Sei sulla pagina 1di 45

Chlef Optimization KPIs &

Projects 2012
Summary

I. Chlef KPI’s 2012


II.Optim main projects
III.Optim problems and bottlenecks
I. Chlef KPI’s
Traffic Evolution/Chlef/2012

23.07% of Traffic increase [from 650 to 800 Kerl] in a period of 7 months !

Chlef , December 2012 4


CSSR Evolution/Chlef/2012

0.31% of Call Setup Improvement [from 97.5% to 97.8%] in spite of:

Around 23% of Traffic increase and 100% of CBR increase [ from 0.1% to 0.2%] !
External Interference in Saida Down Town ( Appeared on 17th of April, Complaint Sent to ARPT)
% not solved HW due to Gel Spare

Chlef , December 2012 5


CDR Evolution/Chlef/2012

11.11% of Call Drop Improvement [from 0.9% to 0.8%] in spite of:

Around 23% of Traffic increase !


External Interference in Saida Down Town ( Appeared on 17th of April, Complaint Sent to ARPT)
% not solved HW due to Gel Spare

Chlef , December 2012 6


HSR Evolution/Chlef/2012

0.78% of Handover Improvement [from 96% to 96.75%] in spite of:

Around 23% of Traffic increase !


External Interference in Saida Down Town ( Appeared on 17th of April, Complaint Sent to ARPT)
% not solved HW due to Gel Spare

Chlef , December 2012 7


HO Qual, Lev, BC Evolution/Chlef/2012

15.55% of HO Qual Improvement [from 11.25% to 9.5%] in spite of:

Around 23% of Traffic increase !


External Interference in Saida Down Town ( Appeared on 17th of April, Complaint Sent to ARPT)
% not solved HW due to Gel Spare

Chlef , December 2012 8


Benchmarking KPI Evolution
West Center Optimization Area

An Improvement/Stability of main Benchmarking indicator (Call Setup, HO Fail) in Spite of HR Usage % degradation
CDR degradation is mainly due to the 8 dropped calls noticed in Saida due to External Interference there.
The degradation of RxQual indicator due to PC activation in Chlef and Tiaret should relativized regarding to improvement of main KPIs and stability of
Voice Quality
II. West Center Optimization
main projects
II. West Center Optimization
main projects
1. AFP Optimi Projects
II. West Center Optimization
main projects
2. WHITE LIST Project
West Center Optimization main projects
White List Project

 White List Project concerns 14.32% of Cells (338/2360) in West Center Area

 96.65% of Original List Implemented (327/338)


West Center Optimization main projects
White List Project

 20.18% (66/327) of FAULTY IMPLEMENTATION


West Center Optimization main projects
White List Project

 Above distribution of done / not done cases per wilaya


West Center Optimization main projects
White List Project

 Above distribution of Ok / not Ok cases per wilaya


II. West Center Optimization
main projects
3. Co-Channels
West Center Optimization main projects
Co-Channels Project

 Co-Channels > 5% are maintained at a reasonable level


II. West Center Optimization
main projects
4. Parameters Audit
West Center Optimization main projects
Parameters Audit

 Periodical parameters audit are performed on below points


Idle Mode
Neighbooring
External Cells
HO Emergency vs HO Comfort
Service Groups (HO/PC Parametrizing for AMR cells)
Power Control
II. West Center Optimization
main projects
5. Capacity Upgrade / New Site
West Center Optimization main projects
Capacity Project
II. West Center Optimization
main projects
6. Summer Cells Project
West Center Optimization main projects
Summer Project
II. West Center Optimization
main projects
7. EDGE Project
West Center Optimization main projects
EDGE Project
II. West Center Optimization
main projects
8. Field Missions
West Center Optimization main projects
Field Mission / Mascara (1)

