Sei sulla pagina 1di 1

A B C D E F G H J K L M N Q R S

UH_BO_ISO_A0_L_E_tkISIndia.dwg / AG03_UH_BO_ISO_A2-1-0_L.dwg / 24.06.2019


2
KEY PLAN :-
E = 2800

E = 2900

E = 3000

E = 3100

E = 3200

E = 3300

E = 3400

E = 3500

E = 3600

E = 3700

E = 3800

E = 3900

E = 4000

E = 4100

E = 4200

E = 4300

E = 4400

E = 4500

E = 4600
E = 4039.927
N = 4400
14M WIDE LINK ROAD
PLANT LOGISTICS ENTRANCE/EXIT
3 N = 4366.682
(GATE-1) 3

PL
SECURITY OFFICE

A NT
021AA

G
AT
E-
E = 4088.464

1
)
E -1
YP
(T
2
AD
-4
IN
G N = 4306.188
N = 4300 RO RK
PA
(NOTE-7)
N
BI CA
R

J CA O
S. STP-1
1A Y 19
2N 40M x 20M
IT 1 02
URGATE-1 A 835AA

E = 4178.829
A 013AA
EC 0 27 AVENUE-42 (TYPE-4)
S N = 4252.000

ROAD-38 (TYPE-4)
4 T 4

ROAD-43 (TYPE-4)
E = 4062.000
1)
E-
YP

E = 4125.500
(T AVENUE-41 (TYPE-4)
- 42 N = 4210.000
N = 4200 AD 027AB

105nos. car parking


RO CENTRAL CANTEEN N = 4191.573

ROAD-32 (TYPE-4)
E 45.3m x 60.15m

7A

E = 3975.000
02 ADMIN BUILDING
58.4m x 65.4m
AVENUE-40 (TYPE-4)
011AA N = 4171.000
LAWN/
ASSEMBLY
POINT
T A

ROAD-29 (TYPE-1)
TEMPLE
STORM
GENERAL NOTES :-
(TYPE-3) SECURITY OFFICE
N = 4137.500
20m x 20m
023AA

E = 3862.000
WATER POND-1
11900m2 AVENUE-39 (18.0M WIDE) PLANT GATE EMPLOYEE ENTRANCE
N = 4119.000
833AB (GATE-2)

ROAD-26 (TYPE-3)

ROAD-39 (TYPE-4)

60NOS. VISITOR CAR PARKING


N = 4100 017AA

E = 3820.000
1) ALL DIMENSIONS , ELEVATIONS & CO-ORDINATES ARE IN METERS UNLESS INDICATED

E = 4075.000
OCCUPATION TRAINING PARKING AREA
HEALTH
CENTER
14M WIDE LINK ROAD CENTRE 027AD
WEIGH BRIDGE 35.5M x 33.5M 42M x 23M
027AC OTHERWISE. PLANT N =0.000M CORRESPONDS TO UTM N = 2517000M AND PLANT E =0.000M
5 WIND TURBINE
AVENUE-38 (TYPE-4)
N = 4069.500
030AA
CORRESPONDS TO UTM E =555000M 5
A14AA SECURITY OFFICE
GATE-9 A06-SSB-2003
NON-PLANT
WASHROOM,
SHOWER &
LOCKER ROOM
015AA
GATE-10
2) REFERENCE FGL ELEVATION +99.700 CORRESPONDS TO CHART DATUM + 8.5M. AND HPP IS +1
SUB-STATION
3) ALL SIZES OF CUs INCLUDING PIPE RACKS SHOWN ARE INDICATIVE ONLY AND ARE SUBJECT T
26.5M x 21.26M
(NPSS-1)
021AG 30m x 20m 025AA
U/G ELECT. & INSTR. CABLE TRAY U/G ELECT. & INSTR. CABLE TRAY

GATE-8 AVENUE-37 (TYPE-1) CHANGE DURING BASIC / DETAIL ENGINEERING.


N = 4019.500
4) LOCATION OF BATTERY LIMITS SHOWN IS INDICATIVE ONLY AND IS SUBJECT TO CHANGE DURI
N = 4000 RO SECURITY OFFICE PVC WAREHOUSE-1 021AH
CH
AD
- 2
(T
021AF A19AA LOADING YARD SECURITY OFFICE
BASIC / DETAIL ENGINEERING.
EM
G ICA

VC T

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER

DOCKER
132+ 1 L

Y
5) GREEN BELT OF 10 PERCENTAGE IS CONSIDERED. MPL TO CONSIDER REMAINING REQUIRED G
ST DRIVER WASH ROOM
PA ACST MAINTENANCEDINNING
(N OR
LLE KIN
TS GAG
PE ROOM ROOM BATTERY CHARGING AREA 8000x3000

OT
E

M -4
LOADING / UNLOADING DOCK 8000x8000 8000x8000 FORKLIFT PARKING AREA
OFFICE AREA
22000x8000 LABOUR WASH ROOM
8000x5000 LOADING DOCK LOADING DOCK
E-
CH
G EM
132+ 1
ICA
ST L
)
RO 7)
PA ACST
LLE KINOR
TS G AGE

AD
-2
(T
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET AREA AS PER NORMS.

(TN -1 -4)
STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE
YP A1 784 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos.

6) SIZE AND LOCATION OF SUBSTATIONS, LCR, PIB,NON-PLANT BUILDINGS IS INDICATIVE ONLY


S TYPE
E-

)
CA C OAD E TRAY EXISTING COPPER

-7
4) 9A

TE
(
D
PV R . CABL
-2

0MYS E
O
G+1 G+1 G+1 G+1 G+1 G+1 G+1 G+1 G+1 G+1
CONVEYOR AND WILL BE SUBJECT TO CHANGE DURING BASIC/DETAIL ENGINEERING.
R

M A A
ST

FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET
57 T PH
IN

PVC WAREHOUSE-2
STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE
&

x5 L
588 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos.
T.

