÐ µÔ ´ µÑ é § §Ò¹Ãкºä¿¿é Ò

FIRM WITH CO-ORDINATION IN THE ENGINEERING BUSINESS

1. BOONYIUM & ASSOCIATES LIMITED Distributor of


“CLEAVER BROOKS” Packaged boilers, high and low
pressure steam boiler, boiler equipment, steam line
produces and etc.,.

2. ABADAN CO.,LTD. Design and service supplier of


instrument control, control equipment, process control
and etc.,.

3. UREAKA ENGINEERING CO.,LTD. Design and service


supplier of electric power, electric equipment and etc.,.
ÈÑ ¡ ÂÀÒ¾...........·Ò§´é Ò ¹§Ò¹Í͡ẺÇÔ È Ç¡ÃÃÁ
POTENTIAL IN ENGINEERING & DESIGN
¤ÇÒÁàÍÒã¨ãÊè µ è Í ¤ÇÒÁµé Í §¡ÒâͧÅÙ ¡ ¤é Ò ÍÂè Ò §ÁÕ » ÃÐÊÔ · ¸Ô À Ò¾ ¤× Í ¨Ø ´ ÁØ è §
ËÁÒÂÊÓ¤Ñ ­ «Ö è § ·Õ Á §Ò¹ÇÔ È Ç¡Ã ¼Ù é ª Ó¹Ò­·Ò§´é Ò ¹§Ò¹Í͡Ẻ¢Í§ºÃÔ É Ñ · Ï
µÃÐË¹Ñ ¡ ÍÂÙ è à ÊÁÍàÃÒ¨Ö § à¹é ¹ §Ò¹Í͡Ẻà¾× è Í ãËé Å Ù ¡ ¤é Ò ä´é Ã Ñ º »ÃÐ⪹ì Ê Ù § ÊØ ´
´é Ç Â¼Å§Ò¹·Õ è Ê ÒÁÒöªè Ç ÂÅ´µé ¹ ·Ø ¹ ´é Ò ¹¤è Ò ãªé ¨ è Ò Â µÅÍ´¨¹à¾Ô è Á ÈÑ ¡ ÂÀÒ¾
·Ò§¡ÒüÅÔ µ ¢Í§ÅÙ ¡ ¤é Ò ÍÂè Ò §ÁÕ » ÃÐÊÔ · ¸Ô À Ò¾

To effectively looking after requirement of customer is our


important goal. Our expert engineers in engineering design
always aware in this point. We are stretch to make the
creativity design for giving the best resulting to our customer
by a deed that can help to reduce the expenditure capital
including production efficiency increment.

ÈÑ ¡ ÂÀÒ¾...........¡ÒÃµÔ ´ µÑ é § §Ò¹ÇÔ È Ç¡ÃÃÁ


POTENTIAL IN ENGINEERING INSTALLATION

¤Ø ³ ÀÒ¾¢Í§§Ò¹¡ÒüÅÔ µ ¡ÒÃÊÃé Ò §áÅÐµÔ ´ µÑ é § ¤× Í ÊÔ è § «Ö è § ºÃÔ É Ñ · ÏãËé ¤ ÇÒÁ


ÊÓ¤Ñ ­ à»ç ¹ ÍÂè Ò §ÁÒ¡àÃÒ¨Ö § ÊÃé Ò §¤Ø ³ ÀÒ¾¢Í§§Ò¹´é Ç Â¡ÒÃãªé Ç Ñ Ê ´Ø á ÅÐ
ÍØ » ¡Ã³ì · Õ è Á Õ ¤ Ø ³ ÀÒ¾ÊÙ § ¾Ãé Í Áà·¤â¹âÅÂÕ · Õ è · Ñ ¹ ÊÁÑ Â ã¹¡ÒüÅÔ µ áÅÐµÔ ´ µÑ é §
à»ç ¹ ¾Ô à ÈÉ ÁÕ ¡ ÒäǺ¤Ø Á ·Ø ¡ ¢Ñ é ¹ µÍ¹¡ÒüÅÔ µ §Ò¹ÍÂè Ò §¾Ô ¶ Õ ¾ Ô ¶ Ñ ¹ â´Â
ÇÔ È Ç¡ÃáÅЪè Ò §à·¤¹Ô ¤ ·Õ è Á Õ · Ñ ¡ ÉÐ ¤ÇÒÁªÓ¹Ò­ áÅлÃÐʺ¡Òóì Ê Ù §

Quality of our production, fabrication and installation are


serious points of our company. So, our material and
instrument what we use must be a quality grade including
especially high technology in production and installation
process. By the particular control in every production
process by our experienced engineers and technicians.
ÈÑ ¡ ÂÀÒ¾...........§Ò¹ÃкºËÁé Í ä͹é Ó ÍØ µ ÊÒË¡ÃÃÁ
POTENTIAL IN WATER & FIRE TUBE BOILER
´é Ç Â¼Å§Ò¹áËè § ¤ÇÒÁÊÓàÃç ¨ ÍÑ ¹ ¹è Ò àª× è Í ¶× Í Êè § ¼ÅãËé · Ò§ºÃÔ É Ñ · ÏÁÕ ¤ ÇÒÁªÓ¹Ò­·Ò§´é Ò ¹Í͡ẺáÅÐµÔ ´ µÑ é §
§Ò¹ÃкºËÁé Í ä͹é Ó ÊÓËÃÑ º §Ò¹ÍØ µ ÊÒË¡ÃÃÁ·Ø ¡ »ÃÐàÀ·ä´é Í Âè Ò §ÊÁºÙ à ³ì á ººáÅФúǧ¨Ã â´Â¤Ó¹Ö § ¶Ö §
»Ñ ­ ËÒ´é Ò ¹Å´¡ÒÃÊÙ ­ àÊÕ Â ¤è Ò ãªé ¨ è Ò ÂÊÓËÃÑ º ¡ÒüÅÔ µ áÅÐÅ´ÁÅÀÒÇÐÊÔ è § áÇ´Åé Í Áà»ç ¹ ÊÓ¤Ñ ­ ...

