Sei sulla pagina 1di 22

PORTABLE

WATER Presentation By

DISPENSER Sanyam Dua FIB1953


Daksh bhatia FIB1920
Sahil Munjal FIB1952
Akshit Chawla FIB1911
Naman Sharma FIB1935
WHAT IS THE
PRODUCT

Automatic Water Dispenser Come with Cylinder


body, Dispense Water in a Single touch Super Silent
yet powerful motor insures to dispense water
easily .Now simply Attach the water Dispenser &
dispense water from the Can with ease
WHY THIS PRODUCT
CONVENIENCE : No heavy lifting of water
cans and hence ideal for women/ senior
citizens/Children.
PORTABLE : Easy to carry.
ECONOMICAL

3
TARGET MARKET

Add a footer 4
COSTING
Components of Products Amount
Rechargeable lithium battery 1400 Mah 100
Silicone Tube 20
USB Water Dispenser Pump 80
Touch Button Covered With Silicon 50
Plastic Body 60
TOTAL 310
Add a footer 5
FR

.
PRODUCTION
FR
PRODUCTION PROCESS
• Assembly Line Production : An assembly line is a
production process that breaks the manufacture of a
good into steps that are completed in a pre-defined
sequence. The method is used in the mass production
of products. They are able to reduce labor costs
because unskilled workers could be easily trained to
perform specific tasks.

Add a footer 7
FR
LAYOUT

Add a footer 8
FR
Location
•Pipe : Ganesh Nagar
•Water Pump : Maya Puri ( Jaggi industry )
•Battery & Button : Karol Bagh

Add a footer 9
FR

Location analysis
Weightage Factor Bahadurgarh Noida Kirti
Nagar
30 Land 8 8 9
35 Labour 7 9 9
20 Transportation 6 7 9
15 Govt. Policy 6 7 8

Add a footer 10
FR

• Bahadurgarh :- 30*8 + 35*7 + 20*7 + 15*6 = 695

• Noida :- 30*8 + 35*9 + 20*7 + 15*7 = 800

• Mayapuri :- 30*9 + 35*9 + 20*9 + 15*8 = 885

Add a footer 11
o S FR
Strategic Decisions

- Standardization

- Business process re-engineering

Add a footer 12
INVENTORY FR
MANAGEMENT

• Raw Materials Inventory


1.Plastic Body
2.Motor
3.Silicon Pipes
4. Battery
• Work in Progress Inventory
• Finished Goods Inventory
Portable Water Dispenser
• Maintainance, Repair and operating supplies Inventory
Add a footer 13
  Particulars Details Amount

Industrial space in Kirti Nagar District

 
 

Land required
 

500 sq. feet


 

 
FR
  Price available ( Rent ) ₹40,000.00
  Registration fees ₹30,000.00  

  Dealer charges ₹5000.00  

    ₹75,000.00
       
       
Purchase of raw material for first production of 500 units    

  Rechargeable lithium battery 1400 Mah 500*60 ₹30,000.00


  Packing box 500*2 ₹1000.00
  Silicone Tube 500*20 ₹10,000.00

₹20,000.00
  USB Water Dispenser Pump 500*40  

Touch Button Covered With Silicon


    500*50 ₹25,000.00
  Plastic body 500*30 ₹15,000.00
  Total raw material   ₹1,36,000.00
       
Labour required 20 (approx)      
  Skilled labour 4*14000 ₹56,000.00
  Unskilled labour 6*10000 ₹60,000.00
  Transportation charges (varies)   ₹5,000.00
  Total labour cost   ₹121,000.00
       

  Electricity and water bill( varies every month) 10000 ₹10,000.00


   
Add a footer    
14
Economic Order Quantity FR
(EOQ)
• Traditional approach is used for controlling inventory- EOQ
• The EOQ model seeks to ensure that the right amount of inventory is
ordered per batch 
• The Formula for Economic Order Quantity
The EOQ model finds the quantity that minimizes the sum of these costs.

Add a footer 15
FR
Quality Management
• Point Allocation System (PAS) based quality control.
• For an effective PAS in practice, workers need to be
trained in defects’ checking.
• Management can opt for staring with the most
frequent defects

Add a footer 16
Comprehensive data on reports of different types of defects were FR
collected in from various literature review. From this one can easily
get idea regarding types of defects that are most common for each of
the operations

Defect Type

 Measurement of Pipe
 Defect in Battery
 Defect in Motor
 Fitting of Plastic Body

Add a footer 17
FR
Maintenance Management
• The goal of maintenance management is to control the resources, time and
costs of a company to ensure the efficiency and adequacy of
the maintenance operations and to avoid waste of resources or periods of
downtime due to faulty equipment.
• There are some functions of maintenance management.
1. Inspection
2. Repair
3. Overhaul
4. Lubrication
5. Salvage
Add a footer 18
Types of Maintenance FR
Generally, there are 2 types of maintenance system in garment industry.
1. Breakdown maintenance 2. Preventive
maintenance/Routine maintenance

Breakdown Maintenance
 Machines are allowed to run without any maintenance
 Only when it becomes out of order (stop working) it is repaired.
 Next time maintenance is down when it is breakdown.
 Machine breakdown time is considered as loss time in garment
manufacturing.
 Breakdown time should be recorded and track to see mechanic
performance.
Add a footer 19
FR
Supply Chain Management
Raw Material: Work in progress: Finished goods &
Manufacturing. Distribution
Rechargeable lithium Packaging.
battery 1400 Mah Storing.
Order Processing. Silicone Tube Distribution
USB Water Dispenser
Pump
Touch Button Covered
With Silicon
Plastic Body

20
FR
Conclusion
• Water Dispenser are important for the people
who are living PG’s and Hostels.
• With less investment we will going to increase our
profit per year.
• Low risk
• We will soon become market leader because of
greater demand and less competition.
Add a footer 21
THANK
YOU
Add a footer 22

Potrebbero piacerti anche