WASTE : excavated earth to be thrown away and not to be used as filling materials. BORROW : the excavated materials obtained from borrow pits located beyond the limits of the road when the excavation for the roadway is not sufficient to form embankments.
LEH xR FHD
LEH
xL
xL FHD Vcut=Vfill
xR
NGL
cg
FHM
OHM waste
Profile Diagram
Problem: Here under shows a table of quantities of earthworks of a portion of a proposed national road to be constructed to connect some provinces in the Philippines. The length of the free haul distance is specified to be 50m long. It is required to determine the stationing limits of free haul distance so as not to include in the computation of overhaul. Station 2+000 +020 +040 +060 +080 2+100 +120 +140 Cut (m2) 60 35 20 10 0 Fill (m2)
0 15 60 100
Cut (m2) 60 35 20 10 0
Fill (m2)
0 15 60 100
FHD = 50m 2+140 2+080 15 y2 60 100
60 35 2+000 20 y1 10
1 2 3
Problem: The cross-sectional area of sta 1+460 is 40m2 in fill, at sta 2+060 is 60m2 in cut. The free haul distance is 50m. The cost of borrow is PhP4.00/m3 while the cost of excavation is PhP3.50/m3. Cost of haul is PhP0.20 per meter-station. Balancing point is at sta 1+760. Assume the ground surface to be sloping upward uniformly up to station 1+760 and then with a slightly steeper slope to sta 2+060.
LEH=450m 400-z z x FHD=50m 50-x y2 sta 1+760 y1 y3 40 xL 300 sta 2+060 y4 60
sta 1+460
xR 300
Find the following: a.Sta limits of FHD b.Sta limits of LEH c.Length of Overhaul d.Overhaul e.Cost of Haul f.Cost of Waste g.Cost of Borrow 1 2 3
Problem: The following data represents a single summit mass diagram of a proposed expansion of the Tolosa Expressway. Free Haul Distance = 50m Limit of Economical Haul = 400m Mass Ordinate of Initial Limit of the Free Haul = +910m3 Mass Ordinate of the initial Limit of Economical Haul = +350 1.Compute the volume of waste in m3. 2.Compute the volume of overhaul in m3. 3.Compute the volume of borrow in m3.
Station 10+000 10+040 10+080 10+120 10+160 10+200 10+240 10+280 10+320 10+360 10+400 10+440 10+480 10+520 10+560 10+600
Volumes Cut Fill +200 +100 +150 +140 +110 +190 +50 -40 -120 -90 -80 -200 -220 -110 -320 -280
Station 10+000 10+040 10+080 10+120 10+160 10+200 10+240 10+280 10+320 10+360 10+400 10+440 10+480 10+520 10+560 10+600
Volumes Cut +200 +100 +150 +140 +110 +190 +50 -40 -120 -90 -80 -200 -220 -110 -320 -280
Mass Ordinate Fill +200 +300 +450 +590 +700 +890 +940 +900 +780 +690 +610 +410 +190 +80 -240 -520
1. Volume of waste Volume of Waste = 350 200 Volume of Waste = 150 m3 2. Overhaul Volume Overhaul Volume = 910 350 Overhaul Volume = 560 m3 3. Volume of Borrow Volume of Borrow = 350 + 520 Volume of Borrow = 870 m3