ºÃÔ É Ñ · ÏÁÕ º ÃÔ ¡ Òôé Ò ¹µè Ò §æ¤× Í

- ÊÃé Ò § µÔ ´ µÑ é § à¤Å× è Í ¹Âé Ò Â áÅЫè Í ÁºÓÃØ § ËÁé Í ä͹é Ó µÅÍ´¨¹ªÔ é ¹ Êè Ç ¹áÅÐÍØ » ¡Ã³ì
- »ÃÑ º »ÃØ § ´Ñ ´ á»Å§ à¾Ô è Á »ÃÐÊÔ · ¸Ô À Ò¾ ¢ÂÒ¡ÓÅÑ § ¼ÅÔ µ ¢Í§ËÁé Í ä͹é Ó ·Ø ¡ ¢¹Ò´áÅÐ·Ø ¡ »ÃÐàÀ·
- Ãкº»ÃÑ º »ÃØ § ¤Ø ³ ÀÒ¾¹é Ó àªè ¹ ¶Ñ § ¾Ñ ¡ ¹é Ó ãÊ Ãкº·Ó¹é Ó Íè Í ¹ ÃкºäÅè Í Í¡«Ô à ¨¹ã¹¹é Ó ÃкºÊÒÃ
à¤ÁÕ áÅÐÍ× è ¹ æ
- Ãкº¡ÒûÃÐËÂÑ ´ ¾ÅÑ § §Ò¹â´Â¡ÒùӤÇÒÁÃé Í ¹¡ÅÑ º ÁÒãªé à ªè ¹ ÃкºáÅ¡à»ÅÕ è  ¹¤ÇÒÁÃé Í ¹
ÃкºÍè Ø ¹ ÍÒ¡ÒÈ Ãкºà¾Ô è Á ÍØ ³ ËÀÙ Á Ô ¢ ͧ¹é Ó ËÃ× Í ¹é Ó ÁÑ ¹ Ãкºàª× é Í à¾ÅÔ § áÅСÒÃà¼ÒäËÁé ©¹Ç¹
¡Ñ ¹ ¤ÇÒÁÃé Í ¹ áÅÐÍ× è ¹ æ
- Ãкº¤Çº¤Ø Á ¡Ò÷ӧҹ¢Í§ËÁé Í ä͹é Ó Ãкºä¿¿é Ò Ãкº¤ÇÒÁ»ÅÍ´ÀÑ Â
- Ãкº¡ÒÃÅ´ÁÅÀÒÇеè Í ÊÔ è § áÇ´Åé Í Á ¡ÒÃ¡Ó¨Ñ ´ ½Ø è ¹ ÅÐÍͧ
- Í͡Ẻ ÊÃé Ò § áÅÐµÔ ´ µÑ é § Ãкº¼ÅÔ µ ä¿¿é Ò â´Âãªé à ÈÉÇÑ µ ¶Ø ´ Ô º ·Õ è à ËÅ× Í ¨Ò¡¡Ãкǹ¡ÒüÅÔ µ àªè ¹
á¡Åº, ¡Ò¡Íé Í Â, ¢Õ é à Å× è Í Â ÏÅÏ ÁÒãªé à »ç ¹ àª× é Í à¾ÅÔ § ÊÓËÃÑ º ¼ÅÔ µ ¡ÃÐáÊä¿¿é Ò ãªé À ÒÂã¹âç§Ò¹
à¾× è Í Å´µé ¹ ·Ø ¹ ¤è Ò ä¿¿é Ò
- áÅкÃÔ ¡ Òôé Ò ¹Í× è ¹ æ

Ú B y our success stories in the pass, improve the company growing up with strong experience
and intelligence skill in completely design, build new and install boiler system for all
industries under the way to reduce production expense and less pollution.

Ú O UR SERVICES ARE....
- Build, installation, removal and maintenance any kind of boiler including spare
parts and equipments.
- Improvement, modification to increase more efficiency and capacity for any kind
and any size of boiler.
-Water treatment system such as clearifier, softener, deaerator, chemical
treatment and etc.
- Energy saving system by using heat recovery such as heat exchanger system, air
heater system, economizer steam, insulation system and etc.
- Boiler control system, electrical system and safety system.
- Pollution control system, dust wiping system.
-Design, build and install ; power generator system by using unusable raw
material such as rice husk, bagasse, sawdust and etc as the fuel to generate own
electricity. This solution is suitable for rice mill industry, sugar industry and
general industries.
- Other service for industrial and engineering business.
ÈÑ ¡ ÂÀÒ¾....§Ò¹¼ÅÔ µ ªÔ é ¹ Êè Ç ¹à¤Ã× è Í §¨Ñ ¡ Ã
POTENTIAL OF LATHE FACTORY
à¾ÃÒеÃÐË¹Ñ ¡ ¶Ö § ¤ÇÒÁÊÓ¤Ñ ­ ¢Í§¡ÒüÅÔ µ ªÔ é ¹ Êè Ç ¹ÍØ » ¡Ã³ì à ¤Ã× è Í §¨Ñ ¡ Ã«Ö è § µé Í §
ÁÕ ¤ Ø ³ ÀÒ¾ä´é Á ҵðҹ ºÃÔ É Ñ · Ï ¨Ö § ä´é ¨ Ñ ´ ÊÃé Ò §âç§Ò¹¡ÅÖ § ·Õ è ä ´é Á ҵðҹ
¾Ãé Í ÁÍØ » ¡Ã³ì á ÅÐà¤Ã× è Í §¨Ñ ¡ ÃÍÑ ¹ ·Ñ ¹ ÊÁÑ Â ¤Ãº¤ÃÑ ¹ à¾× è Í ÃͧÃÑ º ÈÑ ¡ ÂÀÒ¾·Ò§
´é Ò ¹¡ÒüÅÔ µ ÍØ » ¡Ã³ì ª Ô é ¹ Êè Ç ¹à¤Ã× è Í §¨Ñ ¡ à ÍÐäËÅè áÅÐÍ× è ¹ æËÅÒ¡ËÅÒÂÃÙ » Ẻ
µÒÁ¤ÇÒÁµé Í §¡ÒâͧÅÙ ¡ ¤é Ò àªè ¹ ¡ÒüÅÔ µ »Ñ ê Á ¹é Ó Íé Í Â, »Ñ ê Á ¢Í§àËÅÇ·Õ è Á Õ ¤ ÇÒÁ
Ë¹× ´ ÊÙ § , ÇÒÅì Ç ¢¹Ò´ãË­è , à¿× Í §¢¹Ò´ãË­è , ¡Ãк͡ÅÁ, ¡Ãк͡äÎâ´ÃÅÔ ¡ ,
à¤Ã× è Í §à¨ÒÐÃÙ ä Îâ´ÃÅÔ ¡ áÅÐÍ× è ¹ æ

Because of emphasize in the production quality. Every part of machine what we


are produce must be the highest quality. So, we was built a modern factory
including modern machine tools for support high quality production following the
customer’s demand. Such as Centrifugal chockless pump, Gear pump, High
capacity valve, Gear, Hydraulic cylinder, Hydraulic punching machine and etc.

