What is a Project?
Temporary with a beginning and end Creates a unique product, service or result Progressive elaboration Done for a purpose Has interrelated activities
Temporary
Definite beginning and end End is reached when the project objectives have been achieved Market window Ad hoc team
DEFINATION
Unique
Something new
no two projects are the same, some degree of customization is there New airliner Bring a new drug to market
Progressive
Proceeding in steps Continuing steadily in increments Worked out with care and detail Developed thoroughly
Elaboration
Distinguishing characteristics first broadly defined will become more explicit and detailed as the team develops a better understanding
4
Characteristics of a Project
Conflict
Project
mgr. full of conflict; projects compete with functional dept. for resources & people Project members conflicting for projects resources & leadership roles in solving problems; deal with clients & org. Individuals conflict two bosses at the same time; different objectives & priorities
5
Characteristics of a Project
Purpose Project
usually
a one-time activity with a set of desired end result can be divided into subtasks, which required coordination & control
slow beginning progress to a buildup of size peak begin decline finally must terminate
Characteristics of a Project
Interdependencies Projects interact with other project being carried out simultaneously by parent org., but always interacts with the parents standard, ongoing operations, etc. The patterns of interaction between functional dept. may change. Marketing Marketing e.g: Manufacturing Finance
Beginnin g of project
Finance
Intermediate of project End of project
Temporary has a beginning and an end Produces a unique output or deliverables Has no pre-defined work assignment
On going- the same process is repeated over and again Produces the same output each time the process is run Has a predefined work assignment
Projects Vs Operations
Projects Performed by people Constrained by limited resources Planned, executed and controlled Temporary Unique Operations Performed by people Constrained by limited resources Planned, executed and controlled Ongoing Repetitive
9
Programmes Vs Programme is simply a collection of Projects projects, each project several inter-related
in a programme has its own objectives and contributes to the objectives of the programme
A Project is: a unique set of coordinated activities, with definite starting and finishing points undertaken by an individual or organization to meet specific objectives within defined schedule, cost ad performance parameters
11
12
Project Management
Establishing clear and achievable objectives
Application of skills tools and techniques to meet or exceed stakeholders expectations while using resources efficiently & effectively and meeting project requirements
Balancing the competing demands for quality, scope, time and cost.
13
Identifying the requirements Establishing clear and achievable objectives Balancing the competing demands for quality, scoop, time, and cost Adapting specifications, plans, and concerns of the stakeholders
14
15
Who is a stakeholder?
Project manager Customer Performing organization Sponsor Team Internal/external End user Society, citizens
16
17
Projects worth billions of rupees undertaken every year. Effective management has bearing on overall growth of national economy. Experience with regard to project management is mixed. Some projects completed before time and most others completed with time and cost overrun. Time, resource, cost management are sine-qua-non of project
18
development times, lower costs, higher quality & reliability, higher profit margins Sharper orientation towards results, better interdepartmental coordination & higher worker morale
19
Increased organizational complexity Increase the likelihood that organizational policy being violated project mgr being autonomous Higher costs, management difficulties, low personnel utilization PM is difficult even when everything goes well - what more if things go badly Project organization is the only feasible way to accomplish certain goals - literally not possible to design & build a major weapon system in a timely & economically acceptable manner, except through project organization i.e. applying PM tools
20
Lack of management system Lack of well-defined deliverables Poor communications Poor change management Incorrect technical architecture Inadequate planning Lack of sponsorship & functional commitment Inability to manage risk and uncertainty
21
Management Processes
The POLC Model
Controlling
22
Effort Cost
Concep t
Plannin g
Executi on
Terminat ion
23
24
Project Initiation
25
Project Charter
Control Changes Manage Project Team Manage Quality/ Performing to Requirements Manage Risk
Project Start Up
Phase Assessment
Phase Assessment
26
Project Initiation
Project Request Scope and objectives Business case Preliminary resource estimates Review & Authorization Requests prioritized and funded Project Charter Developed after request approval
27
Purpose
Recognizes
existence of the
project Describes the project at a high level Explains the business need for project Authorizes use of resources for planning
28
Content
Project
Typical Participants
Business
description Business background Project scope Objectives (ROI if not in request) Deliverables Constraints Assumptions Planning budget
Area
Manager Project Manager Steering Committee Core Project Team Others if relevant
29
Project Planning
Purpose: to determine What needs to be done Who will be involved How objectives will be met When it will be implemented How much it will cost Project Plan Statement of Work Project Organization Work Breakdown Structure Schedule Resource requirements Standards and Procedures Communications Risk Management 30
people, materials and equipment, forecast of financial requirements and provision of milestones against which progress can be measured. All project management expertise areas are needed in planning: Resource Management Integration Management Environment Scope Management Participants Time Management Tools Cost Management Communications Management Quality Management Risk Management Procurement Management
31
Planning Principles
Plan should provide information in a readily understood form. be realistic. be flexible. serve as a basis for progress monitoring the control. be comprehensive.
