PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS DEL ESTADIO MUNICIPAL DE LA CIUDAD DE PANAO,

DISTRITO DE PANAO - PROVINCIA DE PACHITEA - REGIÓN HUANUCO"


PRESUPUESTO
DEDUCTIVO DE OBRA N° 01 (TRIBUNA NORTE)

PRECIO PRECIO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL
06 DEDUCTIVO DE OBRA

06.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL m3 207.14 32.54 6,740.34

EXCAVACION PARA ZAPATAS DE 1.70 M. A MAS DE PROFUNDIDAD CON


06.01.02.02 m3 1,349.31 10.89 14,693.99
RETROEXCAVADORA

06.01.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 885.92 11.01 9,753.98

ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO A MANO) REN.=25


06.01.02.04 m3 838.17 18.22 15,271.46
M3/DIA
ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO Y TRANSPORTE
06.01.02.05 m3 838.17 8.66 7,258.55
VOLQUETE DE 10 M3) REND.= 150 M3/DIA

06.01.02.06 NIVELACION, REFINE Y COMPACTADO m2 1,003.91 2.22 2,228.68

06.01.02.07 BASE AFIRMADO DE 4" CON EQUIPO LIVIANO m2 91.05 10.05 915.05

COSTO DIRECTO TOTAL 56,862.04


GASTOS GENERALES (8.00%) 4,548.96
UTILIDAD (7.00%) 3,980.34
SUB TOTAL 65,391.35
I.G.V. (18.00%) 11,770.44
PRESUPUESTO TOTAL 77,161.79
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS DEL
ESTADIO MUNICIPAL DE LA CIUDAD DE PANAO, DISTRITO DE PANAO -
PROVINCIA DE PACHITEA - REGIÓN HUANUCO"

DISTRITO : PANAO
MUNICIPALIDAD
PROVINCIA : PACHITEA
PROVINCIAL REGION : HUÁNUCO
DE PACHITEA FECHA : MARZO - 2022

RESUMEN DEL SUSTENTO DE METRADOS

ITEM DESCRIPCION UND TOTAL

01 TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO

01.01 TRABAJOS PRELIMINARES

01.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA glb 1.00

01.02 MOVIMIENTO DE TIERRAS

01.02.01 CORTE DE TERRENO PARA MEJORAMIENTO DE SUELO m3 6,754.73

RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO


01.02.02 m3 4,122.76
C/RODILLO VIBRATORIO
RELLENO Y COMPACTADO CON MATERIAL PROPIO
01.02.03 m3 2,168.55
C/RODILLO VIBRATORIO
ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO Y
01.02.04 m3 3,289.96
TRANSPORTE VOLQUETE DE 10 M3) REND.= 150 M3/DIA

01.02.05 CARGUIO DE MATERIAL AFIRMADO m3 4,122.76

01.02.06 TRANSPORTE DE MATERIAL AFIRMADO m3 4,122.76

01.03 CONCRETO ARMADO

01.03.01 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 393.89

ENCOFRADO Y DESENCOFRADO EN VIGAS DE


01.03.02 m2 318.02
CIMENTACION
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS DEL ESTADIO MUNICIPAL DE LA CIUDAD DE PANAO,
DISTRITO DE PANAO - PROVINCIA DE PACHITEA - REGIÓN HUANUCO"

DISTRITO : PANAO
PROVINCIA : PACHITEA
MUNICIPALIDA REGION : HUÁNUCO
D DE FECHA : MARZO - 2022
PROVINCIAL
DE PACHITEA

SUSTENTO DE METRADOS : ADICIONAL DE OBRA N° 01 (TRIBUNA NORTE)

