OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI

COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

PREMESSA .............................................................................................................................................................. 2

DESCRIZIONE DEGLI INTERVENTI IN ALVEO ............................................................................................ 3

VERIFICHE IDRAULICHE DI MOTO PERMANENTE................................................................................... 6


3.1
MODELLO DI CALCOLO UTILIZZATO..................................................................................................................... 6
3.2
CONDIZIONI DI CALCOLO ..................................................................................................................................... 7
3.2.1
Geometria dellalveo .................................................................................................................................. 7
3.2.2
Portata defluente......................................................................................................................................... 7
3.2.3
Condizioni al contorno ............................................................................................................................... 7
3.2.4
Scabrezza .................................................................................................................................................... 8
3.3
SIMULAZIONI IDRAULICHE EFFETTUATE ............................................................................................................ 13
3.4
OUTPUT DEI CALCOLI IDRAULICI ....................................................................................................................... 13
3.5
SINTESI DEI RISULTATI ....................................................................................................................................... 13
3.5.1
Ante operam.............................................................................................................................................. 13
3.5.2
Post Operam ............................................................................................................................................. 14
3.5.3
Interrimento .............................................................................................................................................. 15

COMPATIBILITA IDRAULICA DEL NUOVO PONTE ................................................................................ 16

CONCLUSIONI...................................................................................................................................................... 17

ALLEGATI RISULTATI DEI CALCOLI IDRAULICI ................................................................................. 18

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
1

PREMESSA

La presente relazione specialistica finalizzata alla verifica di compatibilit idraulica degli interventi
di progetto previsti nellalveo del torrente Lesina.

Dal 2004 ad oggi sono stati svolti dagli scriventi professionisti tre studi idraulici sul torrente:

2004: nellambito dellindividuazione delle fasce di rispetto sul reticolo idrico principale sono
state effettuate delle verifiche in moto permanente della tratta compresa tra la briglia
immediatamente a monte di Torrazza e la passerella pedonale di via Fanfulla da Lodi;

2005: al fine di valutare i possibili effetti della presenza della frana di Canargo, ubicata nella
parte mediana del bacino imbrifero del torrente in sponda sinistra, stato redatto uno
studio geologico idrologico idraulico preliminare;

2006: allo scopo di caratterizzare esaurientemente il fenomeno di propagazione dellonda


di piena nelle condizioni studiate nel 2005 sono state eseguite simulazioni idrauliche di
moto permanente bidimensionale e tridimensionale.

Gli studi sopra elencati hanno permesso di inquadrare compiutamente le problematiche idrauliche
e di trasporto solido di cui possono essere oggetto il torrente Lesina e labitato di Delebio durante
gli eventi di piena.

Gli interventi di progetto sono finalizzati a:

ottenere adeguati franchi idraulici sulla piena centenaria ed evitare esondazioni anche in
concomitanza del transito dellonda di piena prodotta dellerosione dello sbarramento
causato dalla ipotetica frana di Canargo;

creare un volume di invaso per il materiale eroso presso la frana di Canargo che,
nellipotesi pi gravosa, potrebbe essere trasportato verso valle dal torrente in piena.

Nel 2006 - 2007 il torrente Lesina stato oggetto di interventi di manutenzione consistenti nello
sfalcio della vegetazione infestante, in ripristini puntuali di tratte erose, nel rifacimento dello scarico
in alveo della derivazione della ditta Carcano, e nella sistemazione della sponda destra da detto
scarico fino alla soglia a monte della passerella pedonale con una nuova scogliera in massi.
Gli interventi realizzati hanno quindi modificato la situazione dei luoghi rispetto alla geometria
verificata negli studi pregressi, si proceduto di conseguenza ad aggiornare le verifiche idrauliche
nella configurazione ANTE OPERAM inserendo la geometria odierna del torrente, cos come
rilevata topograficamente.

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
2

DESCRIZIONE DEGLI INTERVENTI IN ALVEO

Gli interventi di progetto salienti dal punto di vista idraulico sono:


1. demolizione dellattuale passerella pedonale di via Fanfulla da Lodi e della relativa pila in
alveo;
2. sistemazione del torrente in sponda destra in corrispondenza del nuovo ponte consistente
in:
a. scavo di sbancamento con ampliamento della sezione di deflusso;
b. realizzazione di una scogliera in massi intasata in cls a sostegno della banca;
c. rifacimento del muro arginale con separazione dalla fondazione del nuovo ponte;

Fig. 1.

Sistemazione sponda destra

3. realizzazione di unarginatura in sinistra idraulica allinterno della gola a sostegno della


pista definitiva di accesso dei mezzi pesanti per le manutenzioni dalveo;
4. ricostituzione della presa idrica in sinistra idraulica interferita dalle opere di progetto;
5. realizzazione di una briglia selettiva con relativo selciatone e controbriglia allinterno della
gola;
6. movimenti terra per la regolarizzazione del fondo alveo in corrispondenza della tratta di
intervento allinterno della gola.

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
La demolizione della passerella pedonale esistente congiuntamente alla sistemazione della
sponda destra consentono di incrementare notevolmente larea utile per il deflusso idraulico
rispetto alla situazione attuale.
La realizzazione dellarginatura con le caratteristiche descritte nella relazione generale consente di
ottenere la sicurezza idraulica nel punto oggi maggiormente critico della briglia allingresso del
centro abitato.
La costruzione della briglia selettiva permette di trovare collocazione a circa 6000 m3 di materiale
proveniente dalla frana di Canargo.

La presa idrica verr ricostituita con le medesime caratteristiche geometriche dellattuale, la


posizione tangente rispetto allarginatura eviter gli intasamenti che si verificano attualmente,
garantendo comunque un approvvigionamento continuo per effetto della quota ribassata rispetto
alla testa della briglia esistente e pari a quella odierna.

Fig. 2.

Presa idrica asciutta

Fig. 3.

Intasamento della presa a tergo del muro deflettore

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

Fig. 4.

Opere in corrispondenza della briglia allingresso del centro abitato

I movimenti terra in alveo assicureranno un corretto deflusso delle acque in particolare durante il
periodo di magra.
Gli effetti delle opere sui livelli idrici sono calcolati e descritti nei paragrafi seguenti.

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
3

VERIFICHE IDRAULICHE DI MOTO PERMANENTE

Nel modello di calcolo di seguito descritto stato importato landamento plano-altimetrico


dellalveo cos come rilevato topograficamente negli anni 2004 e 2006 e come integrato dal rilievo
celerimetrico effettuato nel 2008.

3.1

MODELLO DI CALCOLO UTILIZZATO

Lindividuazione dei profili dacqua del torrente Lesina richiede, per effetto della presenza di
variazioni della geometria e dellandamento plano-altimetrico dellalveo, la verifica delle condizioni
di deflusso in condizioni di moto permanente di tipo stazionario monodimensionale.
A tal fine stato utilizzato il modello di calcolo HEC-RAS (Versione 3.1.3) che consente di
definire i livelli idrici in qualunque sezione dellalveo risolvendo lequazione del moto:

v m2
v v2
v2
hm +
= hv +
+ a +
2g
2g
2g

[1]

Indicando con a laltezza del salto e con i pedici m e v rispettivamente le grandezze riferite a monte
e a valle. Il coefficiente consente di quantificare le perdite di carico concentrate.
Lequazione [1] viene risolta per differenze finite discretizzando lalveo in tratte di lunghezza s:

s =

E
i j

dove:

j=

Q2
(Formula di Chezy)
k s R 4 / 3 A2

E =h+

Q2
2gA2

nelle quali i la pendenza del canale, j la cadente piezometrica, R il raggio idraulico, ks il


coefficiente di scabrezza di Strickler (inverso di Manning) ed E lenergia della corrente rispetto al
fondo.

In corrispondenza di variazioni rapide della quota di fondo il modello di calcolo procede


raccordando il livello idrico di corrente veloce a valle del salto di fondo con quello lento proveniente
da valle, mediante la ricerca della posizione del risalto idraulico, ovvero della sezione in cui si ha
lequilibrio delle spinte totali dei due livelli:

S M = SV
dove lespressione della spinta totale la seguente:

S = A h + Q v
6

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
3.2
3.2.1

CONDIZIONI DI CALCOLO
GEOMETRIA DELLALVEO

Nel modello di calcolo sono state importate le sezioni rilevate con nellesatta ubicazione
planoaltimetrica. Per maggiore precisione di calcolo, le tratte tra una sezione e la successiva sono
state simulate interpolando i punti significativi delle sezioni rilevate, ottenendo una modellazione
geometrica dellalveo quasi continua.
In totale sono state inserite nel modello 49 sezioni trasversali, da progressiva 0 a 424.26.
Nel calcolo idraulico si sono considerate tre configurazioni geometriche dellalveo:

ANTE OPERAM: geometria attuale dellalveo;

POST OPERAM: geometria dellalveo a opere realizzate;

INTERRIMENTO: geometria dellalveo a opere realizzate con interrimento


completo della briglia selettiva.

I punti notevoli di riferimento lungo lalveo si trovano alle progressive:

3.2.2

424.26 m: briglia nella gola;

413.20 m: controbriglia nella gola;

313.25 m: briglia di progetto;

278.32 m: briglia a monte di torrazza;

89.90 m:passerella pedonale ponte carrabile.

PORTATA DEFLUENTE

Le simulazioni di moto permanente sono state condotte nelle condizioni di portata calcolate negli
studi idrologici e geologici effettuati negli anni passati e sopra richiamati:

TR100 conoide: deflusso della piena centenaria allapice del conoide, come
calcolata nei paragrafi precedenti, pari a 176.92 m3/s;

TR100 trasporto: deflusso della piena centenaria aumentata della quota parte
relativa al trasporto solido, pari a 192.50 m3/s;

DIGA+PIENA: simulazione della contemporaneit dellevento di piena con


lerosione dello sbarramento della frana di canargo con deflusso dellidrogramma di
piena in uscita dallo sbarramento come calcolato nella modellazione di dam beach,
per una portata pari a 277 m3/s.

3.2.3

CONDIZIONI AL CONTORNO

Le pendenze della tratta in studio sono tali da determinare condizioni di deflusso tipiche di alvei a
forte pendenza, la cui condizione al contorno da ricercarsi a monte.