6 7) UNITS ARE LOCATED IN CRZ AREA BASED ON CONFIRMATION FROM CLIENT 6


EC
EL
U/G

A69AA
A1
N = 3900 9 AC
G+19
EMPTY NEW PALLET STORAGE
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET
G+1
FILLED PALLET 8) FIRE WATER STORAGE WILL BE 3M BELOW GROUND AND 2M ABOVE GROUND.
2)
4400 Nos. STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE

E-
476 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos.

YP
RO
AD
(T
G+19
9) PHASE I OF SEMI-COKE & CaC2 PLANTS IS LOCATED IN THIS PLOT. FOR ACETYLENE, VCM, PVC
1
EMPTY NEW PALLET STORAGE
-2
-

6400 Nos.
AD

(T
YP
G+1 G+1

PLANTS BOTH PHASES (I & II) ARE LOCATED.


RO

G+1 G+1 G+1 G+1 G+1 G+1 G+1 G+1


FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET
E- G+19 STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE
4)

A10-LCR-104
IN PROCESS EMPTY PALLET STORAGE448 Nos. 768 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos.
6400 Nos.

SPACE FOR FORKLIFT MOVEMENT

ROLLING SHUTTER 10) PRESENTLY WASTE WATER TREATMENT PLANT IS CONSIDERED FOR PHASE I ONLY. FEASIBILI
CONTROL ROOM
T

(4Mx5M)
AN

16m x 12m
G+5

FOR PHASE II SHALL BE CHECKED AFTER RECEIPT OF VENDOR DRAWINGS.


SOD

14M WIDE LINK ROAD


IUM

25kg EMPTY BALES STORAGE


HYP
OCH
HCL LOR
UNL ITE
OAD
ING
BAY
2352 Nos. SPACE FOR FORKLIFT MOVEMENT G+1 G+1 G+1 G+1 G+1 G+1 G+1

SPACE FOR FORKLIFT MOVEMENT


BAY
PL

FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET
G+5
25kg EMPTY BALES STORAGE A19AB G+1 G+1 STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE

11) LOCATION OF METERING STATION IS TENTATIVE AND SUBJECT TO CHANGE DURING BASIC/
AT A

410 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos. 816 Nos.
H

VCM PALLET VCM PALLET


2352 Nos.
PVC WAREHOUSE

STORAGE STORAGE
W 858A
ER
3P

970 Nos. 388 Nos.


MCC ROOM
15m x 18m
0M
A5

7)
10

A19-MCC-4001
DETAIL ENGINEERING.
UNLOADING DOCK
E-
x

G+1 G+1 G+1 G+1 G+1 G+1 G+1


M
OT

G+5 FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET FILLED PALLET
50

1 MT EMPTY BALES STORAGE G+1 G+1 STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE STORAGE
(N

1104 Nos. VCM PALLET VCM PALLET 506 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos. 1008 Nos.

N = 3800 A06AK STORAGE STORAGE

12) MPL TO CONSIDER SATELLITE CANTEEN (SC-5) NEAR FABRICATION SHOP


DM

628 Nos. 264 Nos.


G+2
FILM ROLE STORAGE
228 NOS SPACE FOR FORKLIFT MOVEMENT

13) MPL TO DECIDE FINAL DISCHARGE OF WATER FROM STORM WATER PONDS
U/G ELECT. & INSTR. CABLE TRAY
700PZ

AVENUE-36 (TYPE-3)
7 N = 3779.000
700PH
700PY
14) COAL STORAGE CONCEPT IS CHANGED FROM SILO STORAGE TO YARD STORAGE 7
700PG PVC PLANT OSBL PVC PLANT OSBL

VCM RECOVERY AREA


ISBL
VCM RECOVERY AREA
ISBL 15) PHASE II AREA WILL BE CONSIDERED AS LAYDOWN AREA FOR PHASE I
701PF 704PF VCM RECOVERY AREA
705PF 708PF VCM RECOVERY AREA
T
701AE 705AE
DRYING DRYING 704AE DRYING DRYING 708AE
T

OSBL
AN

ISBL

ROAD-35 (TYPE-3)
A
8A

SOD
IUM

HCL

701AF 702AF 703AF 704AF 705AF 706AF 707AF 708AF


HYP
PL

UNL
OCH

OAD
LOR

ING

E = 4019.000
ITE
80

BAY
BAY

SLURRY STRIPPING SLURRY STRIPPING SLURRY STRIPPING SLURRY STRIPPING


N = 3700
ROAD-18 (TYPE-3)
ER

701AD 703AD 705AD 707AD


SUSPENDING AGENT & UTILITY

SUSPENDING AGENT & UTILITY


702AD 704AD 706AD 708AD
TE 0M

SUSPENDING AGENT & UTILITY

SUSPENDING AGENT & UTILITY


701PD
Y

704PD

705PD

704PD
)
-7
O 10
AT
3P

701PE 704PE 705PE 708PE


E = 3690.000
(N 0M x
A0

5
W

OSBL

OSBL
OSBL

701PB 704PB 705PB 708PB


ISBL

ISBL
)
-2

ISBL
DM

E
YP

PVC COOLING TOWER


(T
-1

701PA
AD

704PA

705PA

708PA
013AB 701AC 704AC 705AC 708AC
RO

SATELLITE 830AA POLYMERIZATION


701AA 701AB 704AB 704AA POLYMERIZATION POLYMERIZATION
705AA 705AB 708AA 708AB POLYMERIZATION
CANTEEN
36.5M x 13.2M FEEDSTOCK
PH
AS
E-
I
FEEDSTOCK FEEDSTOCK FEEDSTOCK
(TYPE-4)
14M WIDE LINK ROAD N = 3635.000
ISBL ISBL
8 8
E = 3366.000

