AUTOMATIC TURBINE RUN-UP SYSTEM

OPERATION RELEASE: 1. Starting device 0% 2. Position set point turbine controller < 0% 3. Field breaker OFF. 4. Generator breaker OFF. 5. Drain HP control valve1 not closed. 6. Drain HP control valve2 not closed. 7. Drain HP control valve3 not closed. 8. Drain HP control valve4 not closed. 9. Limit pressure operation ON. 10. Load controller is ON. 11. Synchroniser is OFF.

STEP 1 Commands : 1. SLC drains ON. 2. AVR switched to AUTO. Monitoring time - 2 Secs CRITERIA FOR STEP 2 1. SLC drains ON. 2. HP ESV1 closed. 3. HP ESV2 closed. 4. INTCPT ESV1 closed. 5. INTCPT ESV2 closed. 6. HP control valve1 closed. 7. HP control valve2 closed. 8. INTCPT valve1 closed. 9. INTCPT valve2 closed.

10. CRH NRV left closed. 11. Extraction NRV A5 < 5% 12. Extraction NRV A4.1 < 5% 13. Extraction NRV A4.2 < 5% 14. Extraction NRV A3 < 5% 15. Extraction NRV A2 < 5% 16. AVR is on auto.

STEP 2 Commands: No command is issued. Monitoring time - 500 Secs

CRITERIA FOR STEP 3 1. Turbine speed > 15 rpm. 2. Condenser pressure < 0.5Kg/cm2. 3. Any one CEP is ON. 4. Drains no fault. 5. DT HPT casing mid top/bottom < 55 0K 6. DT IPT casing front top/bottom < 30 0K 7. DT IPT casing rear top/bottom < 30 0K 8. Trip fluid pressure is > 5 Kg/ cm2 9. Drain main steam stainer1 not closed. 10. Drain main steam stainer2 not closed. 11. Drain HRH stainer1 not closed. 12. Drain HRH stainer2 not closed. 13.Trip fluid pressure > 5Kg/cm2

STEP 3 Commands: 1. Drain before HPCV1 close. 2. Drain before HPCV2 close. Monitoring time - 60 Secs. CRITERIA FOR STEP 4 1. Drain before HPCV1 closed. 2. Drain before HPCV2 closed. STEP 4 Commands: No command is issued. Monitoring time is blocked.

CRITERIA FOR STEP 5 1. Boiler fire is ON. 2. Steam before HP BP1 > 30 0K superheat. 3. Steam before HP BP2 > 30 0K superheat. 4. Steam before LP BP1 > 30 0K superheat. 5. Steam before LP BP2 > 30 0K superheat 6. DT (HP bypass1 - HPCV1 /TM) > X1.1 7. DT (HP bypass2 - HPCV2 /TM) > X1.2 8. DT (Wet steam1 - HPCV1) < X 2.1 9. DT (Wet steam2 - HPCV2) < X 2.2 10. Temperature H.P control fluid > 50 0C. 11. Oil temperature after cooler > 35 0C.

STEP 5 Commands : 1. Starting device raise. Monitoring time 30 secs.

CRITERIA FOR STEP 6: 1. Any one ESV is not closed. Or Starting Device Position >42%.

STEP 6 Commands: No command is issused. Monitoring time - 60 Secs

CRITERIA FOR STEP 7: 1. HP ESV1 is open. 2. HP ESV2 is open.

STEP 7 Commands: No Command is issued. Monitoring time - Blocked.

CRITERIA FOR STEP 8 1. Main steam flow > 15% 2. Steam before HP BP1 > 30 0K.superheat 3. Steam before HP BP2 >30 0K.superheat 4. Steam before LP BP1 >30 0K superheat. 5. Steam before LP BP2 >30 0K superheat.
SPEP 8 Commands : 1. HPCV Drain Controller switched to Auto Mode. Monitoring time - 2 Secs

CRITERIA FOR STEP 9: 1. HPCV Drain Controller on Auto.

STEP 9 Commands : 1. Tracking device is switched ON. Monitoring time - 20 Secs

CRITERIA FOR STEP 10 1. Tracking device is ON. 2. INTCPT ESV1is open. 3. INTCPT ESV2 is open.

STEP 10 Commands : No command is issued. Monitoring time - 30 Secs

CRITERIA FOR STEP 11 1. Drains no fault. 2. Speeder gear position is 100 %. 3. Seal steam pressure controller on. 4. Lub oil temperature control valve on AUTO. 5. Any One oil vapour extractor fan is ON. 6. Any one Generator bearing Exh. Fan is ON. 7. Generator bearing extractor fan 1 available. 8. Generator bearing extractor fan 2 available. 9. Hydrogen temperature controller is on AUTO. 10. Hydrogen concentration is > 94%. 11. Hydrogen Pressure (manifold) > 3 Kg/cm2