32
Work Planning
Whole set of activities to be identified( work break down structure) Activities to be arranged in correct order or logical sequence Approaches for time estimates based on sound resource planning -Deterministic where previous experience is available ( CPM) -Probabilistic where no experience available or uncertainty (PERT) - Time estimates are made for each activity on a three-way basis: -Optimistic time -Most Likely time
33
Integration Management
Processes required to ensure that the various elements of the project are properly coordinated:
Project plan development Project plan execution Integrated change management
35
Scope Management
Processes required to ensure that the project includes all of the work required, and only the work required, to complete the project successfully: Initiation Scope planning Scope definition Scope verification Scope change control
36
Time Management
Processes required to ensure timely completion of the project: Activity identification Activity sequencing Activity duration Estimating Schedule development Schedule control
37
Cost Management
Processes required to ensure that the project is completed within the approved budget:
Financial resource Task Hours Rate planning Project 200 (1 person @ 40 Cost estimating Managemen 2hrs a wk for 100 Cost budgeting wks) t Cost control Requiremen 150 (10 people @ 35
ts 1 hrs a wk for 12 wks + 1 person for 30 hrs) 320 (1 person @ 40 hrs a wk for 8 wks) Cost 8000
5250
Design
40
12800
30
19200
38
Resource Budgeting
Task
Project Management Requirements
Hours
Rate
Cost
8000 5250
200 (1 person @ 2hrs a wk 40 for 100 wks) 150 (10 people @ 1 hrs a 35 wk for 12 wks + 1 person for 30 hrs) 320 (1 person @ 40 hrs a 40 wk for 8 wks) 640 (2 people @ 40 hrs a 30 wk for 8 wks) 480 (3 people @ 40 hrs a 30 wk for 4 wks)
Quality Management
Processes required to ensure that the project will satisfy the needs for which it was undertaken:
Chartering Quality planning Quality assessment Quality control
40
HR Management
Processes required to make the most effective use of the people involved with the project: Organizational planning Team recruitment Team development
41
generation, collection and dissemination, storage and ultimate disposition of project information:
Communications planning Information distribution Performance reporting Administrative closure Audience Who needs to know? Message What do they need to know? Intent Why do they need to know? Media How are they going to know? Timeframe When are they going to know? Responsibilities Who is delivering the message? Goals: No surprises Up and down the chain Repetition,
42
43
Risk Management
Processes required to systematically identify, analyze, and respond to project risks:
Risk management planning Reactive managing surprises, putting out fires Risk identification Qualitative Risk Analysis Proactive risk avoidance, buy Quantitative Risk Analysisoff risk Risk management Risk response planning Identify it Risk monitoring and control Analyze it Plan for it (mitigation planning)
44
Types of Risk
1) Uncertainty: an event may or may not happen 2) Loss: an event has unwanted consequences or losses
Accept the risk Avoid the risk Monitor and develop contingency plan Transfer the risk
46
Procurement Management
Processes required to acquire goods and services from outside the performing organization:
Procurement planning Solicitation planning Source selection Contract administration Contract close-out
47
Change Management
A set of formal procedures that provide for the orderly control of change in a dynamic environment: Change includes: Added New standards / functionality practices Incorrect Environment alterations assumption Imposed delays Extended approval times Change management does not prohibit or inhibit change!!
48
Variance Analysis
Departure from the estimated project cost is known as variance (not the statistical variance). Called unfavorable if planned amount exceeded favorable if less cost incurred than planned Variance analysis is to be done for each activity in the network, where cost overrun occurs and they are to be done separately for the (i) Use of resources (such as material & labor) (ii) Prices of the above resources. This enables to pinpoint actual cause of cost overrun for taking corrective action or any further misuse of any resources
49
CONFLICT RESOLUTION
50
51
lack of understanding of project management tools and an over reliance on project management software communication problems failure to adequately adjust to changes that occur during the course of the project
52
The forces within an organisation that resist change are: Personal Many people resist change!
Organisational Structures and System may not suit the Changes that are being introduced Environmental The culture, values and beliefs may be turned on their head.
53 of 21 53
Complex projects will have a number of activities running in parallel. Some parts of the project will need other parts of the project to be completed before they can begin or progress. Some projects will require a feasibility stage before the completion of a detailed plan.
Project Management
54
55
Conflict Resolution
Ensure Buy in from core stakeholders Participation and active support from all stakeholders Communicate
At the end of your successful project hold a review with the team. Ensure you understand what happened and why. Reflect on any failures and mistakes positively, objectively, and without allocating personal blame. Reflect on successes gratefully and realistically.
56
57
58
A WBS displays and defines the product, or products, to be developed and/or produced. It relates the elements of work to be accomplished to each other and to the end product. A WBS can be expressed down to any level of interest. However the top three levels are as far as any program or contract need go unless the items identified are high cost or high risk. Then, and only then, is it important to take the work breakdown structure to a lower level of definition.
59
Definition
Insuring that we didnt forget anything Matching staff skills to tasks Assignment of responsibilities Tracking progress via milestones
We
Example WBS
61
e s i g e s ig
I n t e D r fe a v c e e l o p P a g a n d L i n k s S e Dt u e p v e l o p F u n c t i o n a l it y
e r v e r
D e v e lo p S e r v e r C o n t e n t u p p o r t I n f r a s tM r u i g c r t au tr i eo n / I n t e g T e s t in g
r a t io
62
WBS Rules
Avoid too much detail break down until a group can do the activity in a week or month - a work package Only specify what you can manage Limit depth of indention to manageable level Use regular milestones Helps measure progress Break it down one level at a time Clearly describe each detailed level Make it a team effort Leverage past projects
63
Bottom-up approach This is the most appropriate method for projects involving untested methods and approaches OR where team members have not performed similar projects before Generate all activities you can think of that will have to be done and group into categories
64
such
as IEEE 1074
65
Bottom-up approach (using Brainstorming) This is the most appropriate method for projects involving untested methods and approaches OR where team members have not performed similar projects before Generate all activities you can think of that will have to be done and group into categories
66
Gantt Charts
Gantt Charts are extremely useful project management tools. You can construct a Gantt Chart using MS/Excel or a similar spreadsheet. Every activity has a separate line. You can colour code the time blocks to denote type of activity You can schedule review and break points. At the end of each line you can show as many cost columns for the activities as you need.
