Type Of Faults
DISADVANTAGE
Longer De ionization time
Where the Loss of a single line is unlikely to cause loss of synchronism between two ends
2.
Dead Time is allowed to be long enough for any power swings due to fault and tripping allowed to decay before reclosing a) Less shock to system than with high speed A/R b) Problems of arc de ionization times, and circuit breaker operating charactersitics are eliminated
Dead Time
Allow for power swings and rotor oscillations to die down.
Different settings for opposite feeder ends. Typically 5 to 60 secs.
Scheme Operation
Live bus/ Dead Line Charging Other end closing under synchronism check relay Live Bus/ Live line charging
Voltage
under voltage/differential voltage
Initiation Dead Timer Anti Pumping Devices Reclaim timer CB Lockout Manual Closing Multi Shot Scheme
120
203
Line 2 113
T1 213 T2
120/G1/Remote Open 120/Remote Reclose T1 Energised G1 Close After Time Delay 120/Remote Opens Again 103 Opens Automatically 120 Closes Followed By G1 T1/T2 Fed From Line 2
G1
G2
Transformer Fault
120/G1/Remote Trip 113 Auto Opens G1 Lock Out 120/Remote Reclose
LV CB
120/420/G1 Trip 120 Dead Line Charge 420 Check Sync G1 Check Sync If Req.
Persistent Line Fault
420
120
HV Mesh CB
120/420/G1 Trip 113 Auto Isolation 120/420 Sequence Close G1 Locked Out