1. Mascara performed by Nadhir RAHMOUNE from 22th to 27th of May 2011


Report and Result (1)
Drive Test Comment Action
Road Algiers -> SIG 1 bad level portion P1 WO HO Add 83280
1 bad quality portion Q1 WO Freq. Change 83281
SIG
Level PBs Sent to Radio team
4 bad level portions P1-> P4
WO Parameter tuning 83142
7 bad quality portions Q1-> Q7
Mascara Down WO Frequency Tuning 83077
6 drops
town Upgrade O29X090_S3, O29X001_S3
5 Call Setup failures
Some Quality issues related to Level issues (wait
3 Handover Failures
Radio feedback)
Road Mascara ->
Tighennif 3 bad level portions P1 1 Level PB Sent to Radio team
TIGHENNIF Down 2 due to site swap O29X064
Town
Congestion PB in target cells of neighbors
29679->29445,
3 bad level portions P1-> P3
Mohammadia 29263 -> 29393 (need hopping activation on
3 HO failures
Down Town 29263),
29679->29445

Bouhnifia Down
DT OK  
Town
Algiers -> Mascara DT with some issues To check with Radio team
West Center Optimization main projects
Field Mission / Mascara (2)

Report and Result (2)

Site Visit Comment Action

O29X032 DT OK + NO Additionnal Antenna  


O29X139 Faulty Azimuth detected 50/310 rather 50/280 Azimuth correction ask to radio team

Need
O29X081 Open area + Overshooting PB Mechanical action in O29X081
+ traffic rebalancing towards DCS

O29X037 offset of the both antennas according to the BSS NOC Engineer, locking separate Need Radio chain check by radio team
antennas (antenna 1 (4trx), antenna 2 (2trx )), the KPIs are improving.
As shown in the photos below the antennas of the sector are shifted horizontally
(one on one foot and one on the other foot of the pestle)

Sent to Radio team


O29X124 Coverage PB
+ Need LAC audit and HO Audit
West Center Optimization main projects
Field Mission / Mascara (3)

Conclusion

The mission took place in a good framework and all Scheduled


Work were done.

After knowledge of the field and cities of mascara, problem


solving will be more objective and easier especially problems
related to design.

All WO sent are done, and actions related to coverage


problems are supported by west radio team.
West Center Optimization main projects
Field Mission / Tiaret (1)

2. Tiaret performed by Merzouk SEKHI from 14th to 19th of May 2011


Report and Result (1)
West Center Optimization main projects
Field Mission / Tiaret (2)

Report and Result (2)


West Center Optimization main projects
Field Mission / Tiaret (3)

Conclusion

The added value of this mission is the possibility to collect field


data for each parameter configuration.

Global goals of the mission have been reached as we trend to


the best PC parameters values for a good inter-working of PC
with HO + the best results on field.

Final PC parameters values have been implemented in Chlef


and Tiaret wilayas with good field results.
III. Problems and Bottlenecks
III. Problems and Bottlenecks
III.1 HW
West Center Optimization Problems and Bottlenecks
HW
West Center Optimization Problems and Bottlenecks
HW
III. Problems and Bottlenecks
III.2 External Interference
West Center Optimization Problems and Bottlenecks
External Interference
SAIDA

=> Generate important KPIs degradation (below table)

Most of these degradations have been improved thanks to AFP Project implemented in Saida on
17.06.2011

=> Complaint sent to ARPT authority (Status : wait on ARPT feedback)


West Center Optimization Problems and Bottlenecks
External Interference
RELIZANE

=> Generate important KPIs degradation (below table)

=> Complaint sent to ARPT authority (Status : wait on ARPT feedback)


West Center Optimization Problems and Bottlenecks
External Interference
MASCARA

=> Generate important KPIs degradation (below table)

% of KPIs degradation

Nb Sites
Problem Wilaya Commune concerne Site Sector CI CSSR CDR HO Inc Status
d

MASCARA
O29X051 3 29513 -1% 50% -6%
Down Town external Interference
external
Mascara 3 confirmed, Scan Done
Interference MOHAMMADIA O29X018 1 29181 -3% 50% -12% Complaint will be sent to ARPT
OGGAZ O29X021 3 29213 -3% 78% -44%

=> Complaint will be sent to ARPT authority


IV. Optim Roadmaps
West Center Optimization Roadmaps
Roadmaps

 Some points need to be checked on next weeks


RLTO = 28 for AMR cells and down town cells (even not AMR)
BSIC Optimization for Mascara-Relizane
HO Level parametrizing
PC DL generalization to other wilayas
Thanks
END OF DOCUMENT