AFTER SALE SERVICE


§Ò¹ºÃÔ ¡ ÒÃËÅÑ § ¡ÒâÒÂ
¹Í¡àË¹× Í ¨Ò¡¡ÒÃÊÃé Ò §¼Å§Ò¹ÃÐ´Ñ º ¤Ø ³ ÀÒ¾áÅé Ç ºÃÔ É Ñ · ÏÂÑ § ¨Ñ ´ ·Õ Á ºÃÔ ¡ ÒÃËÅÑ § ¡ÒâÒ ´é Ç Â¤ÇÒÁàÍÒã¨ãÊè µ è Í
ÅÙ ¡ ¤é Ò à»ç ¹ ¾Ô à ÈÉ ·Ñ é § ´é Ò ¹¡ÒÃãËé ¤ Óá¹Ð¹Ó»ÃÖ ¡ ÉÒàÃ× è Í §¢é Í ÁÙ Å à·¤¹Ô ¤ áÅÐÇÔ ª Ò¡Òà µÅÍ´¨¹ÇҧἹ ¡ÒûÃÑ º »ÃØ §
¡ÒõÃǨÊͺá¡é ä ¢»Ñ ­ ËÒ ºÃÔ ¡ Òëè Í Áá«Á áÅЫè Í ÁºÓÃØ § ÃÑ ¡ ÉÒ à¾× è Í Â× ´ ÍÒÂØ á ÅлÃÐÊÔ · ¸Ô À Ò¾¡ÒÃãªé § Ò¹¢Í§
à¤Ã× è Í §¨Ñ ¡ à ¾Ãé Í Á·Ñ é § ºÃÔ ¡ Òôé Ò ¹ÍØ » ¡Ã³ì Í ÐäËÅè µ è Í ÅÙ ¡ ¤é Ò ¡ÒúÃÔ ¡ ÒõÃǨÊͺ
ÍÍ¡ãºÃÑ º Ãͧ·Ò§´é Ò ¹ÇÔ È Ç¡ÃÃÁãºÍ¹Ø ­ ÒµÍ× è ¹ æ

Moreover the quality products have been produced, We are also arrange service team for take
care and provide you suggestion, planing for maintenance, repair and modify for more
efficiency of products. We are also provide spare part, an inspection, certification in
engineering field and various permits.
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1991
KASET PHOL SUGAR CO.,LTD. - UDONTHANI PROVINCE - THAILAND
-Remove and re-erection Boiler 80 T/H 2 units
-Remove and re-erection Boiler 60 T/H 2 units
-Remove and re-erection Boiler 40 T/H 2 units
MITR PHOL CORP.- SUPHANBURI PROVINCE - THAILAND
-Design, fabricated and erected Deaerator Tank capacity 560 T/H 1 unit
MITR SIAM SUGAR - KAMPANGPETCH PROVINCE - THAILAND
-Fabricate for Deaerator Tank 1 unit

YEAR 1992
KORACH INDUSTRY - NAKORNRATCHASIMA PROVINCE - THAILAND
-Erection of Takuma Boiler capacity 180 T/H 2 units
-Erection of Deaerator Tank 480 T/H capacity 1 unit
-Erection of High pressure pipe 1 unit
MITR SIAM SUGAR - KAMPANGPETCH PROVINCE - THAILAND
-Maintenance Boiler Takuma capacity 60 T/H 1 unit
THAI MOLLAST SYSTEM - THAILAND
-Silo, Molasses pipe 1 unit
-Erection of Sugar conveyor system 1 unit
-Erection of Molasses transfer system 1 unit
-Erection of Molasses pump 1 unit

YEAR 1993
RERM UDOM SUGAR FACTORY CO.,LTD. - UDONTHANI PROVINCE - THAILAND
-Design, Fabricated and Erected cane carrier system
-Truck tipping platform 1 unit
-Cross cane carrier 1 unit
-Main cane carrier 1 unitT
-Shredder carrier 1 unit
-Intermediate carrier 4 units
-Bucket elevator 2 units
-Bagasse conveyor 3 units
-Ash conveyor 3 units
-Juice heater 12 units
-Erection of Boiler 200 T/H with water treatment system 1 unit
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1993
MITR SIAM SUGAR - KAMPANGPETCH PROVINCE - THAILAND
-Maintenance for Takuma Boiler capacity 60 T/H 1 unit

YEAR 1994
EASTERN SUGAR CO.,LTD. - SRAKAEW PROVINCE - THAILAND
-Fabricated and erected Boiler house W 28 m X L 120 m X H 25 m 1 unit
-Fabricated and erected Process house W 42 m X L140 m X H 25 m 1 unit
-Erected Boiler capacity 60 T/H
-Erected high pressure piping system
RERM UDOM SUGAR FACTORY - UDON THANI PROVINCE - THAILAND
-Erected Boiler 200 T/H with water treatment and ash handling system 1 unit
THE KUMPHAWAPI SUGAR CO.,LTD. - UDON THANI PROVINCE - THAILAND
3
-Design, Fabricated and Erected Vacuum pan 150 m 1 unit
SYSTEM CORP. - THAILAND
-Design, Fabricated and Erected Fermentor Tank 3 units
-Design, Fabricated and Erected CB Tank 3 units
-Thin Film Evaporator 1 unit
THAI SUNROCK CO.,LTD.
-Fabricated and Erected Boiler part for Boiler 200 T/H 1 unit
-Fabricated and Erected Boiler part for Boiler 80 T/H 1 unit

