Takasago Thermal Engineering Co., Ltd.

Basic Technical Training

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning 3. Flow Calculation

1.1 Functions Of Air Conditioning 3.1 Air


Human Comfort Environment Air Balance
Purpose of Air Conditioning Frictional Loss
Indoor and Outdoor Condition The Ductulator
Duct size and Static Pressure
1.2 Methods of Air Conditioning Static Pressure Calculation
AHU - Air Handling Unit Fan Selection
FCU - Fan Coil Unit Fan Performance
DX - Split Unit
PAC - Packaged Unit (Air-cooled / Water-cooled) 3.2 Water
Water Balance
1.3 Psychrometry The Ductulator
Psychrometric Chart Head Calculation
Psychrometric Terms Pump selection
Psychrometric Sample Pipe Pressure
Understanding Psychrometry What is Pressure?
Properties of Air and Water
Heat
Psychrometric Process 4. Automatic Control
Psychrometric Calculation
4.1 Elements of Control
1.4 Ventilation Temperature control
Purpose of Ventilation Humidity control
Fresh Air Requirement Room Pressure control
Ventilation Modes VAV control
Methods of Mechanical Ventilation Supply Water Pressure control

2. Heat Load 5. Conversion Table


2.1 Heat Load Calculation
Heat Source
Unit Heat Load
AHU Selection
Chiller Selection

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 1

Human Comfort Environment

A human comfort environment can be created by essentially controlling these elements:

Illumination

HUMAN
Air condition COMFORT Human factor
ENVIRONMENT

Others
(noise, vibration,
cleanliness,..etc.)

Air conditioning is only one aspect to artificially create an environment for human occupants and
factory needs.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 2

Purpose of Air Conditioning

• Comfort air conditioning

– to create an environment for human comfort.


e.g. office building, hotel, hospitals, etc.
in some special case for animal breeding room.

• Industrial air conditioning

– to create an environment for production and process needs.


e.g. semiconductor manufacturing, food manufacturing,
pharmaceutical manufacturing, biotech facility, etc.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 3

Indoor and Outdoor Condition

• Comfort air conditioning

A general indoor condition for human comfort:


Dry bulb temperature between 22.5℃ to 25.5℃
Relative Humidity between 50% to 70%
Airflow of not more than 0.25m/s
Fresh air introduction – (refer to requirement in CP13)
Dust – 0.15 mg/m3
Noise & Vibration – (refer to requirement in CP13)

• Industrial air conditioning

The indoor condition will depend on customer requirement of production


and process needs.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 4

Indoor and Outdoor Condition

Extract from CP13:1999

Table 1 - Outdoor air supply requirement for comfort air-conditioning

Minimum outdoor air supply


Type of building / Occupancy
m 3/h per m 2 floor area
Restaurants 10.0
Dance halls 19.0
Offices 2.3
Shops, supermarkets and department stores 3.6
Lobbies, concourse and corridors 0.9
Classrooms 9.2
Theatres and cinemas 7.3
Factories and workshops:
Light 4.3
Medium 2.6
High 1.3
3
Hotel guest rooms 54 m /h per room

Note: The above table assumes no smok ing in air-conditioned space

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 5

Indoor and Outdoor Condition

The outdoor condition (Singapore) *for design purpose

During the day


Daily ~ Maximum 32.4 ℃ @ 1400 hr
~ Minimum 24.0 ℃ @ 0500 hr

Monthly ~ Maximum 32.4 ℃ @ April


~ Minimum 27.1 ℃ @ December

Average 28.2 ℃

*The design value for outdoor condition ~ 34 ℃ and 65% R.H.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.1 Functions of Air Conditioning - 6

Indoor and Outdoor Condition

Extract from CP13:1999

Table 5 - Recommended ambient sound level

Area Low dBA Average dbA High dbA


Cinemas, theatres - 35 40
Private executive type offices 35 40 45
General offices, other private or semi-private offices 40 45 50
Conference rooms 35 40 45
Air-conditioned classrooms 40 45 50
Hotel bedrooms 35 40 45
Hospital wards 35 40 45
Places of public resort e.g. shops 40 50 55
Circulation areas e.g. staircases, lobbies, car parks 50 55 60

Noise and vibration in mechanical ventilation and air-conditioning systems arise from mechanical
and electrical equipment, and from the flow of water through pipes and the flow of air through ducts
and grilles.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.2 Methods of Air Conditioning - 1

AHU – AIR HANDLING UNIT

• Main components - Fan, Coil and Filter section


• Heat is conveyed by air
• Cool air is supplied to room by duct
• Air is cooled by passing through coil filled with chilled water
• Handles high air volume, static pressure and cooling capacity
• Ideal for cooling big space
• Requires space for duct, AHU and chiller plant

Chilled
Water

Fresh Air

FAN COIL FILTER

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.2 Methods of Air Conditioning - 2

