Maga RMX– Ambathale

Complain on high bleeding, segregation and setting time issue


Introduction
• Customer made a complain on high bleeding, segregation and setting time delaying with
concreting in Prime land project. Due to that concrete had been collapsed when demolding
as customer informed.
• This customer is using INSEE Extra and INSEE RF these days heavily.
• Quality team and I&A team involved and met Plant manager and Material Manager in Maga
RMX Ambathale as immediate response.
• Then I&A team started investigation and proceeded trials for understand situation and find a
solution.
• We proceeded lab trials, production in Apartment project in ‘Pipeline lane’ and Address 606
project. I&A team and B2B team involved heavily on those concreting.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 2


Summery: Maga RMX Ambathale
Complain Observations and Results Recommendation
Concrete not hardened • Previously this design was • Proceeding with trialed mix
and collapsed when proceeded with both Extra and RF. design is must and changing
demolding in Prime But due to not availability of RF, cement types and amount
Grand Residencies 100% Extra used for concreting surely affected to concrete
project. and setting delay may effect properties.
comparing OPC mix. • 100% Extra definitely lead to
• Vertical shutters demolding time is setting delay and they have
24Hrs as they practice in site but demolded earliest than normal
they had been demolding after practice which is double
20Hrs. Four hours earlier. mistakes done by them.
High Bleeding and • When we proceed existing design, • With optimized design, we
segregations concrete shown high bleeding and reduced admixture dosage,
segregations. They trialed same which is cost effective for them.
mix with Sika team using Ultratech And gain far more good
PPC but shown no excess concrete than previous.
bleeding and segregation. • But we identified that there
• Then we optimized design in terms should be internal change in
of admixtures to gain required cement and customer have no
properties. Shown no excess idea. Recommend to inform
bleeding and segregation. property changes,
improvements doing to our
cement.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 3


Summery: Maga RMX Ambathale

Complain Observations and Results Recommendation


Setting time Delay with • For the existing design, initial • With optimized design setting
new cement bulk setting time was 22Hrs. time was controlled but
• With optimized design initial setting according to experience 15Hrs
time was 15Hrs. also delayed setting time result.
Need to improve that.

Can not do concreting • I&A team and B2B team executed • Concreted Apartment project in
with current Extra bulk concreting of two projects without ‘Pipeline lane’ from G25 100%
any defect under our inspections Extra.
and quality controlling. • Concreted Address 606 project
from G40 100% Extra

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 4


Summery: Maga RMX Ambathale
Complain Observations and Results Recommendation
• INSEE has done • According to the results and • With cement report which is
some what observations can identify major providing with bulk Maga RMX could
changes in variations in concrete identify setting delay and proceed
cements but not properties for on going precautions.
informed to designs. • As a practice we should inform all
Customers and • And cement report which is customers and Admixture teams in
Admixture teams as providing with bulk also shown terms of our cement property
usual. property changes. changes then they can adopt and we
can avoid this kind of complains.
• Recommend to send our cement
samples to Admixture teams once a
month or two weeks period to adjust
their products.
• In Address 606 concreting we used
complained cement bulk and new
unloaded bulk. Here shown two
colours with two cement bulks and
customer concern is INSEE have
change cement again without
informing and now again some
failure will happen with optimized
designs.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 5


Concreting in ‘Address 606’ project

New cement Complained cement


bulk/Light colour bulk/Dark colour
Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 6
Concreting Prime Grand Residencies
• MAGA RMX complain handling on 10/05/2019
• Problem status :
• 1.G70 Strength not achieved from last two months
• 2.G40 SCC is segregation.
• Handling the issue:
 Batching 1m^3 and observe the performance of initial and after half an hour. Shown high
bleeding.
 Finding out the root cause and optimize the admixture dosage. Reduced dosage from
0.2% dosage.
 Then Batched all required 50 m^3 without any performance issue.
 Some error was in G70 design and it was corrected.
• Concerns of customer :
• If there is any quality change it has to be informed in advance

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 7


Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 8
• Loss of 1D strength due to delay in setting time of Extra