YEAR 1995
IRRIGATION PROJECT KLONG SADAO - SONGKLA PROVINCE - THAILAND
-Fabricated and Erected Main water pipe 3,000 mm length 192 m with hydraulic
water gate
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
3
-Erected Vacuum Pan 55 m 1 unit
3
-Erected Refine Vacuum Pan 55 m 1 unit
-Fabricated drive sprocket with hydraulic driven unit for vertical Crystalizer 2 units
3
-Fabricated and erected Crystalizer 600 M 2 units
A.P.R. CONSULTANT CO.,LTD. (PROJECT : NAKHONPETCH SUGAR FACTORY - THAILAND)
-Removed and re-erection Boiler Takuma 200 T/H with accessories 2 units
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1995
EASTERN SUGAR CO.,LTD. - SRAKAEW PROVINCE - THAILAND
-Removed and erected Boiler 60 T/H
K.T.M.S.G. CO.,LTD. - ANGTHONG PROVINCE - THAILAND
-Fabricated and erected Fermentor Tank dia. 4,600 mm height 12,500 mm 3 units
-Sight glass 253 , 20 units and 354 , 100 units
-U-bolt, gear support, blade and support for bearing
MITR SIAM SUGAR CO.,LTD. - KAMPANGPETCH PROVINCE - THAILAND
-Cane cutter 70 Pcs.
-Pump blade stainless for pump 154W31 3 Pcs.
-Pump blade stainless for pump 204W31 3 Pcs.
PRACHUAB SUGAR FACTORY - PRACHUAB PROVINCE - THAILAND
-Foot valve 24” and 28” with steel screen
R.P.B INDUSTRY CO.,LTD.
-Erected vertical Crystalizer with hydraulic accessories
-Fabricated driving unit for vertical Crystalizer and hydraulic sets
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
3
-Erected Vacuum Pan 55 m 1 unit
3
-Erected refine Vacuum Pan 55 m 1 unit
-Fabricated drive sprocket with hydraulic unit for vertical Crystalizer 2 units
3
-Fabricated and Erected vertical Crystalizer 600 m 2 units

YEAR 1996
N.S.T. STEEL INDUSTRY CO.,LTD. - BANGKOK - THAILAND
-Constructed factory building 1 unit
N.Y. SUGAR CO.,LTD. - NAKORNRATCHASIMA PROVINCE - THAILAND
-Removed and Erected Boiler Fakuma 80 T/H 1 unit
-Removed and Erected Boiler Takuma 120 T/H 1 unit
-Internal gear pump size 8” x 8” and 5” x 5” 10 units
-Internal gear pump size 8” x 8” and 3” x 3” 2 units
KASET PHOL SUGAR LTD. - THAILAND
-Rotan pump model HD 124 size 3” x 3” 2 units
-Rotan pump model HD 201 size 8” x 8” 1 unit
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1996
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
3
-Fabricated and Erected Vacuum Pan 120 m 1 unit
-Fabricated and Erected Takuma Boiler model N-7700 capacity 250 T/H with
accessories 1 unit
-Fabricated and Erected Deaerator Tank with accessories 480 T/H 1 unit
-Fabricated and Erected dust collector 12 T/H 2 units
-Water Softener Tank with accessories 2 units
-Erected Raw juice heater 12 units
-Erected Juice pump Rotan model HD 201 8” x 8” 2 units
CHUMPORN PALM OIL PUBLIC COMPANY LIMITED - CHUMPORN PROVICE - THAILAND
-Rotary Seal damper 300 X 300 mm gear motor 1 unit
-Rotary damper size 300 X 300 mm capacity 1 unit
-Manhole gate 4 units
EASTERN SUGAR CO.,LTD. - SRAKAEW PROVINCE - THAILAND
-Erected drive sprocket and hydraulic unit for vertical Crystalizer
-Hydraulic screen 2 units
-Roller chain support 170 Pcs.
-Removed and Erected Takuma Boiler 45 T/H 1 unit
-Removed and Erected Cheng Chen boiler 45 T/H 1 unit
-Replaced boiler tube for John Thompson Boiler 200 T/H 1 lot.

YEAR 1997
THAI BETTER FOOD CO.,LTD. - RATCHABURI PROVINCE - THAILAND
-Noodle machine (not included press head) 1 set
-Noodle oven 1 set
-Noodle retort 1 set
-Improved noodle making process
-Cutting and support 1 set
-Press head 1 set
BURIRUM SUGAR - BURIRUM PROVINCE - THAILAND
-Washer spray nozzle for Evaporator 2” 40 pcs.
-Molasses Pump Viking model LL124 1 set
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1997
MITR SIAM SUGAR - KAMPANGPETCH PROVINCE - THAILAND
-Fabricated Boiler structure for 5 units
-Erected Boiler structure and Boiler part 5 units
-Removed Boiler part 5 units
-Material and tools
-Forced and Induced Draft Fan 2 sets
-Praffle Deaerator 30 sets
THAI UNION PAPER PUBLIC CO.,LTD. - BANGKOK - THAILAND
-Repair Boiler Tube 1 Job
-Cutting Steam Tube 1 Job
-Bending Boiler Tube 1 Job
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
-Sprocket 12 Pcs.
-Expanded capacity of Refined Sugar Dryer 1 set
-Piston Seal , U-Ring , Wiper 12 Pcs.
-Expanded capacity of Bucket Elevator A-B
-Stainless Bucket 40 Pcs.
-Cap for Juice heater size 1,800 mm , 10 sets
-Pressure reducing valve 8” with control 1 set
UNITED FARMER & INDUSTRY CO.,LTD. - CHAIYAPHUM PROVINCE - THAILAND
-Gear Pump Rotan size 8” x 8”
-Repair Boiler Tube 2” joint 1 curve Total 960 curves
-Bended Super heater Tube size 50.8 x 3.5 x R-200, R-270 480 curves
-Blower 4 units
THE KUMPHAWAPI SUGAR CO.,LTD. - UDON THANI PROVINCE - THAILAND
-Removed Boiler part Boiler capacity 40 T/H 1 unit
-Erected Boiler 160 T/H 1 unit
-Fabricated Boiler structure
-Bended Boiler Tube Takuma Boiler model N-5000
SIAM METROTECH CO.,LTD. - BANGKOK - THAILAND
-Water gate “SA-DAO” at Songkla Province.
GUANGXI FUNAN EAST ASIA SUGAR CO.,LTD. NANING CHINA
-Design , Fabricate , Inspect and Deliver complete set of Refined Sugar Dryer and
Cooler 1 set
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1998
RAYONG SUGAR CO.,LTD. - RAYONG PROVINCE - THAILAND
-Design and Fabricated for expanded capacity Boiler 27 T/H 2 units
-Bended tube, erected Boiler tube
-Designed, fabricated and erected main cane carrier
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
-Foot valve with metal screen 24” and 28” 10 sets
-Blade for pump 154 W 31 1 Pcs.
-Gear pump 1 set
MITR PHOL CO.,LTD. - BANGKOK - THAILAND
-Bagasse Feeder (chain) 12 sets