MEDIDA METRADO

UNIDAD
FACTOR
ITEM DESCRIPCION #
CANT. LARGO ANCHO ALTO AREA PARCIAL TOTAL
VECES
VOLUMEN
01 ADICIONAL DE OBRA N° 01
01.01 TRABAJOS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA glb 1.00 1.00 1.00 1.00
01.02 MOVIMIENTO DE TIERRAS
01.02.01 CORTE DE TERRENO PARA MEJORAMIENTO DE SUELO m3 1.00 1.00 4.60 1,468.42 6,754.73 6,754.73
RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO
01.02.02 m3 1.00 1.00 3.10 1,468.42 4,552.10 4,122.76
C/RODILLO VIBRATORIO
Resta Zapataz y Solados
Z-1 2.00 -1.00 3.40 2.05 0.70 -9.76
Z-2 2.00 -1.00 2.95 3.15 0.70 -13.01
Z-3 2.00 -1.00 2.75 2.95 0.70 -11.36
Z-4 2.00 -1.00 2.75 2.95 0.70 -11.36
Z-5 2.00 -1.00 3.25 3.10 0.70 -14.11
Z-6 2.00 -1.00 2.85 3.05 0.70 -12.17
Z-7 2.00 -1.00 3.00 2.85 0.70 -11.97
Z-8 2.00 -1.00 3.60 3.80 0.70 -19.15
Z-9 2.00 -1.00 3.80 4.00 0.70 -21.28
Zapatas Combinadas
ZC-1 2.00 -1.00 4.90 3.45 0.70 -23.67
ZC-2 2.00 -1.00 2.60 4.00 0.70 -14.56
ZC-3 2.00 -1.00 3.60 2.10 0.70 -10.58
ZC-4 2.00 -1.00 2.80 8.10 0.70 -31.75
ZC-5 2.00 -1.00 3.10 8.00 0.70 -34.72
ZC-6 2.00 -1.00 2.90 8.20 0.70 -33.29
ZC-7 2.00 -1.00 5.30 9.70 0.70 -71.97
ZC-8 2.00 -1.00 3.50 3.20 0.70 -15.68
ZC-9 2.00 -1.00 3.20 6.20 0.70 -27.78
ZC-10 2.00 -1.00 2.45 4.97 0.70 -17.05
ZC-11 2.00 -1.00 4.80 1.65 0.70 -11.09
ZC-12 2.00 -1.00 1.55 3.05 0.70 -6.62
ZC-13 2.00 -1.00 3.05 1.50 0.70 -6.41
RELLENO Y COMPACTADO CON MATERIAL PROPIO
01.02.03 m3 1.00 1.00 1.50 1,468.42 2,202.63 2,168.55
C/RODILLO VIBRATORIO
Resta Columna
C-1 42.00 -1.00 0.40 0.60 1.50 -15.12
C-4 8.00 -1.00 1.50 0.42 -5.04
C-5 16.00 -1.00 0.30 0.25 1.50 -1.80
Resta Placa
PL-1 Y C-2 10.00 -1.00 1.50 0.52 -7.80
PL-2 Y C-2 4.00 -1.00 1.50 0.72 -4.32
ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO Y
01.02.04 m3 2,631.97 F= 1.25 3,289.96 3,289.96
TRANSPORTE VOLQUETE DE 10 M3) REND.= 150 M3/DIA
01.02.05 CARGUIO DE MATERIAL AFIRMADO m3 4,122.76 4,122.76 4,122.76
01.02.06 TRANSPORTE DE MATERIAL AFIRMADO m3 4,122.76 4,122.76 4,122.76
01.03 CONCRETO ARMADO
01.03.01 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 393.89
Z-1 2.00 1.00 3.40 2.05 0.60 13.08
Z-2 2.00 1.00 2.95 3.15 0.60 14.64
Z-3 2.00 1.00 2.75 2.95 0.60 13.68
Z-4 2.00 1.00 2.75 2.95 0.60 13.68
Z-5 2.00 1.00 3.25 3.10 0.60 15.24
Z-6 2.00 1.00 2.85 3.05 0.60 14.16
Z-7 2.00 1.00 3.00 2.85 0.60 14.04
Z-8 2.00 1.00 3.60 3.80 0.60 17.76
Z-9 2.00 1.00 3.80 4.00 0.60 18.72
Zapatas Combinadas 0.00