67
Project Management
68
Project Team
69
Task Assessment
Individual components of WBS needs to be defined clearly Scope and methodology of Task Lifecycle critical Resource allocation a critical component of the function
70
Projects rely on effective teamwork and team members should be selected on the bases of their: Relevant experience Technical knowledge Appreciation of project objectives Creative and innovative ability Enthusiasm and commitment Ability to work as a member of a team Ability to communicate Level of available of resources
71
Matrix Organization Projectized Organization Balanced Matrix Organization Organic Projectized Organization
72
Functional Organization
Director Project Coordination
Functional Manager Staff Staff Staff Light colored boxes: involved in projects
73
Functional Organization
Specialists grouped by function Difficult to cross functional lines Barriers exist on horizontal information flow Functional emphasis loyalties may impede completion
Matrix Organization
Director
Project Coordination
75
Matrix Organization
Multiple-command system Individuals from functional areas assigned on temporary basis to Project Manager Individuals return to functional organization to
Careful plans and procedures needed Project Manager: An individual responsible for minimize effects of dual reporting managing a project
76
Matrix Organization
Advantages
Visible
objectives Efficient utilization of resources Better co-ordination Better information flow Retention of home after project
Disadvantages
More
than one boss Complex structure to control Differing priorities of Project Manager and Functional Manager Duplication of effort Conflict
77
Projectized Organization
Director Project Coordination Project Manager Staff Staff Staff Project Manager Staff Staff Staff Project Manager Staff Staff Staff Light colored boxes: involved in projects
78
Projectized Organization
Emerges from functional when latter impedes progress Line of authority is the Project Manager Uncertainty where to go on completion of project Tendency to retain assigned personnel too long Functional Managers feel threatened as people are removed from their areas
79
Project Coordination
F M A P M A PM B P M C
FM B
FM C
81
82
83
PERT/CPM
PERT Program Evaluation and Review Technique Developed by U.S. Navy for Polaris missile project Developed to handle uncertain activity times CPM Critical Path Method Developed by Du Pont & Remington Rand Developed for industrial projects for which activity times generally were known Todays project management software packages have combined the best features of both approaches.
84
PERT/CPM
PERT/CPM is used to plan the scheduling of individual activities that make up a project. Projects may have as many as several thousand activities. A complicating factor in carrying out the activities is that some activities depend on the completion of other activities before they can be started. Project managers rely on PERT/CPM to help them answer questions such as: What is the total time to complete the project? What are the scheduled start and finish dates for each specific activity? Which activities are critical and must be completed exactly as scheduled to keep the project on schedule? How long can noncritical activities be delayed
85
Project Network
A project network can be constructed to model the precedence of the activities. The nodes of the network represent the activities. The arcs of the network reflect the precedence relationships of the activities. A critical path for the network is a path consisting of activities with zero slack. Slack is the amount of time that noncritical activities can be delayed without increasing the project completion time. Immediate predecessor(s) is (are) activities that must be completed immediately before the current activity can begin. 86
A path through a network is one of the routes following the arrows (arcs) from the start node to the finish node. The length of a pathis the sum of the (estimated) durations of the activities on the path. The (estimated) project duration or project completion time equals the length of the longest path through the project network. This longest path is called the critical path. (If more than one path tie for the longest, they all are critical paths.)
87
Project networks are not unique. A project network is considered valid provided all precedence relationships are preserved. Mohawks project network shows that no activities precede activities A and B. For this reason an arc goes directly from start to these activity nodes. The immediate predecessors of each node is (are) displayed on the network by arcs leading from these immediate predecessors to the node. Also notice that activity H is the only activity that has an arc that goes directly to the finish node. ONLY ACTIVITIES THAT ARE NOT IMMEDIATE PREDECESSORS TO ANY OTHER NETWORK 88 ACTIVITIES MAY HAVE A LINK DIRECTLY TO THE
J
Immediate Predecessor
---
---
---
A,B
A, B
F,G,H,I
89
Start
Finish
H C
90
3.
4.
Determine the sequence of activities. Construct the network or precedence diagram. Starting from the left, compute the Early Start (ES) and Early Finish (EF) time for each activity. Starting from the right, compute the Late Finish (LF) and Late Start (LS) time for each activity. Find the slack for each activity.
91
93
94
Experience and historical data can be used for projects that have be completed in the past (such as home and apartment construction) to provide accurate activity time estimates. In many cases, however, projects are new or unique and activity times are uncertain. In these cases estimating activity times could be difficult. When there is uncertainty associated with activity times, they are often best described by a range of possible values instead of one specific time estimate. Uncertain activity times are treated as random variables with associated probability distributions. These distribution allows us to form probability statements about the likelihood of meeting a specific completion date. 95 Three time estimates are collected for each activity to
an activity is assumed to follow a Beta distribution. An activitys mean completion time is: t = (a + 4m + b) 6
a = the optimistic completion time estimate b = the pessimistic completion time estimate m = the most likely completion time estimate
96
a = the optimistic completion time estimate b = the pessimistic completion time estimate m = the most likely completion time estimate
97
98
Completion Activity Description Predecessors Time (wks) A Study Feasibility --6 B Purchase Building A 4 C Hire Project Leader A 3 D Select Advertising Staff B 6 E Purchase Materials B 3 F Hire Manufacturing Staff B,C 10 G Manufacture Prototype E,F 2
Immediate
99
Start
PERT Network
B A
6
E
4
C
8
G
I Finish
6 3
3
H F
10
100
Critical Activities
16 616 22 13 317 20 20 10 20 10
F 10 E 10 D 10
S ta rt
0 6 0
A
6 6
6 10 4 6 10
B
22 30 822 30
I F in ish
6 9 3 7 10
C
22 220 22
G 20
28 624 30
H 22
102
Crashing
Deterministic times are more prone to changes Lat minute changes by clients, unforeseen situations make crashing away of life We need to crash the activities of some project to ensure timely completion
103
Project Crashing
Rules: only crash critical activities crash the cheapest critical activity first assume each task can be crashed one day at a time (simplifying assumption, but not necessary) all critical paths must decrease by one day, in order for the project duration to decrease by one day Crashing example
104
Crashing An Example
Activity Normal Time Normal Cost Crash Time Crash Cost Slope Max Crsh Tm
3 6 10 11 8 5 6
50 80 60 50 100 40 70
2 4 9 7 6 4 6
Cost/Time Slope
Step1 compute a cost /time slope that can be crashed. Slope is defined as Slope = (Crash cost Normal cost)/(Crash Time Normal time) Slope is the Cost Per day of crashing a project Slope is negative which means As time required for a project or task is reduced, cost is increased
107
Cost/Time Slope
In the above activity 6-7 can not be crashed Calculating the slope this way might give the impression that activities can be crashed in increments of one day But this is not true Example An activity could be carried out in eight days or Four days (No intermediary times are possible) The crash has to be four days in this case
108
Crashing
First task Develop a table or graph of cost of the project as a function of the projects various completion dates Starting with the normal schedule, crash selected activities one at a time, to decrease the project duration at the minimum additional cost
110
Crashing
Two principles
1.