DG SHED
PO

U&IO SUBSTATION-414M x 8M
A03QE

A53PE
A03QD

A53PF
TASTO

(USS-4) OSBL OSBL


(TYPE-3)

55M x 26M
BL R

II
E-
AS
PH
E AG

A06-SSB-2002
HOLD LIST :-
W E

3 AVENUE-35 (TYPE-4)
10
AT

8M
N = 3600 x1
R- N = 3606.000
GE
E

M
18
R

C GATE-12
A 0-L A03PR A53PD
OR
A03PV
A1 PIB-PVC40M x 10M
OSBL OSBL
T 7) 021AK PIB-PVC40M x 10M
RS E- ISBL ISBL
RESTRICTED AVENUE-34 (TYPE-3) 700-PIB-101 TANK FABRICATION AREA
T GATE-13 700-PIB-102
TE
325 X 48 (15500 SQ M)
N = 3577.000
( NO VCM PLANT SUBSTATION PVC PLANT SUBSTATION
WA 1)ROADS, TRUCK PARKING AREA, GREEN BELT REQUIREMENTS.
A 600-PIB-102
E = 2961.373

4A 600-SSB-1001 ISBL
SECURITY OFFICE
600-PIB-101 ISBL 700-SSB-1001
3P
W
AL 81 VCM STORAGE VCM STORAGE 021AL PIB-VCM
40M x 10M
602PD
601PD

603PD

604PD
S PIB-VCM OSBL OSBL OSBL OSBL
A0
40M x 10M

DE
A01AD 2)SIZE & LOCATION OF STORM WATER & CRWS PONDS, SEWAGE TEATMENT PLANT
MAIN AND RECYCLE REACTORS AREA

MAIN AND RECYCLE REACTORS AREA

AVENUE-33 (TYPE-3)
N = 3546.000

VCM PLANT
OSBL VCM PLANTOSBL VCM PLANT VCM PLANT 3)SIZE OF WORKSHOPS, WAREHOUSES, TEMPORARY STORAGE OF WASTE RESIDUE
MAIN REACTORS AREA

MAIN REACTORS AREA

CANTEEN
ISBL ISBL
4)WIDTH OF ROADS / STORM WATER TRENCHES
98 X 20.4 (2000 SQ M )
GATE-16
A
6A
GATE

021AP
ROLLING SHUTTER

81 -2)
(4.5m x 4.5m)

CANOPY
RAMP

OSBL

N = 3500 PE
5)B.L SIZES AND LOCATION.
SAFETY FENCING

ISBL
RESTRICTED ROAD-7 (TYPE-4)

OSBL

(TY
601AA

601AB

E
CLASS-A STORAGE

602AA

602AB
ISBL

METHANOL

-1
AG
WBS 7
A51AB

METHANOL
SAND PIT
2M3
ROAD-14 (TYPE-4)

ROAD-22 (TYPE-4)

AD A19AF EQUIPMENT

RO
OR
RESTRICTED ROAD-5 (TYPE-3)

158 X 76
WBS 8
E = 3616.500

E = 3770.500

N = 3482.890
ST
DOCKER
WBS 9
INSTRUMENTATION
ELECTRICAL
98 X 66.3
6)ASSEMBLY AREA
9 )
9
E = 3399.500

56.8 X 117
9
14M WIDE LINK ROAD ER
DOCKER
ROAD-3 (TYPE-4)

7&
SHALLOW SUMP (DEPTH 300mm)

SHALLOW SUMP (DEPTH 300mm)

ATx 45 7)SIZE AND LOCATION OF WIND TURBINES


OSBL

-
E = 3206.000

ACETYLENE COMPRESSOR & DRYING ISBL

E
E = 3270.500

ACETYLENE COMPRESSOR & DRYING AREA

AREA
A51AA

OSBL

OT

STORM WATER POND-7


ISBL

E W195
A03PQ

(N
AREA
AREA LIGHT ENDS STRIPPING AREA

AREA LIGHT ENDS STRIPPING AREA

D
VCM COMPRESSOR

VCM COMPRESSOR

PAVE
E = 2868.845

VCM COMPRESSOR

VCM COMPRESSOR

FIR 8)PVC WAREHOUSE


KO DRUM AREA

KO DRUM AREA
A03PU

ROAD-45 (TYPE-3)
601PC 602PC
VCM HEAVIESVCM FRACTIONATION &
ACETYLENE COOLING AREA

ACETYLENE COOLING AREA


VCM HEAVIESVCM FRACTIONATION &
ROAD-11 (TYPE-3)

601CB 601CA 601DA

WBS 2
602CB 602CA 602DA
ROAD-2 (TYPE-4)

601PB

CIVIL
602PB

ROAD-28 (TYPE-3)

E = 4191.500
A19AE
ROAD-17 (TYPE-3)

ROAD-36 (TYPE-3)

9)400 kV SUBSTATION
601DB
E = 3532.000

602DB

42.27 X 60
801AB

E = 3152.000

AREA

AREA

WBS 3
E = 3857.000

E = 4030.000

TANKAGE
E = 3683.000

115.7 X 73.4
A01AC

10)LOCATION OF COOLING TOWER FOR PVC PLANT PHASE 2

833AH 7600m2
ROAD-1 (TYPE-2)

WBS 5
601BB

602BB

N = 3407.419 AG PIPING
VCM CHILLER

VCM CHILLER
601BA
E = 3050.000

602BA

98 X 76.5
PLANT AIR,
11)REQUIREMENT OF FIRE STATION (01NF-3)
601PA

602PA
601EA

N = 3400
602EA

INSTRUMENT AIR
A03PT

601FA AREA

602FA AREA

35 x 55
CABLE TRAY

WBS 6
U/G ELECT.