THAI FERMENTATION INDUSTRY CO.,LTD. - RATCHABURI PROVINCE - THAILAND


-Change Traveling Stoker 1 lot

MITR SIAM SUGAR - KAMPANGPETCH PROVINCE - THAILAND


-Removed and erected Takuma Boiler 60 T/H and 80 T/H 4 units
-Erected Process Piping 1 lot
N.R. INTERTECT CO.,LTD. - BANGKOK - THAILAND
-Ratchet gear for vertical Crystalizer 2 sets
-Tube STB-340, STB-A13
THAI UNION PAPER PUBLIC COMPANY LIMITED - BANGKOK - THAILAND
-Repaired Boiler Tube 1 Job
-Bended Boiler Tube 1 Job
-Repaired Furnace Refractory 1 Job
THANYAKIJ RICE MILL - PATHUMTHANI PROVINCE - THAILAND
-Designed, Fabricated and Erected Power Plant System 1 plant
2 O
Boiler Capacity 15 T/Hr Pressure 20 kg/cm Temperature 360 C
Steam Turbine Generator 1,000 kw
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 1999
GUANGXI FUNAN EAST ASIA SUGAR CO.,LTD. NANING CHINA
-Design, Fabricated and Erected Rotary Dryer 700 T/D 2 units
MITR PHOL CORP. - SUPHANBURI PROVINCE - THAILAND
-Maintenance Boiler 60 T/Hr and 80 T/Hr 6 units
INDORAMA CHEMICALS (THAILAND) LTD. - SARABURI PROVINCE - THAILAND
-Fabricated and Erected Takuma CFB-30 (Circulation Fluidized Bed) Boiler 1 unit
-Erected Water Treatment, Deaerator, Oil Burner, Coal Feeder
-Fabricated and Erected Electrostatic Precipitator 1 unit
CHUMPORN PALM OIL INDUSTRY PUBLIC COMPANY LIMITED - CHUMPORN PROVINCE -
THAILAND
-Fabricated and Erected Flosep Collection System 1 set
-Design and Erection Machine 1 Job
N.R. INTERTECH CO.,LTD. - BANGKOK - THAILAND
-Ratchet Gear for vertical Crystalizer 1 set
-Fabricated Middle Frame 6 sets
THAI ACRYLIC FIBER COMPANY LIMITED. - SARABURI PROVINCE - THAILAND
-To dismantle and re-assemble the stoker for Boiler No.1 , 1 Lot.
-Boiler for Stoker with shaft 1 set
PATHUM RICE MILL AND GRANARY PUBLIC CO.,LTD. - PATHUMTHANI PROVINCE - THAILAND
-Replaced Boiler Tube 1 set
-Replaced Boiler Chimney 1 set
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
-Maintenance Boiler 250 T/Hr 1 unit

YEAR 2000
BURAPA INDUSTRY CO.,LTD. - PATHUMTHANI PROVINCE - THAILAND
-Remove and Erected Power Plant 3,000 kw with Boiler 35 T/Hr Pressure 35 T/Hr
Pressure 63 kg/cm2 Temperature 450 oC and Water Treatment System, Wood chip and
Ash Conveyor system
WANGKANAI SUGAR CO.,LTD. - KANCHANABURI PROVINCE - THAILAND
-Dismantled and Re-assembled Air Heater Tube for Boiler capacity 60 T/Hr 1 unit
-Replaced Refractory 24.82 m2
SOMCHAI MECHANIC CO.,LTD.- BANGKOK - THAILAND
-Piping for Cooling Tower , Chiller , and removed machine 1 job
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2000
CHUMPORN PALM OIL INDUSTRY PUBLIC COMPANY LIMITED. - CHUMPORN PROVINCE -
THAILAND
-Maintenance Machines and changed piping 1 lot
CHIA MENG CO.,LTD. - NAKORNRATCHASIMA PROVINCE - THAILAND
-Replaced Combustion Grate 300 pcs.
K.T.M.S.G CO.,LTD. - ANGTHONG PROVINCE - THAILAND
-Pipe for Main Air Fermenter Tank and Pipe for Air Seed Tank 3” 8 sets
-Sleeve of Fermentation Tank 1 set
-Removed and Fabricated Bearing of Blade Mixer
MITR KALASIN SUGAR CO.,LTD. - KALASIN PROVINCE - THAILAND
-Performance adjustment Boiler 90 to 120 T/H 1 Job (Economizer and Air Heater)
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
-Maintenance Boiler No. 2, 3 TAKUMA N-1600 60 T/Hr
MITR PHOL CORP. - SUPHANBURI PROVINCE - THAILAND
-Performance adjustment Boiler TAKUMA #1 N-2200 80 T/Hr
-Air Duct and Damper #1 , 2
SIMA INTER PRODUCTS CO.,LTD.
-Economizer and Air Heater 1 set
PATHUM RICE MILL AND GRANARY PUBLIC COMPANY LIMITED - PATHUMTHANI PROVINCE
- THAILAND
-Maintenance Boiler YOSHIMINE H-1100 35 T/H
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2001
E-SAAN SUGAR INDUSTRY CO.,LTD. - KALASIN PROVINCE - THAILAND
Design, supervised for New Sugar Factory Cane Capacity 12,000 Ton/Day
-Mill Section
-Boiler Section
-Evaporator Section
-Vacuum Pan Section
-Centrifugal, Packing Section
-Refined Sugar Section
-Steam Turbine Generator Section
-Electrical Section
-Water Circulation for Condenser
2
Design, Construction and Erection Boiler Capacity 250 T/Hr Pressure 26 kg/cm Temp.
o
360 C with Control System