FCU – FAN COIL UNIT

• Main components - Fan, Coil and Filter section


• Heat is conveyed by water
• Cool air is supplied directly into room
• Handles low air volume, static pressure and cooling capacity
• Ideal for cooling individual room or area
• Suitable for removing local heat load e.g. beside window
• Difficult to supply fresh air
• Requires space for chiller plant

Chilled
Water

Fan Coil Fresh Air


Unit
Fan

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.2 Methods of Air Conditioning - 3

DX – SPLIT UNIT

• Main components - Fan Coil Unit and Condenser Unit


• Heat is conveyed by refrigerant
• Cool air is supplied directly into room
• Handles low air volume, static pressure and cooling capacity
• Ideal for cooling individual room or area
• Suitable for removing local heat load e.g. beside window
• Difficult to supply fresh air
• Requires outdoor space for condenser unit only
• Does not require chiller plant

Refrigerant Pipe

Fan Coil
(Indoor Unit)

Condenser (Outdoor Unit)

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.2 Methods of Air Conditioning - 4

PAC - PACKAGED UNIT (AIR-COOLED / WATER-COOLED)

• Main components - Indoor Unit and Outdoor Unit or Cooling Tower


• Heat is conveyed by condenser water or refrigerant
• Cool air can be supplied directly into the room or through duct.
• Self-contained unit complete with compressor inside unit
• Mid-range application when FCU or AHU is not suitable
• Requires outdoor space for condenser unit or cooling tower
• Additional pump required for water-cooled
• Does not require chiller plant

COOLING

Condenser Water
TOWER

Refrigerant Pipe

CONDENSER (OUTDOOR UNIT)

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 1

Psychrometry is the study of atmospheric air - that is air and its


associated water vapour.

Dry
DryAir
Air
• The water vapour is completely
Nitrogen
Nitrogen 78%
78%
independent of the gases. The gases’
behaviour is not effected by the Oxygen
Oxygen 21%
21%
vapour’s presence or absence. Other
Othergases
gases 1%
1%
• For any given temperature there is a
maximum amount of water vapour Humid
that can exist. HumidAirAir
Dry
Dryair
air 98%
98%--99%
99%
• With increased temperature there is
Water
Watervapour
vapour 1%
1%--2%
2%
an increase in the amount of water
vapour that can exist.
Atmospheric
AtmosphericPressure
Pressure
Range
Rangeatatsea
sealevel
level 95
95kPa
kPa--105
105kPa
kPa
Standard
Standardatm.
atm.pressure
pressure 101.325
101.325kPa
kPa

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 2

Psychrometric Chart

34 35 36 37 38 39 40 41 42 43 44 45
39
27
0. 033 38

33
26
37

600
0. 032

650
550

700
25 36

500
0. 031

750

32
35

45
24 0. 030

0
80
34
40
0

0
23 0. 029

85

31
35
0 33
0
90
30 0. 028
0 22
32
250

30
200 0. 027
21 31
150
100
Psychrometric
湿り空気線図 Chart 0. 026
30

29
50 20
0
(Atomospheric
(大気圧 760mmHg) 760mmHg) 0. 025 29

90
-100
-200 19

28

80
0. 024 28
-400

70
-600 18 27
0. 023

27
-1000

60
26
-2000 17 0. 022
-3000
)

50
25
D) A

26
- 6000
- 10000
nce
gD(A
16
iffere
± ∞ 0. 021

Partial Pressure of water vapor h


D
idity l/gk(
100 00 24

(DA)(DA)
Hum ox kcal/kg caal/
k
60 0 0

40
25
alpy uR=aditi/d
40 00 0. 020
3000
Enth cal/k
g ii kkc 15 23

熱水分 i / dx k
2500 比
pyピ

x kg/kg
lル
u=d
0. 019

水  蒸  気  分  圧    h mmHg
24
haタ
2000 22
14
tン

湿  度      x kg/kg
1800
1600
1500
Enエ 0. 018 21

23

mmHg
13
1400

絶  対 Humidity
0. 017 20
1300

22
1200 12 19
0. 016
0

21
1.0 110
11 18

Absolute
0. 015
0 20
100 17

0.92
0.9
0 10
95 0. 014

19
16
0
90
0.8 9 18 W湿
et球B 0. 013
15
温u度
lb
0
85

17 t't'℃℃ 0. 012
8 14
16
0.7 13
0. 011
7 15
12
14
t 0. 010
H ea
sibleF r
6 13 11
Se顕n熱比aSH
F cto 12 0. 009
0.6
10
5 11
0. 008
10 9

0.91
4 9
0. 007
8 90 8
7 80
3 6 70 0. 006 7

t℃
5 60

Bulb t℃
0.5 4 6
2 50 0. 005
3

乾球温度
2 40
1
ity φ% 5

度idφ
0 % 0. 004
1 30
e対 um
H湿
Relativ相
-1 4
26

Dry
-2
-3 22 0. 003
-4
18 3
14
0. 002 2
10

6 1
0. 001
2
0
0. 000
-5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
3
Temperature
温 度 t℃ t ℃ Specific比容積
Volume
   vm/kgv(Dm
A) /kg(DA) 3