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
La prima sezione di simulazione ubicata in corrispondenza della briglia allinterno della gola dove
il passaggio dalla debole pendenza determinata dalla tratta di calma a monte della briglia, a forte
pendenza in corrispondenza del salto, condizione sufficiente al passaggio per laltezza critica.
La condizione al contorno di monte quindi costituita dallaltezza critica calcolata per la sezione a
progressiva 424.26 per le diverse portate di calcolo e pari a:

TR100 conoide: 272.56 m;

TR100 trasporto: 272.68 m;

DIGA+PIENA: 273.23 m.

Laltezza idrica dellultima sezione di rilievo, data la pendenza del torrente, risulta indipendente sia
dai fenomeni idraulici dovuti ai manufatti esistenti a valle (attraversamento SS38 e ferroviario) che
alle dinamiche idrauliche dellAdda durante gli eventi di piena.
3.2.4

SCABREZZA

Lalveo oggetto di studio schematizzabile dal punto di vista della scabrezza in quattro tratte
omogenee:

Inizio studio briglia a monte di Torrazza:


o

fondo alveo: materiale alluvionale grossolano;

sponda destra e sinistra: roccia, con vegetazione infestante;

Fig. 5.

Tratta da inizio studio alla briglia a monte di Torrazza

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

Briglia a monte di Torrazza - soglia a valle del ponte di via Torrazza:

sponda sinistra: regimazione con arginatura rivestita in massi;

fondo alveo: materiale alluvionale grossolano;

sponda destra: roccia, con vegetazione infestante;

Fig. 6.

Tratta a valle della briglia di Torrazza

Soglia a valle del ponte di Torrazza - passerella pedonale via Fanfulla:


o

sponda sinistra: regimazione con arginatura rivestita in massi;

fondo alveo: materiale alluvionale di modeste dimensioni con fondello in


calcestruzzo sul lato sinistro;

sponda destra: regimazione con scogliera e vegetazione arbustiva soprastante;

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

Fig. 7.

Tratta soglia a valle del ponte via Torrazza - passerella pedonale sponda destra

Fig. 8.

Tratta soglia a valle del ponte via Torrazza - passerella pedonale sponda sinistra

passerella pedonale via Fanfulla fine studio:


o

sponda sinistra: regimazione con arginatura rivestita in massi;

fondo alveo: materiale alluvionale di modeste dimensioni con fondello in


calcestruzzo sul lato sinistro;

sponda destra: con vegetazione arbustiva con arginatura solo nella parte alta della
sezione.

10

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

Fig. 9.

Tratta passerella pedonale fine studio

I valori di scabrezza assegnati alle sezioni, espressi in coefficiente di Strickler [m1/3/s], sono stati
stimati secondo le indicazioni contenute nelle Norme di attuazione del PAI, Direttiva n4 ed in
particolare:

fondo alveo: per corsi dacqua minori in terreni montani con ciottoli e molti grossi massi 20
m1/3/s (inizio studio ponte via Torrazza), con pochi grossi massi 30 m1/3/s (ponte via
Torrazza fine studio);

sponda sinistra: per alvei artificiali in muratura con scarpate lastricate 45 m1/3/s (dalla briglia
a monte di Torrazza a fine studio), per alvei con vegetazione arbustiva spontanea 25 m1/3/s
(da inizio studio alla briglia a monte di Torrazza);

sponda destra: per alvei con vegetazione arbustiva spontanea 25 m1/3/s (da inizio studio
alla soglia a valle del ponte di Torrazza), per alvei artificiali in muratura con scarpate
lastricate e vegetazione arbustiva 30 m1/3/s (dalla soglia a valle del ponte di Torrazza alla
passerella pedonale), ancora 25 m1/3/s nella tratta finale.

Nella configurazione post operam stata assegnata scabrezza di 45 m1/3/s alla muratura arginale
allinterno della gola, e alla sistemazione dalveo in corrispondenza del nuovo ponte stato
assegnato 30 m1/3/s per tenere conto di una possibile mancanza di manutenzione della banca.

11

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA

Fig. 10. Coefficienti di Strickler tratti dal PAI

12

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
3.3

SIMULAZIONI IDRAULICHE EFFETTUATE

In totale sono state effettuate nove simulazioni idrauliche di moto permanente: ad ognuna delle tre
configurazioni geometriche dellalveo (ante operam, post operam, interrimento) sono state
applicate le tre portate defluenti (TR100 conoide, TR100 trasporto, DIGA+PIENA).
La briglia stata simulata come in line structure, in riferimento alla quale il programma di calcolo
esegue delle iterazioni di calcolo specifiche per la verifica dellenergia minima con la quale la
corrente in grado di superare lostacolo costituito dalla struttura.

3.4

OUTPUT DEI CALCOLI IDRAULICI

Per ognuna delle simulazioni idrauliche effettuate vengono riportati in allegato:

tabulato di calcolo delle principali grandezze idrauliche per le sezioni di calcolo (output
HEC-RAS);

sezioni trasversali con indicazione del livello idrico (output HEC-RAS);

profilo idraulico di moto permanente del torrente (output HEC-RAS);

tabulato di calcolo specifico per la briglia di progetto (output HEC-RAS).

Per la configurazione geometrica di interrimento i risultati presentati si riferiscono alla sola tratta
che risente della modifica del fondo alveo (da prog. 424.26 a prog.278.32).

3.5

SINTESI DEI RISULTATI

3.5.1

ANTE OPERAM

Le simulazioni ante operam hanno riconfermato le problematiche gi note per tutte le portate di
verifica considerate:

esondazione in sinistra gi per la sola portata centenaria in corrispondenza della briglia


allingresso del centro abitato (livello idrico 259.80 m, quota testa muro deflettore 259.45
m);

franchi idraulici inferiori al metro in corrispondenza della piena centenaria alla passerella
pedonale (livello idrico 248.28 m, quota minima della passerella 249.22 m);

sommersione della passerella al transito della piena proveniente da Canargo (livello idrico
249.60 m) con esondazioni in destra.

I livelli idrici nella tratta compresa tra la passerella pedonale e la soglia a valle del ponte di
Torrazza sono leggermente inferiori rispetto a quelli riportati nelle verifiche passate in quanto i
recenti lavori di manutenzione e sistemazione dellalveo hanno prodotto dei modesti abbassamenti
dei tiranti di piena.

13

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
.022

.033

.04

Elevation (m)

264

Legend

263

EG TR 100

262

WS TR 100
Ground

261

Ineff
260

Bank Sta

259
258
257
85

90

95

100

105

110

115

120

Station (m)

Fig. 11. Sezione in corrispondenza della briglia a monte di Torrazza

3.5.2

POST OPERAM

Nella condizione post operam stata inserita una sezione ulteriore di verifica nel punto pi stretto
della gola a monte di Torrazza lungo la tratta di intervento.
La scabrezza della sponda sinistra nella tratta arginata incrementata a 45 m1/3/s e quella di 30
m1/3/s in sponda destra in corrispondenza della scogliera a valle del ponte di Torrazza stata
prolungata fino alla fine del ponte di progetto.
I risultati salienti della condizione post operam sono i seguenti:

la posizione del muro arginale in corrispondenza della briglia allingresso del centro
abitato fornisce una larghezza di stramazzo superiore rispetto alla condizione ante
operam che, unitamente alla minore scabrezza della sponda sinistra per tutta la tratta a
monte della briglia, consente di ottenere un livello idrico di 259.59 mslm (TR100
conoide);

gli interventi in alveo in corrispondenza del nuovo ponte permettono di incrementare


notevolmente larea utile al deflusso ottenendo un deciso abbassamento dei livelli idrici
(247.00 m -TR100 conoide);

leffetto dellallargamento dellalveo in corrispondenza del nuovo ponte si risente fino alla
soglia immediatamente a monte in quanto il salto di fondo da essa realizzato tale da
disconnettere idraulicamente la corrente;

la portata di piena centenaria transita sulla briglia di progetto allinterno della gaveta a
quota 263.56 m, mantenendo un ampio franco idraulico sulla pista soprastante che ha
quota 264.95;

la pista mantiene il franco di un metro sulla piena centenaria per la quasi totalit della
sua estensione, solo in corrispondenza del minimo alla sezione di progetto n10 il franco

14

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
si riduce, avendo scelto la maggior cautela di avere un minimo di scarico tale da
escludere la possibilit che la pista funzioni da canale fugatore in caso di calamit.

La presenza della nuova briglia produce un rallentamento della corrente con un aumento dei livelli
idrici nella tratta compresa tra la controbriglia allinterno della gola e la briglia di progetto.
La struttura stata simulata come in line structure di tipo stramazzo (weir) con apertura
costituita dalla sovrapposizione di due aperture:

Fessura: stata cos denominata lapertura centrale di larghezza 2 m e altezza 4,


posizionata sul fondo alveo a quota 257.87 m;

Stramazzo: indica la gaveta soprastante di altezza 1.55 m e larghezza 19.15 m,


posizionata alla quota minima della gaveta 261.87 m.

Le aperture cos definite approssimano per difetto le aree effettive di deflusso fornite dalla briglia di
progetto.
Lapertura centrale in grado di convogliare fino a 40 m3/s.
La corrente si mantiene lenta sia monte che a valle della struttura.

3.5.3

INTERRIMENTO

Si ipotizzato lintero interrimento della briglia fino alla quota della gaveta (261.87) simulandolo
con un innalzamento del fondo alveo a monte della struttura con pendenza longitudinale pari a
quella attuale, considerata pendenza di equilibrio dellalveo.
In corrispondenza della briglia si viene quindi a creare un salto di fondo di altezza pari a 4 m.
Il calcolo idraulico ha fornito i seguenti risultati:

in corrispondenza della briglia si instaura laltezza critica;

a monte della briglia la corrente pi veloce rispetto alla condizione post operam, i
tiranti sono quindi minori tuttavia, a causa dellinnalzamento del fondo, le quote assolute
di piena risultano superiori;

linterrimento interessa il paramento della briglia allinterno della gola fino a quota
263.63;

il franco idraulico sulla pista si riduce rispetto alla condizione post operam fino al minimo
di 1 m in corrispondenza della sezione n18 della p ista.

La briglia sar in grado di invasare circa 6000 m3 di materiale e la pista manterr la sicurezza
idraulica anche ad interrimento avvenuto.
Per consentire le operazioni di svaso la pista ha un tratto piano a monte della briglia, la quota
stradale stata progettata in modo che al termine del tratto piano a quota 264.95 (sez. 18 della
pista e prog. 335.54 di calcolo idraulico) si abbia il franco di 1 m sulla piena centenaria (livello
idrico 263.95).