YEAR 2002
SAHARUANG CO.,LTD. - MOOKDAHAN PROVINCE - THAILAND
o 2
-Designed, Fabricated and Erected Boiler 120 T/Hr Temp. 360 C Pressure 26 kg/cm
N.Y. SUGAR CO.,LTD. - NAKHONRATCHASIMA PROVINCE - THAILAND
-Maintenance Boiler Capacity 120 T/Hr
-Removed, Fabricated, Erection Boiler Tube 24 sets
-Changed Blade of I.D.F. for Boiler No. 5 , 1 Job
UNITED FARMER & INDUSTRY CO.,LTD. AT MITR PHUVIANG - KHON KAEN PROVINCE -
THAILAND
2
-Designed, Fabricated and Erected Evaporator 2,600 m 1 set
-Replaced Boiler Tube No. 1 -3
UNITED FARMER & INDUSTRY CO.,LTD. - CHAIYAPOOM PROVINCE - THAILAND
-Replaced Superheater Tube Boiler TAKUMA N-3700 2 units
THAI ACRYLIC FIBER COMPANY LIMITED. - SARABURI PROVINCE - THAILAND
-To dismantle and re-assemble the stoker for Boiler No.1 , 1 Lot.
-Repaired Boiler No.2 , 1 Job
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2003
CHUMPORN PALM OIL INDUSTRY PUBLIC COMPANY LIMITED. - CHUMPORN PROVINCE -
THAILAND
- Repair Superheater Water Tube 1 Job
- Soot Blower Retractable , Fabrication and Erection 2 sets
PATHUM RICE MILL AND GRANARY PUBLIC COMPANY LIMITED - PATHUMTHANI PROVINCE
- THAILAND
- Changed Stack of Boiler capacity 20 T/Hr
- Refractory brick of Stack for Boiler capacity 35 T/Hr 1 Job
THAI CANE PAPER PUBLIC COMPANY LIMITED - KANJANABURI PROVINCE - THAILAND
- Repaired Boiler capacity 50 T/Hr
UNITED FARMER & INDUSTRY CO.,LTD. - CHAIYAPHUM PROVINCE - THAILAND
- Blade for Sugar Dryer 2 Pcs.
- To changed Superheater Tube for Boiler 4 units
MITR PHU VIANG SUGAR CO.,LTD. - KHON KAEN PROVINCE - THAILAND
- To change Superheater Tube for Boiler 4 units
3
- Evaporator capacity 4,000 m 1 set
NEW KRUNG THAI SUGAR FACTORY CO.,LTD. - KANJANABURI PROVINCE - THAILAND
- Bagasse dryer 50 T/Hr 1 set
- Designed, fabrication and erection Raw Sugar Silo size 29.22 x 77 m
MITR KALASIN SUGAR CO.,LTD. - KALASIN PROVINCE - THAILAND
- Continuous Vacuum Pan Model 11-19-5.6-170 1 set
KHON-KHEN SUGAR CO.,LTD. - KHON-KHEN PROVINCE - THAILAND
- Bagasse Dryer 60 T/Hr with power chain and sprocket 1 set
- Air locks valve 4 sets
SING-BURI SUGAR CO.,LTD. - SING-BURI PROVINCE - THAILAND
3
- Evaporator capacity 4,000 m 1 set
- Repaired Boiler capacity 120 T/Hr
T.N. SUGAR INDUSTRY CO.,LTD. - LOPBURI PROVINCE - THAILAND
- Changed Economizer Tube 1 set
THAI POWER SUPPLY CO.,LTD. - PRAJEENBURI PROVINCE - THAILAND
- Changed Condenser Tube and Ejector Tube 1 job
ìN.Y. SUGAR CO., LTD. - NAKORN-RATCHASIMA PROVINCE - THAILAND
- Changed blade of I.D.F. for Boiler 2 sets
ANGVIEN INDUSTRY CO.,LTD - NAKORN-RATCHASIMA PROVINCE - THAILAND
3
- I.D.F. Boiler CHENG-CHEN capacity 5,000 m
3
- Rotary Damper (Rotary Valve) size 300 x 300 mm Capacity 7 m /hr
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2004
BUAYAI BIO POWER CO.,LTD. - NAKORN-RATCHASIMA PROVINCE - THAILAND
2
- Design and Construction Boiler 35 T/Hr Pressure 45 kg/cm
Model BE-35T/H-45K-S/H
3 3
- Rotary Damper 7 m /Hr 13 sets , 13 m /Hr 4 sets
UNION RATCHABURE (1992) CO.,LTD. - RATCHABURI PROVINCE - THAILAND
- Removed Old Cyclone and Construction New Cyclone 1 set
KHON-KHEN SUGAR PUBLIC CO., LTD. - KHON-KHEN PROVINCE - THAILAND
- Damper size 3.00 m x 3.00 m 1 set
- Damper (square) 3.00 m x 3.00 m 1 set
- Multi Cyclone dia 406.4 x 7.9 F x L 1400 mm 100 sets
ANGVIEN INDUSTRY CO.,LTD - NAKORN-RATCHASIMA PROVINCE - THAILAND
3
- I.D.F. For Bagasse Dryer Capacity 50 T/H size 4,100 m /min 2 sets
W H
- Gas Damper size 2,350 mm x 2,350 2 sets
W H
- Gas Damper size 1,730 x 3,350 mm 2 sets
- Rotary feeder size 860 x 1,250 mm with Cyclo-drive Driving and Driver Pulley ,
Coupling 4 sets
CHUMPORN PALM OIL INDUSTRY PUBLIC COMPANY LIMITED. - CHUMPORN PROVINCE -
THAILAND
t
- Cutting Superheat Tube size 42.4 x 3.6 x 300 mm 1 Job
t
- Changed Water Tube of Lower Drum size 50.5 x 3.5 441 Pcs. 1 Job
MITH PHOL DANCHANG CO.,LTD. - SUPHANBURI PROVINCE - THAILAND
- Repaired Super heater Tube Boiler 1 Job
- Tube Plate Heater set 1/1 c 1 set
- Piping for Main, Valve, Support, Trap 1 set
EASTERN SUGAR CO.,LTD. - SRAKAEW PROVINCE - THAILAND
- Hydraulic for Cane Unloader 2 sets
WANG PALM OIL CO.,LTD. - PRAJEENBURI PROVINCE - THAILAND
- Coil for Vaporat HP. Boiler 1 set
UNITED FARMER & INDUSTRY CO.,LTD. - CHAIYAPHUM PROVINCE - THAILAND
- Steam Air Heater for Shelf Dryer 1 set
BLACKHOUSE FOODSFIELD INTERNATIONAL CO., LTD. - PHATHUMTHANI PROVINCE
- Changed Ball Valve of Evaporator Tank 1 set
THAI ACRYLIC FIBER COMPANY LIMITED. - SARABURI PROVINCE - THAILAND
- To dismantle and re-assemble the stoker for Boiler No.3 , 1 Lot.
INDO-RAMA CHEMICAL (THAILAND) CO.,LTD. - SARABURI PROVINCE - THAILAND
- Repaired Boiler capacity 30 T/Hr 2 Job.
ºÃÔÉÑ· ÀÙà¢ÕÂÇ äºâÍ-àÍç¹à¹ÍÃìÂÕè ¨Ó¡Ñ´ ¨Ñ§ËÇÑ´ªÑÂÀÙÁÔ
- Changed Side Wall Tube dia 3” No.4 Boiler 120 T/Hr 3 sets
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2004
CHIA MENG CO.,LTD. - NAKORNRATCHASIMA PROVINCE - THAILAND
- Repaired Boiler 1 Job
NEW KRUNG THAI SUGAR FACTORY CO.,LTD. - KANJANABURI PROVINCE - THAILAND
- Repaired blade of I.D.F. for Boiler No.4 1 Job
MITR KALASIN SUGAR CO.,LTD. - KALASIN PROVINCE - THAILAND
- Repaired Boiler 80 T/Hr (Boiler No.5) 1 Job
SING BURI SUGAR CO.,LTD. - SING BURI PROVINCE - THAILAND
- Maintenance Boiler 120 T/Hr. 1 Job
THAI PLYWOOD CO.,LTD. - SARABURI PROVINCE - THAILAND
- Repaired Cap of Hot Oil Boiler 1 set
BURAPHA INDUSTRY CO.,LTD. - PHATHUMTHANI PROVINCE - THAILAND
- Repaired Traveling Grate Stoker 1 Job
THE SAHA-RUANG CO.,LTD. - MUKDAHAN PROVINCE - THAILAND
- Supervised for Expansion of Mill section cane capacity 12,000 T/D
- Machine for Mill section cane capacity 12,000 T/D

