Sei sulla pagina 1di 12

Model 1700 Training

Activity Two
Reposition Integral Transmitter

transmitter
housing Rotatetransition
Rotate
Repositiontransition
ring
and align.
clockwise to lock.
counterclockwise to
disengage.

transition ring
base

2 Initials
Reposition Remote Mount Transmitter

junction housing

junction end cap mounting


bracket
3 Initials
Step 1 -- Mount Bracket on Pipe or Panel

4 Initials
Step 2 -- Disassemble Transmitter

Pull mating
connector down to bolts
disengage.
Rotate junction housing
counterclockwise and pull
down to disengage junction
housing from bolts.

Unscrew
5Initials junction end cap
Step 3 -- Wire Core Processor to Mating Connector

mating
connector

1 2 3 4

core
processor

(cable gland not


shown)

6 Initials
Step 4 -- Position Main Enclosure on Bracket

Check that
junction housing
seal is in place.

7 Initials
Step 5 -- Insert Mating Connector

Note connector is keyed.

1 2 3 4

(cable and cable


8 Initials
gland not shown)
Step 6 -- Position and Seat Junction Housing

Seat junction housing on bolts in


desired position and rotate
clockwise to locking position.

Tighten bolts to secure


housings in position on
bracket.

9 Initials
Step 7 -- Replace Junction End Cap

10 Initials
Accessing LDO Subassembly
and Wiring Compartment

wiring
compartment LDO cover
cover

end cap clamps

11 Initials
Output and Power Supply Wiring Terminals

Terminal Connects to
No.
1 mA/HART 
2 mA/HART 
3
Unscrew lifthatch.
andFO
4 FO 
5 RS-485 A
6 power
Swing RS-485 B cover
terminal
7
upward SP
to expose terminals.
8 SP
9 power
10 power

12 Initials

Potrebbero piacerti anche