WBS 1

12)LOCATION OF ALL SATELLITE CANTEENS


GATE-15 UG PIPING
SPENT CAUSTIC

PILING 4800 SQ M
SPENT CAUSTIC

AVENUE-32 (TYPE-4) 42.27 X 23.8

N = 3385.000
WBS 4

A03PS 13)SIZE OF FIRE & SAFETY BUILDING AND TRAINING CENTRE


AREA

AREA

STRUCTURE
VCM PLANT 4000sqm

PATROL ROAD (TYPE-5)


E = 3014.244

AVENUE-31 (TYPE-3) WORKSHOP-MECHANICAL,


14)FENCE / COMPOUND WALL LOCATION
P& M 2
PLANT GATE-7
N = 3360.000 ELECTRICAL, INSTRUMENTATION 5550 SQ M
55M x 27M SECURITY OFFICE
SECURITY OFFICE ISBL ISBL
E = 2903.438

P&M 1

N = 3355.724 019AA 021AN 021AM


5200 SQ M

A03PP
GATE-14
N - 3284.00
OSBL
A03PP
OSBL OSBL
A53PB
15)SIZE AND LOCATION OF PIG RECEIVER
U/G ELECT. CABLE TRAY

10 021AE AVENUE-30 (TYPE-3)


N = 3319.000
PLANT GATE-3 EMERGENCY EXIT 16)VCM STORAGE, LOCATION OF VCM RUNDOWN TANKS. 10
(GATE-3)
17)ALL GATES
U/G COOLING WATER LINES CORRIDOR

SUBSTATION

A56-SSB-1001

WIND TURBINE E - 3584.64


Entry
6x3 mtr Gate Entry

Security

N = 3300
6x3 mtr

A08-CCR-101
Pantry
A06-SSB-1003

PATROL ROAD (TYPE-5) AVENUE-29 (TYPE-3)


U&IO SUBSTATION-2
Conference room
Car Parking

12 x 3 mtr

829AA
Office-3

12 x 3 mtr

20183.6380

VCM Office 19348


021AB
UTILITY

N = 3300.000 90M x 40M


18)UNDERGROUND CABLE ROUTE IN NON-PLANT AREA
ROAD-19 (TYPE-3)

SECURITY OFFICE
10 x 5 mtr
30nos. car parking
55M x 40M

Toilet 12 x 3 mtr 12 x 3 mtr


PHASE-2

Office-1
(USS-2)75M x 35M

A53PA

CENTRAL LABORATORY
37877
E = 3714.000

N - 3284.00

30NOS. CAR PARKING


INCINERATOR

N = 3277.978 SPARE PART SPARE PART SPARE PART SPARE PART


19)LOCATION OF FLARE
601KA

WAREHOUSE 1 WAREHOUSE 2 WAREHOUSE 1 WAREHOUSE 2


80M x 25M

ROAD-42 (TYPE-3)

A12AA
STORM
50m x 15m

20)SIZE AND LOCATION OF CENTRAL LABORATORY


A03PM

E = 3050.289
A03PN

WBS 11
E = 4107.000

FIREPROOFING WBS 10
WATER POND-3 A19AG A19AH A69AG A69AH 61.72 X 72.9 REFRACTORY
ROAD-12 (TYPE-3)

72.9 X 74.2 (5400 SQ M )


INSTRUMENT AIR

4200m2
E = 3436.151 21)FENCING REQUIREMENT AND PROFILE FORF ISBL AREA
E = 3560.000

833AD N = 3226.358 T
N = 3218.482
PLANT AIR,

CENTRAL CONTROL ROOM


851AA

N = 3219.879
55M x 40M

INCINERATOR NON-PLANT
SUBSTATION
N = 3220.069 N = 3217.388 SATELLITE
013ACCANTEEN
80M x 25M
(NPSS-2)
20M x 25M
STORM WATER
COLLECTION
603KA
U/G ELECT. & INSTR. CABLE TRAY

36.5m x 13.2m
A06-SSB-2004 POND-8
N = 3200 E = 3097.119 E = 3543.913 A03QF 1100m2
N = 3199.626 833AJ
E = 3436.151

AVENUE-28 (TYPE-3)
E = 3278.095

N = 3188.000

11 ACETYLENE GENERATION PLANT OSBL A03PL 11


E = 3604.058

OSBL
AVENUE-27 (TYPE-3) ISBL WBS 1

N = 3153.065 N = 3158.000 SUPERNATANT FLUID POOL


PILING
E = 3199.150

1000 SQ M
46 X 21.7
ROAD-27 (TYPE-4)

ROAD-37 (TYPE-4)

ROAD-41 (TYPE-4)

WBS 6

500-SSB-1001
ROAD-21 (TYPE-4)

