Proyek Grand Dharma husada Lagoon Rekap by Sularto
Lokasi Jl. Mulyorejo surabaya
Sub. Pekerjaan Struktur Structing Lantai B2
Update : 30 Mei 2018
No Uraian Material Sat Structing Baja Jumlah Keterangan
WF 700.300 WF 350.350 WF 300.300 WF 200.200
A Struktur Lantai B2
1 Zone 2
Structing 1 mm 3,360 kg
2 mm 2,760
3 mm 2,760
4 mm 2,760
5 mm 3,560
6 mm 3,360
Zone 3
Structing 7 mm 6,450
8 mm 6,450
9 mm 6,450
10 mm 6,450
11 mm 6,450
12 mm 6,110
Zone 4
Structing 13 mm 7,725
14 mm 7,635
15 mm 7,535
16 mm 7,480
17 mm 7,515
18 mm 8,970
19 mm 6,845
20 mm 3,250
21 mm 5,960
22 mm 5,560
23 mm 3,090
24 mm 5,915
25 mm 8,930
Zone 5
Structing 26 mm 5,370
27 mm 4,910
28 mm 5,460
29 mm 4,910
30 mm 5,370
31 mm 7,125
32 mm 7,725
33 mm 7,725
34 mm 7,125
35 mm 10,685
36 mm 5,460
37 mm 10,685
38 mm 5,700
39 mm 11,570
40 mm 11,570
41 mm 5,700
42 mm 10,900
43 mm 10,900
44 mm 7,950
45 mm 7,950
46 mm 10,965
47 mm 5,460
48 mm 10,970
49 mm 7180.00
50 mm 9,700
51 mm 9,700
52 mm 7180.00
53 mm 5,435
54 mm 5,860
55 mm 3,360
56 mm 5,860
57 mm 5,435
2 Ramp RL.a
dari bawah ke atas 5.41 19.54 -6,900.00 -9,700.00 2,800.00 775.36 -9,790.00 -9014.64
11.97 19.54 -6,900.00 -9,700.00 2,800.00 1,715.04 -9,790.00 -8074.96
17.62 19.54 -6,900.00 -9,700.00 2,800.00 2,524.64 -9,790.00 -7265.36
19.54 19.54 -6,900.00 -9,700.00 2,800.00 2,799.86 -9,790.00 -6990.14
3 Ramp RD.b
dari bawah ke atas 2.90 19.23 -3,700.00 -6,500.00 2,800.00 422.42
6.83 19.54 -3,700.00 -6,500.00 2,800.00 978.22
9.90 19.54 -3,700.00 -6,500.00 2,800.00 1,417.91
13.88 19.54 -3,700.00 -6,500.00 2,800.00 1,988.25
19.23 19.54 -3,700.00 -6,500.00 2,800.00 2,754.73
4 Ramp RL.b
dari bawah ke atas 5.41 19.54 -3,700.00 -6,500.00 2,800.00 775.36
11.97 19.54 -3,700.00 -6,500.00 2,800.00 1,715.04
17.62 19.54 -3,700.00 -6,500.00 2,800.00 2,524.64
19.54 19.54 -3,700.00 -6,500.00 2,800.00 2,799.86
5 Ramp RD.c
dari bawah ke atas 3.07 29.97 735.00 -3,285.00 4,020.00 411.43
4.61 29.97 735.00 -3,285.00 4,020.00 617.88
6.87 29.97 735.00 -3,285.00 4,020.00 920.92
12.87 29.97 735.00 -3,285.00 4,020.00 1,725.81
15.38 29.97 735.00 -3,285.00 4,020.00 2,063.59
16.92 29.97 735.00 -3,285.00 4,020.00 2,270.31
19.99 29.97 735.00 -3,285.00 4,020.00 2,681.74
23.97 29.97 735.00 -3,285.00 4,020.00 3,215.79
29.56 29.97 735.00 -3,285.00 4,020.00 3,965.94
6 Ramp RL.c
dari bawah ke atas 6.11 28.89 735.00 -3,285.00 4,020.00 850.64
11.53 28.89 735.00 -3,285.00 4,020.00 1,603.74
15.25 28.89 735.00 -3,285.00 4,020.00 2,121.53
20.89 28.89 735.00 -3,285.00 4,020.00 2,907.33
25.47 28.89 735.00 -3,285.00 4,020.00 3,544.65
31.47 28.89 735.00 -3,285.00 4,020.00 4,378.46
B3 500 x 700
B2A 450 x 700
B2C 400 x 700 balok Travelator / Escalator
BK 700 x 1200
OK 700 x 700-1200 balok konsul
S1 300 x 600
S1C 350 x 600
S2 350 x 500 void tangga
S3 500 x 800
S4 500 x 900
S5 300 x 500
TP 300 x 700
SP 400 x 700
OV 450 x 900
OV 450 x 900
5 Lantai F2 (lantai 2)
a. Type Kolom K1 900 x 900
K2 900 x 900
K2' 900 x 900 kolom diatas Dwall
K4 350 x 350 kolom Bordes
KTR 400 x 400 Kolom Travelator / Escalator
B2 450 x 700
B3 500 x 700
RB 700 x 700
S1 300 x 600
S1A 350 x 700
S2 350 x 500 void tangga
S5 300 x 500
TP 300 x 700