Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
JIT Production
The JIT concept has been borrowed from the inventory systems of American Super markets. i.e.. Units that are sold are replaced
Just in Time
According to APICS : A Philosophy of manufacturing based on planned elimination of waste and continuous improvement of productivity.
JIT Components
Production leveling Good House keeping Kamban Small lot Production Total quality control Total preventive maintenance
BMW
Full form of BMW ? Bayerische Motoren Werke AG (german) Bavarian Motor Works (english) It was founded in 1913 by Karl Friedrich Rapp in Munich (Germany).
Contd
Before world war 1 they are into aircraft production later into railway brakes. Then they are into Bikes and later they are into Luxury cars. Their first car BMW 3/15.
BMW in India
Formal entry into India in 2007 and three outlets in India. Manufacturing unit in Delhi and Chennai. They manufacture BMW 3series and 5series are only for local market.
Manufacturing of BMW
Mass Customization
To build flexibility into its factory system BMW is making Major Changes including a $300 million capital expense program that just completed manufacturing changes are as diverse as procedures
Industry
analysts have termed this process 'mass customization', implying that it combined the features and advantages of both mass production and customization.
VIN
BMW is changing its standard global factory procedure of assigning vehicles to customers When they receive an order for a car its stamped a VIN on to a freshly welded body, that vehicle remained assigned to the same customer as it moved.
Scheduling Freedom
The company is adopting a computer ordering system at dealerships in Europe. Customers will work with retailers to configure the vehicle wanted and receive the date of delivery on the screen within 5 seconds.
Still Lean
The Spartanburg plant will double the size of its vehicle stacking center-a giant mechanism that can temporarily shelve half of a shifts worth of cars at once. This would reduce the scheduling glitches caused by a series of cars passing down the line out of order while the worker is loaded with parts of different cars.
Presented by:
Sumanth
Abhishek Afzal
Aishwarya
Alwin Ramya