YEAR 2005
MITRPHOL SUGAR CO.,LTD. - SUPHANBURI PROVINCE - THAILAND
- Air support conveyor system (Aerobelt) for New Packing Station 1 Set
- Sugar Bin Support Structure for New Packing Station 1 Job
WANG N T CRAFT PAPER CO.,LTD. - LOPBURI PROVINCE - THAILAND
2
- Boiler 12 T/H Pressure 10 kg/cm 1 set
PHU-KHIEO BIO-ENERGY CO.,LTD. - CHAIYAPHUM PROVINCE - THAILAND
- Repaired Boiler No.3, No.4 1 Job
- Changed Main Water Tube Boiler N-3700 1 Job
- Repaired Economizer Boiler 1 Job
- Changed Screen Tube dia 3”
HV FILA CO.,LTD. - SAMUTSAKHON PROVINCE - THAILAND
- Hot Oil Heater Capacity 4,000,000 kcal/Hr. 1 set
- Heating Coil 16 sets
SAHAVIRIYA STEEL INDUSTRIES PUBLIC CO.,LTD.
- Balance Impeller of Oxide Transport Fan 1 set
UNITED FARMER & INDUSTRY CO.,LTD. - CHAIYAPHUM PROVINCE - THAILAND
- Repaired Main Water Tube Boiler No.5
¼Å§Ò¹·Õ è ¼ è Ò ¹ÁÒ
SUCCESS PROJECT IN THE PAST

YEAR 2005
U-THONG BIOMASS CO.,LTD. - SUPHANBURI PROVINCE - THAILAND
- Bio-mass Power Plant 7.5 MW
- Boiler capacity 40 T/H Pressure 45 kg/cm2 Temperature 450 oC
- Steam Turbine and Generator 7.5 MW
- Cooling Water System
- Electrical System
- Fuel Handling System and Ash Handling System
- Utilities System
Reference Project

Boiler 15 T/H Pressure 20 kg/cm2 Temperature 360 oC

Wet Scrubber for Boiler Ash Conveyor

Steam Turbine Generator 1,000 kW

1997-1998
Thanyakij Nakhon Pathom Rice Mill (2521)
Reference Project

Modify Boiler 60 T/H 5 Units

1997-1998
Mitr Kalasin Sugar Co.,Ltd.
Reference Project

Lower Drum Boiler 250 T/H Upper Drum Boiler 250 T/H

2001
Boiler 250 T/H E-saan Sugar Industry Co.,Ltd.
Design and Construction by BPE
Reference Project

Control room Generator 12,500 kW


2001
Boiler 250 T/H E-saan Sugar Industry Co.,Ltd.
Design and Construction by BPE
Reference Project

2001
Consulting for New Sugar Factory Cane Capacity 12,000 T/D
E-saan Sugar Industry Co.,Ltd.
Reference Project

2002
Bagasse Firing Fuel Boiler Capacity 120 T/H Pressure 26 kg/cm2 Temp. 370 0C
The Saharuang Co.,Ltd.
Reference Project

2002
2 0
Bagasse Firing Fuel Boiler Capacity 120 T/H Pressure 26 kg/cm Temp. 370 C
The Saharuang Co.,Ltd.
Reference Project

2004 - 2005
Construction Boiler 35 T/H Pressure 40 kg/cm2
Bua Yai Bio Power Co.,Ltd.
Reference Project