15

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
4

COMPATIBILITA IDRAULICA DEL NUOVO PONTE

Le verifiche idrauliche sopra riportate sono conformi a quanto disposto dal Piano Stralcio delle
Fasce Fluviali nella direttiva infrastrutture che individua i Criteri per la valutazione della
compatibilit idraulica delle infrastrutture pubbliche e di interesse pubblico allinterno delle fasce A
e B. Esse possono quindi considerarsi valide per la verifica di compatibilit idraulica del nuovo
ponte.
In particolare in riferimento alla nuova struttura si pu affermare che:

nella condizione attuale dei luoghi la passerella pedonale e la relativa pila in alveo
producono un rallentamento della corrente e il livello idrico alla sezione 89.90 per la
portata TR 100 conoide di 248.28 mslm;

gli interventi di progetto consentono di ottenere un ampliamento della sezione defluente


e un miglioramento anche in termini di scabrezza tali da determinare un livello idrico per
la portata TR 100 conoide di 247.00 mslm;

il nuovo ponte non determiner quindi alcun effetto di rigurgito sulla corrente idrica;

le fondazioni della struttura saranno realizzate a tergo delle strutture arginali e


poggeranno su micropali al fine di evitare qualunque trasferimento agli argini;

il rifacimento dellargine in destra verr effettuato raccordando gradualmente le sezioni


di inizio e fine intervento allargine esistente.

La quota minima dellintradosso del ponte 249.40 m, il franco richiesto da normativa quindi
ampiamente rispettato.
Per un confronto immediato della situazione ante e post operam vengono riportate di seguito le
sezioni 89.90 sovrapposte in trasparenza.

16

Lesina Torrazza - ANTEOPERAM

Plan: Centro - Torrazza

24/06/2008

SEZ. 13 - Passerella
.022

.033

.035

252

Legend
WS TR100 conoide
Ground
Bank Sta

250

Elevation (m)

248

246

244

242
15

20

25

30

35
Station (m)

40

45

50

Lesina Torrazza - POSTOPERAM

Plan: Centro - Torrazza

11/07/2008

SEZ. 13 - Ponte di progretto


252

Legend
WS TR100 conoide
Ground
Bank Sta

250

Elevation (m)

248

246

244

242
15

20

25

30

35
Station (m)

40

45

50

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
5

CONCLUSIONI

Tutte le opere di progetto sono compatibili del punto di vista idraulico e assicurano il franco di 1
metro al passaggio della piena centenaria.

Al transito della piena proveniente dallo sbarramento di Canargo il franco si riduce ma il deflusso
comunque confinato in alveo.
La volumetria invasabile dalla briglia selettiva di progetto di circa 6000 m3, inferiore al volume
teorico che potrebbe raggiungere lapice del conoide.

17

OPERE DI DIFESA ALLAPICE DEL CONOIDE SUL TORRENTE LESINA NEI


COMUNI DI DELEBIO E ANDALO VALTELLINO - RELAZIONE IDRAULICA
6

ALLEGATI RISULTATI DEI CALCOLI IDRAULICI

18

SIMULAZIONI ANTE OPERAM

HEC-RAS Plan: Del-Torr River: LESINA Reach: Reach 1


Reach
River Sta
Profile
Q Total
(m3/s)
Reach 1
424.26
Diga+Piena
277.00
Reach 1
424.26
TR100 conoide
176.92
Reach 1
424.26
TR100 trasporto
192.50

Min Ch El
(m)
270.11
270.11
270.11

W.S. Elev
(m)
273.23
272.56
272.68

Max Chl Dpth


(m)
3.12
2.45
2.57

Crit W.S.
(m)
273.23
272.56
272.68

Crit Depth
(m)
3.12
2.45
2.57

E.G. Elev
(m)
274.37
273.46
273.62

E.G. Slope
(m/m)
0.021373
0.022630
0.022380

Flow Area
(m2)
58.63
42.09
44.81

Vel Chnl
(m/s)
4.72
4.20
4.30

Top Width
(m)
25.87
23.40
23.86

Froude # Chl
1.00
1.00
1.00

Specif Force
(m3)
211.55
120.37
133.86

Num Trials
6.00
6.00
6.00

Reach 1
Reach 1
Reach 1

413.83
413.83
413.83

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

270.00
270.00
270.00

272.52
271.98
272.07

2.52
1.98
2.07

272.86
272.22
272.33

2.86
2.22
2.33

274.06
273.14
273.30

0.033487
0.032631
0.034176

50.34
37.05
39.24

5.50
4.78
4.91

25.57
22.98
24.22

1.25
1.20
1.23

211.53
118.85
132.49

8.00
17.00
17.00

Reach 1
Reach 1
Reach 1

413.2
413.2
413.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

261.00
261.00
261.00

262.39
261.92
262.00

1.39
0.92
1.00

264.44
263.57
263.72

3.44
2.57
2.72

273.09
272.17
272.33

0.420135
0.651734
0.598363

19.12
12.47
13.52

14.49
14.19
14.24

14.27
13.88
13.94

4.00
4.78
4.62

422.12
261.41
285.98

12.00
16.00
16.00

Reach 1
Reach 1
Reach 1

400
400
400

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

260.00
260.00
260.00

261.19
260.91
260.96

1.19
0.91
0.96

262.62
261.96
262.07

2.62
1.96
2.07

267.73
265.48
265.87

0.295231
0.281873
0.287134

24.43
18.70
19.60

11.34
9.46
9.82

21.38
21.04
21.09

3.39
3.20
3.25

334.30
179.04
201.94

7.00
8.00
6.00

Reach 1
Reach 1
Reach 1

398
398
398

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

259.00
259.00
259.00

260.58
263.38
263.59

1.58
4.38
4.59

262.23

3.23

261.52

2.52

267.22
263.67
263.90

0.227090
0.003366
0.003411

24.26
74.59
78.74

11.42
2.37
2.44

16.54
19.71
19.92

3.01
0.39
0.39

340.77
197.30
218.55

7.00
2.00
2.00

Reach 1
Reach 1
Reach 1

375.57
375.57
375.57

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.82
258.82
258.82

264.55
263.32
263.53

5.73
4.50
4.71

264.92
263.59
263.81

0.003444
0.003087
0.003143

102.52
76.87
81.03

2.70
2.30
2.38

22.22
19.83
20.04

0.40
0.37
0.38

349.90
204.78
226.34

2.00
2.00
2.00

Reach 1
Reach 1
Reach 1

365.55
365.55
365.55

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.64
258.64
258.64

264.10
263.04
263.23

5.46
4.40
4.59

264.83
263.52
263.74

0.007791
0.005983
0.006283

73.22
58.22
60.77

3.78
3.04
3.17

14.46
14.01
14.06

0.54
0.48
0.49

300.94
179.55
197.72

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

355.54
355.54
355.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.45
258.45
258.45

262.52
261.96
262.11

4.07
3.51
3.66

264.48
263.09
263.33

0.028838
0.019262
0.019823

44.70
37.55
39.44

6.20
4.71
4.88

13.00
12.69
12.77

1.07
0.87
0.89

256.26
143.41
159.93

4.00
2.00
2.00

Reach 1
Reach 1
Reach 1

345.54
345.54
345.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.27
258.27
258.27

263.48
262.38
262.58

5.21
4.11
4.31

263.94
262.72
262.93

0.004546
0.004235
0.004261

91.73
69.23
73.14

3.02
2.56
2.63

20.78
20.44
20.50

0.46
0.44
0.44

295.46
168.48
187.63

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

335.54
335.54
335.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.09
258.09
258.09

263.20
262.11
262.30

5.11
4.02
4.21

263.77
262.54
262.75

0.005924
0.005790
0.005793

82.60
60.84
64.45

3.35
2.91
2.99

20.87
19.48
19.68

0.54
0.53
0.53

278.99
159.14
176.87

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

326.54
326.54
326.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.90
257.90
257.90

263.38
262.25
262.44

5.48
4.35
4.54

263.64
262.44
262.64

0.002350
0.002159
0.002197

124.22
90.74
96.03

2.23
1.95
2.00

32.22
27.00
27.74

0.36
0.34
0.34

361.51
211.79
234.01

1.00
1.00
1.00

Reach 1
Reach 1
Reach 1

310.98
310.98
310.98

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.64
257.64
257.64

261.94
261.09
261.23

4.30
3.45
3.59

261.94
261.09
261.23

4.30
3.45
3.59

263.43
262.26
262.46

0.023243
0.024353
0.024141

51.31
36.98
39.31

5.40
4.78
4.90

17.53
16.12
16.34

1.01
1.01
1.01

240.34
136.64
151.92

6.00
6.00
6.00

Reach 1
Reach 1
Reach 1

300.62
300.62
300.62

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.61
257.61
257.61

260.28
259.88
259.94

2.67
2.27
2.33

261.07
260.43
260.54

3.46
2.82
2.93

262.83
261.67
261.87

0.068457
0.061420
0.063492

39.12
29.83
31.24

7.08
5.93
6.16

24.02
22.13
22.43

1.77
1.63
1.67

238.11
131.32
147.19

6.00
6.00
6.00

Reach 1

278.5

Diga+Piena

277.00

257.57

261.01

3.44

260.09

2.52

261.52

0.006154

87.65

3.24

29.48

0.57

228.74

5.00

262.67
261.69
261.85

4.22
3.24
3.40

HEC-RAS Plan: Del-Torr River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)
Reach 1
278.5
TR100 conoide
176.92
257.57
Reach 1
278.5
TR100 trasporto
192.50
257.57

W.S. Elev
(m)
260.31
260.42

Max Chl Dpth


(m)
2.74
2.85

Crit W.S.
(m)

Crit Depth
(m)