0.77 0.78 0.79 0.80 0.81 0.82 0.83 0.84 0.85 0.86 0.87 0.88 0.89 0.90

Takasago Thermal Engineering Co., Ltd.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 3

Psychrometric Terms

e
urv
nc
o
ati
tur

yit
id
sa

m
Hu
e
t iv
la
Re
Ent
ha l py

Absolute Humidity

We
Dew Point

tB

Dry Bulb
ulb

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 4

Psychrometric Sample

34 35 36 37 38 39 40 41 42 43 44 45
27 39

0.033 38
26

33
37

600
0.032

650
550
Dry Bulb 22 ℃

700
25
36
0.031

500

750

32
24 35

450
0.030

800
34

0
23

40

85
0.029

31
0
0 90
35 0 33

Relative Humidity 50 %
22 0.028
300
32

30
250 0.027
21
200 31
150
100 Psychrometric
湿り空気線図 Chart 20
0.026
30

29
50
0 (Atomospheric
(大気圧 
760 mmHg) 760mmHg) 0.025 29

90
-100 19
-200

28

80
0.024 28

Absolute Humidity 0.0082Kg/kg (DA) -400 18

70
-600 27
0.023

27
-1000

60
17 26
-2000 0.022
-3000
)

50
25
DA

26
-6000
ce エ 16
feren
-10000

g(
0.021

y Dif
±∞

Partial Pressure of water vapor h


タル /k
midit
10 0 0 0 24
ピ cal

Absolute Humidity x kg/kg (DA)


60 0 0
熱水 比uu = atio

40
lpy分H

25
40 0 0 15 0.020
3000 tha R di kg i ikkc
Due Point 11.1℃ En /d 23
caall//kg
xkkc

絶 
2500 a
i / dx py 14 l/kg
u=d al
0.019

水 蒸 
2000

24

対 
1800 h (D 22
nt A)

湿 度   x kg/kg (DA)


1600
1500 E 0.018 21

気 分 圧  h mmHg
23
13

mmHg
1400
1300 0.017 20

22
120 12
0
19
1100 0.016

21
1.0 11

Wet Bulb 15.5 ℃


18
100 20 0.015

10.
0
17

0.92
0.9 950 10

3Kc
0.014

19
900 16
18 We
al/k
9

15.
0.8 0.013
tB
u t'℃
15
85

温度lb t'
g
17
0

(DA 5℃ 湿球 ? 0.012 14

%
16

)
0.7

Enthalpy 10.3Kcal/kg (DA) 50


15 0.011 13
7
14 12
eat
0.010
le H 6 13
nsib r
Se顕
11
0.6 cto
FaSH
熱比
F 5
10
11
12 0.009

0.008
0.0082Kg/kg (DA) 10

0.91
4 9
8 90 0.007 8
7 80
3 70
6 0.006 7
5 60

Dry Bulb t ?
0.5

乾球温度 t
2 4 50 6
3 0.005
2 40
1 0
1
相対湿 idity f % 0.004
5
-1 30
e Hum
度 φ%
Relativ
-2 26 4


-3 22
-4 0.003
18 3
14
0.002 2
10
6 1
0.001
2
0
0.000
-5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
3
Temperature
温度 t ℃ t? Specific比Volume
容積  vm /kgv3(DAm
) /kg(DA)
0.77 0.78 0.79 0.80 0.81 0.82 0.83 0.84 0.85 0.86 0.87 0.88 0.89 0.90

11.1℃ 22 ℃ Takasago Thermal Engineering Co., Ltd.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 5

Understanding Psychrometry
Relative Humidity

Saturated Air * Same Temperature


100% relative
humidity

10 5

Air + Water Vapour Water 10 Water 5 3 2

RH 100% RH 50% 30% 20%

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 6

Understanding Psychrometry
Relative Humidity & Temperature

30degC 30degC

20degC B B

RH 100% RH 100% RH 50%

• For any given temperature there is a maximum amount of water vapour that can exist.
• With increased temperature there is an increase in the amount of water vapour that can exist.

