Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
&
PROBLEM SOLVING
By
MQS Office
AUTOMOTIVE SECTOR
Mahindra Quality System (A. S.)
Whose perspective should we look at?
products
processes
results
outcomes
benefits
Lens of customer
2. Intermediate customers
E.g. Retailer, Distributor, OEM
- Kaoru Ishikawa
The 7 QC Tools;
☛ Flow chart
☛ Check sheet
☛ Histogram
Q
☛ Pareto Diagram
☛ Scatter diagram
The 7 QC Tools;
☛ Check sheet
☛ Histogram
☛ Pareto Diagram
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 7
AUTOMOTIVE SECTOR
FLOW CHARTS
Operation
Inspection
Transportation
Delay
Storage
➨ Manufacturing
☛ Accounting
☛ Services
➨ Restaurants
➨ Real estate
The 7 QC Tools;
CHECK SHEET
☛ Flow chart
☛ Check sheet
☛ Histogram
☛ Pareto Diagram
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 15
AUTOMOTIVE SECTOR
CHECK SHEET
The 7 QC Tools;
HISTOGRAM
☛ Flow chart
☛ Check sheet
☛ Histogram
☛ Pareto Diagram
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 22
AUTOMOTIVE SECTOR
HISTOGRAM
What is a Histogram ?
TITLE: __________________________
‘X’ Axis
Constructing a Histogram
Constructing a Histogram
A B
Target Target
C D
Target Target
Mahindra Quality System (A. S.) 28
AUTOMOTIVE SECTOR
INTERPRETING HISTOGRAM
Benefits of Histogram
Histogram of C1
10
8
Frequency
0
12 14 16 18 20 22
C1
Descriptive Statistics: C1
Bin Frequency
Histogram 0 0
11.5 1
20 13 0
16
15 12
14.5 3
Frequency
8 9 16 12
10
5 17.5 8
5 3 19 16
0 1 0 0
0 20.5 9
0 11.5 13 14.5 16 17.5 19 20.5 22 23.5 22 5
Gap in mm
23.5 0
More 0
The 7 QC Tools;
PARETO DIAGRAM
☛ Flow chart
☛ Check sheet 1
☛ Histogram 2
☛ Pareto Diagram 3
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 35
AUTOMOTIVE SECTOR
PARETO DIAGRAM
99% 100%
96% 100%
400 92%
90%
350
80%
74%
300 70%
60%
ACCIDENT IN NO.
250 54%
50%
200
40%
30%
150
128
30%
102
100
82 76 20%
50
10%
20
12
4
0 0%
MAINTENANCE - 1MAINTENANCE - 2OPEARATIONS - 1OPEARATIONS - 2 ADMINISTRATION TRAINING SAFETY
DEPARTMENT
300
Percent
60
200
40
100 20
0 0
Department
-1 -2 -1 -2 O
N
her
I
E E NS NS AT Ot
ANC ANC I O IO R
T
T EN T EN RAT RAT NIS
I
AI
N
AI
N
PEA PEA DM
M M O O A
Count 128 102 82 76 20 16
Percent 30.2 24.1 19.3 17.9 4.7 3.8
Cum % 30.2 54.2 73.6 91.5 96.2 100.0
The 7 QC Tools;
☛ Flow chart
CAUSE & EFFECT DIAGRAM
☛ Check sheet
☛ Histogram
☛ Pareto Diagram
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 44
AUTOMOTIVE SECTOR
CAUSE & EFFECT DIAGRAM
Quality characteristic.
☛ Negative (a problem)
POOR
MILEAGE -
5 KMPL
METHOD MACHINE
POOR
MILEAGE -
5 KMPL
PEOPLE MATERIAL
Use wrong
gears Under inflated
tyres
Rash Carburetor
Driving adjustment
POOR
MILEAGE -
Poor 5 KMPL
Improper
maintenance
lubrication
Poor Wrong
Driving habits fuel
PEOPLE MATERIAL
POOR
MILEAGE -
5 KMPL
PEOPLE MATERIAL
The 7 QC Tools;
SCATTER DIAGRAM
☛ Flow chart
☛ Check sheet
☛ Histogram
☛ Pareto Diagram
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 56
AUTOMOTIVE SECTOR
SCATTER DIAGRAM
☛ To confirm a Hypothesis.
Line of Best Fit - Y Intercept Point at which line of best fit crosses Y axis
Strong correlation
Moderate correlation
Weak correlation
(Tan 45 degree = 1)
The 7 QC Tools;
CONTROL CHARTS
☛ Flow chart
☛ Histogram
X
☛ Pareto Diagram
LCL
☛ Cause & Effect
☛ Scatter diagram
☛ Control charts
Mahindra Quality System (A. S.) 65
AUTOMOTIVE SECTOR
CONTROL CHARTS
UCL
LCL
The 7 QC Tools;
STRATIFICATION
☛ Stratification
60
Parameter Y
50
☛ Brain storming 40
30
20
10
1 2 3 4 5 6 7 8 9 10 11
Parameter X
What is Stratification ?
to be treated separately.
process.
Example:
☛ For instance, analysing ‘Quality’ cost.
☛ Prevention cost
☛ Appraisal cost
to 5 %
☛ Stable process
UCL
LCL
Benefits of Stratification
UCL
1 2 3 X
LCL
The 7 QC Tools;
GRAPHS & CHARTS
☛ Stratification
☛ Brain storming
1. Bar graph
2. Line graph
The 7 QC Tools;
BRAINSTORMING
☛ Stratification
☛ Brain storming
What is Brainstorming?
or solutions.
Benefits of Brainstorming
☛ Creativity
Ground Rules
☛ No discussion / No debate
Brainstorming sequence
80 • • 100%
PROCESS •
STEPS 60 • 75%
•
40 50%
DECISION
20 25%
A B C D E Other Check Sheet
STOP
Pareto Chart
Flow
Chart
IS IS NOT
WHAT?
Histogram
WHO?
WHERE?
WHEN?
HOW MUCH?
Capability Study
Is/Is Not Analysis Control Chart
6. Report results.
4. Identify causes for the current 5. Develop a plan for improvement and
situation. how success will be measured.
and/or
and/or
Team Problem
Draw Establish
Conclusions the Focus
Examine
the Current
DEFINE Situation
Standardise
the CONTROL MEASURE
Changes
Analyze
Act Plan the
ANALYZE Causes
Study
(Check) Do
IMPROVE
Study Act on
the the Causes
QC STORY
Results
DMAIC
PDSA/PDCA
The tools listed above are ideally utilized in reducing the process
• Improvement
• Monitoring
• Implementation