Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
and Implementation
14 June 2006
Tripatra Fluor Consortium
QAQC Departement
TF Main Office-Duri, Sumatra
What is Quality?
Quality in TF FPM Practice
System is :
Process
Product Spec
&
Activities Customer
Needs
Knowledge
Assurance:
The act of giving confidence, the state of being certain or the act of making
certain.
Quality assurance:
The planned and systematic activities implemented in a quality system so that
quality requirements for a product or service will be fulfilled.
Control:
An evaluation to indicate needed corrective responses; the act of guiding a
process in which variability is attributable to a constant system of chance
causes.
Quality control:
The observation techniques and activities used to fulfill requirements for quality.
Function in quality can vary from one organization to another. Nevertheless, a few primary job
classifications are consistent, regardless of industry or organization:
Mutual Expectation:
Q
ytil a u Q
COS/ FPM
CS/
RC
© Chevron 2005
High Quality,
Competitively priced work,
Safely and on time
DOC ID
Quality Basic Concept
And Implementation
20
?
Q
TF FPM QUALITY SYSTEM GENERAL
+
Operating
Proven System
Processes & Requirements
Procedures
Content of
TF Project
Execution Plan
Quality Management
System is
the shared
responsibility of all
project team members
–
Engineer
Designer
Supplier/
Subcontractor,
Field personnel
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
24
QUALITY
MANAGEMENT
SYSTEM
Content of
Quality
Managements
System
References detailed
implementing
procedures, practice and
plans
Content of
Quality
Managements
System
Contract
Deliverables
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
27
HOW QUALITY IS ACHIEVED IN TF FPM
ORGANIZATION
FPM CONTRACTOR
TF TF TF CONST TF CONSTRUCTION
ENGINEERING SUPPLY CHAIN SUPERVISION/ EQUIPMENT
MANAGEMENT SUBCONTRACTOR
DESIGN
E P C CM
MAINTENANCE,
ENGINEERING PROCUREMENT CONSTRUCTION REPAIR,
RECONDITION
QUALITY
ACTIVITY QUALITY QUALITY
CONTROL/
QUALITY ASSURANCE/ CONTROL/ QUALITY
SURVEILLANCE
PLAN SURVEILLANCE ASSURANCE
QUALITY AUDITS
SLS
QC Inspectors QC Inspectors QC Inspectors NDE Coordination
Construction
Equipment
Site Construction QC Surveillance & Testing Maintenance
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
29
How Quality is cascaded down to TF
Subcontractor
Comply with
Tender Process •Review Quotation Exhibit-F
Develop •Pre Bid Meeting (Subcontractor’s
WAF -Exhibit F quality
-Specification requirement)
(CPI, Codes, etc) •Site Surveillance &
•Audits Specification
1.3.1 Organization
1.3.2 Field Design Change Control
1.3.3 Purchasing
1.3.4 Document Control
1.3.5 Identification and Traceability of Equipment and Material
1.3.6 Inspection and Testing
1.3.7 Inspection, Measuring and Test Equipment
1.3.8 Quality Process Control
1.3.9 Inspection and Test Status Procedures & Reporting
Requirements
1.3.10 Control of Non-Conformance
1.3.11 Material and Equipment Receiving, Handling, Storage and
Maintenance
1.3.12 Quality Records
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
33
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
34
DOCUMENT HIERARCHY
CTOP-400
Data Sheets
CPI Specification
TF FPM Specifications
Referenced Codes and Standards
Approved for Construction Drawings
Vendor/Supplier/Subcontractor Standards
Executethe work
2. Work out the Implementation of
based on the
Plan the Quality Plan
specific ITP
TF Subcontractor
Quality Org
TF Quality Org
1. Develop Quality Plan
1. Review and approve Quality Plan
1. Planning the 2.
3.
Develop Procedures
Develops the generic ITP
2. Review Procedures
3. Review the ITP
Work 4. Establish Quality
4. Review Quality Personnel
Organization
TF FPM Subcontractor TF
Construction Services
Control Control
No
Activities Reference/ Acceptance Hold/ Witness/
Spot Witness
Hold/ Witness/ Spot
Witness
Document Criteria
TF FPM Subcontractor TF
Construction Services
Then...
TF FPM will feel?
Satisfy
Happy to pay as the invoice
Happiness Long term relationship
Thank You
CPI Construction
Representative
CS
Sr. QC Inspector
Superintendent
QC Inspector CS Engineer
FPM Subcontractor
Coordination Line
Quality Basic Concept
And Implementation
© Chevron 2005 DOC ID
48
SITE COORDINATION
- Work Requisition Process Flow-
No Revise
Accept?
Yes
Get input from User and
User to identify CS to identify hold Copy and distribute to
CS on inspection
Yespoints
hold and witness and witness points CS & QC
and return to
points
Subcontractor
Surveillance Report
Initiate RFI
Received &
Review
Yes Need No
Design
Engineerin
g Support.?
Accept and
Transmit to
Log Implement
Subcontractor
No
Verify Report Test Accept?
Yes
Instruct No
Repair the job Subcontractor to Job Pass QC?
repair the job Interpretation and
Report
Yes
Accept job
completion
Send copy to CPI
Regular reporting
for information
on data base,
Data Base Report weekly and
Evaluation monthly
Data Base Report
Evaluation