Focus on critical path when trying to shorten the duration of the project. (with the exception that the resource needed for one activity, not on the critical path is needed for another project) 2. when shortening a project duration, select the least expensive way to do it.
Crashing An Example
Activity Normal Time 1-2 2-3 2-4 2-5 3-6 5-7 6-7 3 6 10 11 8 5 6 Normal Cost 50 80 60 50 100 40 70 Crash Time 2 4 9 7 6 4 6 Crash Cost 70 160 90 150 160 70 70 Slope -20 -40 -30 -25 -30 -30 0 Max Crsh Tm 1 2 1 4 2 1 0
112
113
114
116
RESOURCE ALLOCATION
117
A shortcoming of most scheduling procedures is that they do not address the issues of resource utilization and availability Scheduling procedures tend to focus on time rather than physical resources Time itself is always a critical resource in project management, one that is unique because it can neither be inventoried nor renewed
118
The Resource Allocation The extreme points of the relationship between Problem
time use and resource use are these: Time Limited: The project must be finished by a certain time, using as few resources as possible. But it is time, not resource usage, that is critical Resource Limited:The project must be finished as soon as possible, but without exceeding some specific level of resource usage or some general resource constraint If all three variables - time, cost, specifications are fixed, the system is over determined
119
Resource Loading
Resource loading describes the amounts of individual resources an existing schedule requires during specific time periods The loads (requirements) of each resource type are listed as a function of time period Resource loading gives a general understanding of the demands a project or set of projects will make on a firms resources Is an excellent guide for early, rough project planning Because the project action plan is the source of information on activity precedence's, durations, and resources requirements, it is the primary input for both the project schedule and its budget 120
Resource Leveling
Resource leveling aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances When resources are leveled, the associated costs also tend to be leveled The project manager must be aware of the cash flows associated with the project and of the means of shifting them in ways that are useful to the parent firm Resource leveling is a procedure that can be used for almost all projects, whether or not resources are constrained The purpose is to create a smoother distribution of resource usage Several advantages include:
121
Heuristic Methods
Heuristic approaches to constrained resource scheduling problems are in wide, general use for a number of reasons:
1.
They are the only feasible methods of attacking the large, nonlinear, complex problems that tend to occur in the real world of project management 2. While the schedules that heuristics generate may not be optimal, they are usually quite good- certainly good enough for most purposes
123
Heuristic Methods
Most heuristic solution methods start with the PERT/CPM schedule and analyze resource usage period by period, resource by resource In a period when the available supply of a resource is exceeded, the heuristic examines the tasks in that period and allocates the scarce resource to them sequentially, according to some priority rule Technological necessities always take precedence 124
Heuristic Methods
Common priority rules:
As
soon as possible As late as possible Shortest task first Most resources first Minimum slack first Most critical followers Most successors Arbitrary
125
Heuristic Methods
Most priority rules are simple adaptations of the heuristics used for the traditional job shop scheduling problem of production/operations management Most heuristics use a combination of rules: a primary rule, and a secondary rule to break ties As the scheduling heuristic operates, one of two events will result: The routine runs out of activities before it runs out of resources The routine runs out of resources before all activities have been scheduled
126
Optimizing Methods
The methods to find an optimal solution to the constrained resource scheduling problem fall into two categories:
Mathematical Enumeration
programming
Mathematical programming can be thought of as liner programming (LP) for the most part
Linear programming is usually not feasible for reasonably large projects where there may be a dozen resources and thousands of activities
127
The most common approach to scheduling and allocating resources to multiple projects is to treat the several projects as if they were each elements of a single large project Another way of attacking the problem is to consider all projects as completely independent To describe such a system properly, standards are needed by which to measure scheduling effectiveness 128
In-process
The organization (or the project manager) must select the criterion most appropriate for its situation
129
Schedule slippage, often considered the most important of the criteria, is the time past a projects due date or delivery date when the project is completed Resource utilization is of particular concern to industrial firms because of the high cost of making resources available The amount of in-process inventory concerns the amount of work waiting to be processed because there is a shortage of some resource 130
PROCUREMENT MANAGEMENT
131
& external labor (hrs,rates) during the refined materials course of the project , supplies definitive just prior to construction contracts special costs Estimat e ROM + 100% or 50% Intermediate + or - 30% Definitive + or - 20%
132
B A
r y a n S y s t e r c h i t e c L e a d (
N e a l y T m t u r e T R 5 0 % )
i n T e e ea n e
S e s c h n i c sm o u r c e d e d
h a d r Pi a l A e ( aD s e v ) L e
e t e H a l e p p l i c a t i o n e l o p m e n t T a d ( 1 0 0 % )
a m
4 A
B n
1 C o n t u s i n e s s I n t e g a l y s t s D a t a D e v e
r a c t S y s t e r a t i o n / b a s e l o p e r
3 D
C e
o n t r a c t v e l o p e r s
133
Procurement documents:
Build Budget & Spending Plan Budgeting involves assigning the cost
estimates to all the tasks creating a cost Budget/Spending Plan baseline.
Jan Internal Labor External Labor HW/SW Contracts Training Total 5,000 Feb 5,000 Mar 5,000 7,000 3,000 June 6,000 15,000 20,000 9000 50,000 So on 10,000 15,000 20,000 30,000 5,000 80,000
5,000 10,000
5,000 10,000
15,000
135
136
Level of Activity
Plan
Initiate
Close
Start
Time
Finish
137
Monitor & Control Project Work Integrated Change Management Scope Verification & Control Prevent scope creep! You didnt budget for it! Schedule Control & Update Critical path monitoring Reschedule as needed to optimize resources Cost Control Quality Control Manage Project Team Make staffing updates are required Performance Reporting Communicate with Stakeholders & Executives Risk Monitoring & Control Risk Planning & Risk Mitigation Contract Administration
138
Project Control
Project control taking corrective actions to keep the project on target toward meeting its performance goals (time, cost, deliverables) The project manager has final responsibility for project control There are many ways to exert control; the PM must decide which is most appropriate Resource allocations, funding decisions, personnel assignments, change in priorities
139
1.
