PRE-START CHECKLIST FOR HYDRAULIC (MOBILE) CRANE


Equipment
Site Name   Type of Work   Number  
Manufacturer   Model   Capacity  
Year Manufactured   Date of First Use   Date of Inspection  

11
  Sheave
2
  Anti-two Block
  
 
 
  6
Structure/Boom
 
 
 
  1
Wire Rope
 
 
 
 
 
 
  
 
 
 
 4 Hook & Safety Latch
 
 
 
  12
  3
Hydraulic Cylinder Wire Drum
 
 
 
 
 
 
5 8
 
 
Overload Protection Brake
 
 
 
  
  9
  Counterweight
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
  13
  Tire Assembly 7
  Horn & Rearview Mirror 10
   Outrigger/Pad

14 Certification   16 Oil Leakage   18 Lifting Gears   20 Fire Extinguisher  


Overhead & Ground
15 Permit to Work   17 Banksman/Signal Man   19   21 Alcohol Test  
Condition
Operator (Sig) Const. Team (Sig) HSE Personnel (Sig)

(Keep the copy of Daily Pre-Start Equipment Checklist on Site for the Job Duration. Submit a copy to the Project HSE Department, if requested/required)
Note: Mark appropriate boxes
with:  Acceptable;  Unacceptable;  Need Further Check; NA Not Applicable

Form: HDEC-HSE-CE-005 (E)


Company:
DAILY PRE-START CHECKLIST FOR HYDRAULIC Equipment No.
(MOBILE) CRANE
MON TUE WED THU FRI SAT SUN REMARKS
NO. ITEM
/ / / / / / /
1 Wire Rope

2 Anti-Two Block

3 Hydraulic Cylinder

4 Hook & Safety Latch

5 Overload Protection

6 Structure/Boom

7 Horn & Rearview Mirror

8 Brake

9 Counterweight

10 Outrigger/Pad
11 Sheave

12 Wire Drum

13 Tire Assembly

14 Certification

15 Permit to Work

16 Oil Leakage

17 Banksman/Signal Man

18 Lifting Gears
19 Overhead & Ground Condition

20 Fire Extinguisher

21 Alcohol Test

22

23

24

25

26

27

Operator (Name: )

Sig. Const. Team (Name: )

HSE Personnel (Name: )

(Keep the copy of Daily Pre-Start Equipment Checklist on Site for the Job Duration. Submit a copy to the Project HSE Department, if requested/required)
Note: Mark appropriate boxes
with:  Acceptable;  Unacceptable;  Need Further Check; NA Not Applicable

Form: HDEC-HSE-CE-005 (E)


COMPANY :
Equipment No.
DAILY PRE-START CHECKLIST FOR HYDRAULIC MOBILE CRANE
MON TUE WED THU FRI SAT SUN REMARKS
No ITEM
/ / / / / / /
1 Wire Rope / Tali Baja
2 Anti-Reserve / Anti Mundur
3 Anti-Two Block / Anti dua blok
4 Load Indicator Function / Fungsi Indikator Beban
5 Hook & Safety Latch / hook dan kunci pengaman
6 Overload Protection / Perlindungan Dari Kelebihan
7 Swing Alarm
8 Wind Speed Indicator / Indikator Kecepatan Angin
9 Structure boom / struktur rangka boom
10 Angle Indicator / Indikator Sudut
11 Flash Beacon / Lampu Rotary
12 Brake / Rem
13 Rearview Mirror / kaca spion
14 Hydraulic Cylinder Condition / Kondisi silinder hidrolik
15 Horn / klakson
16 Sheave / pulley
17 Wire Drum / Tali Baja Drum
18 Counterweight / Pengimbang
19 Out rigger (pad) /
20 Lower Frame Condition / Kondisi casis bawah
21 Certification / Sertifikasi
22 Permit To Work / Surat Ijin Kerja
23 Oil Leakeg / Kebocoran oli
24 Banksman / Signal Man
25 Steel Plate Base / Dasar Plat Baja
26 Lifting Gears / Alat Bantu Angkat
27 Fire Extinguisher / APAR
28 Alcohol Test / Test alkohol
Operator Name / Nama Operator :
Sign Construction Team Name / Nama team konstruksi :
HSE Personnel Name / Nama petugas K3 :
(Keep the copy of Daily Pre-Start Equipment Checklist on Site for the Job Duration. Submit a copy to the Project HSE Department, if requested/required)
Note: Mark appropriate boxes
with:  Acceptable;  Unacceptable;  Need Further Check; NA Not Applicable

Form: HDEC-HSE-CE-005 (E)