T T R What? S
T R S
its a French thing!!!
Taux de Rendement Synthetique
A new way to measure overall line efficiency in a consistent & comparable way across sites & technologies
The measure is to be used as a basis for continuous improvement & investment decisions in Masterfoods Europe
BD
HF
ED
Efficiency Challenges
Site Based Measures (a*(b-c))/100=Eff.
OK ???
We need to remove interpretation & allowances & create a global measure that is accepted!
TRS definition
TRS assumption
Working time is counted as defined by the line's shift pattern, but maintenance & cleaning activities which take place outside of the shift pattern are also included. A very simple picture for the counted working time is the time between: "switching the lights in the factory on and off"
TRS definition
ASSOCIATE PAID HOURS = All time that associates are on the line, No exception for: Cleaning, Start-up, Shutdown, Changeovers, P.M.s. Only allowance is for: Holidays, Demand, Major engineering.
TRS Example #1
4 x 8 Opening Time Less Fixed Activities Start Up Maintenance Cleaning Less Losses in Running Time Flexibility Changeovers Product Mix Weekly Cycle Efficiency Plant Uptime 85% 21.4 121.2 ) ) ) 3% 4.4 142.6 3 4 6 13 147 20Shifts 160 Paid Hours 160
TRS
121.2 160
75%
TRS Example #2
168 hrs/week
Start-up 3 hrs
Clean 4 hrs
Maintain 8 hrs
Efficiency TRS
144 hrs
TRS 40%
60% Opportunity
Mtce/engineering
?Capital Investment
Reporting Standardisation
BENCHMARK AGAINST PERFECTION Site: aaa Line: xxx Period 6 to Period 9 2001 100% TRS - GLOBAL 90% 80% 70%
% of use
VERSUS PLAN OBJECTIVE Site: aaa Line: xxx From P6W1 to P9W4 2001
TRS - DETAILS
100% 95% 90% 85% 80% 75%
% of use
Scheduling losses (low demand, ch-o, pack mix) Operations losses - planned (PM's, cleaning) Operations losses - unplanned (breakdowns, scrap&rework) Actual = TRS
Scheduling speed losses (packmix) Scheduling downtime (ch-o, materials unavailable) Planned Operations speed losses (PM's wrappingmc's) Planned Operations downtime (PM's line, cleaning) Reliability speed/lanes losses Reliability downtime Scrap/rework Unexplained Actual =TRS
47,8%
71,8%
In Summary
Global measure
Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency Efficiency
Efficiency
Efficiency
Efficiency
Efficiency ency Efficiency Efficiency
Efficiency
ency
ency ency
Efficiency
Efficiency Efficiency
Efficiency
Efficiency Efficiency
TRS
Efficiency
Efficiency Efficiency Efficiency
Efficiency
Efficiency
Efficiency
Efficie Efficiency
Efficiency
Efficiency
Efficiency Efficiency
Efficie
Efficiency Efficie Efficiency Efficie Efficiency
Efficiency Efficiency
Efficiency Efficiency
Non-detail
Efficiency
ency
Efficiency
Efficiency
Efficiency
Efficiency
Efficie
BUT... It is not intended to be the sole measure and it must be used in context of a bigger picture
Open Points
How do we standardise hours for activities?, e.g. a partial crew cleaning at weekends? What if we contract-out cleaning/maintenance activities?
What about non-continuous lines (3 shift operation) using a shared technician pool?
What is the TRS of a batch process? How do we measure the efficiency of non-bottleneck activities?
PB&A
Back-up
Spreadsheet Template
WEEKLY LINE EFFICIENCY INPUT REPORT SLOUGH BOUNTY MAIN LINE Site Technology Period Week SHIFTS LOST Legal Restrictions Weekend Not Working Holidays Shutdowns Planned Maintenance Cleaning Changeovers Other (Specify) Total SHIFTS GAINED V STD PAID WEEK Additional Shifts (Specify) Extensions to standard shift pattern, for production or cleaning or maintenance, e.g. 3 shift, 5 days increased by one shift for maintenance outside normal crewing hours. WEEK TONNES Planned Productive Shifts Actual Production Scheduled Production Sched Prod per shift Others = Weekly start ups 15 179.7 244.4 16.3 Scheduled volume for the week. Expected number of shifts that are productive 0 6 0 0 0 1.1 1.0 0.5 8.6 Definition as per A30 Definition as per A30 Definition as per A30 Definition as per A30 Definition as per A30 Definition as per A30 Definition as per A30 Definition as per A30 input cells calc cells copied cells SLO Bounty 2 2 COMMENTS Main line
CAPACITY AND UTILIZATION WORKSHEET SLOUGH BOUNTY MAIN LINE Site : Technology
input cells calc cells copied cells SLO Bounty 8 Hour Shifts Period Week Tonnes Per Shift 21 16.87 2 2 Tonnes Per Week 354 % Theor. Available Capacity 100%
THEORETICAL AVAILABLE CAPACITY (Perfection rate at Plan Mix) Less Those things which reduce output when running Breakdowns/Reliability Scrap/Rework Other, specify below *)1 Standard Output per Shift (at Plan Mix) CONTINUOUS CREWING Theoretical Less: Those equipment-related things which reduce the number of production shifts Shutdowns Planned Maintenance Cleaning Changeovers Other, specify below Continuous Crewing SOC MAXIMUM LEGAL CREWING Theoretical Less: Those equipment & legal-related things and legal which reduce the number of production shifts Legal Restrictions Shutdowns Planned Maintenance Cleaning Changeovers Other, specify below Maximum Legal Crewing SOC
73.5%
Cont.
