Mindanao Power Situation

DEPARTMENT OF ENERGY

OUTLINE
Mindanao Power Situation
2011 Mindanao Supply-Demand Outlook

Mindanao Supply-Demand Outlook


Needs total additional capacity of 1,950 MW onwards to 2030
4500

Required
Reserve Margin

4000

3500

MW

3000
2500

2000
1500

Projected Demand
AAGR % = 4.56

1000
500
0

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Required Additional Capacity

100

50

Committed Capacity

28

Existing Capacity
Required Reserve Margin
Peak Demand

100

300

30 150

100

100

100

100 200

100

100

100

200

100

100

100

100

1658 1685 1693 1693 1843 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943
269

272

275

277

280

283

286

289

293

297

300

304

309

313

318

322

327

333

338

344

1484 1550 1616 1686 1755 1829 1906 1987 2071 2163 2259 2360 2465 2575 2690 2811 2937 3069 3207 3351

*Based on NGCPs official web posting

Load to Maintain

Mindanao Customers Excess Demand Consumption as against Contract


Allocation for Feb. 2012
No.

Customer

1 PNOC-EC
2 LANECO
3 MOELCI-I
4 MOELCI-II
5 ZAMCELCO
6 ZAMSURECO-I
7 ZAMSURECO-II
8 PSC
9 BUSECO
10 CAMELCO
11 FIBECO
12 ANECO
13 ASELCO
14 MORESCO-II
15 SURNECO
16 DLPC
17 DANECO
18 DASURECO
19 DORECO
20 DOLEPHIL
21 COTELCO
22 SUKELCO

Contract
Equivalent
Demand in Kw

1,084
8,937
5,969
16,205
73,560
21,105
12,847
7,707
14,266
2,396
22,777
35,510
11,575
11,421
17,787
247,843
49,777
27,008
10,201
7,939
27,989
16,975

Actual Load in kW Actual Load in kW


drawn from
drawn from
NPC/PSALM with TMI
NPC/PSALM

30,684

48,410
21,892
25,012
279,783
73,078
38,426
20,014

24,914

2,408
11,736
8,318
21,890
85,356
25,684
19,219
11,307
21,678
3,319
26,531
38,410
16,892
19,829
20,012
254,795
63,078
30,426
17,014
9,522
42,572
21,914
TOTAL

Difference
Overdrawn
(kW)
1,324
2,799
2,349
565
11,796
4,579
6,372
3,600
7,412
923
3,754
900
5,317
8,408
2,225
16,952
13,301
3,418
6,813
1,583
14,583
4,939
123,912

Percentage
Overdrawn
122.14
31.32
39.35
3.49
16.04
21.70
49.60
46.71
51.96
38.52
16.48
2.53
45.94
73.62
12.51
6.84
26.72
12.66
66.79
19.94
52.10
29.10
35.72% Ave

Mindanao Customers Excess Energy Consumption as


Against Contract Allocation for Feb.2012
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Name of Customer
PNOC-EC
LANECO
MOELCI-I
MOELCI-II
ZAMCELCO
ZAMSURECO-I
ZAMSURECO-II
PSC
BUSECO
CAMELCO
FIBECO
ANECO
ASELCO
MORESCO-II
SURNECO
DLPC
DANECO
DASURECO
DORECO
DOLEPHIL
COTELCO
SUKELCO

Contract Energy in
kWh
501,578
4,986,846
3,330,702
8,271,000
41,046,215
11,776,590
7,168,626
4,500,000
7,960,428
1,336,968
9,144,773
20,930,580
5,833,800
6,372,918
9,921,998
110,637,208
27,775,566
15,070,464
5,692,158
4,629,952
15,617,862
9,472,050

Actual Energy in kWh


drawn from NPC/PSALM

Difference
Overdrawn (kWh)

Percentage
Overdrawn

603,134
5,516,882
3,749,316
9,940,012
41,487,177
14,073,956
9,471,886
4,555,901
10,383,168
1,476,493
9,569,252
22,428,595
9,998,825
8,233,833
11,682,910
129,472,813
32,198,906
16,853,499
7,782,433
4,795,189
18,857,907
10,338,230