Evaluating
Analyzing causes of problems and potential corrective actions
1.
Correcting
Taking corrective actions to bring project performance back in line with goals
140
141
Reports are one way to give many different people a chance to look for potential problems They also can keep everyone updated about the current project status Everyone concerned with the project should receive reports containing info. relevant to issues under their control What types of info. should an engineer working on a project receive, vs. senior management? When should these reports be provided?
142
Resource Allocation
Resource allocation can be used as a control mechanism Allocating more, less, or different physical resources can affect the progress of activities, and can affect their cost and/or the quality of outputs/deliverables as well Assigning more, less, or different employees also can affect project performance Allocating more or less funds to an activity is yet another way to affect project performance
143
Resource Conflicts
Sometimes a limited resource is needed (at the same time) by several activities in one project or by different activities in multiple projects (so some of the activities must wait) Setting priority rules for which activity get the constrained resource first can be a means of project control In the case of multiple projects, the goals and importance of all the projects should be considered
144
Project Accelerating/Crashing
Project crashing (or accelerating a project) is another way to exert project control Crashing a project means shortening its duration, or speeding it up (doing it quicker) Unfortunately, this almost always costs more Sometimes crashing is done because earlier activities were delayed; other times it is done because the customer is 146 willing to trade a higher cost for a
Resource Loading
For each resource during each time period, determine the total amount of resource time required by all activities combined Compare this total time with the capacity of the resource during each time period Identify resources that are over-utilized (or overloaded) during any time period What should be done about it?
147
Resource Leveling
Re-scheduling some activities to eliminate resource overloading in certain time periods Try to delay activities that have extra slack time firstthis will not delay the project If that doesnt work, then activities must be delayed which will delay the project due date Popular project management software 148
Popular project management software allows you to easily track cost and schedule performance as the project progresses This provides a useful tool for project control The current cost and schedule status must be entered routinely (daily or weekly) For each activity, you must estimate: actual cost so far, and percent complete Earned Value Analysis is a common tracking tool that provides performance 149
Earned Value Analysis compares the current project status with the original (baseline) plan It computes several performance metrics for individual activities and for the entire project It focuses on cost and schedule performance Its a useful tool for project control Popular project management software computes these metrics
150
Earned Value
Earned Value for a task = (budgeted cost of task)*(% completion of task) Its often difficult to estimate % completion of a task; 4 approaches once task is started:
assume
finished assume 0% until task is finished use % of budgeted cost or time used so far best guess of knowledgeable person (best)
151
Cost variance (CV) = BCWP ACWP Schedule variance (SV) = BCWP BCWS
152
3 lines on chart: Baselineplanned cost over time (BCWS) Actual Cost line (ACWP) Earned Value line (BCWP) Schedule variance (negative is bad) Cost variance (negative is bad) Example chart on next slide describe project performance in this example
153
Rupees
Cost schedule plan (baseline) ACWP Actual cost BCWS BCWP Now Time Cost variance
Schedule variance
154
Rupees
BCWS baseline
Now Time
155
Rupees
BCWP = EV ACWP
BCWS baseline
Now Time
156
Cost variance (CV) = BCWP ACWP Schedule variance (SV) = BCWP BCWS
157
158
Example
Example: Budgeted cost for finished task = Rs 850; Actual cost to date = Rs 550; Task is 70% complete, but was scheduled to be 80% complete by now BCWS = 0.8*(Rs 850) = Rs 680 PV (baseline) BCWP = 0.7*(Rs 850) = Rs 595 EV ACWP = Rs 550 AC Cost variance = BCWP ACWP = + Rs 45 (good) Schedule variance = BCWP BCWS = - Rs 85159 (bad)
= budgeted cost at completion = Rs 850 ETC = (850 595) / 1.082 = Rs 235.67 Estimated (total cost) At Completion EAC = ETC + ACWP EAC = 235.67 + 550 = Rs 785.67
160
BAC
Scope Creep
PM must be cautious of scope creep. Why? Most common cause is due to the client or project team wanting to enhance the projects deliverables The later that changes are made, the more difficult and costly they become Scope creep is welcome if it lowers costs or enhances the firms competitiveness A change control system allows the PM to assess the impacts and desirability of potential changes before deciding to 161 implement them
Review suggested changes Assess all impacts to project goals Evaluate advantages and disadvantages Consider alternative changes that are better Allow responsible parties to make decision in light of all information Communicate changes to everyone involved Implement changes Summarize all changes and impacts in report 162
163
R44 1 R21 2 R7 3
Project severity = expectation (1-10) * impact (1-10) When should risk analysis be formed? Is not a time activity Periodic update and reviewed
164
Calculating Severity
Problem
Staff Late delivery of hardware Communication and Networks problem
165
Probability/impact
Probability/Impact Matrix
A probability/impact matrix or chart lists the relative probability of a risk occurring on one side of a matrix or axis on a chart and the relative impact of the risk occurring on the other. List the risks and then label each one as high, medium, or low in terms of its probability of occurrence and its impact if it did occur. Can also calculate risk factors: Numbers that represent the overall risk of specific events based on their probability of occurring and the consequences to the project if they do occur.
167
168
169
170
Top Ten Risk Item Tracking is a qualitative risk analysis tool that helps to identify risks and maintain an awareness of risks throughout the life of a project. Establish a periodic review of the top ten project risk items. List the current ranking, previous ranking, number of times the risk appears on the list over a period of time, and a summary of progress made in resolving the risk item.