73.5%
ACTUAL CREWING Theoretical Less: All things which reduce the number of production shifts Legal Restrictions Weekends Holidays Shutdowns Planned Maintenance Cleaning Changeovers Other, specify below Actual Crewing SOC PAID CREWING Theoretical Less: Those shifts which reduce crew availability Legal Restrictions Weekends Holidays Shutdowns Additional Crewed Shifts above standard shift system Paid Crewing SOC ACTUAL VOLUME PRODUCED SCHEDULE UTILIZATION (as % Paid Crewing SOC) UTILIZATION (as % Actual Crewing SOC) % SCHEDULE ACHIEVED Actual Shifts v Planned Shifts *) 1 Usage on the Line
Cont.
21 0 6 0 0 0 1 1 1 12 21 0 6 0 0 0 15 14.16 212 180 244 84.6% 102.4% 136.0% 82.7% 59.9% 50.7% 14.16 176 49.5%
SFE EFFICIENCY REPORT 2001 Site : Slough Line : Bounty Period Week THEORETICAL CAPACITY Tonnes per shift (Perfection rate at Plan Mix) Standard Output per Shift (at Plan Mix) THEORETICAL AVAILABLE CAPACITY Shifts Theoretical Capacity Tonnes per Week CONTINUOUS CREWING Shifts Continuous Crewing SOC Tonnes Continuous Crewing Theoretical Tonnes MAXIMUM LEGAL CREWING Shifts Maximum Legal Crewing SOC Tonnes Maximum Crewing Theoretical Tonnes ACTUAL CREWING Shifts Actual Crewing SOC Tonnes Actual Crewing Theoretical Tonnes PAID CREWING Shifts Paid Crewing SOC Tonnes Paid Crewing Theoretical Tonnes ACTUAL VOLUME PRODUCED SCHEDULE UTILIZATION (as % Paid Crewing SOC) UTILIZATION (as % Actual Crewing SOC) TRS (% of Paid Crewing Theoretical Tonnes) TRS Potential % SCHEDULE ACHIEVED % THEORETICAL ACHIEVED
input cells calc cells copied cells 2 1 2 17 14 21 354 18 260 310 18 260 310 12 176 209 15 212 253 180 244 84.6% 102.4% 71.0% 69.4% 73.5% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 4
50.7%
#DIV/0!
#DIV/0!
It is assumed that actual shifts cannot exceed maximum legal crewing shifts. Therefore, utilisation will never exceed 100%. It is also noted that utilisation differs from efficiency. Utilisation is time based whereas efficiency is rate based. A utilisation of 100% means that the line produced all that was possible for the time period. A utilisation of less than 100% means that the line could have produced more if it were needed.
Rate Definitions
Nominal rate
The number of 100g pouch per minute the machine has been designed or specified. Toyojidoki TLA1S: 240 strokes per minute
It is automatically calculated from the nominal rate and the net production hours.
Real output
Tonnage of product actually produced on the line.
Efficiency
This is the calculated % of the real output versus the nominal one.
TRS
This index is calculated as follows: Real output / (Total production hours)*(Nominal rate) Its the ratio in % between the real output and the theoretical output achievable if the Toyo should run every minute; maintenance, cleaning and changeovers are included.
Goods in
Goods out
Upstream & downstream bottlenecks avoided Optimum utilisation of the rate determining asset/activity
Pouch 441
Challenge established by Frank Mars
TRS is a critical lever in shaping cost performance, focusing on optimising asset (people & plant) utilisation
Upstream/downstream assets may be shared, but bottlenecks are avoided The reported overall line performance (TRS) is based on the designed pouch filling rate
Pragmatism
Definition
Interpretation
Idealism
Why TRS?
TRS
where used, reasoning is that OEE gives allowances for plant not operating and as such
12 hr shift duration Planned Available Hours Total Possible Machine Usage Actual Available Time Operating Time Running Time Line Utilisation Machine Performance
Line Scrap
Planned Maintenance Planned team meetings Machine Delays No Materials Raws Quality No operator Manning Unplanned Meetings
OEE
Offline Scrap
Allowances
OEE =
Actual Time Producing Good Product (hours) x 100 Planned Available Hours