According to the normal installation sequence, the installation of equipment can be divided into three major parts: hardware installation, software installation and data configuration & software debugging. Mainly presents the basic procedures of U-SYS SoftX3000 hardware&software installation and describes them in detail.
2
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Objectives
Upon completion of this course,you will be able to: Mainly presents the basic procedures of U-SYS SoftX3000 hardware&software installation and describes them in detail.
3
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
References
4
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Course Contents
5
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
6
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
sdraob ecivreS
sdraob ecivreS
sdraob rewoP
sdraob ecafretnI
sdraob ecafretnI
sdraob tnorF
enalpkcaB
sdraob kcaB
FE Frame 0#
FE
FE Standby iGWB
Frame 1#
GE
Active iGWB
BAM
Emergency WS
Hub
8
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Installing
iGWB
software
End
9
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Summary
10
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Course Contents
11
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
2.1 Overview 2.2 Installing Internal Cables 2.3 Installing External Cables
12
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
14
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
(1)Power distribution frame (2)Expansion frame (3)Basic frame (4)Slave iGWB (5)Master iGWB
15
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
2.1 Overview 2.2 Installing Internal Cables 2.3 Installing External Cables
16
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
)lanoitpo( elbac kcolc lanretni gnillatsnI emarf noitubirtsid rewop gnirotinom rof elbac gnillatsnI elbac rehctiwS/revreS gnillatsnI yarra ksid drah dna BWGi neewteb elbac atad gnillatsnI sBWGi neewteb elbac trop laires gnillatsnI IUIS dna ICSH neewteb elbac langis EF gnillatsnI hctiwS NAL dna emarf e civres ni sdraob neewteb selbac hguorht thgiarts gnillatsnI hctiwS NAL dna MAB/BWGi neewteb selbac krowten hguorht thgiarts gnillatsnI sehctiwS NAL neewteb elbac krowten hguorht thgiarts gnillatsnI
17
The
straight
through cable. They work in dual backup mode. The dual backup mode, which is adopted to ensure data security, means that the two LAN Switches detect each signal.
Confidential Information of Huawei. No Spreading without Permission.
A twisted pair
A twisted pair
A twisted pair
other's
heartbeat
Three servers (two iGWBs and one BAM) are configured in the integrated configuration cabinet, and each server uses two straight through network cables to connect with the active & standby LAN Switches
19
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Straight Through Network Cable between LAN Switch and HSCI Board
In integrated configuration cabinet and service processing cabinet, there are six 10/100M network ports on both active and standby HSCI boards in each basic/expansion frame. The ports labeled 10/100BT6 at the uppermost position of the active/standby HSCI boards are connected to the active and standby LAN Switches respectively through straight through cables, realizing not only the communication between the service processing subsystem and BAM, but also the interconnection between the service processing frames.
The connection positions on the front panel of LAN Switch are determined by port configuration scheme.
20
21
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
To ensure the dual backup working mode of iGWB, and in view of security design, the two iGWBs in the integrated configuration cabinet need to be connected by serial port cable to form the second heartbeat signal transfer path for the dual backup mode. The connection port is the RS232 serial port at the back of iGWB server, located above VGA interface
22
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
BAM
iGWB1
iGWB0
24
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
25
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
26
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
2.1 Overview 2.2 Installing Internal Cables 2.3 Installing External Cables
27
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
28
The EPII boards are configured in active/standby mode, and only the active EPII board is connected with the trunk cable through its DB50 trunk port, as shown in Figure 618. After out of the panel of EPII, the trunk cables pass through the cabling trough of the cabinet in horizontal direction, and then are out of the cabinet by upward or downward cabling along the left column of the cabinet.
29
DB50
30
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
31
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
32
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
External
clock
cable
is
used
to
connect
the
BITS outputs two types of clock signals, including 2-MHz analog clock signal and 2-Mbit/s digital clock signal. When SoftX3000 adopts 2-MHz signal, the active and standby clock cables connect respectively with the corresponding SMB connectors LINE1 and LINE2 of CKII boards in the basic frame. When SoftX3000 adopts 2Mbit/s signals, the active and standby clock cables connect frame respectively with the corresponding SMB
33
connectors BITS1 and BITS2Level: Internal boards in the basic Security of CKII
34
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
resource server is also connected to SoftX3000 through external networking devices. The active and standby MRIAs, MPCs and SCCs are connected to the external Routers or LAN Switches through the external network cables.
35
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Summary
The signal cables are divided into internal signal cables and external signal cables. Among the external signal cables, the clock cable, trunk cable and external network cable are optional depending on the actual hardware configuration.
36
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Course Contents
37
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
2.1 Overview 2.2 Installing BAM Server Software 2.3 Installing Client Software
38
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Overall Structure
MAB
39
erawtfos tsoH
tsoH
BAM
BAM software
Ordinary workstation
None
None
Emergency workstation
1) Windows 2000 Server plus service pack 4 2) SQL Server 2000 plus service pack 3 Windows 2000 Server plus service pack 3
iGWB
None
Billing workstation
None
None
40
End
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
41
2.1 Overview 2.2 Installing BAM Server Software 2.3 Installing Client Software
42
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
Software architecture
BAM software architecture
erawtfos revres MAB
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
reyal metsys gnitarepO mroftalp erawdrah revres MBI revreS 0002 swodniW 0002 revreS LQS
43
reyal noitacilppA
44
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
dnE
0002 revreS LQS fo drowssap rotartsinimda eht yfidoM s gnittes t luafe d-yrotcaf yfidoM revreS 0002 swodniW fo drowssap rotartsinimda eht yfidoM
oN
tratS
On-site installation
45
2.1 Overview 2.2 Installing BAM Server Software 2.3 Installing Client Software
46
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
47
Software requirement
Software type Version Microsoft Windows NT Microsoft Windows XP Microsoft Windows 2000 Client software Internet Explorer SoftX3000 V300R001 Microsoft Internet Explorer 5.5 or later
48
Confidential Information of Huawei. No Spreading without Permission. Security Level: Internal
dnE
tratS
Installation Procedure
49
Summary
Like the normal order of project construction, equipment installation falls into three stages, namely hardware installation, software installation, and data configuration & software debugging. This slide details the basic software installation process of U-SYS SoftX3000 SoftSwitch System (hereinafter referred to as SoftX3000).