TANKAGES
500-PIB-101

WBS 4
E = 4053.000
E = 3827.000

E = 4103.000

CANTEEN 8000 SQ M
STRUCTURE
PATROL ROAD (TYPE-5) 2700 SQ M WBS 2
E = 3777.000

5000 SQ M CIVIL
27X100
E = 3533.441

64.5 X 80
501FA 43.4 X 46(2000 SQ M)
25M x 13M

501CA ACETYLENE GAS CLEANING


16M x 12M
N = 3100 STORM WATER POND-2
A10-PIB-101 ACETYLENE ADANI INFRA
26000m2 737 SQ M
SUBSTATION
N = 3085.258 833AC 501AA
STP-2 AVENUE-26 (TYPE-4) WBS 5
AG PIPING
OSBL

N = 3081.500
501PA

50M x 30M 4500 SQ M


ISBL

OSBL

CONCENTRATED 501PF
ISBL

835AB
TANK
E = 3207.337

500-PIB-102

AVENUE-25 (TYPE-3)
WBS 7
EQUIPMENT
BATTERY LIMIT G05
:
ROAD-31 (TYPE-3)
25M x 13M

N = 3048.000 501PE 12000 SQ M(150 X 80)


E = 3942.000

ACETYLENE GENERATION
ACETYLENE GENERATION
501PD

OSBL A03PJ WBS 9 WBS 10


BATTERY LIMIT : PIPING
12 INSTRUMENTATION Refractory

12
OSBL
ROAD-16 (TYPE-3)
ISBL

8500 SQ M(85 X 100) 6000 SQ M(60 X 100)


ISBL
ROAD-47 (TYPE-3)

SIZE
A03PK

C2H2 GAS HOLDER TIE-N (PROCESS/UTILITIES)


E = 4247.000
E = 3625.000

(DN) RATING IN OUTREMARK


ROAD-9 (TYPE-3)

WBS 3
501EA
OSBL

ELEVATED FLARE
ISBL

UG PIPING
E = 3495.500

N = 3000 FILTER PLANT


4000 SQ M(80 X 50)

N = 2295.298
818AA 501GA 501BA TP-xx NITROGEN 400 xx
ISBL FILTER PLANT
U/G ELECT. BUILT-UP CABLE TRAY

ACETYLENE GENERATION
ACETYLENE GENERATION
OSBL
AVENUE-23 (TYPE-4)
AVENUE-24 (TYPE-4)
N = 2971.500
TP-xx RLNG 300 xx
CARBIDE SILO

N = 2968.000
TEMPORARY STORAGE 501PC
OF WASTE RESIDUE WBS 8
CALCIUM
19348

ELECTRICAL
501HA

SULFURIC ACID CRACKING


501PB

8500 SQ M(58 X 147.4)


033AA Conference room
A03PH

12 x 3 mtr

WBS 11
6x3 mtr
Pantry

CONCENTRATED
12 x 3 mtr
Office-1

FIRE PROOFING
Accetelene Office

50M x 45M
501DA 7100 SQ M (NOTE-11)
TANK
Gate Entry
Entry

37877

ANALYZER
12 x 3 mtr
6x3 mtr
Security

SHELTER ISBL
Office-3
12 x 3 mtr
T
10 x 5 mtr

12Mx7M
OSBL
Toilet

Car Parking

N = 2900 SECURITY OFFICE

ROAD C.L. A14AC AVENUE-22 (TYPE-3) PLANT GATE Labour / Material


PLANT GATE-6
UTM (N = 2519888) N = 2888.000 (GATE-4)
13 MATERIAL OSBL
A03PJ
OSBL A03PG 023AB
13
ISBL STP-3
835AC 75M
T TRANSFER STATION ISBL x 30M
827AD 301EA PHASE 1 CAC2 CONVEYOR FROM PRIMARYPHASE
TRANSFER STATION CRUSHER
1 CAC2 CONVEYOR PHASE 2 CAC2 CONVEYOR
PHASE 2 CAC2 CONVEYOR FROM PRIMARY CRUSHER
021AD 301DA 1234567 7654 32 1
301GA
GAS HOLDER(50000M3) 5# COOLING CIRCULATING Phase 1 Phase 2301GB
WATER STATION INDIRECT WATER AVENUE-21 (TYPE-4) Secondary Secondary
INCLUDING COOLING TOWER
AVENUE-20GAS COOLING
(TYPE-4)
N = 2830.682 Crusher Crusher
N = 2820.682
CALCIUM CARBIDE PLANT
N = 2800 301CB
LIME SHED
PHASE 2 CAC2 CONVEYOR

BATTERY LIMIT G04


: 3# CARBIDE COOLING 4# CARBIDE FIRST
CRUSHING UNIT 4# CARBIDE COOLING
WORKSHOP WORKSHOP
BATTERY LIMIT MATERIAL
: HANDLING 400kV/33kV MISS
301AC 301AD MAIN INTAKE SUBSTATION
ROAD-25 (TYPE-3)

CaC2 SLUDGE CONVEYOR A06-SSB-1001


E = 3807.500

N2 METERING SKID

GAS METERING SKID

AVENUE-19 (TYPE-4) WASTE GAS

14 N = 2728.457 FILTER DUST


5# CALCIUM CARBIDE
GAS PURIFICATION 6# CALCIUM CARBIDE
GAS PURIFICATION 7# CALCIUM CARBIDE
GAS PURIFICATION 8# CALCIUM CARBIDE 14
300-PIB-106

