Homebuilding & Renovating

We’re preparing for the groundworks

After demolishing the old house on site and grading the ground, we started by setting the boundary lines so we could split the plot in two and clearly see where the profiles for both of the oak framed cottages needed to go. We measured the site

You’re reading a preview, subscribe to read more.

More from Homebuilding & Renovating

Homebuilding & Renovating7 min read
Self-build for beginners PART 11 BRINGING SERVICES TO SITE
Talk to anyone who’s built a home and they’ll probably have a few scare stories relating to the connection of the mains services. From a professional point of view, dealing with the service providers (network operators) is frustrating as you have lit
Homebuilding & Renovating1 min readArchitecture
In Natural Harmony
The original concept for the rear extension to this ground-floor flat within a conservation area in Hampstead, north London, was based on the reinterpretation of the decorative bay windows of the Victorian building’s front façade. The existing flat h
Homebuilding & Renovating3 min readArchitecture
Loggias & verandas
The word loggia originates from the Italian for ‘lodge’ and is an architectural term used for an outdoor corridor with a roof and outer wall built into the structure of the building but open to the elements. They were introduced by the Romans to prov

Related Books & Audiobooks