Boiler Pass 1&2 Ducts Rotary parts ESP Turbine auxilaries Generator
PMI Revision 00 2
24 May 2012
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
Visual inspection for erosion & Cleaniness. Rotary parts: I APH: 1. Guide bearing : Visual inspection and level checking 2. Support bearing: visual (wear & tear on runner area)
24 May 2012
PMI Revision 00
10
24 May 2012
11
ESP:
Erosion of emitting electrodes, hammer Rings, bending of shock bar and cracking of suspension frame hooks of collecting electrodes.
24 May 2012
PMI Revision 00
12
24 May 2012
PENETRANT APPLICATION
PMI Revision 00
13
TURBINE
Main turbine (HP,IP and LP) checks NDT checks on turbine and auxilaries Generator checks NDT on generator Other checks in different areas
24 May 2012
PMI Revision 00
14
TURBINE CHECKS
Radial alignment Axial alignment Clearances measurement Coupling run out
24 May 2012
PMI Revision 00
15
24 May 2012
PMI Revision 00
16
VISUAL INSPECTION
Turbine blades, De aerator perforated sheets, rotor alumina blast cleaning Shafts of CEP,BFP and vacuum pumps HRH & MS strainers Valves seating area
24 May 2012
PMI Revision 00
17
24 May 2012
PMI Revision 00
18
24 May 2012
PMI Revision 00
19
24 May 2012
PMI Revision 00
20
UT of bearings
To assess the de-bonding of babbitting Reference Standard: ASTM A 435 Acceptance norms: No multiple backwall echos
UNIT 4 Brg Thrust pads-36 Nos
24 May 2012
PMI Revision 00
21
24 May 2012
PMI Revision 00
22
GENERATOR CHECKS
After rotor threading out-rotor N2 pressure test(leakage - Not morethan 0.5 kg/sg.cm for 6 hrs) IR value of rotor RSO test of rotor( sinusoidal wave form) Winding resistance
24 May 2012
PMI Revision 00
23
GENERATOR CHECKS
Stator Visual inspection of stator IR value of stator Wedge tightness , ELCID test and tan Winding resistance
24 May 2012
PMI Revision 00
24
24 May 2012
PMI Revision 00
25
24 May 2012
PMI Revision 00
26
GENERATOR CHECKS
(CONTINUED..)
Compressor Hub And Baffle Ring Carrier Radial & axial Clearances( min.1.8) Radial alignment of GEN-Exciter and correction Axial alignment & Exciter Swing check CRO readings of gen. exciter Hydro test of H2 coolers and exciter coolers Gen. casing pressure test( 4 kg / sq.cm)
24 May 2012
PMI Revision 00
27
Other areas
DPT of expansion bellows DPT of HP heaters parting plane welds Condenser cleaning Deaerator visual inspection
24 May 2012
PMI Revision 00
28
THANK YOU