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 7

Understanding Psychrometry
Real Figure of Relative Humidity & Temperature & Absolute Humidity
20℃ 30℃ 30℃

0.89 m3 0.89 m3
0.85 m3

0.0000147m 3 0.0000272m3 0.0000133m3

RH 100% RH 100% RH 50%


Air 1kg Air 1kg Air 1kg
Water 0.015kg Water 0.027kg Water 0.013kg

Absolute Humidity Absolute Humidity Absolute Humidity


0.015kg/kg(DA) 0.027kg/kg(DA) 0.013kg/kg(DA)

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 8

Properties of Air and Water

Specific Gravity

Water 1,000 kg/m3

Air 0℃ 1.28 kg/m3


10 ℃ 1.23 kg/m3 Design 1.2 kg/m3
20 ℃ 1.17 kg/m3
30 ℃ 1.12 kg/m3

Specific Heat

Water 1 kcal/kg 4.19kJ/kg

Air 0.24 kcal/kg 1.01 kJ/kg

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 9

Heat

Sweat Vapor Latent Heat

Breath
+

Temperature
Sensible Heat
22℃

=
Temperature
36℃
Heat
Total Heat

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 10

Heat

Water
10 L
10 kg

20 ℃ 100 ℃ 100 ℃

( 100-20 )℃ x 10 kg x 1 kcal/kg ℃ 540 kcal/kg x 10 kg = 5,400 kcal


= 800 kcal
( latent heat of vaporization : 540 kcal/kg )

Sensible Heat Latent Heat

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 11

Psychrometric Process

20℃ 26℃
72% 50%

20℃ 26℃
72% 50%

Cooling

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 12

Psychrometric Process

12℃ 34℃
100% 65%

34℃ 26.8℃
65% 100% 12℃
Dehumidifying
100%
Cooling

Cooling

34℃
65%
12℃ Dehumidifying
100%

Cooling

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 13

Psychrometric Calculation

Supply Air Condition


Q m3/h ?
12℃, 100%

Room Condition
23℃, 50%
SH = 31,700 kcal/h 12℃
100% 23℃
50%

q SH kcal/h
Q m3/h =
1.2 kg/m3 x 0.24 kcal/kg ℃ x ⊿ T(air)℃

31,700
=
1.2 x 0.24 x (23 – 12)

= 10,000 m3/h

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 14
Cooling Capacity
Psychrometric Calculation
q TH kcal/h ?
Fresh Air Condition
10,000 m3/h
Supply Air Condition 34℃, 65%
12℃, 100%
g 21
a l /k .6
kca
kc l /kg 34℃
.5 65%
Room Condition 13
I=
23℃, 50% ⊿
SH = 31,700 kcal/h 8.1
kca
l/kg
23℃
12℃ 50%
100%

q TH kcal/h = 1.2 kg/m3 x Q m3/h x ⊿ i kcal/kg(DA)

= 1.2 x 10,000 x (21.6 – 8.1 )

= 162,000 kcal/h

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 15

Psychrometric Calculation
12℃ Chilled water flow rate
Cooling Capacity V l/min ?
162,000 kcal/h

Supply Air Condition 10,000 m3/h


12℃, 100% Fresh Air Condition
34℃, 65%

7℃
g 21
Room Condition a l /k .6
kca
23℃, 50% kc l /kg 34℃
.5 65%
SH = 31,700 kcal/h 13
I=

8.1
kca
l/kg
23℃
12℃ 50%
100%
V l/h = q TH kcal/h / ⊿T (water) ℃
= 162,000 / (12 – 7)

= 32,400 l/h
= 540 l/min

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 16
Cooling Capacity
Psychrometric Calculation 162,000 kcal/h
12℃ Drain volume
Chilled water flow rate
540 l/min VD l/min ?

Supply Air Condition 10,000 m3/h


12℃, 100% Fresh Air Condition
34℃, 65%

7℃
Room Condition
23℃, 50% 34℃
SH = 31,700 kcal/h 65%
0.0225 kg/kg (DA)

23℃ 0.0087 kg/kg (DA)


50%
12℃
100%
VD l/h = 1.2 kg/m3 x Q m3/h x ⊿x kg/kg (DA)
= 1.2 x 10,000 x (0.0225 – 0.0087)

= 165 kg/h = 0.165 m3/h


= 2.75 l/min

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
1.3 Psychrometry - 17

Psychrometric
Calculation

34℃
65%
TH

12℃ LH
100%

SH

q TH kcal/h = 162,000 kcal/h


q SH kcal/h = 1.2kg/m3 x 0.24kcal/kg ℃ x 10,000m3/h x (33 – 12)℃
= 60,480 kcal/h

q LH kcal/h = q TH - q SH = 101,520 kcal/h

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 1

Purpose of ventilation

Ventilation is the provision of outside fresh air to achieve:

• Adequate oxygen to maintain life


• Dilution of odours to a socially acceptable level - e.g. kitchen
• To limit the concentration of carbon dioxide, CO 2
• To remove contaminants created in the space

Ventilation air may also be required for:

• Combustion appliances - e.g. boilers


• Prevention of condensation
• Smoke clearance in the event of fire
• To provide natural cooling

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 2

Fresh air requirement


For Human
refer to CP13

For Production
depends on owner’s specification

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 3

Ventilation Modes

NATURAL VENTILATION
Natural ventilation is defined as the change of air in a building
by means of natural openings such as doors, windows,
louvres, etc.