E.G. Elev
(m)
260.67
260.81

E.G. Slope
(m/m)
0.005623
0.005748

Flow Area
(m2)
67.41
70.70

Vel Chnl
(m/s)
2.69
2.79

Top Width
(m)
28.61
28.75

Froude # Chl
0.53
0.54

Specif Force
(m3)
132.69
146.73

Num Trials
5.00
5.00

Reach 1
Reach 1
Reach 1

278.32
278.32
278.32

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.57
257.57
257.57

260.37
259.80
259.90

2.80
2.23
2.33

260.37
259.80
259.90

2.80
2.23
2.33

261.46
260.62
260.76

0.014818
0.015680
0.015529

60.77
44.97
47.59

4.66
4.09
4.19

28.25
27.46
27.59

0.91
0.90
0.90

204.49
116.19
129.06

7.00
9.00
9.00

Reach 1
Reach 1
Reach 1

277.78
277.78
277.78

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

250.11
250.11
250.11

257.77
255.61
255.97

7.66
5.50
5.86

253.18
252.39
252.51

3.07
2.28
2.40

257.97
255.79
256.15

0.000701
0.000912
0.000860

144.27
98.24
105.76

2.05
1.88
1.90

24.62
20.82
20.88

0.24
0.26
0.25

575.50
292.02
332.16

1.00
2.00
2.00

Reach 1
Reach 1
Reach 1

268.7
268.7
268.7

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

250.12
250.12
250.12

257.80
255.62
255.99

7.68
5.50
5.87

257.95
255.77
256.13

0.000545
0.000722
0.000670

166.22
109.15
118.22

1.79
1.65
1.66

29.53
24.85
25.05

0.21
0.23
0.22

610.69
294.85
338.97

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

268.6
268.6
268.6

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

251.23
251.23
251.23

257.72
255.48
255.86

6.49
4.25
4.63

257.94
255.75
256.12

0.001018
0.001996
0.001682

135.17
78.54
87.64

2.19
2.29
2.23

28.76
23.83
24.21

0.28
0.36
0.34

443.57
188.85
222.90

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

257.25
257.25
257.25

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

250.76
250.76
250.76

257.72
255.48
255.86

6.96
4.72
5.10

257.92
255.72
256.09

0.000882
0.001585
0.001366

141.20
84.45
93.46

2.04
2.07
2.03

28.93
23.65
24.16

0.25
0.32
0.30

477.02
209.02
245.37

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

241.81
241.81
241.81

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

249.29
249.29
249.29

257.69
255.48
255.86

8.40
6.19
6.56

257.91
255.69
256.06

0.000742
0.001229
0.001094

140.29
89.97
98.42

2.00
2.03
2.01

23.08
22.51
22.61

0.24
0.29
0.27

522.88
247.54
285.93

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

235.76
235.76
235.76

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

249.24
249.24
249.24

257.38
255.17
255.55

8.14
5.93
6.31

257.87
255.65
256.03

0.001712
0.002685
0.002417

94.13
60.15
65.86

3.21
3.21
3.18

15.70
14.89
15.08

0.37
0.44
0.42

403.94
201.82
230.34

2.00
3.00
1.00

Reach 1
Reach 1
Reach 1

227.39
227.39
227.39

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.46
248.46
248.46

254.84
253.36
253.61

6.38
4.90
5.15

254.84
253.33
253.61

6.38
4.87
5.15

257.61
255.44
255.81

0.013603
0.014901
0.014584

40.19
29.04
30.91

7.50
6.48
6.65

7.68
7.22
7.43

0.98
0.98
0.98

320.09
177.36
198.27

6.00
1.00
6.00

Reach 1
Reach 1
Reach 1

221.26
221.26
221.26

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.75
248.75
248.75

254.61
253.08
253.41

5.86
4.33
4.66

254.71
253.22
253.46

5.96
4.47
4.71

257.34
255.27
255.62

0.006167
0.007463
0.006799

42.49
29.42
32.05

7.48
6.66
6.69

9.06
7.95
8.11

1.01
1.05
1.02

316.44
174.86
195.73

5.00
4.00
4.00

Reach 1
Reach 1
Reach 1

214.96
214.96
214.96

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.66
248.66
248.66

253.75
252.74
252.95

5.09
4.08
4.29

254.08
252.81
253.01

5.42
4.15
4.35

256.51
254.61
254.92

0.007845
0.007321
0.007173

39.92
30.47
32.41

7.43
6.10
6.26

9.49
9.20
9.26

1.10
1.02
1.02

296.37
163.09
182.39

5.00
3.00
3.00

Reach 1
Reach 1
Reach 1

201.9
201.9
201.9

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.93
248.93
248.93

252.86
251.66
251.82

3.93
2.73
2.89

253.37
252.33
252.50

4.44
3.40
3.57

255.49
254.13
254.38

0.011566
0.018109
0.017339

40.67
26.33
28.20

7.32
7.04
7.18

12.18
11.75
11.81

1.22
1.43
1.41

273.44
156.86
174.67

16.00
4.00
6.00

Reach 1
Reach 1
Reach 1

186.31
186.31
186.31

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.62
248.62
248.62

252.59
251.65
251.76

3.97
3.03
3.14

253.26
252.08
252.50

4.64
3.46
3.88

255.27
253.88
254.15

0.012796
0.015312
0.015616

42.55
28.91
30.44

7.61
6.83
7.08

15.41
13.41
13.43

1.27
1.32
1.34

269.81
153.48
171.63

0.00
2.00
2.00

Reach 1
Reach 1

162.42
162.42

Diga+Piena
TR100 conoide

277.00
176.92

248.50
248.50

251.89
251.24

3.39
2.74

252.72
251.85

4.22
3.35

254.83
253.42

0.017621
0.016911

39.39
29.33

8.49
7.18

15.54
15.12

1.49
1.40

264.79
147.80

4.00
4.00

HEC-RAS Plan: Del-Torr River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)
Reach 1
162.42
TR100 trasporto
192.50
248.50

W.S. Elev
(m)
251.74

Max Chl Dpth


(m)
3.24

Crit W.S.
(m)
251.99

Crit Depth
(m)
3.49

E.G. Elev
(m)
253.35

E.G. Slope
(m/m)
0.010157

Flow Area
(m2)
37.06

Vel Chnl
(m/s)
6.25

Top Width
(m)
15.45

Froude # Chl
1.12

Specif Force
(m3)
156.86

Num Trials
15.00

Reach 1
Reach 1
Reach 1

161.92
161.92
161.92

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

246.09
246.09
246.09

248.25
247.65
247.80

2.16
1.56
1.71

249.91
248.99
249.15

3.82
2.91
3.07

254.49
253.08
252.98

0.062757
0.082661
0.069895

25.04
17.14
19.09

10.97
10.28
10.02

13.25
12.95
13.02

2.48
2.76
2.56

336.79
197.93
212.34

16.00
16.00
16.00

Reach 1
Reach 1
Reach 1

152.32
152.32
152.32

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.99
245.99
245.99

248.38
247.76
247.92

2.39
1.76
1.92

249.89
248.96
249.12

3.90
2.96
3.13

253.68
252.10
252.13

0.048091
0.056793
0.049497

27.16
19.18
21.19

10.10
9.15
9.00

13.02
12.69
12.78

2.18
2.30
2.17

317.40
181.39
196.53

4.00
5.00
5.00

Reach 1
Reach 1
Reach 1

137.42
137.42
137.42

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.78
245.78
245.78

248.82
248.15
248.35

3.04
2.37
2.57

250.01
249.04
249.21

4.23
3.26
3.43

252.72
251.08
251.19

0.028571
0.028661
0.025289

31.67
23.35
25.78

8.69
7.53
7.42

12.73
12.15
12.32

1.72
1.68
1.59

289.32
160.61
175.40

4.00
4.00
4.00

Reach 1
Reach 1
Reach 1

122.54
122.54
122.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.57
245.57
245.57

248.29
247.70
247.86

2.72
2.13
2.29

249.49
248.60
248.75

3.92
3.03
3.18

252.28
250.67
250.80

0.032374
0.032916
0.029537

31.36
23.20
25.41

8.69
7.49
7.44

13.96
13.54
13.65

1.82
1.79
1.71

286.55
158.48
173.58

4.00
2.00
4.00

Reach 1
Reach 1
Reach 1

111.14
111.14
111.14

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.44
245.44
245.44

248.27
249.41
249.60

2.83
3.97
4.16

249.34

3.90

251.82
250.07
250.30

0.026299
0.003017
0.002998

33.47
50.33
53.54

8.36
3.62
3.73

13.82
16.00
18.36

1.70
0.61
0.61

277.80
154.79
172.53

4.00
3.00
3.00

Reach 1
Reach 1
Reach 1

104.28
104.28
104.28

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.42
245.42
245.42

249.75
248.59
248.78

4.33
3.17
3.36

249.75
248.61
248.78

4.33
3.19
3.36

251.33
249.97
250.20

0.007173
0.009685
0.009087

52.10
34.18
36.86

5.71
5.28
5.35

20.05
13.24
13.74

0.91
1.00
0.98

254.69
142.84
159.37

7.00
5.00
6.00

Reach 1
Reach 1
Reach 1

104.18
104.18
104.18

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.42
245.42
245.42

249.08
248.70
248.58

3.66
3.28
3.16

249.66
248.73
248.91

4.24
3.31
3.49

251.27
249.93
250.19

0.011522
0.007430
0.010195

44.92
37.93
35.92

6.82
5.05
5.76

18.80
17.46
16.90

1.18
0.93
1.08

251.40
140.44
157.66

4.00
2.00
7.00

Reach 1
Reach 1
Reach 1

101.46
101.46
101.46

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.40
245.40
245.40

248.97
248.63
248.45

3.57
3.23
3.05

249.60
248.66
248.85

4.20
3.26
3.45

251.25
249.86
250.16

0.012349
0.007624
0.011433

43.98
37.81
34.73

6.96
5.08
5.96

18.53
17.25
16.65

1.22
0.94
1.14

251.73
139.27
157.63

16.00
3.00
16.00

Reach 1
Reach 1
Reach 1

101.36
101.36
101.36

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

243.38
243.38
243.38

250.18
248.92
249.19

6.80
5.54
5.81

247.86
246.88
247.04

4.48
3.50
3.66

250.76
249.33
249.63

0.001381
0.001262
0.001236

91.73
67.13
72.20

3.82
3.16
3.24

21.43
17.65
18.63

0.48
0.44
0.44

347.16
204.70
229.53

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

89.9
89.9
89.9

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

243.17
243.17
243.17

249.60
248.28
248.55

6.43
5.11
5.38

250.86
249.24
249.53

0.003340
0.003407
0.003282

64.89
45.36
49.29

5.29
4.52
4.61

14.97
14.63
14.70

0.69
0.67
0.67

304.53
171.81
192.27

6.00
3.00
4.00

Reach 1
Reach 1
Reach 1

87.58
87.58
87.58

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.80
242.80
242.80

247.39
246.31
246.49

4.59
3.51
3.69

248.38
247.08
247.32

5.58
4.28
4.52

250.63
249.04
249.32

0.012365
0.014363
0.014001

38.86
26.15
28.10

8.69
7.74
7.92

12.81
10.77
11.06

1.33
1.37
1.36

292.49
167.57
186.23

14.00
14.00
14.00

Reach 1
Reach 1
Reach 1

73.2
73.2
73.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.65
242.65
242.65