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 9


CEC RMX– Central Expressway Narammala
Complain on high bleeding and segregation issue
Introduction
• Customer made a complain on high bleeding and segregation with Rapid flow plus. .
• This customer is using INSEE Extra and INSEE RF + these exclusively.
• I&A team involved and met Material Manager in CEC RMX CEW as immediate response.
• Then I&A team started investigation and proceeded trials for understand situation and find a
solution.
• We proceeded lab trials, plant trials for design optimization as solution for complained
cement bulk. I&A team and B2B team involved heavily on those trials and discussions with
CEC Senior Project Manager, Plant Manager and Material Engineer.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 11


Summery: CEC RMX Central Express way
Complain Observations and Results Recommendation
High bleeding and • When we proceed existing design, • With optimized design, we
segregations concrete shown high bleeding and reduced admixture dosage,
segregations. which is cost effective for them.
• Then we optimized design in terms And gain far more good
of admixtures( reduced dosage concrete than previous.
from 1.05 to 0.9) to gain required • But we identified that there
properties. Shown no excess should be internal change in
bleeding and segregation with cement and customer have no
admixture reductions. idea. Recommend to inform
property changes,
improvements doing to our
cement.
Admixture behavior • For the bulk received on • Explained them variation of
changed bulk to bulk 2019.03.29 optimized admixture admixture will be huge effect to
dosage was 0.9%.(Shown good concrete with Quarry dust and
flow and retention) need to check admixture time to
• For the bulk received on time.
2019.04.01, 0.95% admixture
dosage also gave margin results.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 12


Summery: CEC RMX Central Express way
Complain Observations and Results Recommendation
Design optimization for • We received samples from Quality • Should proceed plant trial after
coming cement bulk team for improved next cement receiving new bulk.
bulk. • Should change mix design and
• According to lab trials on going get approvals for reduced
admixture dosage 1.05% shown admixture dosage from
high bleeding and segregation consultant.
after 45min.
• Then according to trials proceeded
0.9% dosage gave good results.
Slump is increased • As shown when concreting first • I&A team proceeded lab trials
when concreting going three or four mixers are good but simultaneously and shown no
on. after that high initial slump is giving issue with cement, but their
so tend to bleeding. might be error in plant.
• So recommendation given to
customer for proper plant
calibration should done before
move on.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 13


Plant trials with on going design

Initial slump
70mm After 1Hrs:Slump-240mm
High segregation and bleeding
Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 14
Plant trials with optimized design

Initial slump After 1Hrs:Slump-200mm


75 mm No segregation and bleeding

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 15


Lab trials for cement samples

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 16


Access RMX– Paliyagoda
Complain on high water demand and strength lost
Introduction
• Customer made a complain on water demand increased with Extra so adding around 10kg to
15kg for on going design.
• This customer is using INSEE Extra these days heavily.
• Customer complaining on property variation with each cement bulk so feel difficult to control
fresh concrete quality and affect to strength.
• As they start to use Extra from 2019 May 3 rd replacing INSEE RF+, strength reduction also
shown and they have lost major three projects as mentioned by Plant manager Mr.Anura.
• I&A team and B2B team started investigation and proceeded lab trials with their samples in
Extra ( Batch date-2019/05/21) with Access lab crew to find best solution for customer.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 18


Summery: CEC RMX Central Express way
Complain Observations and Results Recommendation
Early strength reduction • When we proceed existing design, • We proceeded design
optimized to INSEE RF+ but using optimization with customer for
INSEE Extra cement. So early INSEE Extra and achieved
strength reduction was shown to good early strength.
customer. • Due to increase of water
demand in Msand and cement
may be adding more water to
concrete which should be
avoids..
Increase in water • Customer seems water demand • Design optimization done for
demand for cement new increased with new bulks. So we water demand by adjusting
bulks proceeded flow test. admixture, and fine so no need
• Flow test results shown slight of more water.
water demand increment than • Need to check cement variation
previous may affect to concrete for water demand in our side.
highly.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 19


