Sei sulla pagina 1di 1

9000

6000 3000

TANGGA 3

R. IRNA 1
+ 10.00

6000
TOILET
+9.95

JANITOR
+9.95

6000
TOILET
+9.95

R. IRNA 2
+ 10.00

6000
R. ISOLASI 1
+10.00
TOILET
+9.95

TOILET
+9.95
R. ISOLASI 2
+10.00

4000
SH
+9.50 STASI
PANTRY
PERAWAT 4
+10.00
+10.00

2000
R. PENYIMPANAN
ALAT, LINEN
& OBAT
+10.00
ADM
IRNA 4
TOILET +10.00
R. IRNA 3 R. IRNA 4
+9.95
+ 10.00 + 10.00

6000
R. KONSULTASI
TANGGA 2 +10.00

TOILET TOILET
+9.95

1000
+9.95

SELASAR
+ 10.00

2550
R.

6000
tr ADM
PENYIM- IRNA 3 STASI TOILET
PANAN +10.00 PERAWAT 3 +9.95
LIFT.2 ALAT, +10.00
R. IRNA 5
3450
LINEN
& OBAT + 10.00
SH
+10.00
R. +9.95
PENYIM-
PANAN
ALAT,
R. PANEL LINEN STASI
ADM
UTAMA & OBAT PERAWAT 2
IRNA 2
+10.00 +10.00 +10.00
+10.00

R. IRNA 6
MUSHOLLA
+ 10.00
6000

+10.10

TOILET
+9.95
TOILET
R. URIN
R.SAMPLING

ramp TOILET
LIFT.1
R.LAB

+9.95
2800

A
R. IRNA 7
+ 10.00
Meja Beton

R.ADMIN

6000

TANGGA 1
G. LAB

R.DOKTER

3200

TOILET
+9.95

R. IRNA 8
R. IRNA 9
+ 10.00
+ 10.00
6000

TOILET
+9.95

SH
H.C.U JANITOR TOILET
+9.95
+9.95 +9.95

1800 1800 3250


3600 2400 6000 6000 6000 6000
30000

C
B

DENAH LAYOUT LANTAI 3


SKALA 1 : 200

Potrebbero piacerti anche