MECHANICAL VENTILATION
Mechanical ventilation is a means of ventilating the space
through mechanical systems, e.g. fans

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 4

Methods of Mechanical Ventilation

Supply Air Exhaust Air


Fan Fan

Filter

Room

Method 1

To maintain temperature and air circulation


• switch room
• plant room
• lift motor room
• kitchen

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 5

Methods of Mechanical Ventilation

Supply Air
Fan

Filter Exhaust
Opening

Room

Method 2

To maintain air circulation


• boiler room

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 6

Methods of Mechanical Ventilation

Exhaust Air
Fan

Intake air
opening
Room

Method 3

To control smell
• toilet
• kitchen

Takasago Thermal Engineering Co.,Ltd


1.Basic Air Conditioning
1.4 Ventilation - 7

Extract from CP13:1999


Table 2 - Outdoor air supply requirement for mechanical ventilation in
non air-conditioned buildings

Minimum outdoor air supply


Type of building / Occupancy
Air-change/h
Offices 6
Restaurants, canteens 10
Shops, supermarkets and department stores 6
Workshops, factories 6
Classrooms 8
Theatres and cinemas 8
Lobbies***, concourse, corridors, staircases
and exits 4
Toilets**, bathrooms 10
Kitchens (commercial, institutional and
industrial) 20
Car Parks 6*
Fire Command Centres 6
Civil Defence Shelters 16*
Wastewater facilities / pumping installation 8

Note:
* Where the ceiling exceeds 2.5m, the air change rate will be calculated based 2.5m ceiling height.
** For heavily used public toilets, refer to Code of Practice on Environmental Health.
*** Lobbies of area 10m2 or less are exempted from being mechanically ventilated.

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 1

Heat Source Roof

Ceiling
Lighting

Fresh Air Window Human


Equipment

Wall

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 2

Typical values
Unit Heat Load (1)

SH : Skin Load 40 – 60 kcal/h m2


(Wall, Ceiling, Window ….)
Human 50 – 60 kcal/h Person
Light 20 – 25 kcal/h m2
Equipment depends on power wattage of equipment
(PC, Copy ….)

LH : Human 50 – 60 kcal/h Person


Fresh Air depends on amount of fresh air

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 3

Typical values
Unit Heat Load (2)

Office : Normal 100~150 kcal/h m2


Under Roof 130~180 kcal/h m2

CR : 150~400 kcal/h m2

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 4

AHU Selection

RA SA

Room 4 Room 3 Room 2 Room 1

Fresh
Air

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 5

AHU Selection

Cooling Capacity and Supply Air Flow


75,000
500 m2 x 150 kcal/h m2 0.288 x (23 – 12)

Area Unit Heat Load SH Supply Air Flow


(m2) (kcal/h m2) (kcal/h) (m3/h)
Room 1 500 150 75,000 23,700
Room 2 300 150 45,000 14,300
Room 3 150 150 22,500 7,200
Room 4 150 150 22,500 7,200
Total 1,100 165,000 52,400

Fresh Air

Area Minimum fresh air rate Fresh Air Flow


Take Data from CP13
(m2) (m3/h per m2) (m3/h)
Room 1 500 2.3 1,200
Room 2 300 2.3 700
Room 3 150 2.3 400
Room 4 150 2.3 400
Total 1,100 2,700

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 6

AHU Selection
AHU Air Flow SA 52,400 m3/h FA 2,700
= = 0.05
FA 2,700 m3/h SA 52,400
RA 49,700 m3/h
MA 23.9℃, 54%

SA
52,400m3/h 34℃
12℃, 100% ity FA
65%

pac
C a
g
o lin
Co

95%
RA FA MA
SA
49,700m3/h 2,700m3/h
RA
23℃, 50% 34℃, 65% 5%

12℃ 23℃

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 7

AHU Selection
Enthalpy MA : i MA = 11.8 kcal/kg (DA)
SA : i SA = 8.1 kcal/kg (DA)

⊿i = 3.7 kcal/kg (DA)

Cooling Capacity
1.2 kg/m3 x Q m3/h x ⊿i kcal/kg
= 1.2 x 52,400 x 3.7
= 232,660 kcal/h

Water Flow Rate


⊿T = 5℃ (7 to 12 ℃)
232,660
5 x 1,000
= 46.5 m3/h
= 776 l/min

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 8

AHU Selection
Sample of AHU equipment schedule

AHU Area Specification Qty. Electricity Location


No

AHU-1 Room-1,2,3,4 Floor mounted type 1no. 3P-415V-7.5kW AHU room


Fan
52,400 m3/h x 30 mmAq

Coil
Cooling Capacity. : 232,660 kcal/h (TH)
Water Flow : 776 l/min (7 – 12 ℃)
on-coil : 23.9℃, 54%
off-coil : 12℃, 100%

Filter
Pre-filter
AHU-2

Takasago Thermal Engineering Co.,Ltd


2. Heat Load
2.1 Heat Load Calculation - 9

Chiller Selection

AHU Room SH kcal/h TH kcal/h


Room 1 75,000
Room 2 45,000
AHU-1 240,000
Room 3 22,500
Room 4 22,500
Room 5 28,000
Room 6 42,000
AHU-2 150,000
Room 7 20,000
Room 8 15,000
Room 9 84,000
AHU-3 180,000
Room 10 40,000