Trials/Testing summery

Test
Grade Slump/ mm Strength / MPa Remarks
#

Cube Time Requirement Achievement Days Requirement Achievement

01 G30 Initial 175+-25 170 • Added 10 kg of


Extra
4 23.7 MPa extra water to get
1.1% required initial
dosage 1Hrs 175+-25 180 7 slump
of Sika • Flow was slow
208 2Hrs 175+-25 195

3Hrs 175+-25 125

02 G30 Initial 175+-25 165 • Added 11.5 kg of


3 extra water to get
Extra
1.2% required initial
dosage 1Hrs 175+-25 180 7 slump
of Sika • Flow was slow
208 2Hrs 175+-25 110 • Slump dropped
in 2hrs.
3Hrs 175+-25

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 20


Trials/Testing summery

Test
Grade Slump/ mm Strength / MPa Remarks
#

Cube Time Requirement Achievement Days Requirement Achievement

03 G30 Initial 175+-25 185 • Moisture of MS


Extra 4 22.2 MPa increased 5.8%
1.1% to 9.4% and
dosage proceed same
of Sika 1Hrs 175+-25 200 design in T#01.
208 7 • Added 6 kg of
extra water to get
2Hrs 175+-25 200 required initial
slump
• Concrete and
Flow was very
3Hrs 175+-25 195 good.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 21


Trials/Testing summery

Test
Grade Slump/ mm Strength / MPa Remarks
#

Cube Time Requirement Achievement Days Requirement Achievement

04 G35 Initial 175+-25 • This concrete


Extra 3 was concreted to
1.1% site and we
dosage proceed lab trial
of
1Hrs 175+-25 to get
Hyperc 7 understand.
rete • Proceed with
+M moisture of MS
2Hrs 175+-25 5.8% .
• Added 16 kg of
extra water but
required slump
was not their.
3Hrs 175+-25 • Removed as
failed

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 22


Remarks…
• In #T01 and #T02 trials proceeded with same design and same material condition but
different admixture dosage. Dosage was increased as #T01 dropped in 3Hrs but #T02
also behave as #T01 and dropped in 2hrs.
• Then #T03 trial was proceeded with same material and #T01 dosage but Msand moisture
was increased from 5.8% to 9.4%. Then concrete was so good in fresh stage and gave
good retention. So there is a issue with Msand absorption which is clearly shown
comparing #T01 and #T03 lab trials and successful concrete production and #T04 lab trial.
• After discussion with Mr.Anura and Lab crew we proceeded Grading and Clay test for
Msand sample, although fine % is slightly high (12.6%) and clay content 3.68%, results
can be accepted for those parameters.
• May be due to wrong absorption, admixture will absorb to Msand with water initially then
they will add more water to get required initial slump and will effect to water cement ratio
ultimately strength of concrete. As Ultratech crew also their and as heard strength issue is
with them also. 7day strength of Ultretech less around 2MPa than our PPC Extra.
• We achieved acceptable 4 day strengths and customer was satisfied with those results.
• We need to focuses on consistent cement properties and inform customer on any variation
as requested by customer Access RMX Paliyagoda.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 23


Port city project RMX
Complain on cement variation
Introduction
• Customer made a complain on cement variation with new cement bulks.
• They have noticed that fresh concrete properties couldn’t achieved with proceeding design
and materials.
• So I&A team with B2B team involved to find solution to customer supporting with admixture
supplier CashTech.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 25


Summery: CEC RMX Central Express way
Complain Observations and Results Recommendation
Customer complaining • We proceeded trials with new • In fresh stage we couldn’t
on cement variation in cement samples provided by achieve initial slump
Extra bulk to bulk. Quality team. requirement.
• As customer concern they refuse • We added water 25 kg to one
to go with design optimization so meter cubes then get some flow
we had to go with trials for existing but slump was not their.
design. • Then discussed with admixture
supplier to upgrade admixture
to achieve requirements of
customer.