101,556
530,036
418,614
1,669,012
440,962
2,297,366
2,303,260
55,901
2,422,740
139,525
424,479
1,498,015
4,165,025
1,860,915
1,760,912
18,835,605
4,423,340
1,783,035
2,090,275
165,237
3,240,045
866,180

20.25
10.63
12.57
20.18
1.07
19.51
32.13
1.24
30.43
10.44
4.64
7.16
71.39
29.20
17.75
17.02
15.93
11.83
36.72
3.57
20.75
9.14

TOTAL

51,492,035

18.34 % ave

ACTUAL GENERATION COMPARISSON (MWHr)

ACTUAL DEMAND DELIVERED COMPARISSON (MW)

* Actual recorded peak for 2011 is 1,346MW.


* 2012 projected peak is approximately 1,360MW.
* Year to date peak is 1,219 MW
* System required reserve at 144MW does not include the 100MW Cold reserve
requirement as stated in the Grid Code.

ACTUAL GENERATION COMPARISSON (MWHr)

Proposed measures to address the


present situation
1. Fast tract the operation of Iligan Diesel Power Plant thru
negotiation with COA and ERC.
2. Immediate transfer of the Power Barges 101-103 from Panay in
Visayas to Mindanao. (90 MW total installed Capacity)
3. Strict Compliance of Distribution Utilities regarding their load to
maintain schedule in accordance with their existing contracts.
4. Assistance to the Power Projects Proponents by
LGUs(endorsements), DENR(ECC), BOI (Tax Incentives/Holidays)
and etc.
6. Selective Dredging/Flushing of Pulangi Dam

Mindanao Supply-Demand Outlook


Needs total additional capacity of 1,950 MW onwards to 2030
4500
4000

3500

MW

Mapalad &
EEI
(2x15MW)
MW) 2013)
Cabulig HEP
(8 MW)
2012

Mt. Apo 3 (50 MWW) 2014


Conal 1 (100 MW) 2014

Required
Reserve Margin

Conal 2 (100 MW) 2015

3000
2500

2000
1500

Projected Demand
AAGR % = 4.56

1000
500
0

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Required Additional Capacity

100

50

Committed Capacity

28

Existing Capacity
Required Reserve Margin
Peak Demand

100

300

30 150

100

100

100

100 200

100

100

100

200

100

100

100

100

1658 1685 1693 1693 1843 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943 1943
269

272

275

277

280

283

286

289

293

297

300

304

309

313

318

322

327

333

338

344

1484 1550 1616 1686 1755 1829 1906 1987 2071 2163 2259 2360 2465 2575 2690 2811 2937 3069 3207 3351

Investments in Power Generation


Legend :
Wind Power

Mindanao Grid
35-MW Green Power
Bukidnon Biomass Project

Geothermal
Oil-based
Biomass

CEPALCO Cabulig HEP (8MW)


= 2012
EDC Camiguin
Island Wind (5
MW)

Minergy Bunker Fired


(28 MW)=2011
COMMISIONED

Hydropower

Coal-Fired

AGUS 3 HEP (225


MW)

Tagoloan HEP (68


MW)

Aboitiz PowerTherma South.


(300 MW)

Mapalad Energy Diesel Fired PP


(Iligan City)
(15 MW)=2013

Conal Holding CFTPP


(200 MW)-Sarangani
Unit I=2014
Unit II=2015

EDC Mindanao Geothermal 3


(50 MW)=2014

Note: Committed power projects are those which have complied with the
necessary permits and clearances of various agencies and concerned local
government and in the process of financial closing.
Indicative power projects are those which are at different stages of project
developments prior to financial closing.

EEI Bunker Fired PP


(Tagum City)
(15 MW)=2013

HEDCOR Tamugan.
(12 MW)

- Indicative Projects
- Committed Projects, 286 MW

Thank You
DEPARTMENT OF ENERGY
MINDANAO FIELD OFFICE
www.doe.gov.ph

19