300-PIB-105

GAS PURIFICATION GAS PURIFICATION GAS PURIFICATION GAS PURIFICATION


806AB

WASTE GAS FURNACE WORKSHOP FURNACE WORKSHOP FURNACE WORKSHOP FURNACE WORKSHOP
15x20
824AA

FILTER DUST
A03PX

DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF
40M x 13M

40M x 13M

15x30
300-PIB-101

ELEVATOR
N = 2700 FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT

FUTURE
40M x 13M

FURNACE
LOGISTICS ENTRANCE
300-MCR-101 AVENUE-18 (TYPE-3) (GATE-5)
300-PIB-102 40M x 20M
AVENUE-17 (TYPE-3)
N = 2676.000
EL. ROOM
HANDLINGS
301PC 40M x 13M
N = 2667.000 021AC
ELECTRODE PASTE

CRUSHING & CRUSHING & AVENUE-16 (TYPE-4) RO


AD
ROAD-15 (TYPE-3)

WAREHOUSE

PHASE2 CAC2 CONVEYOR


SCREENING 1-2
SCREENING 3-4 N = 2552.524
-4 SECURITY OFFICE
TOILET
301PA

E = 3622.818

NITROGEN PH 0
A03PF AS (T
YP
301FA E
301WA

2
C E-3 PLANT GATE-5
827AB COMPRESSED AIR 827AC AC
FIRES AND BUCKET

)
MAINTENANCE
WORKSHOP

N2 PACKAGE
EXTINGUISHER

DUST COLLECTION 2# 33/6.6kV VAP7 VAP8 VAP9 VAP10 VAP11 VAP12


2
C
O
N
N = 2615.358
VAP1 VAP2 VAP3 VAP4 VAP5 VAP6

2# 33/6.6kV 3# COOLING CIRCULATING 4# COOLING CIRCULATING STORAGE P. B. COIL-1 P. B. COIL-2 P. B. COIL-3


VE
YO
REGIONAL
301WC

R
WATER STATION WATER STATION 806AA STORM WATER
ROAD-10 (TYPE-3)

LIN STORAGE TANK-1 LIN STORAGE TANK-2 LIN STORAGE TANK-3

N = 2600 SUBSTATION
ROAD-20 (TYPE-3)

ROAD-30 (TYPE-3)

ROAD-33 (TYPE-3)

COLLECTION
OSBL

INCLUDING COOLING INCLUDING COOLING


E = 3501.500
ISBL

OSBL
E = 3774.437

E = 3900.502

E = 3984.834

ISBL

TOWER TOWER AVENUE-10 (TYPE-3) POND-4


300-SSB-1002 N = 2590.000 6200m2
A03PE

PLANT AIR, INSTRUMENT AIR 833AE


15 15
ROAD-40 (TYPE-3)

SEMI COKE, CAC2


ROAD-4 (TYPE-3)

301HA 301HB 301HC 301HD


E = 3232.000

E = 4097.000

80 x 50
SCREENING SYSTEM 1# MATERAIL BATCHING SYSTEM
TRANSFER STATION 301JE
ROAD-46(TYPE-3)
ROAD-13 (TYPE-3)

E = 4596.728

CAC2 FROM
E = 4226.000

301JA
E = 3562.343

LIMESTONE SILO(1.5DAYS) 301JB 301JC 301JD AVENUE-15 (TYPE-4) PRODUCT PHASE-2


SCATTERED POINT DUST TRANSFER STATION N = 2540.769
801AA WASTE WATER TREATMENT PLANT OFFICE
ELECTRODE PASTE

301CA REMOVAL SYSTEM 41000m2


WAREHOUSE

TRANSFER STATION
300-LCR-101 300-SSB-1001
BIN

812AA
300-PIB-103

18M x 18M TRANSFER STATION


034AA
CA

AVENUE-14 (TYPE-3) A10-LCR-102


SPARES WORKSHOP 2# 33/6.6kV 827AA
GE

N = 2500 828AA
301WB

N = 2456.773
40M x 13M

4M BRID

AVENUE-13 (TYPE-4) 18M x 18M


2# 33/6.6kV
M

CIRCULATING N = 2498.769
x4

301WD REGIONAL 1# COOLING CIRCULATING 2# COOLING


IGH
TOILET

TOILET
CRWS POND

SUBSTATION 300-PIB-104
WE

WATER STATION WATER STATION 40M x 13M


A03PZ
AB

INCLUDING COOLING INCLUDING COOLING


833AA

SATELLITE AVENUE-12 (TYPE-4)


TOWER TOWER
A14

CANTEEN N = 2471.000
36.5m x 13.2m
AVENUE-11 (TYPE-4) 013AD
300-PIB-107
N = 2456.773 U&IO(USS-1)
SUBSTATION-1
ROAD-6 (TYPE-3)

80M x 35M
E = 3342.000

40M x 13M
301PB A06-SSB-1002

16 16
AVENUE-10 (TYPE-1)
回料仓

N = 2411.000
N = 2400 BATTERY LIMIT G03
: DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF DUST REMOVAL OF

SEMI-COKE SILO (2DAYS) CARBON DRYING SYSTEM


FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT FURNACE FRONT
ROAD-24 (TYPE-3)

1# CALCIUM CARBIDE FURNACE 2# CALCIUM CARBIDE FURNACE 3# Calcium carbide furnace 4# CALCIUM CARBIDE FURNACE

BATTERY LIMIT MATERIAL


: HANDLING
GAS PURIFICATION WORKSHOP GAS PURIFICATION GAS PURIFICATION WORKSHOP GAS PURIFICATION GAS PURIFICATION workshop GAS PURIFICATION GAS PURIFICATION
WORKSHOP PUMP AREA
SEMI COKE TO PHASE-2 CAC2 PLANT
E = 3805.500

301BA 301BB SIDE STREAM


ROAD-51 (TYPE-2)