Total 394,000 570,000

Chiller Capacity
188 RT

1 USRT = 3024 kcal/h


Takasago Thermal Engineering Co.,Ltd
3. Flow Calculation
3.1 Air - 1

Air Balance

EA
1,900

D RA SA
49,700 52,400
C A
7,200 7,200 14,300 23,700
6,800 6,800 13,600 22,500
F
Toilet Room 4 Room 3 Room 2 Room 1 G
- + + + + FA

2,700
E
1,900 400 400 700 1,200
AHU-1 B
800
H Corridor

A=B+C 52,400 = 2,700 + 49,700


B=D+E 2,700 = 1,900 + 800
F=G+H 23,700 = 22,500 + 1,200

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 2

Frictional Loss

Steel Duct

Frictional Loss
λ = 0.0055 ( 1 + (20,000 x ε/d + 106 / Re) 1/3)

Frictional Loss
Steel Duct : 0.18
ε: Brick : 5.00
Concrete : 0.50
PVC : 0.0015

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 3

The Ductulator

Air Flow (cmm)

Friction loss

Air Flow (cmh)


Air Flow
(cmm)

Aspect
Ratio
Air velocity
Circular Duct

Rectangular Duct
Rectangular Duct (mm)
Air Duct Slide Rule
(Dry bulb: 20oC, Relative Humidity: 50%) s
h icknes
duct t
elocity m)
Low v (m

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 4

Duct Size & Static Pressure


Case 1
10m 10m 10m 10m

2500 cmh 5000 cmh 7500 cmh 10000 cmh


600x600 600x600 600x600 600x600
0 mmAq/m 0.03 mmAq/m 0.06 mmAq/m 0.1 mmAq/m

2500 cmh 2500 cmh 2500 cmh 2500 cmh

Total Frictional Loss


0.1x10 + 0.06x10 + 0.03x10 + 0x10
= 1.9mmAq
Duct Area 96m2

Case 2
2500 cmh 5000 cmh 7500 cmh 10000 cmh
350x300 450x450 550x550 600x600
0.1 mmAq/m 0.1 mmAq/m 0.1 mmAq/m 0.1 mmAq/m

2500 cmh 2500 cmh 2500 cmh 2500 cmh

Total Frictional Loss


0.1x10 + 0.1x10 + 0.1x10 + 0.1x10
= 4.0mmAq
Duct Area 78m2

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 5

Static Pressure Calculation

Louvre + Chamber
2.5m
5m

00 2.2m
0 x6
2m 70
5m
0
60
0x
10m 70 FAN 12,000m3/h
4m

2m 5m 0
60 60
2m 0x 0x
50 60
10m 0
2m 4 50
0x
55
0
x 30
3 50
25
0x
25
0
2m
1000m3/h each grille
0.3m

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 6
Static Pressure Calculation

FAN

Duct Local
Duct Rate of Duct Fittings Local Equipment
Item Flow rate Duct s ize Velocity friction res is tance
Area Friction los s length resistance resistance
loss factor, ζ
m3/h mm mm m2 m/s mmAq/m m mmAq - mmAq mmAq
v = Q/A from from = ζ*ρ air *v 2 /2g from
ductulator publ. data catalogue

1 FA louvre 12,000 3.00


2 a.contr. 12,000 2500 2200 5.50 0.61 8 0.18
3 str duct 12,000 700 600 0.42 7.94 0.1 5.0 0.50
4 contr. 12,000 700 600 0.42 7.94 0.24 0.92
5 fan
6 expn 12,000 dia. 500 0.20 16.98 0.13 2.29
7 str duct 12,000 700 600 0.42 7.94 0.1 2.0 0.20
8 damper 12,000 700 600 0.42 7.94 0.52 2.00
9 str duct 12,000 700 600 0.42 7.94 0.1 5.0 0.50
10 contr. 12,000 700 600 0.42 7.94 0.11 0.42
11 str duct 10,000 600 600 0.36 7.72 0.1 10.0 1.00
12 contr. 10,000 600 600 0.36 7.72 0.11 0.40
13 str duct 8,000 600 500 0.30 7.41 0.11 5.0 0.55
14 90 elbow 8,000 600 500 0.30 7.41 1.5 5.03
15 str duct 8,000 600 500 0.30 7.41 0.11 10.0 1.10
16 90 elbow 8,000 600 500 0.30 7.41 1.5 5.03
17 str duct 8,000 600 500 0.30 7.41 0.11 4.0 0.44
18 contr. 8,000 600 500 0.30 7.41 0.11 0.37
19 str duct 6,000 550 450 0.25 6.73 0.1 4.0 0.40
20 contr. 6,000 550 450 0.25 6.73 0.11 0.31
21 str duct 2,000 350 300 0.11 5.29 0.11 2.0 0.22
22 r. elbow 1,000 250 250 0.06 4.44 0.09 0.11
23 str duct 1,000 250 250 0.06 4.44 0.11 1.0 0.11
24 90 elbow 1,000 250 250 0.06 4.44 1.5 1.81
25 dropper 1,000 250 250 0.06 4.44 0.11 0.3 0.03
26 a. expn 1,000 250 250 0.06 4.44 0.36 0.43
27 FAgrille 1,000 600 250 0.15 1.85 2.30