245.71
245.01
245.12

3.06
2.36
2.47

247.02
246.09
246.26

4.37
3.44
3.61

250.19
248.59
248.87

0.028636
0.032317
0.031697

31.28
22.10
23.55

9.86
8.67
8.89

13.63
12.60
12.75

1.87
1.89
1.89

301.49
171.05
190.49

4.00
4.00
4.00

Reach 1
Reach 1
Reach 1

63.26
63.26
63.26

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.49
242.49
242.49

245.75
244.96
245.09

3.26
2.47
2.60

247.03
245.96
246.14

4.54
3.47
3.64

249.77
248.19
248.46

0.021311
0.025283
0.024477

33.34
23.22
24.83

9.09
8.07
8.25

13.55
11.97
12.24

1.68
1.73
1.72

295.04
167.30
186.29

4.00
4.00
4.00

HEC-RAS Plan: Del-Torr River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)

W.S. Elev
(m)

Max Chl Dpth


(m)

Crit W.S.
(m)

Crit Depth
(m)

E.G. Elev
(m)

E.G. Slope
(m/m)

Flow Area
(m2)

Vel Chnl
(m/s)

Top Width
(m)

Froude # Chl

Specif Force
(m3)

Num Trials

Reach 1
Reach 1
Reach 1

53.64
53.64
53.64

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.82
242.82
242.82

245.46
244.89
244.98

2.64
2.07
2.16

246.69
245.78
245.93

3.87
2.96
3.11

249.48
247.85
248.15

0.029726
0.030738
0.031159

32.35
23.92
25.15

9.11
7.77
8.06

15.23
14.54
14.58

1.86
1.81
1.83

286.71
158.30
177.67

4.00
3.00
3.00

Reach 1
Reach 1
Reach 1

53.54
53.54
53.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

240.53
240.53
240.53

243.95
243.27
243.38

3.42
2.74
2.85

245.51
244.52
244.69

4.98
3.99
4.16

249.34
247.70
248.00

0.039248
0.045125
0.044328

28.86
20.19
21.53

11.17
10.02
10.26

13.30
12.15
12.34

2.10
2.15
2.15

322.23
185.74
206.39

16.00
12.00
12.00

Reach 1
Reach 1
Reach 1

39.68
39.68
39.68

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

240.63
240.63
240.63

243.10
242.52
242.61

2.47
1.89
1.98

244.69
243.78
243.94

4.06
3.15
3.31

248.75
247.06
247.39

0.044153
0.051964
0.051092

27.16
19.01
20.18

10.75
9.61
9.85

14.80
12.83
13.08

2.26
2.33
2.33

324.95
185.47
207.00

5.00
6.00
7.00

Reach 1
Reach 1
Reach 1

39.58
39.58
39.58

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

241.08
241.08
241.08

243.72
243.14
243.22

2.64
2.06
2.14

245.14
244.23
244.39

4.06
3.15
3.31

248.48
246.80
247.13

0.033934
0.036812
0.037016

29.74
21.27
22.47

9.88
8.61
8.90

15.13
13.64
14.03

2.00
1.99
2.01

305.22
171.37
192.10

6.00
6.00
6.00

Reach 1
Reach 1
Reach 1

22.88
22.88
22.88

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

241.45
241.45
241.45

243.50
243.10
243.16

2.05
1.65
1.71

244.71
243.96
244.09

3.26
2.51
2.64

247.71
246.01
246.33

0.042189
0.038930
0.040665

31.50
24.12
25.13

9.32
7.69
8.04

18.97
18.42
18.50

2.14
1.98
2.03

283.72
153.27
173.14

3.00
2.00
2.00

Reach 1
Reach 1
Reach 1

22.78
22.78
22.78

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.69
238.69
238.69

240.87
240.38
240.46

2.18
1.69
1.77

242.53
241.67
241.82

3.84
2.98
3.13

247.47
245.76
246.08

0.066505
0.080399
0.078044

24.86
17.43
18.60

11.52
10.31
10.56

15.48
14.31
14.66

2.70
2.82
2.81

342.57
197.17
219.31

16.00
16.00
16.00

Reach 1
Reach 1
Reach 1

19.2
19.2
19.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.69
238.69
238.69

240.92
240.44
240.51

2.23
1.75
1.82

242.53
241.67
241.82

3.84
2.98
3.13

247.12
245.35
245.69

0.060367
0.069590
0.068323

25.65
18.27
19.43

11.17
9.86
10.13

15.52
14.57
14.90

2.58
2.64
2.64

334.07
189.97
211.85

4.00
5.00
4.00

Reach 1
Reach 1
Reach 1

19.1
19.1
19.1

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

239.48
239.48
239.48

241.95
241.48
241.54

2.47
2.00
2.06

243.32
242.46
242.61

3.84
2.98
3.13

246.68
244.90
245.24

0.039379
0.039467
0.040424

29.44
22.02
23.08

9.78
8.27
8.60

15.69
15.34
15.39

2.13
2.04
2.08

301.17
165.56
186.23

9.00
10.00
10.00

Reach 1
Reach 1
Reach 1

0
0
0

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.52
238.52
238.52

240.89
240.42
240.49

2.37
1.90
1.97

242.40
241.50
241.65

3.88
2.98
3.13

245.87
244.07
244.39

0.043104
0.044301
0.044550

28.96
21.40
22.56

10.10
8.59
8.88

16.59
15.35
15.55

2.25
2.19
2.21

305.73
168.51
189.04

4.00
3.00
3.00

Lesina Torrazza - ANTEOPERAM

Plan: Centro - Torrazza

11/07/2008

LESINA Reach 1
275

Legend
WS TR100 conoide
Ground

270

265

Elevation (m)

260

255

250

245

240

235
0

100

200
Main Channel Distance (m)

300

400

SIMULAZIONI POST OPERAM

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1


Reach
River Sta
Profile
Q Total
(m3/s)
Reach 1
424.26
Diga+Piena
277.00
Reach 1
424.26
TR100 conoide
176.92
Reach 1
424.26
TR100 trasporto
192.50

Min Ch El
(m)
270.11
270.11
270.11

W.S. Elev
(m)
273.23
272.56
272.68

Max Chl Dpth


(m)
3.12
2.45
2.57

Crit W.S.
(m)
273.23
272.56
272.68

Crit Depth
(m)
3.12
2.45
2.57

E.G. Elev
(m)
274.37
273.46
273.62

E.G. Slope
(m/m)
0.021370
0.022630
0.022380

Flow Area
(m2)
58.63
42.09
44.81

Vel Chnl
(m/s)
4.72
4.20
4.30

Top Width
(m)
25.88
23.40
23.86

Froude # Chl
1.00
1.00
1.00

Specif Force
(m3)
211.55
120.37
133.86

Num Trials
6.00
6.00
6.00

Reach 1
Reach 1
Reach 1

413.83
413.83
413.83

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

270.00
270.00
270.00

272.52
271.98
272.07

2.52
1.98
2.07

272.86
272.22
272.33

2.86
2.22
2.33

274.06
273.14
273.30

0.033477
0.032614
0.034160

50.34
37.06
39.25

5.50
4.77
4.90

25.57
22.99
24.22

1.25
1.20
1.23

211.52
118.85
132.48

8.00
17.00
17.00

Reach 1
Reach 1
Reach 1

413.2
413.2
413.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

261.00
261.00
261.00

262.40
261.92
262.00

1.40
0.92
1.00

264.43
263.57
263.72

3.43
2.57
2.72

273.09
272.17
272.33

0.420081
0.651734
0.598363

19.12
12.47
13.52

14.49
14.19
14.24

14.27
13.88
13.94

4.00
4.78
4.62

422.11
261.41
285.98

14.00
16.00
16.00

Reach 1
Reach 1
Reach 1

400
400
400

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

260.00
260.00
260.00

265.10
263.90
264.04

5.10
3.90
4.04

262.62
261.96
262.07

2.62
1.96
2.07

265.40
264.12
264.28

0.002634
0.002508
0.002650

115.38
85.77
89.16

2.40
2.06
2.16

25.71
23.60
23.75

0.36
0.35
0.36

351.23
199.78
217.47

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

398
398
398

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

259.00
259.00
259.00

265.07
263.88
264.02

6.07
4.88
5.02

265.39
264.11
264.27

0.002853
0.002348
0.002534

110.09
84.58
87.41

2.52
2.09
2.20

23.08
20.21
20.39

0.37
0.33
0.34

380.16
232.08
249.56

2.00
3.00
3.00

Reach 1
Reach 1
Reach 1

375.57
375.57
375.57

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.82
258.82
258.82

265.02
263.85
263.99

6.20
5.03
5.17

265.33
264.06
264.22

0.002642
0.002129
0.002320

113.32
87.59
90.39

2.44
2.02
2.13

23.44
20.41
20.76

0.35
0.31
0.33

393.67
243.53
260.99

1.00
1.00
1.00

Reach 1
Reach 1
Reach 1

365.55
365.55
365.55

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.64
258.64
258.64

264.67
263.65
263.76

6.03
5.01
5.12

265.26
264.01
264.17

0.005845
0.004079
0.004537

81.30
66.81
68.34

3.41
2.65
2.82

14.43
14.19
14.21

0.46
0.39
0.41

334.09
210.60
225.38

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

355.54
355.54
355.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.45
258.45
258.45

264.35
263.39
263.46

5.90
4.94
5.01

265.09
263.90
264.04

0.010438
0.006197
0.007064

72.64
56.29
57.16

3.81
3.14
3.37

21.14
13.50
13.61

0.66
0.49
0.52

294.09
182.15
195.22

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

345.54
345.54
345.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.27
258.27
258.27