Cooling Tower Deaerator Tank

Steam Turbine Generator 7.5 MW


2004 - 2005
Construction Boiler 35 T/H Pressure 40 kg/cm2
Bua Yai Bio Power Co.,Ltd.
Reference Project

2004
Construction Boiler 20 T/H Pressure 20 kg/cm2
S.R. Tyres Co.,Ltd.
Reference Project

2005
New Packing Station : Air Support conveyor system, Gantry and Steel support Structure
Mitr phol sugar Co.,Ltd. Suphanburi Province
Reference Project

Overview of New Mill Motor Drive Mill Tandam and Intermediate Carrier

Extraction Steam Turbine Generator 12,000 kW Truck Unloading Platform

Shredder Elevator Top View Cooling Tower


2004
New Mill Section 12,000 TCD. And Power Plant 12.00 MW
The Saharuang Co., Ltd.
Reference Project

2004
Commercial Operation Day (COD)
between The Saharuang Co., Ltd. and The Electricity Generating Authority of Thailand
December 16,2004
£µ¡Ÿ¨Šµœš¸ÉŸnµœ¤µ
Biomass Power Plant 7.5 MW

¦·¬´š °¼nš°ŠÅ
š°ŠÅÃ°Â¤­ ‹Îµ„´— ‹.­»¡¦¦–»¦¸
ºÃÔ ¡ ÒâͧºÃÔ É Ñ · ºé Ò ¹â»è § àÍç ¹ ¨Ô à ¹Õ Â ÃÔ è § ¨Ó¡Ñ ´
Our Service.........
ºÃÔ ¡ ÒÃÍ͡Ẻ, ÊÃé Ò § áÅÐµÔ ´ µÑ é § ËÁé Í ä͹é Ó ¢¹Ò´ 5-300 µÑ ¹ µè Í
ªÑ è Ç âÁ§ â´Âãªé à ª× é Í à¾ÅÔ § ¨Ò¡á¡Åº, ¡Ò¡Íé Í Â, ¢Õ é à ÅÕ è Í Â áÅжè Ò ¹ËÔ ¹
ÊÓËÃÑ º âçÊÕ ¢ é Ò Ç, âç§Ò¹¹é Ó µÒÅ áÅÐ âç§Ò¹ÍØ µ ÊÒË¡ÃÃÁ·Ñ è Ç ä»
Design, build new and erection of boiler capacity from 5-300
T/H by using fuel from husk, bagasse, sawdust and coal
suitable for rice mill, sugar industry and general.

ºÃÔ ¡ Ò÷ҧ´é Ò ¹¡ÒÃÍ͡Ẻ, »ÃÑ º »ÃØ § , ¾Ñ ² ¹ÒÃкº§Ò¹ÇÔ È Ç¡ÃÃÁ


µÅÍ´¨¹à¤Ã× è Í §¨Ñ ¡ ÃáÅÐÍØ » ¡Ã³ì Ê ÓËÃÑ º ÍØ µ ÊÒË¡ÃÃÁ¹é Ó µÒÅáÅÐ
ÍØ µ ÊÒË¡ÃÃÁ·Ñ è Ç ä»
Design, improvement, development the engineering system
including machine equipment for sugar industry and general
industrial.

ºÃÔ ¡ ÒÃÍ͡Ẻ, ÊÃé Ò § áÅÐµÔ ´ µÑ é § Ãкº¼ÅÔ µ ä¿¿é Ò â´Âãªé ¾ ÅÑ § §Ò¹


ä͹é Ó ·Õ è ã ªé ã ¹¡Ãкǹ¡ÒüÅÔ µ à¾× è Í Å´µé ¹ ·Ø ¹ ¤è Ò ä¿¿é Ò àËÁÒÐÊÓËÃÑ º
âçÊÕ ¢ é Ò Ç, âç§Ò¹¹é Ó µÒÅ áÅÐ âç§Ò¹ÍØ µ ÊÒË¡ÃÃÁ·Ñ è Ç ä»
Design, build new and erection of power generator system by
using steam from production process to reduce cost of
electrical. Suitable for rice mill, sugar industry and general
industry.

ºÃÔ ¡ Òôé Ò ¹§Ò¹¡ÅÖ § áÅмÅÔ µ ÍØ » ¡Ã³ì ª Ô é ¹ Êè Ç ¹à¤Ã× è Í §¨Ñ ¡ à ¼ÅÔ µ ÀÑ ³ ±ì


ÍÐäËÅè áÅÐÍ× è ¹ æËÅÒ¡ËÅÒÂÃÙ » ẺµÒÁ¤ÇÒÁµé Í §¡ÒâͧÅÙ ¡ ¤é Ò
Lathing service, produce machinery part or spare part and
several of style in according to customer’s requirement.

¡ÒúÃÔ ¡ ÒÃËÅÑ § ¡ÒâÒ ´é Ò ¹¡ÒÃãËé ¤ Óá¹Ð¹Ó »ÃÖ ¡ ÉÒ µÅÍ´¨¹¡ÒÃ


ºÃÔ ¡ ÒõÃǨÊͺáÅЧҹ«è Í ÁºÓÃØ § ªÔ é ¹ Êè Ç ¹à¤Ã× è Í §¨Ñ ¡ Ã·Ø ¡ »ÃÐàÀ·
After sales service, giving to advise and discuss including a
service for checking and maintaining in any kind of machine.

ºÃÔÉÑ· ºéÒ¹â»è§àÍ繨Ôà¹ÕÂÃÔè§ ¨Ó¡Ñ´


21/1 ËÁÙè 1 ¶.ËÑÇâ¾-ºéÒ¹ÊÔ§Ëì µÓºÅËÑÇâ¾ ÍÓàÀͺҧᾠ¨Ñ§ËÇÑ´ÃÒªºØÃÕ 70160
â·ÃÈѾ·ì (032) 349515 (Íѵâ¹ÁѵÔ) â·ÃÊÒà (032) 349398
E-mail : contact@bpe-boiler.com
âÎÁྨ : http://www.bpe-boiler.com
BANPONG ENGINEERING CO.,LTD.
21/1 MOO 1 HUAPHO-BANSING RD., HUAPHO, BANGPHAE, RATCHABURI 70160
TEL.(032) 349515 (auto) FAX. (032) 349398
E-mail : contact@bpe-boiler.com