Sei sulla pagina 1di 3

Wat-San Component for Integrated Rural Development Project

ABNEY LEVEL SURVEY


Name of System / Location : Basana

Name of source: Fatukai

District Covalima

Sub District (Zona): Zumalai

Suco: Tacilin

Aldeia: Basana

Ground
Abney
Stick
Distance, m
Station
Point
Chainage,
(Jarak Di
(Lokasi (Lopkasi
m
Tanah)
Level)
Patok)
(d)

Vertical
Angle
(Segi)
(a)

Fiscal Year (Tahun Anggaran): 2009

Vertical
Distance , m Elevation, m
(Jarak
(Hetinggian)
Vertikal)
h= d*sin (a)

Remark
(Keterangan)

H= h1-h2

54.00

Q : 7 l/sec

P.0

P.1

30.00

30.00

(0.15)

(0.078)

53.922

GIP (pipa lewat pinggir kali)

P.1

P.2

41.50

71.50

(0.15)

(0.108)

53.814

GIP (pipa lewat pinggir kali)

P.2

P.3

38.20

109.70

(0.15)

(0.100)

53.714

GIP (pipa lewat pinggir kali)

P.3

P.4

39.80

149.50

0.20

0.138

53.852

GIP (pipa lewat pinggir kali)

P.4

P.5

35.60

185.10

(0.15)

(0.093)

53.759

HDPE

P.5

P.6

60.40

245.50

(0.25)

(0.263)

53.496

HDPE/ bend to left 45

P.6

P.7

9.00

254.50

3.25

0.510

54.006

HDPE/ bend to left 22 1/2

P.7

P.8

37.20

291.70

0.20

0.129

54.135

HDPE

P.8

P.9

32.80

324.50

54.135

HDPE

P.9

P.10

24.10

348.60

(0.25)

(0.105)

54.030

HDPE

P.10

P.11

26.60

375.20

(0.10)

(0.046)

53.984

HDPE

P.11

P.12

28.20

403.40

(0.15)

(0.073)

53.911

HDPE

P.12

P.13

22.30

425.70

53.911

HDPE/ bend to left 22 1/2

P.13

P.14

37.50

463.20

53.911

HDPE

P.14

P.15

41.70

504.90

(0.50)

(0.363)

53.548

HDPE/ bend to right 22 1/2

P.15

P.16

37.20

542.10

(0.50)

(0.324)

53.224

HDPE

P.16

P.17

44.50

586.60

(0.50)

(0.388)

52.836

HDPE

P.17

P.18

60.50

647.10

(0.15)

(0.158)

52.678

HDPE

P.18

P.19

40.20

687.30

(0.50)

(0.350)

52.328

HDPE

P.19

P.20

34.50

721.80

(0.50)

(0.301)

52.027

HDPE / water well. 1

P.20

P.21

31.50

753.30

52.027

HDPE

P.21

P.22

32.10

785.40

52.027

HDPE

P.22

P.23

27.80

813.20

0.50

0.242

52.269

HDPE

P.23

P.24

26.70

839.90

(1.25)

(0.582)

51.687

HDPE / water well. 2

P.24

P.25

17.20

857.10

1.00

0.300

51.987

HDPE

Name of Surveyor: (Nama Surveyor)_Juvinal, Amin, luis


Date (Tanggal): 17, 01, 2009
Community : 8 pop'

page 01of 02

Ground
Abney
Stick
Distance, m
Station
Point
Chainage,
(Jarak Di
(Lokasi (Lopkasi
m
Tanah)
Level)
Patok)
(d)

Vertical
Angle
(Segi)
(a)

Vertical
Distance , m Elevation, m
(Jarak
(Hetinggian)
Vertikal)
h= d*sin (a)

857.10

Remark
(Keterangan)

H= h1-h2

49.866

P.25

P.26

14.00

871.10

(0.75)

(0.634)

49.232

HDPE

P.26

P.27

30.70

901.80

(0.10)

(0.080)

49.152

HDPE

P.27

P.28

30.60

932.40

9.00

3.597

52.749

HDPE / water well. 3

P.28

P.29

26.90

959.30

0.75

0.418

53.167

HDPE

P.29

P.30

27.80

987.10

53.167

HDPE

P.30

P.31

29.10

1,016.20

53.167

HDPE / water well. 4

Name of Surveyor: (Nama Surveyor)_Juvinal, Amin, luis


Date (Tanggal): 17, 01, 2009

page 02of 02

Wat-San Component for Integrated Rural Development Project


ABNEY LEVEL SURVEY
Name of System / Location : Basana

Name of source: Bui Mokal

District Covalima

Sub District (Zona): Zumalai

Suco: Tacilin

Aldeia: Basana

Ground
Abney
Stick
Distance, m
Station
Point
Chainage,
(Jarak Di
(Lokasi (Lopkasi
m
Tanah)
Level)
Patok)
(d)

70

Vertical
Angle
(Segi)
(a)

Fiscal Year (Tahun Anggaran): 2009

Vertical
Distance , m Elevation, m
(Jarak
(Hetinggian)
Vertikal)
h= d*sin (a)

Remark
(Keterangan)

H= h1-h2

70.000

(1.00)

(1.22)

54.000
52.779

Q : 7 l/sec
Source. Bui mokal

P.x

P.0

P.0

P.1

30.00

100.00

(0.15)

(0.078)

52.701

GIP (pipa lewat pinggir kali)

P.1

P.2

41.50

141.50

(0.15)

(0.108)

52.593

GIP (Hydram Box))

P.2

P.3

150.00

291.50

8.00

20.875

73.468

HDPE(Storage tank location plan)

P.3

P.4

250.00

541.50

(1.25)

(5.453)

68.015

HDPE /Public tap.1 (shefi aldea)

P.4

P.5

62.00

603.50

(1.00)

(1.082)

66.933

HDPE /Public tap.2

P.5

P.6

64.00

667.50

(0.75)

(0.837)

66.096

HDPE /Public tap.3

P.6

P.7

64.00

731.50

(1.50)

(1.675)

64.421

P.7

P.8

64.00

795.50

(0.25)

(0.253)

64.168

HDPE /Public tap.4

P.8

P.9

58.00

853.50

(1.25)

(1.265)

62.903

HDPE

P.9

P.10

59.00

912.50

(0.75)

(0.772)

62.131

HDPE

P.10

P.11

41.00

953.50

(3.00)

(2.145)

59.986

HDPE /Public tap.5

P.11

P.12

50.00

1,003.50

(6.50)

(5.660)

54.326

HDPE

Name of Surveyor: (Nama Surveyor)_Juvinal, Amin, luis


Date (Tanggal): 17, 01, 2009
Community : 8 pop'

page 01of 01