FILTER

DOSING PKG. 887AA


E = 4450.000

LIME STONE CONVEYOR 301AA 301AB


(BY OTHERS)
SPACE FOR RETURN HEADER PIPING
A01AA

1# CARBIDE COOLING 2# CARBIDE COOLING


2# CARBIDE FIRST CRUSHING UNIT
BATTERY LIMIT G06
:
A16AA
ROAD-47 (TYPE-3)

ROAD-49 (TYPE-4)

WORKSHOP WORKSHOP
ROAD-50 (TYPE-3)
A03QA

SPACE FOR RETURN HEADER PIPING


E = 4257.000

E = 4330.000

(BY OTHERS)
E = 4387.000

DOSING PKG.
BATTERY LIMIT MATERIAL
: HANDLING
FILTER
837AA
REFERENCE DRAWINGS :-
A03QB

EMERGENCY UNLOADING PORT SIDE STREAM


TAR & WASHING
A03QC
CAUSTIC TANK

PUMP AREA OIL TANKFARM


回料仓

SEMI COKE CONVEYOR


2)

N = 2300
(48%-50%)

AVENUE-9 (TYPE-4)
PE-
A01AB

ISBL N = 2300.700 ISBL


(TY

OSBL OSBL 1. OEPMC-LAY-000-LS-0001 SITE PLAN FOR GREEN PVC COMPLEX


-41
AD

17 SEMI COKE CONVEYORS A03PA


17
RO

A03PD 2. OEPMC-LAY-000-LS-0003 SITE PLAN - POCKET 3


AVENUE-8 (TYPE-3)
N = 2252.000
ROAD-7 (TYPE-3)

A53PG
A03PB
ROAD-8 (TYPE-3)
E = 3385.000

OSBL
E = 3452.000

CONDENSATE RECOVERY
IGNITION PUMP HOUSE CONDENSATE RECOVERY
STP-4 U&IO SUBSTATION-3 U&IO SUBSTATION SUBSTATION
ISBL
70M x 20M
PHASE I
(USS-3)45M x 21M
PHASE II
(USS-6) PHASE-2 45M x 21M
45M x 20M 201AK
200-SSB-1001 CRUSHING AND
SCREENING
机柜 机柜 机柜 机柜 机柜 机柜 机柜 机柜 机柜

备用 备用 备用 机柜 机柜 机柜 机柜 机柜 机柜

013AE
StandbSytandby Standby CCaabbiinneeCttabinetCabineCtabineCtabinet

GAS HOLDER AREA


CabinetCabinetCabinetCabinetCabinetCabinetCabinetCabinetCabinet

N = 2215.445
工业大屏

CONTROL ROOM
Diesel-engine Generator Set

835AD
Large Industrial Screen

操作室

822AA 872AA BUILDING


柴油发电机组

A06-SSB-2001 A56-SSB-1002
Operation Room
(0.38KV)

108M x 60M
500KW

机柜间 DCS DCS DCS DCS备用


DCSDCS
GDS GDS 监控 监控 DCS 备用
MonitoMronitor Standby Standby
Oil Inlet Position

进油口位置 Cabinet Room



Oil R油口rn P位
etu osit 置
ion

20M x 20M
ACCIDENT ASH SITE

Diesel-engine Generator Set

玻璃隔挡
柴油发电机组

20M x 35M
会议桌

SATELLITE
Glass Partition
Meeting Table
201PE

玻璃隔挡
Glass Partition

201AF
Oil Inlet Position

进油口位置


Oil R油口rn P位
etu osit 置
ion

备用 DCS DCS DCS

015AB
Standby

INTERMIDIATE TAR TANK FARM AREA


Up

CANTEEN
工程师站
E = 3217.908

Engineer Station

201AE
消防控制室

STORM WATER
Fire Control Room

消防电话
消防联动
图形显示火灾报警对讲系统消防备用
1000L 油箱

1000L 油箱

1000L 油箱

N = 2200
FirefigFhitrineg P Troetleecpthioonn eIn Gterralopchkicin DgisplayFire alarm Intercom SystemFire Protection Standby DOUGH KNEADER TANDOOR TANDOOR
Oil Tank

Oil Tank

Oil Tank

Female

36.5m x 13.2m
办公室 资料室

Ammonium sulfate warehouse

Office Document Room


201PC
UPS
UPS
UPS
UPS
UPS

Male

80M x 32M
819AA
UPS室
ROTI MAKER

AVENUE-7 (TYPE-3)
UPS Room
BOILER CHIMNEY

N = 2199.000 AVENUE-6 (TYPE-3)


201AG COLLECTION
BOILER PHASE-2

N = 2191.500 POND-6
SEMI-COKE PLANT
STORAGE FOR BOILER

6300m2
201PA
TEMPORARY COAL

201PD

833AG
201AB
CPU

AVENUE-5 (TYPE-3)
ROAD-48 (TYPE-3)

LIME STONE CONVEYOR


A03PC

GAS CLEANING UNIT 200-LCR-101 N = 2165.500


E = 4315.000

L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2as0
B1loCwer L-1G2as0
B1loCwer L-1G2a0s 1BlCower L-1G2a0s 1BlCower L-1G2a0s 1BlCower

18M x 18M
煤气风机 煤气风机 煤气风机 煤气风机 煤气风机 煤气风机

GAS CLEANING UNIT


ab

k
c d

l
h
e f

g
ij

Water Seal of Blower


ab

k
c d

l
h
ef

i
g
j

Water Seal of Blower

101M x 47M
ab

k
c

l
h
de

g
i
f

Water Seal of Blower

鼓风机水封
COOLING TOWER 201PB
Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator Electrostatic Tar Separator
25M x 55M
ROAD-44 (TYPE-3)

