GROUP-7
Onshore Gas Well with Overburden Formation
JAKARTA DRILLING SOCIETY
APRIL 25TH, 2020
JDS - Group-7
2 OUTLINE
Project Resources
Opportunity Statement, Value Drivers & Vision Of Success
Business Case and Economic Summary
Alkaline: Project Frame
Decision Hierarchy
Spider Plot and Structural Map
Campaign Project Timeline
Interpreted Seismic Data
Geological Prognosis
Phase-2 : Work Plan
JDS - Group-7
3 Project Resources
JDS - Group-7
4
Opportunity Statement, Value Drivers &
Vision Of Success
Opportunity Statement
• Drill and complete one (1) development gas wells; ABC-77. To maintain sufficient supply to the existing Buyer refer to daily contact quantity
as per Gas Sales Agreement.
• Produce proved gas reserves from additional compartment 4.0 BSCF, optimize and maintain the production from new well pad.
• Supply gas potentials 2.0 MSCFD which can not be optimized by existing wells.
Value Drivers
The following are the value drivers for this project:
• Monetize additional reserves from Alkaline Field with execution of 1 additional well by continuously maintain gas supply.
• Improve and sustain a positive Net Investment Position (NIP) and minimize unrecovered hydrocarbon throughout PSC life.
• Well economics (NPV; DPI; IRR).
Vision of Success
JDS - Group-7
5
Business Case and Economic Summary
4,500,000,000.00
Sumur ABC-77 4,000,000,000.00
3,500,000,000.00
Total Gross Revenue US $ (000) 24,067
3,000,000,000.00
1 Opex & Depresiasi US $ (000) 8,894
2,500,000,000.00
2 Contractor Take US $ (000) 6,069
2,000,000,000.00
3 Government Take US $ (000) 9,104
NPV @ DF : 10.00% US $ (000) 3,009 1,500,000,000.00
IRR % 30.3% 1,000,000,000.00
POT Years 2.65 500,000,000.00
PI US$ / US$ 1.49
-
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00
Business Case
Outside the Frame: - Amended Drilling Schedule. - Well Portfolio. - AFE Revision
- Surface Facilities –Gas deliverability and Supply. – Existing Contract
JDS - Group-7
7 ABC-77: Decision Hierarchy
Givens
• Drill one (1) gas well with overburden
pressure
• Raw Data
GIVENS • Existing Contract
JDS - Group-7
ABC-77: Timeline
No
No
8 Process
Process
2020
2020 2021
2021
8
8 9
9 10
10 11
11 12
12 1
1 2
2 3
3 4
4 5
5 6
6 7
7 8
8 9
9 10
10 11
11 12
12
Survey
Survey ofof Location
Location
1
1 Survey
Survey Geotechnical
Geotechnical
Internal
Internal Review
Review & & Approval
Approval
2
2 Detail
Detail Engineering
Engineering
3
3 FID
FID Approval
Approval
4
4 Drilling
Drilling Poject
Poject Risk
Risk Assement
Assement
5
5 Hazard
Hazard Effect
Effect Register
Register
6
6 Mobillization
Mobillization Equipment
Equipment Assement
Assement
7
7 DWOP
DWOP
External
External Review
Review & & Approval
Approval
88 POD
POD Approval
Approval
99 EPT
EPT SKK
SKK Migas
Migas well
well design
design approval
approval (3(3 weeks)
weeks)
10
10 AFE
AFE Submission
Submission & & approval
approval (2(2 months)
months)
11
11 Land
Land Clearance
Clearance (5 (5 months)
months)
12
12 Explosive
Explosive permit
permit (3 (3 months)
months)
13
13 PI
PI Besi
Besi Baja
Baja Permit
Permit (4(4 months)
months)
14
14 Master
Master List
List (3
(3 months)
months)
Process
Process ofof Procurement
Procurement
15
15 Drilling
Drilling Rig
Rig && Other
Other services
services
16
16 3rd
3rd Party
Party Services
Services
17
17 Long
Long Lead
Lead Items
Items (OCTG,
(OCTG, Wellhead)
Wellhead) -- 66 mo
mo
18
18 Long
Long Lead
Lead Items
Items (Completion)
(Completion) -- 66 mo
mo
Operation
Operation
19
19 Rig
Rig &
& 3rd
3rd party
party Mobillization
Mobillization & & R/U
R/U -- Well#1
Well#1
Drilling
Drilling well#1
well#1
20
20 Completion
Completion well#1
well#1
Unloading
Unloading & & Testing
Testing well#1
well#1
21
21 R/D
R/D and
and Demobillization
Demobillization
FID:
FID: Final
Final Investment
Investment Decision
Decision
JDS - Group-7
9
ABC-77: Spider Plot and Structural Map
Location Well
PROJECT DETAILS: ALKALINE FIELD
ABC-77
Geodetic System: Universal Transverse
Mercator Djakarta
Ellipsoid: Bessel 1841
Zone: Zone 505 (114 E to 120 E)
System Datum: Mean Sea Level
JDS - Group-7
11 ABC-77: Interpreted Seismic Data
NW
ABC-77
SE
JDS - Group-7
12 ABC-77: Geological Prognosis
DEPTH GENERAL DESCRIPTION GENERALIZED
LITHOLOGY (Approx. depths, ft.TVD)
(FT-MD) WELL DESIGN
0 – 1050 ft TVD 20” casing
Mahakam Group Clayed sand majority, sandstone (~150ft MD)
Handil Dua and Attaka Formation
13-3/8” shoe
? (~467ft MD)
BO Marker
?
4100– 7900 ft TVD
Balikpapan Group
sandstone, shalestone,
sandyclay, coal layer, limestone 3-1/2” tubing
Mentawir and Gelingseh
Formation Co Marker cemented
? (~7323ft MD)
Depth (feet)
• Expect to encounter overburden pressure in KP-Baru formation as well as Marker Name
depletion pressure. TVD
• From seismic analysis ABC-77 will not hit any fault. Limestone B 3540
• Penetrate similar reservoir characteristic as same as offset wells. Limestone Bo 4020
JDS - Group-7
Reservoir 7200
13 Phase-2 Work Plan
Phase 2 Work Plan – Key Activities Est. Completion Date
Establish Value-Based Well Objective (VBWO)
Uncertainty Management Plan (UMP)
Develop Alternatives Matrix and Strategy Table
Generate and Evaluate Well Alternatives
Subsurface Hazards Assessment (SSHA)
Complex Well Process (CWP) 21 June 2020
Surface Facillity Plan
Risk Assessment of Alternatives
Recommend Well Design Concept
Update Project Economics (±20%)
Phase 2 Decision Quality Assessment (DQ Spider)
1 July 2020
Forward DSP/Pre-Read Material to DE/DRB
15 July 2020
Snaking with DE and DRB Members
15 August 2020
Phase 2 to Phase 3 DRB Meeting
JDS - Group-7