264.63
263.59
263.69

6.36
5.32
5.42

264.92
263.77
263.89

0.002330
0.001724
0.001920

115.84
94.08
96.08

2.39
1.88
2.00

21.17
20.82
20.85

0.33
0.28
0.30

397.01
254.62
269.16

1.00
1.00
1.00

Reach 1
Reach 1
Reach 1

335.54
335.54
335.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

258.09
258.09
258.09

264.57
263.52
263.61

6.48
5.43
5.52

264.87
263.72
263.84

0.002596
0.001966
0.002201

114.28
89.63
91.63

2.42
1.97
2.10

25.36
21.94
22.23

0.36
0.31
0.33

387.05
248.23
262.02

1.00
1.00
1.00

Reach 1
Reach 1
Reach 1

325.72
325.72
325.72

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.90
257.90
257.90

264.64
263.57
263.67

6.74
5.67
5.77

264.80
263.67
263.78

0.000693
0.000519
0.000579

158.12
130.42
132.89

1.84
1.41
1.51

26.29
25.62
25.68

0.23
0.19
0.20

551.95
372.20
388.97

1.00
1.00
1.00

Reach 1
Reach 1
Reach 1

315.72
315.72
315.72

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.89
257.89
257.89

264.63
263.56
263.66

6.74
5.67
5.77

264.80
263.66
263.77

0.000693
0.000513
0.000573

156.61
129.75
132.14

1.85
1.42
1.51

25.54
24.97
25.02

0.23
0.19
0.20

554.40
376.04
392.66

0.00
0.00
0.00

Reach 1

313.35

Reach 1

310.98

257.87

261.86

3.99

262.41

0.004541

85.10

3.30

23.31

0.54

252.71

3.00

260.55
259.90
260.01

2.66
2.01
2.12

Inl Struct
Diga+Piena

277.00

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)
Reach 1
310.98
TR100 conoide
176.92
257.87
Reach 1
310.98
TR100 trasporto
192.50
257.87

W.S. Elev
(m)
260.93
261.09

Max Chl Dpth


(m)
3.06
3.22

Crit W.S.
(m)

Crit Depth
(m)

E.G. Elev
(m)
261.33
261.51

E.G. Slope
(m/m)
0.004761
0.004704

Flow Area
(m2)
63.70
67.32

Vel Chnl
(m/s)
2.80
2.89

Top Width
(m)
22.79
22.88

Froude # Chl
0.53
0.53

Specif Force
(m3)
141.56
158.02

Num Trials
2.00
2.00

Reach 1
Reach 1
Reach 1

300.62
300.62
300.62

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.71
257.71
257.71

260.90
260.17
260.29

3.19
2.46
2.58

260.90
260.16
260.29

3.19
2.45
2.58

262.26
261.20
261.38

0.013054
0.014733
0.014492

54.58
39.79
42.14

4.86
4.31
4.42

20.87
19.31
19.56

0.88
0.89
0.89

224.49
125.71
140.24

6.00
2.00
6.00

Reach 1
Reach 1
Reach 1

288.32
288.32
288.32

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.62
257.62
257.62

260.63
259.97
260.09

3.01
2.35
2.47

260.66
259.97
260.09

3.04
2.35
2.47

261.93
260.94
261.11

0.015308
0.016950
0.016452

55.53
40.85
43.42

4.90
4.31
4.40

22.81
21.57
21.79

0.93
0.94
0.94

216.60
121.06
135.06

0.00
6.00
6.00

Reach 1
Reach 1
Reach 1

278.32
278.32
278.32

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

257.52
257.52
257.52

260.24
259.59
259.69

2.72
2.07
2.17

260.25
259.63
259.73

2.73
2.11
2.21

261.44
260.52
260.67

0.015648
0.018782
0.018426

57.54
41.46
43.90

4.73
4.27
4.38

24.97
24.17
24.29

0.94
0.98
0.98

208.11
116.01
129.45

6.00
5.00
6.00

Reach 1
Reach 1
Reach 1

277.78
277.78
277.78

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

251.11
251.11
251.11

257.68
251.99
252.06

6.57
0.88
0.95

254.18
253.39
253.52

3.07
2.28
2.41

257.94
259.74
259.90

0.001106
0.468254
0.426868

125.09
14.41
15.59

2.33
12.35
12.43

22.28
16.98
17.00

0.29
4.26
4.12

451.87
228.27
250.25

2.00
18.00
18.00

Reach 1
Reach 1
Reach 1

268.6
268.6
268.6

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

251.23
251.23
251.23

257.69
255.47
255.85

6.46
4.24
4.62

257.92
255.74
256.11

0.000949
0.001938
0.001629

133.40
78.35
87.45

2.11
2.26
2.19

26.74
23.79
24.20

0.27
0.36
0.33

440.38
187.91
221.82

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

257.25
257.25
257.25

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

250.76
250.76
250.76

257.69
255.47
255.85

6.93
4.71
5.09

257.90
255.71
256.08

0.000835
0.001587
0.001365

139.40
84.18
93.19

1.98
2.07
2.03

26.76
23.64
24.14

0.25
0.32
0.30

473.72
208.04
244.25

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

241.81
241.81
241.81

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

249.29
249.29
249.29

257.67
255.47
255.85

8.38
6.18
6.56

257.89
255.68
256.05

0.000730
0.001207
0.001073

139.92
89.80
98.25

1.98
2.01
1.99

23.08
22.51
22.61

0.23
0.28
0.27

520.14
246.58
284.86

3.00
3.00
3.00

Reach 1
Reach 1
Reach 1

235.76
235.76
235.76

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

249.24
249.24
249.24

257.37
255.17
255.55

8.13
5.93
6.31

257.85
255.64
256.02

0.001680
0.002631
0.002367

94.00
60.16
65.87

3.18
3.18
3.15

15.69
14.89
15.08

0.37
0.43
0.41

402.25
201.26
229.72

2.00
2.00
1.00

Reach 1
Reach 1
Reach 1

227.39
227.39
227.39

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.46
248.46
248.46

254.83
253.35
253.61

6.37
4.89
5.15

254.83
253.33
253.61

6.37
4.87
5.15

257.59
255.43
255.80

0.013581
0.014894
0.014567

40.15
29.01
30.88

7.49
6.47
6.65

7.68
7.22
7.43

0.98
0.98
0.98

319.30
177.05
197.90

6.00
1.00
6.00

Reach 1
Reach 1
Reach 1

221.26
221.26
221.26

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.75
248.75
248.75

254.60
253.18
253.40

5.85
4.43
4.65

254.71
253.20
253.45

5.96
4.45
4.70

257.30
255.23
255.59

0.006135
0.006823
0.006794

42.39
30.20
31.96

7.45
6.47
6.68

9.06
7.98
8.10

1.00
1.01
1.02

314.61
174.09
194.76

6.00
5.00
5.00

Reach 1
Reach 1
Reach 1

214.96
214.96
214.96

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.66
248.66
248.66

253.75
252.58
252.95

5.09
3.92
4.29

254.07
252.81
253.01

5.41
4.15
4.35

256.50
254.63
254.92

0.007828
0.008570
0.007170

39.92
28.93
32.39

7.42
6.39
6.26

9.49
9.15
9.26

1.10
1.09
1.02

295.96
163.45
182.23

5.00
6.00
3.00

Reach 1
Reach 1
Reach 1

201.9
201.9
201.9

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.93
248.93
248.93

252.87
251.66
251.81

3.94
2.73
2.88

253.35
252.32
252.49

4.42
3.39
3.56

255.45
254.10
254.37

0.011250
0.017822
0.017469

40.89
26.41
28.07

7.24
7.00
7.19

12.19
11.76
11.81

1.20
1.42
1.42

271.77
156.17
174.37

16.00
7.00
5.00

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)
Reach 1
186.31
Diga+Piena
277.00
248.62
Reach 1
186.31
TR100 conoide
176.92
248.62
Reach 1
186.31
TR100 trasporto
192.50
248.62

W.S. Elev
(m)
252.53
251.60
251.71

Max Chl Dpth


(m)
3.91
2.98
3.09

Crit W.S.
(m)
253.22
252.06
252.49

Crit Depth
(m)
4.60
3.44
3.87

E.G. Elev
(m)
255.20
253.86
254.13

E.G. Slope
(m/m)
0.013099
0.015986
0.016236

Flow Area
(m2)
41.62
28.24
29.75

Vel Chnl
(m/s)
7.61
6.89
7.14

Top Width
(m)
15.39
13.40
13.42

Froude # Chl
1.28
1.35
1.37

Specif Force
(m3)
267.50
153.16
171.13

Num Trials
0.00
2.00
2.00

Reach 1
Reach 1
Reach 1

162.42
162.42
162.42

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

248.50
248.50
248.50

251.77
251.31
251.27

3.27
2.81
2.77

252.64
251.79
251.93

4.14
3.29
3.43

254.78
253.19
253.59

0.018470
0.013874
0.017510

37.54
30.53
29.87

8.48
6.63
7.37

15.47
15.17
15.14

1.51
1.28
1.43

264.39
142.44
163.84

4.00
5.00
4.00

Reach 1
Reach 1
Reach 1

161.92
161.92
161.92

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

246.09
246.09
246.09

248.26
247.68
247.75

2.17
1.59
1.67

249.91
248.99
249.15

3.82
2.91
3.07

254.45
252.84
253.26

0.061989
0.076382
0.076707

25.15
17.58
18.53

10.93
10.02
10.33

13.25
12.97
13.00

2.47
2.65
2.67

335.73
193.87
217.53

16.00
16.00
16.00

Reach 1
Reach 1
Reach 1

152.32
152.32
152.32

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.99
245.99
245.99

248.39
247.80
247.87

2.39
1.80
1.87

249.89
248.96
249.12

3.90
2.97
3.13

253.65
251.93
252.33

0.047538
0.052760
0.054096

27.27
19.65
20.59

10.06
8.93
9.27

13.03
12.71
12.75

2.17
2.22
2.26

316.51
178.18
200.77

5.00
5.00
4.00

Reach 1
Reach 1
Reach 1

137.42
137.42
137.42

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.78
245.78
245.78

248.83
248.21
248.27

3.05
2.43
2.49

250.02
249.04
249.21

4.24
3.26
3.43

252.69
250.96
251.33

0.028138
0.026164
0.028132

31.83
24.08
24.87

8.64
7.30
7.69

12.74
12.20
12.26

1.70
1.61
1.67

288.45
157.91
178.87

4.00
4.00
4.00

Reach 1
Reach 1
Reach 1

122.54
122.54
122.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.57
245.57
245.57