13. DP seal oil Air-Hydrogen side (E.E) > 0.7 Kg/cm2 14. Pressure seal oil behind pump Hydrogen side > 3 Kg/cm2 15. Seal oil pre-chamber turbine side level < MAX. 16. Seal oil pre-chamber excitor side level < MAX. 17. Liquid Level in Generator < MAX. 18. Liquid Level in Generator < MAX. 19. Liquid Level in Generator lead < MAX. 20. Liquid Level in Generator lead < MAX. 21. Any one seal oil pump Air side is ON. 22. Seal oil pump hydrogen side is ON 23. Seal oil pump 3 Air side voltage is available. 24. Primary water temperature controller is on AUTO. 25 Generator cooling water conductivity < 1.5mS/cm. 26. Any one Primary water pump is ON. 27. Pressure after Primary water pump is > MIN.

STEP 11 Commands: No command is issued.. Monitoring time is Blocked.

CRITERIA FOR STEP 12 1. Generator conditions are fulfilled (Step 10). 2. Steam before HP ESV1 SUPERHEAT > X4.1 3. Steam before HP ESV2 SUPERHEAT > X4.2 4. DT (HP ESV1 - HP CASING) > X5.1 5. DT (HP ESV2 - HP SHAFT) > X5.2 6. Turbine speed is > 15 rpm. 7. Steam temperature before LP BP1 > 400 0 C 8. Steam temperature before LP BP2 > 400 0 C

9. Drain before HPCV1is not closed. 10. Drain before H.PCV2 is not closed. 11. Load reference is > 10 %. 12. Condenser pressure < 0.2 Kg/cm2

STEP 12 Commands : 1. Turbine speed reference raise>360 rpm Monitoring time - 40 Secs.

CRITERIA FOR STEP 13 1. Turbine speed > 300 rpm.

STEP 13 No Command is issued. Monitoring time is Blocked.

CRITERIA FOR STEP 14 1. Turbine speed is > 300 rpm.

STEP 14 Commands: 1. Wall stress test programme - Block. Monitoring time - 180 Secs Waiting time - 180 Secs.

CRITERIA FOR STEP 15 1. Wall stress test programme - Block. Waiting time 180 secs lapsed. Or Wall temp HP Turbine Casing >250 0C 2. TSE Margins are > 30 0K or Turbine Speed 2850 rpm. 3. DT (HP BP1 - HP SHAFT) < X 6

STEP 15 Commands : 1. HPCV Drain Controller switched to manual mode. Monitoring time - 1 Sec.

CRITERIA FOR STEP 16 1. HPCV Drain Controller on manual. 2. Gate valve Gearing is Closed.

STEP 16 Commands : 1. Turbine speed set point raise>3036 rpm 2. Drain before HPCV1 close. 3. Drain before HPCV2 close. Monitoring time 200 Secs.

STEP 17 Commands : No Command issued. Monitoring time is Blocked.

CRITERIA FOR STEP 18 1. Turbine speed is > 2950 rpm. 2. Bearing vibration Casing & Generator < Max. 3. Shaft vibration < Max.. 4. Bearing Temperature < Max.

STEP 18 Commands : 1. AVR is switched to Auto. 2. Field Brkr is switched ON. Monitoring time 40 Secs.

CRITERIA FOR STEP 19 1. Field Bkr / AVR ON/AUTO STEP 19 Commands : 1. Drain before HPCVs (1-2) close . Monitoring time is Blocked.

CRITERIA FOR STEP 20 1. Both AOPs are OFF (timer 0- 10 secs). 2. DT (LP BP1-IP shaft) < X7. 3. H2 Casing Pressure > 3 Kg/cm2 4. Temp cold gas after H2 Cooler A/B < 45 0C. 5. Temp cold gas after H2 Cooler C/D < 45 0C. 6. Excitation cold air temperature < 45 0C. 7. Drain before HPCV1 is closed. 8. Drain before HPCV2 is closed.

11. One Seal Oil Pump Air side is ON. 12. Seal oil Pump1 Air side is available. 13. Seal oil Pump2 Air side is available. 14. Primary Water Temperature is < 50 0C. 15. Conductivity main filter is < 1.5 mS/cm. 16. Primary Water flow in Gen. & Bushing not low. 17. DT( Primary Water- H2) > 1 0K

STEP 20 Commands : 1. AVR is switched to Auto. Monitoring time - 15 Secs. Waiting time - 15 Secs.

CRITERIA FOR STEP 21 1. Waiting time is lapsed.. 2. AVR on Auto. 3. Generator voltage > 95%).

STEP 21 Commands : 1. Synchroniser ON. Monitoring time - 60 Secs.

CRITERIA FOR STEP 22 1. Generator Breaker is ON.

STEP 22 Commands : 1. Load Reference raise. Monitoring time - 1 Sec. Waiting time - 1 Sec.

CRITERIA FOR STEP 23 1. Waiting time 2 seconds. STEP 23 Commands: No command is issued. Monitoring time -2Secs.

END OF PROGRAMME