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 26


• Flow test done in portcity

Siam City Cement (Lanka) Limited | All Rights Reserved. 09/24/2020 27


ICC RMX Bokundara
Complain on slump drop
ICC RMX Bokundara
Complain on slump drop
Summery
Place Contacted Task No. of Materials Final Result
person attempts
Complain on Bleeding and • Extra Done
segregation. So proceed and do • RF+
CEC CEW; design optimization • Qdust
CEC CEW RMX • Mr.Neel • 5-20mm
Narammala • Mr.Nishshanka #Trial: G30:flow 550(+/- 50): 4 • Hy+M
Retention 3Hrs
#Trial: G50:slump 200(+/- 25):
Retention 3Hrs

Consultant lab trials G40 for new • Extra Done


plant in port city project. • M-Sand
CashTech- CashTech; • LRPS3000
Seeduwa • Mr.Aruna 2
Lab Trial: G40:slump 200(+/- s
25): Retention 3Hrs

Complain on flow reduction • Extra Trials shown


• M-Sand less flow. After
Portcity; Lab Trial: G40:slump 200(+/- • Sea sand discussion with
Portcity trials • Mr.Amila 25): Retention 3Hrs 2 • LRPS3000 CasTech
s adjustment done
to achieve
requirements

Complain on strength drop and • Extra Done


high water demand in Extra new • M-Sand Strength
Access RMX- Access; bulk • Sika 208 satisfied with lab
4
Paliyagoda • Mr.Wijesunghe Lab Trial: G30:slump 200(+/- • Hy+M trials
25): Retention 3Hrs

Siam City Cement (Lanka) Limited | All Rights Reserved. 30


Summery of last two week
Place Contacted Task No. of Materials Final Result
person attempts
Bleeding and segregation with Had a deep
Extra and strength loss discussion and
Thudawe;
Thudawe RMX attended to plant
CEW-Wilgoda
• Mr. 1 concrete. Results
were accepted. Only
one time issue
Complain on cracks and Done
Mechanical Sanken; customer request on strength Hammer test result
plant project • Mr.Chamila check as site complaining on were accepted and
Digampathana cement 3 CECB was
-Sanken RMX CECB; convinced on
Kandy • Mr.Thusitha cement. Design
failure
Complain on 1D strength Done
reduction Cube was crushed
Maga RM- Maga;
for 1D and 2D.
Ambathale • Mrs. Muditha
Results accepted by
ME
Issue with strength gain 7D to • RF Done
28D • Rsand
Nuwani
Nuwani; #Trial: G30:slump 150(+/- 25): • Sika 208
Construction-
• Mr.Thilina Retention 2Hrs
2 • MP 300R
Matara
#Trial: G25:slump 150(+/- 25):
Retention 2Hrs

Siam City Cement (Lanka) Limited | All Rights Reserved. 31


Summery
Place Contacted Task No. of Materials Final Result
person attempts
#Trial: G25:slump 125(+/- 25): Done
Retention 2Hrs • RF
• RF+ (slag)
Sam Dam Sam Dam; • Rsand
Engineering- • Mr.Sudam 4 • Qdust
Balangoda • 5-20mm
• CashTech

Consultant lab trials G40 for new • Extra Done


plant in port city project. • M-Sand
CashTech- CashTech; • LRPS3000
Seeduwa • Mr.Aruna 2
Lab Trial: G40:slump 200(+/- s
25): Retention 3Hrs

Complain on flow reduction • Extra Trials shown


• M-Sand less flow. After
Portcity; Lab Trial: G40:slump 200(+/- • Sea sand discussion with
Portcity trials • Mr.Amila 25): Retention 3Hrs 2 • LRPS3000 CasTech
s adjustment done
to achieve
requirements

Complain on strength drop and • Extra Done


high water demand in Extra new • M-Sand Strength
Access RMX- Access; bulk • Sika 208 satisfied with lab
4
Paliyagoda • Mr.Wijesunghe Lab Trial: G30:slump 200(+/- • Hy+M trials
25): Retention 3Hrs

Siam City Cement (Lanka) Limited | All Rights Reserved. 32


Next Two Weeks Key Priorities…

ELS Precast yard Sooriyawewa slag cement Trials

SSP RMX Rathnapura slag cement trials

Nuwani construction Matara trials with Extra

ICC RMX Bokundara reactivation with MM

Senarath RMX Pannala Lab trials