ZC-1 2.00 1.00 4.90 3.45 0.60 20.04


ZC-2 2.00 1.00 2.60 4.00 0.60 15.84
ZC-3 2.00 1.00 3.60 2.10 0.60 13.68
ZC-4 2.00 1.00 2.80 8.10 0.60 26.16
ZC-5 2.00 1.00 3.10 8.00 0.60 26.64
ZC-6 2.00 1.00 2.90 8.20 0.60 26.64
ZC-7 2.00 1.00 5.30 9.70 0.60 36.00
ZC-8 2.00 1.00 3.50 3.20 0.60 16.08
ZC-9 2.00 1.00 3.20 6.20 0.60 22.56
ZC-10 2.00 1.00 2.45 4.97 0.60 17.81
ZC-11 2.00 1.00 4.80 1.65 0.60 15.48
ZC-12 2.00 1.00 1.55 3.05 0.60 11.04
ZC-13 2.00 1.00 3.05 1.50 0.60 10.92
ENCOFRADO Y DESENCOFRADO EN VIGAS DE
01.03.02 m2 318.02
CIMENTACION
EJE 1-1 1.00 1.00 2.22 0.30 0.70 3.53
EJE 2-2 1.00 1.00 1.35 0.30 0.70 2.31
1.00 1.00 1.35 0.30 0.70 2.31
EJE 3-3 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.10 0.30 0.70 1.96
EJE 4-4 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.10 0.30 0.70 1.96
EJE 5-5 1.00 1.00 3.00 0.30 0.70 4.62
EJE 6-6 1.00 1.00 3.00 0.30 0.70 4.62
EJE 7-7 1.00 1.00 3.00 0.30 0.70 4.62
EJE 8-8 1.00 1.00 3.40 0.30 0.70 5.18
EJE 9-9 1.00 1.00 3.40 0.30 0.70 5.18
EJE 10-10 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.40 0.30 0.70 2.38
EJE 11-11 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.40 0.30 0.70 2.38
EJE 12-12 1.00 1.00 3.50 0.30 0.70 5.32
EJE 13-13 1.00 1.00 3.50 0.30 0.70 5.32
EJE 14-14 1.00 1.00 3.00 0.30 0.70 4.62
EJE 15-15 1.00 1.00 3.00 0.30 0.70 4.62
EJE 16-16 1.00 1.00 3.00 0.30 0.70 4.62
EJE 17-17 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.20 0.30 0.70 2.10
EJE 18-18 1.00 1.00 2.10 0.30 0.70 3.36
1.00 1.00 1.20 0.30 0.70 2.10
EJE 19-19 1.00 1.00 1.35 0.30 0.70 2.31
1.00 1.00 1.35 0.30 0.70 2.31
EJE 20-20 1.00 1.00 2.22 0.30 0.70 3.53
EJE F-F_Entre 1-2 1.00 1.00 2.33 0.30 0.70 3.68
EJE F-F_Entre 2-3 1.00 1.00 2.26 0.30 0.70 3.58
EJE F-F_Entre 4-5 1.00 1.00 3.16 0.30 0.70 4.84
EJE F-F_Entre 5-6 1.00 1.00 3.00 0.30 0.70 4.62
EJE F-F_Entre 6-7 1.00 1.00 3.16 0.30 0.70 4.84
EJE F-F_Entre 7-8 1.00 1.00 2.98 0.30 0.70 4.59
EJE F-F_Entre 9-10 1.00 1.00 2.68 0.30 0.70 4.17
EJE F-F_Entre 11-12 1.00 1.00 2.40 0.30 0.70 3.78
EJE F-F_Entre 13-14 1.00 1.00 2.98 0.30 0.70 4.59
EJE F-F_Entre 14-15 1.00 1.00 3.07 0.30 0.70 4.72
EJE F-F_Entre 15-16 1.00 1.00 2.90 0.30 0.70 4.48
EJE F-F_Entre 16-17 1.00 1.00 3.26 0.30 0.70 4.98
EJE F-F_Entre 18-19 1.00 1.00 2.26 0.30 0.70 3.58
EJE F-F_Entre 19-20 1.00 1.00 2.31 0.30 0.70 3.65