Sub-Total 5.1 19.32 5.30


Total 29.67
Note:
a.contr. : abrupt contraction Friction Loss Sum 29.67 mmAq
str duct : straight duct Fan Total Pressure (x1.05) 31.16 mmAq
contr. : contraction 312 Pa
expn : expansion
90 elbow : 90o elbow
r. elbow : radius elbow
a.expn : abrupt expansion

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 7

Fan Selection

Sample of FAN equipment schedule

AHU Area Specification Qty. Electricity Location


No

SF-1 Room-1,2,3,4 Centrifugal Fan 1no. 3P-415V-7.5kW AHU room


12,000 m3/h x 31 mmAq

EF-1 Room-1,2,3,4 Centrifugal Fan 1no. 3P-415V-7.5kW Roof


11,000 m3/h x 30 mmAq

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Air - 8

Fan Performance

70 mmAq Design Point

Control by VCD
44 mmAq

25 mmAq

8000 m3/h 12000 m3/h 20000 m3/h

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.2 Water - 1

Water Balance

AHU-3 AHU-2 AHU-1

800 l/min 300 l/min 500 l/min


Chiller
1600 l/min

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.1 Water - 2

The Ductulator

Water Flow

Friction loss
Water Pipe (Steam Pipe) Slide Rule
Velocity (Water Temp: 20oC, Roughness: 0.3mm)

Water Flow
copper pipe size
Pipe size

steam pipe size steam


water pipe size
velocity

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.2 Water - 3

Head Calculation
2m

Ø10 2m
0
Ø10
0
Ø12
2m 5 5
5m Ø12 Ø12
5
5 Ø12 3m
5m
Ø80

5
AHU-3 Ø12
800 l/min
Ø100

0.2
AHU-2
m 300 l/min
PUMP
0.2
1600 l/min
m AHU-1
4m 500 l/min 1m
Chiller 2m
4m
1600 l/min 1m

3m

4m 1m
2m

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.2 Water - 4
Head Calculation

PUMP

Pipe Coeff. of
Rate of Valve & Fitting Equipment
Item Flow rate Pipe s ize Velocity Pipe length friction local friction
Friction los s friction loss friction loss
loss los s , ζ
l/min Ø mm m/s mmAq/m m mAq - mAq mAq
from from = ζ*ρ w ater *v 2 /2g from
ductulator pub l. data catalogue

1 S 1,600 125 2.17 37 2.0 0.07


2 GL V 1,600 125 2.17 10 2.41
3 S 1,600 125 2.17 37 3.0 0.11
4 L 1,600 125 2.17 0.9 0.22
5 S 1,600 125 2.17 37 2.0 0.07
6 L 1,600 125 2.17 0.9 0.22
7 S 1,600 125 2.17 37 3.0 0.11
8 GV 1,600 125 2.17 0.19 0.05
9 S 1,600 125 2.17 37 2.0 0.07
10 L 1,600 125 2.17 0.9 0.22
11 S 1,600 125 2.17 37 1.0 0.04
12 CHILLER 1,600 125 2.17 5.00
13 S 1,600 125 2.17 37 1.0 0.04
14 L 1,600 125 2.17 0.9 0.22
15 S 1,600 125 2.17 37 2.0 0.07
16 GL V 1,600 125 2.17 10 2.41
17 S 1,600 125 2.17 37 3.0 0.11
18 L 1,600 125 2.17 0.9 0.22
19 S 1,600 125 2.17 37 2.0 0.07
20 L 1,600 125 2.17 0.9 0.22
21 S 1,600 125 2.17 37 4.0 0.15
22 T 1,600 125 2.17 1.8 0.43
23 S 1,100 125 1.49 18 4.0 0.07
24 T 1,100 125 1.49 1.8 0.21
25 S 800 100 1.70 29 4.0 0.12
26 L 800 100 1.70 0.9 0.13
27 S 800 100 1.70 29 2.0 0.06
28 GV 800 100 1.70 0.19 0.03
29 S 800 100 1.70 29 3.0 0.09
30 L 800 100 1.70 0.9 0.13
31 S 800 100 1.70 29 0.2 0.01
32 AHU 800 100 1.70 3.00
33 S 800 100 1.70 29 0.2 0.01
34 L 800 100 1.70 0.9 0.13
35 S 800 100 1.70 29 3.0 0.09
36 GL V 800 100 1.70 10 1.47
37 S 800 100 1.70 29 2.0 0.06
38 L 800 100 1.70 0.9 0.13
39 S 800 100 1.70 29 4.0 0.12
40 T 800 100 1.70 1.8 0.26
41 S 1,100 125 1.49 18 4.0 0.07
42 T 1,100 125 1.49 1.8 0.21
43 S 1,600 125 2.17 37 2.0 0.07
44 L 1,600 125 2.17 0.9 0.22
45 S 1,600 125 2.17 37 8.0 0.30
46 L 1,600 125 2.17 0.9 0.22
47 S 1,600 125 2.17 37 2.0 0.07
48 L 1,600 125 2.17 0.9 0.22
49 S 1,600 125 2.17 37 3.0 0.11
50 GV 1,600 125 2.17 0.19 0.05
51 S 1,600 125 2.17 37 2.0 0.07
52 L 1,600 125 2.17 0.9 0.22
53 S 1,600 125 2.17 37 1.0 0.04