电捕焦油器
ROAD-23 (TYPE-3)

ROAD-34 (TYPE-3)

3A 3B

Horizontal Tube Water Seal Horizontal Tube Water Seal Horizontal Tube Water Seal Horizontal Tube Water Seal Horizontal Tube Water Seal Horizontal Tube Water Seal

LEGENDS :-
E = 4145.000
E = 3805.000

E = 4011.000

Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler Horizontal Tube Cooler

18 869AA Venturi Water Seal

Venturi Tube Tower


Venturi Water Seal

Venturi Tube Tower


Venturi Water Seal

Venturi Tube Tower


Venturi Water Seal

Venturi Tube Tower


Venturi Water Seal

Venturi Tube Tower


Venturi Water Seal

Venturi Tube Tower Venturi Tube Tower Venturi Tube Tower


TAR AND AMMONIA SEPARATION UNIT
90M x 86M
PHENOL AMMONIA RECOVERY
108M x 60M
18
201AA 826AA
N = 2100 BOILER PYROLYSIS UNIT INCLUDING AIR BLOWER
201AL
201AD

110M x 45M
10M x 15M
VOCs

AVENUE-4 (TYPE-3) 201AC 200-LCR-102


N = 2087.000
Pyrolysis Unit
18M x 18M
AVENUE-3 (TYPE-3)
N = 2084.500 FGL FINISHED GRADE LEVEL xxxx CONSTRUCTION UNIT
A10-LCR-101
STORM WATER 18M x 18M AVENUE-2 (TYPE-3)
BIOCHEMICAL TREATMENT UNIT
COLLECTION
833AF
POND-5
N = 2059.000
ISBL
OSBL
100M x 40M

COAL TO PHASE-2 SEMI COKE PLANT


HPP HIGH POINT PAVING GREEN BELT
RAW MATERIAL
RO 4000m2
AD
-52
HANDLING SUBSTATION
20M x 35M
201AM
(TY
PE-
3)
100-SSB-2001 AVENUE-1 (TYPE-3)
N = 2019.000
ISBL
PIPERACK BATTERY (B.L.)
LIMIT
N = 2000 OSBL

PIPEBRIDGE EL. ELEVATION


-3)

19 102AA
19
YPE

102AB
3 (T

FUTURE AREA A ASSEMBLY AREA


AD-5
RO

COMPOUND WALL BOUNDARY


N = 1900 CONVEYOR TO PORT BATTERY LIMIT G08
: FENCING SLEEPER
BATTERY LIMIT MATERIAL
: HANDLING

COAL CONVEYOR T TOILET


STP-5
70M x 20M 835AE

20 20
N = 1800
BATTERY LIMIT G02
:
RT
PO

N = 1771.106
M

BATTERY LIMIT MATERIAL


: HANDLING
RO
RF

Ro
O
EY

COAL CONVEYOR
NV

ad
CO

CO
AL
CO
E = 4223.055

N VE
YO
R
N = 1700
UTM(N = 2518700)
21 21
UTM(E = 557800)

Ra
il Y
ard
E = 2800

BATTERY LIMIT G01


:
BATTERY LIMIT G07
:
BATTERY LIMIT MATERIAL
: HANDLING
BATTERY LIMIT : PIPING
COAL CONVEYOR SIZE
TIE-N (PROCESS/UTILITIES) (DN) RATING IN OUTREMARK

TP-xx STEAM OUT - -


Ro

TP-xx CONDENSATE IN - -
DEC:
ad

22 TP-xx NITROGEN OUT - - 22


TP-xx DM WATER OUT - -
TP-xx POTABLE WATER OUT - -
TP-xx DESAL WATER OUT - - OE/PMC: © thyssenkrupp Industrial Solutions (India)
TP-xx FIRE WATER OUT - - Private Limited
TP-xx POWER SUPPLY (110kV) - -
Owner: Mundra Petrochem Limited
Mundra, Gujarat, India
23 TYPE OF ROADS :- 23
Project Title: 2.0 MMTPA Green PVC Complex Phase #1 1.0
CARRAIAGE WAYSHOULDER TURNING
SL NO. TYPE CATEGORY OF ROADWIDTH-M WIDTH-M RADIUS Tuesday, 05 January 2021 10:03 AM
MMTPA
(a) (b)
1 TYPE-1 FOR MAIN PLANT ROADPrimary Road 14m 1 14
Description: SITE PLAN - POCKET 1
02 04/10/22 IFD GENERALLY REVISED AND ISSUED
NKCFOR DESIGNDCP
\ AWS VHD -
ISO A0

2 TYPE-2 Primary Road 12m 1 14


3 TYPE-3 Primary Road 8m 1 10
01 24/03/22 IFR CLIENT COMMENTS INCORPORATED
RE-ISSUED FOR APPROVAL NKC \ AND
AWS DCP VHD -
4 TYPE-4 INTERNAL PLANT ROADSecondary Road 6m 1 10
5 Secondary Road
TYPE-5 PATROL ROAD/ACCESSWAY 4m 0.5 6 00 01/02/22 IFR ISSUED FOR REVIEW NKC \ AWS
NCIC Page 1
DCP VHD ScalePLANT Code Document No Sheet Rev
24 CSA PRC ELT INS CONSRevDate PreparedChecked By
Approved Acc. 24
Status Description 1:3000 OEPMC-LAY-000-LS-0002 1/2 02
Co-check By By Code
A B C D E F G H J K L M N Q All rights reserved S

Potrebbero piacerti anche