QA in different areas during O/H

Boiler Pass 1&2 Ducts Rotary parts ESP Turbine auxilaries Generator
PMI Revision 00 2

24 May 2012

24 May 2012

PMI Revision 00

ROLE OF QUALITY ASSURANCE DEPT. AT SITE:


TO TO TO TO TO PREPARE QUALITY PLAN BEFORE OVERHAUL. PREPARE QA CHECK LISTS. INVOLVE IN CRITICAL CHECKS DURING OVERHAUL. INVOLVE IN DAY TO DAY MAINTENANCE. CARRYOUT NON DESTRUCTIVE TESTING.

24 May 2012

PMI Revision 00

Boiler pass 1 & 2 (Tube Failure Mechanisms)


Erosion Corrosion Mechanical wear Material mix-up Weld failures i.e Dissimilar & attachment weld failures

24 May 2012

PMI Revision 00

Preventive measures during O/H


100% visual inspection in all the identified areas Deploying IBR qualified welders & use of approved electrodes Extensive Tube Thickness survey NDT of welds( DPT, RT, UT &MPI)

24 May 2012

PMI Revision 00

QA methodology in different areas


Goose neck region: DPT, Visual inspection and TTS RH girdling loops: Visual inspection for dents and distortion of binding loops Economisers & LTSH: TTS for top, bottom, extreme coils both Sides 1 to 5 tubes and visual inspection for alignment and erosion.

24 May 2012

PMI Revision 00

QA methodology in different areas


LTSH bifurcation tubes: Visual inspection for refractory damage and erosion & TTS RH : Visual inspection for overheating ,cleat rubbing (half reheater) and TTS & DPT Header stub joints: Visual inspection and DPT Screen tubes: TTS and visual inspection Raiser tubes: MPI / RT of bends and weldments

24 May 2012

PMI Revision 00

MPI of critical piping

24 May 2012

PMI Revision 00

DUCT AND APH


DUCT:
Deflector plates, damper gates, Duct bend portion eco outlet hopper :

Visual inspection for erosion & Cleaniness. Rotary parts: I APH: 1. Guide bearing : Visual inspection and level checking 2. Support bearing: visual (wear & tear on runner area)

24 May 2012

PMI Revision 00

10

PA Fan support bearing inspection

24 May 2012

PMI Revision 00 VISUAL INSPECTION

11

FANS AND ESP


II PA Fan, FD Fan:
Blade alignment and clearances, motor & fan alignment and blades DPT III ID Fan: 1. Bearing surface Visual & DPT 2. Shaft visual inspection for pitting 3. Welding joints and shaft- MPI&DPT

ESP:
Erosion of emitting electrodes, hammer Rings, bending of shock bar and cracking of suspension frame hooks of collecting electrodes.

24 May 2012

PMI Revision 00

12

ID FAN Shaft welding DPT

24 May 2012

PENETRANT APPLICATION

PMI Revision 00

READY FOR INSPECTION

13

TURBINE
Main turbine (HP,IP and LP) checks NDT checks on turbine and auxilaries Generator checks NDT on generator Other checks in different areas

24 May 2012

PMI Revision 00

14

TURBINE CHECKS
Radial alignment Axial alignment Clearances measurement Coupling run out

24 May 2012

PMI Revision 00

15

NDT on Turbine and Auxiliaries


Visual inspection Blue matching of valves DPT & MPI of components UT of bearings

24 May 2012

PMI Revision 00

16

VISUAL INSPECTION
Turbine blades, De aerator perforated sheets, rotor alumina blast cleaning Shafts of CEP,BFP and vacuum pumps HRH & MS strainers Valves seating area

24 May 2012

PMI Revision 00

17

Blue matching of valves


Line contact to be ensured

24 May 2012

PMI Revision 00

18

DPT and MPI


Shafts of CEP,BFP and Vacuum pumps MS & HRH strainer line weld joints, control fluid oil line weld joints, impulse line weld joints TDBFP gear coupling , bearings babbit metal area. Stop valves & control valves components MPI of rotor & blades

24 May 2012

PMI Revision 00

19

DPT of turbine bearings

24 May 2012

PMI Revision 00

20

UT of bearings
To assess the de-bonding of babbitting Reference Standard: ASTM A 435 Acceptance norms: No multiple backwall echos
UNIT 4 Brg Thrust pads-36 Nos

24 May 2012

PMI Revision 00

21

Eddy current testing on condenser tubes

24 May 2012

PMI Revision 00

22

GENERATOR CHECKS
After rotor threading out-rotor N2 pressure test(leakage - Not morethan 0.5 kg/sg.cm for 6 hrs) IR value of rotor RSO test of rotor( sinusoidal wave form) Winding resistance

24 May 2012

PMI Revision 00

23

GENERATOR CHECKS
Stator Visual inspection of stator IR value of stator Wedge tightness , ELCID test and tan Winding resistance

24 May 2012

PMI Revision 00

24

GENERATOR CHECKS (NDT on Generator)


DPT of compressor blades UT & DPT of gen. retaining rings (ASTM A435) DPT of seal oil system weld joints Completion of protocol before rotor threading in. IR values of Gen. Bearings

24 May 2012

PMI Revision 00

25

DPT of compressor blades

24 May 2012

PMI Revision 00

26

GENERATOR CHECKS
(CONTINUED..)
Compressor Hub And Baffle Ring Carrier Radial & axial Clearances( min.1.8) Radial alignment of GEN-Exciter and correction Axial alignment & Exciter Swing check CRO readings of gen. exciter Hydro test of H2 coolers and exciter coolers Gen. casing pressure test( 4 kg / sq.cm)

24 May 2012

PMI Revision 00

27

Other areas
DPT of expansion bellows DPT of HP heaters parting plane welds Condenser cleaning Deaerator visual inspection