The Railway Magazine

FAILING OUR DISABLED PASSENGERS

At the time of writing it is the end of 2019 and Twitter is full of depressingly similar examples of disabled passengers being left on trains, made uncomfortable by poorly trained staff and made to feel like second class citizens. How and why are we still failing our disabled passengers?

Making rail travel accessible is so much more than providing ramps, (though they are of course very important) it comprises multiple elements. From the type of information screens used to the size and material of handrails, the use of braille signs, colour contrast on doors, audible alarms for closing doors and so much more, the specifications for rolling stock are tailored to attempt to meet the needs of all passengers.

Sadly, not all units are currently compliant, despite the January 1, 2020 deadline, a fact not helping our disabled passengers feel valued as customers. However, most of the UK’s rolling stock is moving in the right direction to ensure not only compliance but passenger comfort and satisfaction.

When so much effort goes into designing the stock to meet rail vehicle accessibility regulations (RVAR), why are so many disabled passengers on record as saying the rail industry makes them feel like second class citizens?

Twitter snapshot

At this juncture, it is worth pointing out although some disability advocates make a point to acknowledge the days when their travel is stress free, mostly when the system works, we tend not to hear about it. The occasions that make the headlines are when it fails.

Rail Delivery Group (RDG)

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine2 min read
Colne Valley Viaduct crosses the Grand Union Canal
DECK construction work for HS2’s 2.1-mile long Colne Valley Viaduct has just over half-a-mile to go after it reached the point where the structure crosses the Grand Union Canal at the end of March. By the time of it bridging the waterway near Denham
The Railway Magazine3 min read
Steam Loco Fleet Strengthened
THE Aln Valley Railway’s (AVR) steam locomotive fleet has been boosted by the news that the Northumberland line will be the new home for Hudswell Clark 0-6-0ST, Renishaw Ironworks No.6, works number 1366 built in 1919. The locomotive, along with fell
The Railway Magazine7 min read
Void Filled After Derailment
FOLLOWING the derailment of a Northern Rail Class 195 on March 22 near Grangeover-Sands, Network Rail has undertaken extensive repairs to the permanent way which took a month, the line reopening on April 22. Two Class 195s – Nos. 195104/133 – were wo

Related Books & Audiobooks