Understanding the Commissioning Process for Building Owners & Design Professionals
October 14, 2008
Presented by:
Lance Stewart, PE, CxA, LEED AP Roger Johnson, CMC, CMGB, SCA
AGENDA
What is Commissioning? Commissioning Team What is LEED? Commissioning for LEED Successful LEED Projects Wall of Shame
Cost of Commissioning
What is Commissioning?
Simple Definition: An Owners quality-based process developed from industry best practice to verify the owner receives at the END OF A PROJECT what they stated they wanted in the BEGINNING OF THE PROJECT
Launched: February 16, 1942 Commissioned: August 16, 1942 Note 6 months to commission!
Potential Savings
Cost to Fix
Concept
Design
Construction
O &M
Cx Team - Design
Architect Civil (site) Engineer Mechanical Engineer Plumbing Engineer Electrical Engineer Communications (tele/com) Engineer
2007 Farnsworth Group, Inc.
Cx Team - Construction
General Contractor/Construction Manager
Site/Civil HVAC Plumbing Fire Protection Electrical Tel/Com TAB Agency Controls Contractor
Pros/Cons of Fundamental Cx
PRO: Lower up-front investment PRO: Improved system performance, documentation, training CON: Minimum benefits from Cx CON(?): May identify costly rework
Pros/Cons of Enhanced Cx
PRO: Improved system performance, documentation, training PRO: Maximum benefits from Cx PRO: May prevent costly rework (design & submittal reviews) CON: Higher up-front cost
Commissioning Plan
Design Reviews
Submittal Reviews
Construction Checklists
E2 E3 E4
E5
KE
0:16
YES
E6 E61
KE KE/ Russelectric
Verify the time for the first ATS (Life Safety and Critical) to switch to the hot bus. (10 seconds) Disconnect battery chargers and verify alarm to the SCADA.
0:16 5:50
YES NO
4 seconds Generator failed to start properly. PLC1 failed and PLC2 during start up. Battery for PLCS could not carry load. Generator batteries did not have adequate capacity to carry load and start generators. 7-8 seconds Currently not monitored. Working with Cummins to correct.
Cx Issues Log
Cx Training Program
LEED Scorecard
LEED Online
LEED Online
LEED Online
Sample Template
Sample Template
LEED Silver More than 30% water conserved Recycled 86% of construction waste
Over 40% local, regional materials Views for over 90% of spaces
2007 Farnsworth Group, Inc.
LEED Silver First project completed under Town of Normal LEED initiative New building designed to blend into old downtown Large percentage of recycled material Building energy systems commissioning
Pilot LEED project for UCCS Focus on local and recycled materials Pool system designed for later retrofit for solar hot water Public education to be incorporated Daylighting controls & views of Front Range from workout areas
2007 Farnsworth Group, Inc.
LEED Gold Water fountain powered by solar power Extensive daylighting and controls PV panels supply onsite renewably generated power Building energy systems commissioning
LEED Platinum Exemplary performance on energy savings & onsite renewable energy through the use of PV panels Green roof with grey water irrigation system Building energy systems commissioning
LEED Silver First laboratory in Colorado to achieve LEED certification 30% energy savings over ASHRAE 90.1 Fume hood commissioning Adhered to Labs 21 criteria
WYARNG, AASF
Ground Source Heat Pump Geo-Exchange System Total Building Cx 98,000 sf Helicopter Maintenance Facility First LEED Project for WYARNG Full-Time On Site Cx
WYARNG, JFRC
Horizontal Ground Source Heat Pump GeoExchange System Total Building Cx 145,000 sf. Joint Forces Readiness Center, Headquarters Building Full-Time On Site Cx
Educates visitors on conserving coastal environment Native plants needing no irrigation system Minimizing impact of construction on surrounding area Use of local and recycled materials Energy-efficient mechanical and lighting systems
Duct Break
Code compliance?
Safe?
Cost of Commissioning
Commissioned Systems HVAC and Control Systems Electrical Systems HVAC, Control & Light Electrical Approximate Cx Cost 2.0 - 3.0% of mechanical 1.0 2.0% of electrical 0.5 1.5% of construction
Factors Affecting Cx Costs: Size of Project Type of Project Complexity of Project Level of Service Owner Wants or Needs Systems to be Commissioned Duration of Commissioning Engagement LEED Fundamental and Enhanced
2007 Farnsworth Group, Inc.