248.30
247.74
247.80

2.73
2.17
2.23

249.49
248.60
248.75

3.92
3.03
3.18

252.25
250.57
250.94

0.031890
0.030408
0.032706

31.52
23.81
24.57

8.65
7.30
7.70

13.97
13.57
13.61

1.81
1.72
1.79

285.65
156.01
177.12

4.00
3.00
2.00

Reach 1
Reach 1
Reach 1

111.14
111.14
111.14

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.44
245.44
245.44

248.29
249.41
249.60

2.85
3.97
4.16

249.34

3.90

251.79
250.07
250.30

0.025783
0.003017
0.002998

33.69
50.33
53.54

8.30
3.62
3.73

13.83
16.00
18.36

1.68
0.61
0.61

276.81
154.79
172.53

4.00
3.00
3.00

Reach 1
Reach 1
Reach 1

104.28
104.28
104.28

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.42
245.42
245.42

249.75
248.59
248.78

4.33
3.16
3.36

249.75
248.61
248.78

4.33
3.19
3.36

251.33
249.97
250.20

0.007173
0.009686
0.009087

52.10
34.18
36.86

5.71
5.28
5.35

20.05
13.24
13.74

0.91
1.00
0.98

254.69
142.84
159.37

7.00
5.00
6.00

Reach 1
Reach 1
Reach 1

104.18
104.18
104.18

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.42
245.42
245.42

249.08
248.70
248.58

3.66
3.28
3.16

249.66
248.73
248.91

4.24
3.31
3.49

251.27
249.93
250.19

0.011522
0.007427
0.010195

44.92
37.94
35.92

6.82
5.05
5.76

18.80
17.46
16.90

1.18
0.93
1.08

251.40
140.44
157.66

4.00
2.00
7.00

Reach 1
Reach 1
Reach 1

101.46
101.46
101.46

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

245.40
245.40
245.40

248.97
248.63
248.45

3.57
3.23
3.05

249.60
248.66
248.85

4.20
3.26
3.45

251.25
249.86
250.16

0.012352
0.007625
0.011437

43.97
37.81
34.73

6.96
5.08
5.96

18.53
17.24
16.65

1.22
0.94
1.14

251.73
139.27
157.64

16.00
3.00
16.00

Reach 1
Reach 1
Reach 1

101.36
101.36
101.36

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

243.38
243.38
243.38

246.57
245.82
245.92

3.19
2.44
2.54

247.93
246.93
247.09

4.55
3.55
3.71

251.03
249.60
249.93

0.030413
0.037619
0.037709

31.73
21.82
23.09

9.77
8.87
9.15

13.45
13.19
13.22

1.85
1.96
1.98

300.63
173.84
194.41

12.00
16.00
16.00

Reach 1
Reach 1
Reach 1

89.9
89.9
89.9

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

243.17
243.17
243.17

247.76
247.00
246.76

4.59
3.83
3.59

248.31
247.00
247.52

5.14
3.82
4.35

250.21
248.69
249.19

0.012305
0.010473
0.016217

45.09
33.71
30.55

7.49
6.06
7.19

15.26
13.20
13.04

1.16
1.03
1.27

270.61
151.76
175.21

4.00
3.00
4.00

Reach 1
Reach 1
Reach 1

87.58
87.58
87.58

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.80
242.80
242.80

248.10
246.68
246.49

5.30
3.88
3.69

248.18
246.93
247.06

5.38
4.13
4.26

249.97
248.60
249.12

0.006307
0.009115
0.013280

51.05
31.41
29.09

6.86
6.62
7.71

14.67
12.23
12.13

0.97
1.11
1.33

272.62
156.66
181.05

20.00
8.00
6.00

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)

W.S. Elev
(m)

Max Chl Dpth


(m)

Crit W.S.
(m)

Reach 1
Reach 1
Reach 1

73.2
73.2
73.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.65
242.65
242.65

248.05
246.93
245.18

5.40
4.28
2.53

246.26

Reach 1
Reach 1
Reach 1

63.26
63.26
63.26

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.49
242.49
242.49

246.64
245.68
245.18

4.15
3.19
2.69

Reach 1
Reach 1
Reach 1

53.64
53.64
53.64

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

242.82
242.82
242.82

245.91
245.67
245.02

Reach 1
Reach 1
Reach 1

53.54
53.54
53.54

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

240.53
240.53
240.53

Reach 1
Reach 1
Reach 1

39.68
39.68
39.68

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

Reach 1
Reach 1
Reach 1

39.58
39.58
39.58

Diga+Piena
TR100 conoide
TR100 trasporto

Reach 1
Reach 1
Reach 1

22.88
22.88
22.88

Reach 1
Reach 1
Reach 1

Crit Depth
(m)

E.G. Elev
(m)

E.G. Slope
(m/m)

Flow Area
(m2)

Vel Chnl
(m/s)

Top Width
(m)

Froude # Chl

Specif Force
(m3)

Num Trials

3.61

249.09
247.70
248.71

0.003325
0.003246
0.028883

66.75
48.91
24.30

5.02
4.22
8.63

16.28
15.21
12.83

0.70
0.67
1.81

278.38
157.81
186.83

4.00
3.00
4.00

247.03
245.96
246.14

4.54
3.47
3.64

248.84
247.41
248.30

0.008441
0.009449
0.021721

46.10
32.40
25.84

6.80
5.96
7.96

15.15
13.43
12.41

1.10
1.11
1.63

264.75
148.77
182.48

15.00
16.00
4.00

3.09
2.85
2.20

246.69
245.78
245.93

3.87
2.96
3.11

248.67
247.04
248.04

0.016454
0.009155
0.028824

39.33
35.47
25.79

7.58
5.33
7.86

15.93
15.44
14.61

1.42
1.04
1.77

259.85
137.48
175.01

6.00
4.00
4.00

244.21
243.53
243.41

3.68
3.00
2.88

245.51
244.52
244.69

4.98
3.99
4.16

248.51
246.84
247.89

0.028193
0.029360
0.042393

32.29
23.41
21.86

10.02
8.70
10.11

13.45
12.60
12.38

1.80
1.77
2.11

299.75
168.96
204.22

16.00
11.00
12.00

240.63
240.63
240.63

243.27
242.69
242.63

2.64
2.06
2.00

244.69
243.78
243.94

4.06
3.15
3.31

248.02
246.34
247.29

0.033761
0.036676
0.049040

29.79
21.30
20.45

9.87
8.60
9.73

15.13
13.65
13.13

2.00
1.99
2.29

304.86
171.24
204.97

5.00
7.00
5.00

277.00
176.92
192.50

241.08
241.08
241.08

243.99
243.45
243.26

2.91
2.37
2.18

245.14
244.23
244.39

4.06
3.15
3.31

247.71
246.01
247.02

0.023293
0.021198
0.034987

33.89
25.68
22.91

8.77
7.23
8.74

15.64
14.61
14.24

1.69
1.55
1.96

281.89
153.66
189.73

6.00
7.00
6.00

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

241.45
241.45
241.45

243.66
243.25
243.17

2.21
1.80
1.72

244.71
243.96
244.09

3.26
2.51
2.64

247.16
245.61
246.28

0.031623
0.028079
0.039328

34.61
26.84
25.40

8.51
6.94
7.96

19.25
18.63
18.52

1.88
1.70
2.00

266.50
143.39
171.85

3.00
2.00
2.00

22.78
22.78
22.78

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.69
238.69
238.69

240.95
240.44
240.47

2.26
1.75
1.78

242.53
241.67
241.82

3.84
2.98
3.13

246.91
245.35
246.03

0.056754
0.069458
0.076680

26.17
18.28
18.71

10.96
9.86
10.50

15.55
14.57
14.69

2.51
2.64
2.78

328.86
189.88
218.30

16.00
16.00
14.00

Reach 1
Reach 1
Reach 1

19.2
19.2
19.2

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.69
238.69
238.69

241.01
243.34
240.52

2.32
4.65
1.83

242.53
241.67
241.82

3.84
2.98
3.13

246.61
243.74
245.64

0.051578
0.001354
0.067115

26.99
66.81
19.54

10.64
2.89
10.08

15.58
18.81
14.93

2.41
0.44
2.62

321.09
183.93
210.88

4.00
5.00
5.00

Reach 1
Reach 1
Reach 1

19.1
19.1
19.1

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

239.48
239.48
239.48

242.11
242.46
241.56

2.63
2.98
2.08

243.32
242.46
242.61

3.84
2.98
3.13

246.14
243.66
245.18

0.030619
0.007613
0.039293

31.92
37.45
23.29

9.04
4.95
8.53

15.81
16.16
15.40

1.90
0.97
2.06

285.19
134.53
185.04

13.00
6.00
10.00

Reach 1
Reach 1
Reach 1

0
0
0

Diga+Piena
TR100 conoide
TR100 trasporto

277.00
176.92
192.50

238.52
238.52
238.52

240.99
240.74
240.50

2.47
2.22
1.98

242.40
241.50
241.65

3.88
2.98
3.13

245.46
243.16
244.37

0.036405
0.023180
0.044052

30.63
26.44
22.65

9.58
7.03
8.85

16.84
16.21
15.57

2.09
1.63
2.20

293.99
147.81
188.55

4.00
4.00
4.00

Lesina Torrazza - POSTOPERAM

Plan: Centro - Torrazza

11/07/2008

LESINA Reach 1
275

Legend
WS TR100 trasporto
Ground

270

265

Elevation (m)

260

255

250

245

240

235
0

100

200
Main Channel Distance (m)

300

400

Plan: Centro - Tor LESINA


E.G. Elev (m)
W.S. Elev (m)
Q Total (m3/s)
Q Weir (m3/s)
Weir Flow Area (m2)
Weir Sta Lft (m)
Weir Sta Rgt (m)
Weir Max Depth (m)
Weir Avg Depth (m)
Weir Submerg
Min El Weir Flow (m)
Wr Top Wdth (m)

Reach 1 RS: 313.35 Gate Group: FESSURA Profile: Diga+Piena


264.80 Q Gates (m3/s)
220.71
264.63 Q Gate Group (m3/s)
85.85
277.00 Gate Open Ht (m)
4.00
56.29 Gate #Open
1
33.81 Gate Area (m2)
12.28
8.18 Gate Submerg
0.58
33.81 Gate Invert (m)
257.87
1.39
1.32
0.00
263.41
25.63

Plan: Centro - Tor LESINA


E.G. Elev (m)
W.S. Elev (m)
Q Total (m3/s)
Q Weir (m3/s)
Weir Flow Area (m2)
Weir Sta Lft (m)
Weir Sta Rgt (m)
Weir Max Depth (m)
Weir Avg Depth (m)
Weir Submerg
Min El Weir Flow (m)
Wr Top Wdth (m)

Reach 1 RS: 313.35 Gate Group: FESSURA Profile: TR100 conoide


263.66 Q Gates (m3/s)
173.04
263.56 Q Gate Group (m3/s)
78.43
176.92 Gate Open Ht (m)
4.00
3.88 Gate #Open
1
5.44 Gate Area (m2)
12.28
9.08 Gate Submerg
0.53
31.64 Gate Invert (m)
257.87
0.25
0.24
0.00
263.41
22.56