171
4 5
4 5
3 3
Decision
173
A decision tree is a diagramming analysis technique used to help select the best course of action in situations in which future outcomes are uncertain. Estimated monetary value (EMV) is the product of a risk event probability and the risk events monetary value. You can draw a decision tree to help find the EMV.
174
175
Sensitivity Analysis
Sensitivity analysis is a technique used to show the effects of changing one or more variables on an outcome. For example, many people use it to determine what the monthly payments for a loan will be given different interest rates or periods of the loan, or for determining breakeven points based on different assumptions. Spreadsheet software, such as Excel, is a common tool for performing sensitivity analysis.
176
177
Risk
General Risk Mitigation Strategies for Technical, Cost, and Schedule Risks
179
180
Its also important to identify residual and secondary risks. Residual risks are risks that remain after all of the response strategies have been implemented. Secondary risks are a direct result of implementing a risk response.
181
Involves executing the risk management process to respond to risk events. Workarounds are unplanned responses to risk events that must be done when there are no contingency plans. Main outputs of risk monitoring and control are: Requested changes. Recommended corrective and preventive actions. Updates to the risk register, project management plan, and organizational process assets.
182
183
PROJECT CLOSURE
184
Level of Activity
Plan
Initiate
Close
Start
Time
Finish
185
Evaluating
186
Project Closing
Involves gaining stakeholder and customer acceptance of the final products and services. Even if projects are not completed, they should be formally closed in order to reflect on what can be learned to improve future projects. Outputs include project archives and lessons learned, which are part of organizational process assets. Most projects also include a final report and 187 presentation to the sponsor or senior
Closing a Project
Is
the project ready for close-out and/or transition? Is the Change management plan up-to-date? Are the deliverables / outputs complete and acceptable based on the quality standards? Is the documentation (training manuals, user guides, evaluation reports, etc.) ready for hand-over? Make sure Phase / Milestone reviews are captured, summarized and maintained in a Body of Knowledge.
188
Closing a Project
Obtain approvals proof of completion Ensure user and stakeholder satisfaction Lessons learned Improve estimates for future projects Improve project methodologies Recognize team members and contributions Evaluate project success according to (1) time, (2) cost (3) quality and (4) scope (deliverables) Establish transition plan for those providing ongoing implementation in local context Assess next steps if any
189
What is it? The Project Close Out Report formalizes closure of the project. This process assures that the Accountable Executives, Business Sponsor and Stakeholders have formally accepted the product or service by verifying that the outcomes met all the deliverables outlined in the Project Scope of Work. Summarily, the Project Close Out Report assesses project successes and areas for growth, and ensures that lessons learned/deliverable documents have been entered into appropriate databases. Why use it? The bookend counterpart to the Project Charter & Justification/Project Scope of Work, the Project Close Out Report ensures that all protocols necessary for project completion are followed. Furthermore, it helps ensure that the projects shared learnings are passed on 190 to the Partnershipand future projects.
191
NEW AVENUES
PERT-based models not well suited for the present day multiproject environment. Complex models of "projects" cause unnecessary costs and low maneuverability in several cases. PM experts try to identify different "lightweight" models, like Agile Project Management methods.
192
Event chain methodology is an uncertainty modeling and schedule network analysis technique that is focused on identifying and managing events and event chains that affect project schedules. Event chain methodology helps to mitigate the negative impact of psychological heuristics and biases, as well as to allow for easy modeling of uncertainties in the project schedules. Event chain methodology is based on the following major principles. Probabilistic moment of risk: An activity (task) in most real life processes is not a continuous uniform process. Tasks are affected by external events, which can occur at some point in the middle of the task. Event chains: Events can cause other events, which will create event chains. These event chains can significantly affect the course of the project. Quantitative analysis is 193 used to determine a cumulative effect of these event chains
Critical events or event chains: The single events or the event chains that have the most potential to affect the projects are the critical events or critical chains of events. They can be determined by the analysis. Project tracking with events: If a project is partially completed and data about the project duration, cost, and events occurred is available, it is possible to refine information about future potential events and helps to forecast future project performance. Event chain visualization: Events and event chains can be visualized using event chain diagrams on a Gantt chart.
194
Project Auditing
195
Another primary purpose of evaluation is to help translate the achievement of the projects goals into a contribution to the parent organizations goals To do this, all facets of the project are studied in order to identify and understand the projects strengths and weaknesses The result is a set of recommendations that can help both ongoing and future projects
196
Project Auditing
A major vehicle for evaluation is the project audit, a more or less formal inquiry into any aspect of the project
A
project audit is highly flexible and may focus on whatever matters senior management desires The evaluation of a project must have credibility in the eyes of the management group for whom it is performed and also in the eyes of the project team on whom it is performed
197
problems earlier Clarify performance, cost, and time relationships Improve project performance Locate opportunities for future technological advances Evaluate the quality of project management Reduce costs
198
Organizational Benefits
Speed
the achievement of results Identify mistakes, remedy them, and avoid them in the future Provide information to the client Reconfirm the organizations interest in, and commitment to, the project
199
Evaluation often makes recommendations that relate to ancillary, unplanned, but important contributions to the project and its parent:
Improve
understanding of the ways in which projects may be of value to the organization Improve processes for organizing and managing projects Provide a congenial environment in which project team members can work creatively 200
Ancillary goals
Identify
organizational strengths and weaknesses in project-related personnel, management, and decision-making techniques and systems Identify risk factors in the firms use of projects Improve the way projects contribute to the professional growth of project team members Identify project personnel who have high potential for managerial leadership
201
problems earlier Clarify performance, cost, and time relationships Improve project performance Locate opportunities for future technological advances Evaluate the quality of project management Reduce costs
202
Evaluation often makes recommendations that relate to ancillary, unplanned, but important contributions to the project and its parent:
Improve understanding of the ways in which projects may be of value to the organization Improve processes for organizing and managing projects Provide a congenial environment in which project team members can work creatively together
203
Ancillary goals
Identify
organizational strengths and weaknesses in project-related personnel, management, and decision-making techniques and systems Identify risk factors in the firms use of projects Improve the way projects contribute to the professional growth of project team members Identify project personnel who have high potential for managerial leadership
204
The project audit is a thorough examination of the management of a project, its methodology and procedures, its records, its properties, its budgets and expenditures and its degree of completion The formal report may be presented in various formats, but should, at a minimum contain comments on some specific points
205
Current status of the project Future status Status of crucial tasks Risk assessment Information pertinent to other projects Limitations of the audit
It is far broader in scope than a financial audit and may deal with the project as a whole or any component or set of components of the project
206
