To increase storage density To recover factory floor space presently used for storing work-in-process (WIP) To improve security and reduce pilferage
To reduce labor cost and/or increase labor productivity in storage operation To improve safety in the storage function To improve control over inventories To improve stock rotation To improve customer service To increase throughput
Storage structure => Rack system to support pallets or shelf system to support tote bins Motions => Linear motions Storage/retrieval operation => travels to compartments in rack structure Replication of storage capacity => Multiple aisles
pickup-and-deposit station
Storage structure Storage/Retrieval machine Storage module One or more pickup-and-deposit station
Application
Unit load storage and handling Order picking work-in-process (WIP) storage system
EXAMPLE
Four aisles AS/RS is to contain 60 storage compartments in length and 12 compartments vertically and x = 42 y = 48 the height of a unit load z = 36 a) The storage capacity capacity per aisle = 2(60) (12) = 1440 unit loads
EXAMPLE
b) The width length and height of the AS/RS W = 3(42+6) = 144 in = 12 ft/aisle Overall width = 4 (12) = 48 ft L = 60(48+8) = 3360 in = 280 ft H = 12(36+10) = 552 in = 46 ft
Exercise
6- aisle AS/RS , 50 storage compartments in the length, 8 compartments in vertical unit load x=36 y = 48 z = 30 a = 6 b=8 c=10 a) unit load b) x x
AS/RS Throughput
Methods of AS/RS cycle time to estimate throughput performance : assumes 1. Randomized storage of loads 2. Storage compartments are of equal size 3. The P&D station is located at the base and end of the aisle 4. Constant horizontal and vertical speed of S/R machine 5. Simultaneous horizontal and vertical travel
AS/RS Throughput
AS/RS Throughput
The single command cycle time Tcs = 2 Max{ 0.5L , 0.5H} + 2 Tpd Vy Vz = Max { L , H } + 2 Tpd Vy Vz Tcs = Cycle time of a single command cycle L = length of the AS/RS H = Height Vy = velocity along the length Vz = velocity in the vertical direction Tpd = Pick/Deposit time
AS/RS Throughput
The Dual command cycle time
Tcd = Cycle time of a dual command cycle Tcd = 2 Max{ 0.75L , 0.75H} + 4 Tpd Vy Vz = Max { 1.5L , 1.5H } + 4 Tpd Vy Vz
AS/RS Throughput
The relative numbers Rcs Tcs + Rcd Tcd = 60 U Rcs = number of single command cycles performed per hour Rcd = number of dual command cycles performed per hour U = system utilization during the hour
AS/RS Throughput
Example 2
L = 280 ft H=46 ft
The S/R machine is Horizontal speed = 200 ft/min Vertical speed = 75 ft/min P&D operation is 20 sec to accomplish
a) Tcs , Tcd Tcs = Max{280/200 , 46/75} + 2 (20/60)
= 2.066 min/cycle Tcd = Max {1.5x 280/200 ,1.5x 46/75} + 4(20/60) = 3.432 min/cycle
Example 2
b) Throughput per aisle U = 90 % Single command = Dual command Rcs Tcs + Rcd Tcd = 60 U Rcs x2.066 + Rcd x3.432 = 60 (0.90) Rcs = Rcd 5.498 Rcs = 54 Rcs = Rcd = 9.822 cycle /hr Rt = Rcs + 2 Rcd Rt = 9.822 + 2(9.822) = 29.36 transaction/hr = 29 transaction/hr/aisle
4 aisle
Rt
= 4x 29
= 116 transaction/hr