EJE G-G_Entre 1-2 1.00 1.00 3.20 0.30 0.70 4.90
EJE G-G_Entre 2-3 1.00 1.00 3.36 0.30 0.70 5.12
EJE G-G_Entre 18-19 1.00 1.00 3.20 0.30 0.70 4.90
EJE G-G_Entre 19-20 1.00 1.00 3.36 0.30 0.70 5.12
EJE H-H_Entre 4-5 1.00 1.00 3.35 0.30 0.70 5.11
EJE H-H_Entre 5-6 1.00 1.00 3.05 0.30 0.70 4.69
EJE H-H_Entre 6-7 1.00 1.00 3.00 0.30 0.70 4.62
EJE H-H_Entre 7-8 1.00 1.00 1.73 0.30 0.70 2.84
EJEH-H_Entre 9-10 1.00 1.00 2.08 0.30 0.70 3.33
EJE H-H_Entre 10-11 1.00 1.00 2.20 0.30 0.70 3.50
EJE H-H_Entre 11-12 1.00 1.00 2.08 0.30 0.70 3.33
EJEH-H_Entre 13-14 1.00 1.00 1.73 0.30 0.70 2.84
EJE H-H_Entre 14-15 1.00 1.00 3.00 0.30 0.70 4.62
EJE H-H_Entre 15-16 1.00 1.00 3.05 0.30 0.70 4.69
EJE H-H_Entre 16-17 1.00 1.00 3.33 0.30 0.70 5.08
EJE I-I_Entre 1-2 1.00 1.00 2.05 0.30 0.70 3.29
EJE I-I_Entre 2-3 1.00 1.00 2.50 0.30 0.70 3.92
EJE I-I_Entre 4-5 1.00 1.00 1.78 0.30 0.70 2.91
EJE I-I_Entre 5-6 1.00 1.00 3.05 0.30 0.70 4.69
EJE I-I_Entre 6-7 1.00 1.00 3.00 0.30 0.70 4.62
EJE I-I_Entre 7-8 1.00 1.00 1.73 0.30 0.70 2.84
EJE I-I_Entre 13-14 1.00 1.00 1.73 0.30 0.70 2.84
EJE I-I_Entre 14-15 1.00 1.00 3.00 0.30 0.70 4.62
EJE I-I_Entre 15-16 1.00 1.00 3.05 0.30 0.70 4.69
EJE I-I_Entre 16-17 1.00 1.00 1.78 0.30 0.70 2.91
EJE I-I_Entre 18-19 1.00 1.00 2.50 0.30 0.70 3.92
EJE I-I_Entre 19-20 1.00 1.00 2.05 0.30 0.70 3.29
EJE J-J_Entre 4-5 1.00 1.00 1.98 0.30 0.70 3.18
EJE J-J_Entre 5-6 1.00 1.00 1.70 0.30 0.70 2.80
EJE J-J_Entre 6-7 1.00 1.00 3.00 0.30 0.70 4.62
EJE J-J_Entre 7-8 1.00 1.00 1.73 0.30 0.70 2.84
EJE J-J_Entre 9-10 1.00 1.00 2.38 0.30 0.70 3.75
EJE J-J_Entre 10-11 1.00 1.00 2.80 0.30 0.70 4.34
EJE J-J_Entre 11-12 1.00 1.00 2.38 0.30 0.70 3.75
EJE J-J_Entre 13-14 1.00 1.00 1.73 0.30 0.70 2.84
EJE J-J_Entre 14-15 1.00 1.00 3.00 0.30 0.70 4.62
EJE J-J_Entre 15-16 1.00 1.00 1.70 0.30 0.70 2.80
EJE J-J_Entre 16-17 1.00 1.00 1.98 0.30 0.70 3.18
EJE K-K_Entre 9-10 1.00 1.00 2.38 0.30 0.70 3.75
EJE K-K_Entre 10-11 1.00 1.00 2.80 0.30 0.70 4.34
EJE K-K_Entre 11-12 1.00 1.00 2.38 0.30 0.70 3.75
Analisis de precios unitarios
Partida 01.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA
Rendimiento GLB/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : GLB
Código Descripción Recurso Unidad Cuadrilla Cantidad
Materiales
0147000023 OPERADOR DE EQUIPO PESADO hh 1.0000