Time and money are two of the most common limits on depth of investigation and level of detail presented in the audit report Accumulation, storage, and maintenance of auditable data are important cost elements Two often overlooked costs are the self protective activity of team members during an audit, and the potential for project morale to suffer as a result of a
207
There are three distinct and easily recognized levels of project auditing:
General
audit - normally most constrained by time and resources and is usually a brief review of the project touching lightly on the six parts of an audit Detailed audit - usually conducted when a follow-up to the general audit is required Technical audit - generally carried out by a qualified technician under the direct guidance of the project auditor
208
The first audits are usually done early in the projects life Early audits are often focused on the technical issues in order to make sure that key technical problems have been solved Audits done later in the life cycle of a project are of less immediate value to the project, but are more valuable to the parent organization 209
As the project develops, technical issues are less likely to be matters of concern Conformity to the schedule and budget become the primary interests Management issues are major matters of interest for audits made late in the projects life Postproject audits are often a legal necessity because the client specified such an audit in the contract
210
The information should be arranged so as to facilitate the comparison of predicted versus actual results Significant deviations of actual from predicted results should be highlighted and explained in a set of footnotes or comments Negative comments about individuals or groups associated with the project should be avoided
211
Introduction Current status Future project status Critical Management issues Risk Analysis Caveats, Limitations, and Assumptions
212
First and foremost, the auditor should tell the truth The auditor must approach the audit in an objective and ethical manner Must assume responsibility for what is included and excluded from consideration in the report The auditor/evaluator must maintain political and technical independence during the audit and treat all materials as 213 confidential
the project
Audit After
214
a written report according to a prespecified format the report to the project manager and project team for their response up to see if the recommendations have been implemented
Distribute
Follow
215
Like the project itself, the audit has a life cycle composed of an orderly progression of well-defined events:
Project
audit initiation Project baseline definition Establishing an audit database Preliminary analysis of the project Audit report preparation Project audit termination
216
For an audit/evaluation to be conducted with skill and precision, and to be generally accepted by senior management, the client and the project team, several conditions must be met:
The
audit team must be properly selected All records and files must be accessible Free contact with project members must be preserved
217
Access to Records
In order for the audit/evaluation team to be effective, it must have free access to all information relevant to the project Most of the information needed will come from the project teams records or from various departments such as accounting, personnel, and purchasing Some of the most valuable information comes from documents that predate the project
218
Access to Records
RFP Minutes of the project selection committee Minutes of senior management committees that decided to pursue a specific area of technical interest
Priorities must be set to ensure that important analyses are undertaken before those of lesser importance 219
There are several rules that should be followed when contacting project personnel Care must be taken to avoid misunderstandings between the audit/evaluation team and project team members Project personnel should always be made aware of an in- progress audit Critical comments should be avoided
220
Measurement
Measurement is an integral part of the audit/evaluation process Performance against planned budget and schedule usually poses no major measurement problems Measuring the actual expenditure against the planned budget is harder and depends on an in-depth understanding of the procedures used by the accounting department
221
Measurement
It is a very difficult task to determine what revenues should be assigned to a project All cost/revenue allocation decisions must be made when the various projects are initiated The battles are fought up front and the equity of cost/revenue allocations ceases to be so serious an issue As long as allocations are made by a formula, major conflict is avoided-or at 222 least, mitigated
Project Auditing
223
Project Auditing
224
Project Auditing
225
The information should be arranged so as to facilitate the comparison of predicted versus actual results Significant deviations of actual from predicted results should be highlighted and explained in a set of footnotes or comments Negative comments about individuals or groups associated with the project should be avoided 227
Introduction Current status Future project status Critical Management issues Risk Analysis Caveats, Limitations, and Assumptions
228
First and foremost, the auditor should tell the truth The auditor must approach the audit in an objective and ethical manner Must assume responsibility for what is included and excluded from consideration in the report The auditor/evaluator must maintain political and technical independence during the audit and treat all materials as 229 confidential
Audit/Evaluation Team
The choice of the audit/evaluation team is critical to the success of the entire process The size of the team will generally be a function of the size and complexity of the project For a small project, one person can often handle all the tasks of an audit, but for a large project, the team may require representatives from several 230
Summary
The purposes of the evaluation are both goal-directed and also aimed at achieving unspecified ancillary goals The audit report should contain at least the current status of the project, the expected future status, the status of crucial tasks, a risk assessment, information pertinent to other projects, and any caveats and limitations
231
Summary
Audit depth and timing are critical elements of the audit The difficult responsibility of the auditor is to be honest in fairly presenting the audit results The audit life cycle includes audit initiation, project baseline definition, establishing a database, preliminary project analysis, report preparation, and termination
232
Summary
Several essential conditions must be met for a credible audit: a credible audit/evaluation team, sufficient access to records, and sufficient access to personnel Measurement, particularly of revenues, is a special problem
233
Big hassle at the end Estimates are rarely accurate Difficult to accurately determine project status (how long to completion) Often, theres no sense of urgency on a project until its too late Project schedules are often unrealistic Hard to see how decisions on one project impact other projects in the pipeline We are constantly in a reactive mode Projects are completed late and over-budget There are lots of changes
Projects are more complex Require coordination of many independent resources Project managers rarely control all of the necessary resources Multi-project Environment Many projects occurring concurrently Competing for the same resources Managers have to constantly react to every bump in the road Managers have little or no visibility of how problems and decisions on one project impact
Success = On time, within budget, committed scope Challenged = Late, overbudget, or lacking key scope Failed = Canceled before completion or never implemented 236
The answers
Failed
237
The answers
Failed
51% of projects were late, overbudget, or lacked scope (probably due to schedule challenges)
Challenged
238
The answers
Failed Successful
Challenged
Only 31% of projects finished on-time, within budget, and with committed scope 239
Critical Chain is a project management application of the Theory of Constraints (TOC) Unlike most continuous improvement methods, TOC doesnt focus on improving individual processes TOC takes a macro-approach How well its many individual processes work together determine an organizations ability Coordinates decisions to synchronize process behavior for maximum output and minimum waste Removes friction between processes, which is the root cause of waste in an organization Top down (globally) driven approach, not
Variability is the one constant on all projects Critical Chain changes how we protect a project from variability How do we establish project schedules? Determine project due date Estimate task lengths and flow dependencies How do we protect a project from variability? Safety factor at end of project Is this protection enough? Is there significant variability at the task level? Is there any variability protection at task level?
