CUADRO DE ELEMENTOS

COEF INCID. COEF INCID.


CODIGO ELEMENTO MONTO (S/) TRASLADO
INICIAL FINAL

47 MANO DE OBRA 22,403.05 0.227 0.227


21 CEMENTO PORTLAND. TIPO 1 12,382.70 0.125 0.125
43 MADERA NAC. ENCOF Y CARP 11,646.79 0.118 0.118
05 AGREG. GRUESO 7,108.36 0.072 0.072
04 AGREG. FINO 5,160.64 0.052 0.052
03 AC. CONS. CORRUGADO 8,065.85 0.082 0.082
02 AC. CONS. LISO 5,679.72 0.057 0.061 +56
32 FLETE TERRESTRE 5,000.00 0.051 0.051
38 HORMIGÓN 3,382.34 0.034 0.034
49 MAQUINARIA IMPORTADA 935.05 0.009
48 MAQUINARIA Y EQ. NACIONAL 874.44 0.009
56 PLANCHA DE ACERO LAC 358.68 0.004
54 PINTURA LÁTEX 300.25 0.003
30 DÓLAR MAS INFLAC. MERC. USA 296.15 0.003 0.025 +49 +48 +37 +54 +26
26 CERRAJERÍA NACIONAL 50.40 0.001
37 HERRAMIENTA MANUAL 12.98 0.000
39 IGPC 15,183.22 0.154 0.154
SUB TOTAL 98,840.62 1.000 1.000

CONFORMACIÓN DE MONOMIOS

�=𝟎.𝟐𝟐𝟕(𝐌𝐎𝐫/𝐌𝐎𝐨)+𝟎.𝟏𝟐𝟓(𝐂𝐏𝐫/𝐂𝐏𝐨)+𝟎.𝟏𝟏𝟖(𝐌𝐫/𝐌𝐨)+𝟎.𝟏𝟓𝟖(𝐀𝐫/𝐀𝐨)+𝟎.𝟏𝟒𝟑(𝐀𝐂𝐫/𝐀𝐂𝐨)
+𝟎.𝟎𝟕𝟓(𝐃𝐫/𝐃𝐨)+𝟎.𝟏𝟓𝟒(𝐈𝐫/𝐈𝐨)

CODIGO ELEMENTO COEF. INCID % PARTICIP


MO MANO DE OBRA 0.227 100.00%

CP CEMENTO PORTLAND TIPO 1 0.125 100.00%

M MADERA NAC. ENCOF Y CARP 0.118 100.00%

AGREG. FINO 45.57%

A AGREG. GRUESO 0.158 32.91%

HORMIGÓN 21.52%

ACERO. CORRUGADO 57.34%


AC 0.143
ACERO. LISO 42.66%

DÓLAR INFLAC. MERCADO USA 32.94%


D 0.075
FLETE TERRESTRE 67.06%

I IGPC 0.154 100.00%

SUMA DE COEF. 1.000