Partida 01.02.01 CORTE DE TERRENO PARA MEJORAMIENTO DE SUELO


Rendimiento M3/DIA MO. 120.0000 EQ. 120.0000 Costo unitario directo por : M3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147000023 OPERADOR DE EQUIPO PESADO hh 1.0000 0.0667
0147010004 PEON hh 1.0000 0.0667

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349040006 CARGADOR S/LLANTAS 125-155 HP 3YD3 hm 1.0000 0.0667

Partida 01.02.02 RELLENO Y COMPACTADO CON MATERIAL PRESTAMO C/RODILLO VIBRATORIO


Rendimiento M3/DIA MO. 60.0000 EQ. 65.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010002 OPERADOR DE EQUIPO PESADO hh 2.0000 0.2667
0147010004 PEON hh 2.0000 0.2667

Materiales
0147010002 MATERIAL AFIRMADO m3 1.0000 1.0500

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0348040003 CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000 hm 1.0000 0.1333
0349090000 MOTONIVELADORA DE 125 HP hm 1.0000 0.1333
0349100007 RODILLO VIBRATORIO hm 1.0000 0.1333

Partida 01.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/RODILLO VIBRATORIO


Rendimiento M3/DIA MO. 60.0000 EQ. 65.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010002 OPERADOR DE EQUIPO PESADO hh 2.0000 0.2667
0147010004 PEON hh 2.0000 0.2667

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0348040003 CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000 hm 1.0000 0.1333
0349090000 MOTONIVELADORA DE 125 HP hm 1.0000 0.1333
0349100007 RODILLO VIBRATORIO hm 1.0000 0.1333

Partida 01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO Y TRANSPORTE VOLQUETE 15 M3)


Rendimiento M3/DIA MO. 230.0000 EQ. 230.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010004 PEON hh 0.2000 0.0070

Equipos
9005500104TM HERRAMINETAS MANUALES %MO 3.0000
909701043179 CAMION VOLQUETE 6X4 300 HP 10M3 hm 2.0000 0.0696

Partida 01.02.05 CARGUIO DE MATERIAL AFIRMADO


Rendimiento M3/DIA MO. 350.0000 EQ. 350.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010004 PEON hh 0.5000 0.0114

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
0349040006 CARGADOR S/LLANTAS 125-155 HP 3YD3 m3 1.0000 0.0229

Partida 01.02.06 TRANSPORTE DE MATERIAL AFIRMADO


Rendimiento M3/DIA MO. 230.0000 EQ. 230.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010004 PEON hh 0.2000 0.0070

Equipos
9005500104TM HERRAMINETAS MANUALES %MO 3.0000
909701043179 CAMION VOLQUETE 6X4 300 HP 10M3 hm 2.0000 0.0696

Partida 01.03.01 ENCOFRADO Y DESENCOFRADO EN ZAPATAS


Rendimiento M2/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.4444
0147010004 OFICIAL hh 1.0000 0.4444
Materiales
0202000008 MATERIAL AFIRMADO kg 0.3000
0202010005 CLAVOS PARA MADERA C/C 3" kg 0.2000
0243000025 MADERA NACIONAL P/ENCOFRADO-CARP p2 3.3000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000

Partida 01.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION


Rendimiento M2/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.4444
0147010004 OFICIAL hh 1.0000 0.4444

Materiales
0202000008 MATERIAL AFIRMADO kg 0.3000
0202010005 CLAVOS PARA MADERA C/C 3" kg 0.2000
0243000025 MADERA NACIONAL P/ENCOFRADO-CARP p2 3.3000

Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000
Costo unitario directo por : GLB 10,000.00

Precio S/. Parcial S/

10,000.00 10,000.00
10,000.00

Costo unitario directo por : M3 20.42

Precio S/. Parcial S/

20.60 1.37
14.61 0.97
2.35

2.35 0.07
270.00 18.00
18.07

TORIO
Costo unitario directo por : m3 97.74

Precio S/. Parcial S/

20.42 5.45
13.82 3.69
9.13

20.00 21.00
21.00

9.13066666666667 0.27
75.00 10.00
250.00 33.33
180.00 24.00
67.61

RIO
Costo unitario directo por : m3 76.74

Precio S/. Parcial S/

20.42 5.45
13.82 3.69
9.13
9.13066666666667 0.27
75.00 10.00
250.00 33.33
180.00 24.00
67.61

QUETE 15 M3)
Costo unitario directo por : m3 8.57

Precio S/. Parcial S/

13.82 0.10
0.10

0.10 0.29
117.64 8.18
8.47

Costo unitario directo por : m3 6.80

Precio S/. Parcial S/

13.82 0.16
0.16

0.16 0.47
270.00 6.17
6.65

Costo unitario directo por : m3 8.57

Precio S/. Parcial S/

13.82 0.10
0.10

0.10 0.29
117.64 8.18
8.47

Costo unitario directo por : m2 26.06

Precio S/. Parcial S/

19.70 8.76
15.37 6.83
15.59

4.50 1.35
4.50 0.90
2.35 7.76
10.00

15.59 0.47
0.47

Costo unitario directo por : m2 26.06

Precio S/. Parcial S/

19.70 8.76
15.37 6.83
15.59

4.50 1.35
4.50 0.90
2.35 7.76
10.00

15.59 0.47
0.47