Consider this
more it costs
The
Perhaps we should figure out a way to prevent projects from taking longer than they absolutely need to!
242
243
244
Murphys Law
What
can go wrong will go wrong When things cannot get any worse, they will When things appear to be going well, you must have overlooked something Estimates each include Safety Buffer Estimates become Commitments
245
Estimation Variation
50% confidence
Safety
10% confidence
90% confidence
10
246
Estimation Variation
Task 1
Task 2
Task 3
Since all tasks are scheduled with 90% confidence, why are most projects still delivered late, overbudget, or with removed scope?
247
Parkinsons Law
Work
expands to fill the time it is given Student Syndrome many people will start to fully apply themselves to a task just in the wake of a deadline Driven by focus on the task due dates
Now what?
Focus on the date that the task is due
Late starts Safety allows the task to start late if there is something else going on when we need to start
If nothing goes wrong, task completes on time. If something goes wrong, task will be late. If this happens on the critical path, the project will be late.
249
Buffer built into each individual estimate is overkill and inefficient Tracking individual task due dates to indicate project health encourages:
Estimates
Encourages individual ownership of individual commitments rather than team ownership of the team commitment
250
aggressive schedule that makes it more possible to deliver early Team focus Team ownership of the team commitment
251
252
Assumes each home will suffer a serious problem So each home self-insures Not enough to cover a serious problem
The
Assume that not every home will get hit with a serious problem Pool your resources Enough to cover a serious problem, possibly more
253
Task 2
Task 3
254
Task 2
Task 3
255
Safety
End
Remove the safety from the individual tasks Put it where the project benefits
Expected Finish
256
Buffer Placement
Project Buffer
Between
the last task of the aggressive project schedule critical chain and the committed end date
Feeding Buffers
Protect
the critical chain from being impacted by non-critical chain Place at the end of non-critical chains before they connect to the critical chain
257
Buffer Sizing
SSQ
Square root of the sum of the squares of the differences for the tasks along the chain (??!?!?!) 258
Build the WBS Identify dependencies Gather estimates with 50% confidence
1 set 50% 2 sets 50% and 90% - check for difference 1 set 90% - and cut in half to get to 50%
Build your project schedule using LATE FINISH (rather than early start) Resolve resource contentions (leveling)
259
260
If a task is late or expected to be late, consume days from the appropriate buffer and DOCUMENT WHY If a task is early (completes ahead of estimate), replenish the appropriate buffer
Monitor trends in buffer utilization for issues Use a fever chart to assess project health
261
262
% Buffer Utilization 100.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 0.0%
Status Date
July October
All is good
December
263
9/27/2005 10/4/2005 10/11/2005 10/18/2005 10/25/2005 11/1/2005 11/8/2005 11/15/2005 11/22/2005 11/29/2005 12/6/2005 12/13/2005 12/20/2005 12/27/2005 1/3/2006 1/10/2006 1/17/2006 1/24/2006 1/31/2006 2/7/2006 2/14/2006 2/21/2006 2/28/2006 3/7/2006 3/14/2006 3/21/2006 3/28/2006 4/4/2006 4/11/2006 4/18/2006 4/25/2006 5/2/2006 5/9/2006 5/16/2006 5/23/2006 5/30/2006 6/6/2006 6/13/2006 6/20/2006 6/27/2006 7/4/2006 7/11/2006 7/18/2006 7/25/2006 8/1/2006 8/8/2006 8/15/2006 8/22/2006 8/29/2006 9/5/2006 9/12/2006 9/19/2006 9/26/2006 10/3/2006 10/10/2006 10/17/2006 10/24/2006 10/31/2006 11/7/2006 11/14/2006 11/21/2006 11/28/2006 12/5/2006 12/12/2006 12/19/2006
Tasks may actually finish early! Treat the transition of tasks as a baton race Keep appropriate people informed that an early finish may be imminent so they can be prepared to grab the baton and run!
264
Focus On
Starting tasks on time Completing tasks as aggressively as possible Maintaining quality, despite aggressive push Amount of Project Buffer that is consumed
265
Differences
The Old Way Uses worst-case estimates Protects individual tasks with safety Starts and finishes tasks at scheduled start and finish times Individual ownership of task completion Project health is based on individual task completion Critical Chain Uses average-case estimates Protects project with buffers Starts tasks as soon as predecessors are done, finishes tasks as quickly as possible. Team ownership of project completion Project health is based on days used from the project buffer
266
Protection against Murphys Law Take advantage of early finishes Team protection of the buffer Opportunity for team to focus Visibility to aggressive, possible, and realistic schedule Better visibility to when project is in trouble Strong response to buffer changes
267
Challenges
Resource multi-tasking goes against key goal of requiring focus to complete tasks as quickly as possible Works best in an environment where everyones doing it Cultural change required Tools availability but a spreadsheet will help Moving target for a completion date
268
Educate the project and management team on the methodology to get buy-in Estimate aggressively by removing safety from individual tasks Trust management to not hold staff accountable to aggressive estimates without safety Minimize multi-tasking Track using buffer consumption
269
can prove a light bulb works without showing how it works To prove a process works, people must 270 understand and accept how it works before the