Training Of Young Engineers On Overhead Power Transmission Line Construction

Who needs this training

Areas We Can Improve In Overhead Line Construction Site Management


Many project managers are not good man-managers and are responsible for high attrition in many organizations Project managers feel that sub-contractor would run the project the our job is just coordinating the teams. Many project managers do not have skills required for effective communication including Report Writing, Letter Writing, IOM, E-mails, and Public Notices Frequent explanations/ justifications of managers of project that got delayed ROW is not our problem and customer is not helping us. Hence the delay I dont get co-operation from HO and my subordinates Customer is not reasonable and rejects the material because the specification is not adhered to We dont have copies of the technical documents and have to follow what the customer says Safety is the look out of sub-contractors. We cant afford to buy safety apparels for contract labor

What Many Project Managers Do Not Know


There are 5 Indian standards for conductors whereas there are more than 19 ASTM codes for overhead transmission line conductors ACSS is a conductor can work at operating temperature as much as 200oC without loosing its properties A 132kv tower can be used for 220kv by changing conductor and cross arms without changing the tower foundation Hand held GPS has error to the extent of 30m UTM coordinates are conversion of Latitude and Longitude of a point to X and Y coordinates for plotting Measuring temperature by hanging a thermometer on a tower is wrong way of selecting sagging temperature while stringing Facilities in most common mobile phone can be used for checking the tension in the conductor The biggest overhead power transmission line span in the world is 5.3km

Who Needs This Training Young Project managers/engineers Fresh engineers Surveyors Project coordinators Designers

What Is Covered In This Training


With a order in hand, how to plan the construction work Options of various transmission lines, configurations and line materials across the globe What are the options in TL survey works Introduction to latest technology and tools regarding survey Various methods of construction of line from foundation types, erection of towers, stringing and Earthing Quality control in construction of OHTL Safety in OHTL construction

What Is Not Covered In This Training


Designing of line capacity Selection of line materials like conductor, insulators and other line materials Designing of towers Selection of technology for survey Calculation of sag tensions selection of method of erection of towers Selection of method of stringing PLSCADD

Training modules
Project Management And Coordination Power Transmission Basics Transmission Line Materials Transmission Line Towers Configuration, Nomenclature & Geometry Survey Of Transmission Lines Foundation Works Tower Erection Works and Earthing Stringing Pre-Commissioning Activities Safety In Construction Of Transmission Lines Quality Assurance In Construction Of Transmission Lines FQP ISO 9001:2008 Quality Management Systems For Transmission Line Construction Agency