Plan: Centro - Tor LESINA


E.G. Elev (m)
W.S. Elev (m)
Q Total (m3/s)
Q Weir (m3/s)
Weir Flow Area (m2)
Weir Sta Lft (m)
Weir Sta Rgt (m)
Weir Max Depth (m)
Weir Avg Depth (m)
Weir Submerg
Min El Weir Flow (m)
Wr Top Wdth (m)

Reach 1 RS: 313.35 Gate Group: FESSURA Profile: TR100 trasporto


263.77 Q Gates (m3/s)
185.72
263.66 Q Gate Group (m3/s)
79.25
192.50 Gate Open Ht (m)
4.00
6.78 Gate #Open
1
7.97 Gate Area (m2)
12.28
8.64 Gate Submerg
0.55
32.08 Gate Invert (m)
257.87
0.36
0.34
0.00
263.41
23.44

Plan: Centro - Tor LESINA


E.G. Elev (m)
W.S. Elev (m)
Q Total (m3/s)
Q Weir (m3/s)
Weir Flow Area (m2)
Weir Sta Lft (m)
Weir Sta Rgt (m)
Weir Max Depth (m)
Weir Avg Depth (m)
Weir Submerg
Min El Weir Flow (m)
Wr Top Wdth (m)

Reach 1 RS: 313.35 Gate Group:


264.80 Q Gates (m3/s)
264.63 Q Gate Group (m3/s)
277.00 Gate Open Ht (m)
56.29 Gate #Open
33.81 Gate Area (m2)
8.18 Gate Submerg
33.81 Gate Invert (m)
1.39
1.32
0.00
263.41
25.63

Stramazzo Profile: Diga+Piena


220.71
134.86
1.55
1
29.68
261.87

Plan: Centro - Tor LESINA Reach 1 RS: 313.35 Gate Group: Stramazzo Profile: TR100 conoide
E.G. Elev (m)
263.66 Q Gates (m3/s)
173.04
W.S. Elev (m)
263.56 Q Gate Group (m3/s)
94.61
Q Total (m3/s)
176.92 Gate Open Ht (m)
1.55
Q Weir (m3/s)
3.88 Gate #Open
1
Weir Flow Area (m2)
5.44 Gate Area (m2)
29.68
Weir Sta Lft (m)
9.08 Gate Submerg
Weir Sta Rgt (m)
31.64 Gate Invert (m)
261.87
Weir Max Depth (m)
0.25

Plan: Centro - Tor LESINA Reach 1 RS: 313.35 Gate Group: Stramazzo Profile: TR100 conoide (Continued)
Weir Avg Depth (m)
0.24
Weir Submerg
0.00
Min El Weir Flow (m)
263.41
Wr Top Wdth (m)
22.56
Plan: Centro - Tor LESINA
E.G. Elev (m)
W.S. Elev (m)
Q Total (m3/s)
Q Weir (m3/s)
Weir Flow Area (m2)
Weir Sta Lft (m)
Weir Sta Rgt (m)
Weir Max Depth (m)
Weir Avg Depth (m)
Weir Submerg
Min El Weir Flow (m)
Wr Top Wdth (m)

Reach 1 RS: 313.35 Gate Group:


263.77 Q Gates (m3/s)
263.66 Q Gate Group (m3/s)
192.50 Gate Open Ht (m)
6.78 Gate #Open
7.97 Gate Area (m2)
8.64 Gate Submerg
32.08 Gate Invert (m)
0.36
0.34
0.00
263.41
23.44

Stramazzo Profile: TR100 trasporto


185.72
106.47
1.55
1
29.68
261.87

SIMULAZIONI DI INTERRIMENTO

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1


Reach
River Sta
Profile
Q Total
(m3/s)
Reach 1
424.26
Diga+Piena
277.00

Min Ch El
(m)
270.11

W.S. Elev
(m)
273.23

Max Chl Dpth


(m)
3.12

Crit W.S.
(m)
273.23

Crit Depth
(m)
3.12

E.G. Elev
(m)
274.37

E.G. Slope
(m/m)
0.021369

Flow Area
(m2)
58.63

Vel Chnl
(m/s)
4.72

Top Width
(m)
25.88

270.11

272.56

2.45

272.56

2.45

273.46

0.022628

42.09

4.20

23.40

Froude # Chl
1.00

Specif Force
(m3)
211.55

1.00

120.37

Num Trials
6.00

Reach 1

424.26

TR100 conoide

176.92

Reach 1
Reach 1

413.83
413.83

Diga+Piena
TR100 conoide

277.00

270.00

272.52

2.52

272.86

2.86

274.06

0.033478

50.34

5.50

25.57

1.25

211.52

8.00

176.92

270.00

271.98

1.98

272.22

2.22

273.14

0.032614

37.06

4.77

22.99

1.20

118.85

17.00

Reach 1
Reach 1

413.2
413.2

Diga+Piena
TR100 conoide

277.00
176.92

263.63
263.63

264.99
264.54

1.36
0.91

266.75
265.96

3.12
2.33

273.33
272.42

0.323942
0.497197

21.65
14.23

12.79
12.44

16.55
16.18

3.57
4.23

375.60
230.54

9.00
12.00

Reach 1

400

Diga+Piena

277.00

263.39

267.66

4.27

265.80

2.41

267.95

0.003027

115.18

2.41

32.28

0.41

298.74

3.00

Reach 1

400

TR100 conoide

176.92

263.39

266.54

3.15

265.19

1.80

266.79

0.003465

80.83

2.19

29.31

0.42

161.32

3.00

Reach 1
Reach 1

398
398

Diga+Piena
TR100 conoide

277.00
176.92

263.35
263.35

267.54
266.44

4.19
3.09

267.94
266.77

0.004171
0.004849

99.03
69.92

2.80
2.53

27.29
26.02

0.47
0.49

273.04
147.56

3.00
3.00

Reach 1
Reach 1

375.57
375.57

Diga+Piena
TR100 conoide

277.00
176.92

262.95
262.95

267.51
266.42

4.56
3.47

267.85
266.68

0.003258
0.003449

107.56
78.15

2.58
2.26

27.47
26.20

0.42
0.42

301.47
167.96

1.00
1.00

Reach 1
Reach 1

365.55
365.55

Diga+Piena
TR100 conoide

277.00
176.92

262.77
262.77

266.30
265.48

3.53
2.71

267.68
266.52

0.024104
0.020834

53.31
39.10

5.20
4.52

19.50
15.63

1.00
0.91

236.45
133.66

8.00
1.00

Reach 1
Reach 1

355.54
355.54

Diga+Piena
TR100 conoide

277.00
176.92

262.59
262.59

266.52
265.64

3.93
3.05

267.17
266.14

0.008694
0.009356

77.42
56.16

3.58
3.15

24.56
23.56

0.64
0.65

234.71
131.59

3.00
3.00

Reach 1
Reach 1

345.54
345.54

Diga+Piena
TR100 conoide

277.00
176.92

262.41
262.41

265.27
263.97

2.86
1.56

266.36
265.51

0.017854
0.049896

59.81
32.17

4.63
5.50

21.42
20.94

0.88
1.42

215.61
124.05

3.00
6.00

Reach 1

335.54

Diga+Piena

277.00

262.23

264.54

2.31

264.87

2.64

266.08

0.033351

50.38

5.50

25.27

1.24

210.66

16.00

Reach 1

335.54

TR100 conoide

176.92

262.23

263.95

1.72

264.22

1.99

265.18

0.036681

36.09

4.90

23.32

1.26

118.48

16.00

Reach 1
Reach 1

325.72
325.72

Diga+Piena
TR100 conoide

277.00
176.92

262.05
262.05

264.75
264.06

2.70
2.01

265.67
264.75

0.012270
0.013471

66.27
48.81

4.29
3.70

25.80
25.18

0.83
0.83

207.49
114.49

1.00
1.00

Reach 1
Reach 1

315.72
315.72

Diga+Piena
TR100 conoide

277.00
176.92

261.87
261.87

264.33
263.70

2.46
1.83

264.33
263.70

2.46
1.83

265.54
264.60

0.018097
0.020055

57.83
42.50

4.91
4.24

24.54
24.00

1.00
1.00

207.08
114.23

0.00
0.00

Reach 1

313.35

Reach 1
Reach 1

310.98
310.98

Diga+Piena
TR100 conoide

277.00
176.92

257.87
257.87

261.86
260.93

3.99
3.06

260.60
259.94

2.73
2.07

262.41
261.33

0.004541
0.004761

85.10
63.70

3.30
2.80

23.31
22.79

0.54
0.53

252.71
141.56

3.00
2.00

Reach 1
Reach 1

300.62
300.62

Diga+Piena
TR100 conoide

277.00
176.92

257.71
257.71

260.90
260.17

3.19
2.46

260.90
260.16

3.19
2.45

262.26
261.20

0.013054
0.014733

54.58
39.79

4.86
4.31

20.87
19.31

0.88
0.89

224.49
125.71

6.00
2.00

Reach 1
Reach 1

288.32
288.32

Diga+Piena
TR100 conoide

277.00
176.92

257.62
257.62

260.63
259.97

3.01
2.35

260.66
259.97

3.04
2.35

261.93
260.94

0.015308
0.016950

55.53
40.85

4.90
4.31

22.81
21.57

0.93
0.94

216.60
121.06

0.00
6.00

266.30
265.32

264.36

3.53
2.55

1.95

6.00

Inl Struct

HEC-RAS Plan: Centro - Tor River: LESINA Reach: Reach 1 (Continued)


Reach
River Sta
Profile
Q Total
Min Ch El
(m3/s)
(m)
Reach 1
278.32
Diga+Piena
277.00
257.52
Reach 1

278.32

TR100 conoide

176.92

257.52

W.S. Elev
(m)
260.24

Max Chl Dpth


(m)
2.72

Crit W.S.
(m)
260.25

Crit Depth
(m)
2.73

E.G. Elev
(m)
261.44

E.G. Slope
(m/m)
0.015648

Flow Area
(m2)
57.54

Vel Chnl
(m/s)
4.73

Top Width
(m)
24.97

259.59

2.07

259.63

2.11

260.52

0.018782

41.46

4.27

24.17

Froude # Chl
0.94

Specif Force
(m3)
208.11

0.98

116.01

Num Trials
6.00
5.00

Lesina Torrazza - INTERRIMENTOPOST

Plan: Centro - Torrazza

11/07/2008

LESINA Reach 1
275

Legend
WS TR100 conoide
Ground

270

265

Elevation (m)

260

255

250

245

240

235
0

100

200
Main Channel Distance (m)

300

400

Potrebbero piacerti anche