Sei sulla pagina 1di 13

Presentation on the Research Project Proposal

Presented by

A M Delanie Jayesuria Index No : PQHRM 41/29 October 02, 2011

RESEARCH TOPIC
The Study as to Whether the Performance Appraisal System Measures Team Effectiveness at ABC COMPANY

1. INTRODUCTION
Why I was guided to select this topic The Study as to Whether the Performance Appraisal System Measures Team Effectiveness was that in order to gain this competitive advantage, it is the team work that remains the ultimate to gain competitive advantage, which is powerful tool and has gone unseen. We have seen that companies that are restructuring, retrenching, down-sizing for the obvious reason has basically excellent strategies, high-tech technology etc, but the performance has been of unsatisfactory standards, as they have not monitored the real value of the performance within teams of their organization. The importance of work teams appears to be gaining in strength as jobs get bigger, organizational structures get more complex, and more and more companies become multi-national in scope. Many jobs are becoming increasingly complex, less time-bound and global in scope. All these factors collectively are making it increasingly difficult for one person to perform a single job. In todays corporate environment, it appears the team not the individual that holds the key to business success. This research study will explain how team base performance impacts on team effectiveness which is the basis in organizational effectiveness.

2. STATEMENT OF THE PROBLEM

Identify the Performance Appraisal System measures team effectiveness or does it still measure individual performances.

3. OBJECTIVES OF THE PROJECT


General Objectives The general objective of this research study are The extend to which the Performance Appraisals levels measure the goals of team effectiveness. To establish better team effectiveness through performance appraisals. Specific Objectives The specific objectives are designed as follows in order to fulfill the above mentioned general objectives. To understand the nature of the Performance Appraisal System. To examine to what extend the Performance Appraisal System contribute to team effectiveness. Understand the Gap between measuring individual Performance vs Team Performances. To examine what are the drawback and issues of team effectiveness through the Performance Appraisal System. Recommend possible corrective action.

4. LITERATURE SURVEY
The literature survey reviewed and since it is a continued process during the research will be built on the contribution made on the present state in connection with the research study and the references will be sourced out accordingly.

Presently reviewed references are: a. Opatha, H H D N P (2009), Human Resource Management, (1st ed.), Colombo b. Armstrong, M (2006), The Performance Management, (10th ed.), New York. c. Henri, J.F. (2004) Performance Measurement and Organizational Effectiveness: Bridging the Gap, Managerial Finance 30(6): 93-123. d. Houldsworth, E. and Jirasinghe, D. (2006) Managing & Measuring Employee Performance. London: Kogan Page e. Hut, J. and Molleman, E. (1998) Empowerment and team development, Team Performance Management 4(2): 53-66. f. Jones, S.D. and Schilling, D.J. (2000) Measuring Team Performance. San Francisco, CA: Jossey-Bass.

5. SCOPE OF THE INVESTIGATION


The scope of the investigation will define the boundaries of
The significance of working in teams The Performance of Individuals in the Teams The Performance of Teams Team Effectiveness- Types of Measure Performance Measures for Teams Team performance-management process Reviewing the Performance of Individuals and the related Teams Gap that entail in achieving the team effectiveness

6. CONCEPTUAL FRAMEWORK
Empowerment Satisfaction Motivation Rewards Autonomy

Team Effectiveness

Cohesiveness
Viability

Independent Variables (X)

Dependent Variable (Y)

7. HYPOTHESIS
Empowerment Satisfaction Motivation Rewards Autonomy Cohesiveness Viability

Alternative
Hypothesis

Team Effectiveness

Empowerment Satisfaction Motivation Rewards Autonomy Cohesiveness Viability

H0

1H

Null
Hypothesis

Team Effectiveness

7. HYPOTHESIS
Alternative Hypothesis
H1 - There is a positive relationship to the dependent variable of Team Effectiveness (Y) to the selected independent variables of Empowerment, Satisfaction, Motivation, Rewards, Autonomy, Cohesiveness, Viablility.

Null Hypothesis

8. METHODOLOGY
8.1 Sample Population - The sample population will be chosen of 30% from the total population.
The sample will be chosen with the respective team leaders and team members which will be done through the Stratified Sampling Technique.

8.2 Primary Data


a. Questionnaires b. Interviews

8.3 Secondary Data


a. HR Records b. Other related records

8.4 Statistical Tools Used


Quantitative Analysis - The testing of the hypotheses will be based on the Co-relation between Dependent Variable and Independent Variable.
-

8.5 Presentation on the Findings (Tools)


a. Bar Chart; c. Histogram; and/or b. Pie Chart; d. Scatter Diagram

9. TIME FRAME
ACTIVITY SEPT 2011 OCT 2011 NOV 2011 DEC 2011 JAN 2012 FEB 2012 MAR 2012 APR 2012 1

Researching of the Research Topic Topic Approval from the Director of Studies Literature Review Prepare for the Research Project Proposal Presentation Meeting the organisation in under research study Meeting the Supervisor and obtaining the guidance of the research Methodology and Designing of the Questionnaires accordingly

Administrating the questionnaire and conducting the interview


Tabulating of Data Writing the Project Proposal and Finalising Submission of the Research Project Proposal

10

11

THANK YOU

Potrebbero piacerti anche