Sub-Total 2.27 10.22 8.00


Total 20.49
Note:
S : straight pipe Friction Loss Sum 20.5 mAq
L : 90o elbow Pump Head (x1.05) 21.5 mAq
T : tee
GV : gate valve
GL V : globe valve

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.2 Water - 5

Pump Selection
Sample of PUMP equipment schedule

AHU Area Specification Qty. Electricity Location


No

CHW-1 Chilled water Centrifugal Pump 3no. 3P-415V-11kW Chiller


pump 1600 l/min x 22 mAq room

CW-1 Cooling water Centrifugal Pump 3no. 3P-415V-15kW Chiller


pump 15000 l/min x 30 mAq room

Takasago Thermal Engineering Co.,Ltd


3. Flow Calculation
3.2 Water - 6

Pipe Pressure

1 kg/cm22 = 1 bar 2m
Expansion
Tank

Piping Pressure loss


0.5 kg/cm2 1.1 kg/cm2
2.5 kg/cm2
6m
P P 0.5 kg/cm2
2.8 kg/cm2
3m
AHU

Pressure Drop
0.3 kg/cm2

1.4 kg/cm2 Pressure loss Pump 30mH


6m 3.1 kg/cm2 0.5 kg/cm2 Pressure Drop (3 kg/cm2)
P P
0.5 kg/cm2
P P P

CHILLER 1.4 kg/cm2


AHU
1.4 kg/cm2

1.4 kg/cm2 1.4 kg/cm2 1.4 kg/cm2


• Pressure when pump stop
3.4 kg/cm2 3.9 kg/cm2 4.4 kg/cm2
• Pressure when pump running

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
3.2 Water - 7

What is pressure?

Air Weight = 1 atm

10m

1mm

Air

This pressure is 1mmAq This pressure is 10mAq

1 mmAq = 9.81 Pa
1 mAq = 9.81 kPa = 0.1 kgf/cm2 = 0.098 bar = 0.097 atm

Takasago Thermal Engineering Co.,Ltd


1. Basic Air Conditioning
3.2 Water - 8
36,000 km stationary satellite
What is pressure?

satellite

300 km
500 km

100 km

80 km air

Atmosphere

50 km 1 atm
Stratosphere

Mount
Everest
8,848 m
10 km Troposphere

Takasago Thermal Engineering Co.,Ltd


4. Automatic Control
4.1 Elements of Control - 1
DDC or PLC DDC: Direct Digital Controller
Temperature
PLC: Programmable Logic Controller
Control

Return
Air
Supply
Air

Room

Fresh Air
AHU Note: All control valves to
be installed in return line

2-way valve 3-way valve

100%
50%

Takasago Thermal Engineering Co.,Ltd


4. Automatic Control
4.1 Elements of Control - 2

Humidity Control
DDC or PLC

Dew Point or
Temperature
Sensor
DP

Fresh Air

MAU
DDC or PLC

MAU

Return
Air
Supply
Air
Dew
Point
AHU
T
Room

AHU

Takasago Thermal Engineering Co.,Ltd


4. Automatic Control
4.1 Elements of Control - 3

Room Pressure Control

DDC or PLC

VSD

Supply Fresh Air


Air
AHU

P
Room

Takasago Thermal Engineering Co.,Ltd


4. Automatic Control
4.1 Elements of Control - 4
DDC or PLC
VAV (Variable Air Volume)
Control
DDC or PLC

VSD
Supply DP P Fresh Air
Air

VAV AHU

Return
Air

T T T
Change
Room Room Room
q
Q=
0.288 x ⊿T
Change
Constant

Takasago Thermal Engineering Co.,Ltd


4. Automatic Control
4.1 Elements of Control - 5

Supply Water
Pressure Control
AHU

AHU

AHU

supply DDC or PLC return


P

Chiller

Chiller

Takasago Thermal Engineering Co.,Ltd


5. Conversion Table

Conversion Table
3
Flow 1 cfm = 1.7 m /h
3
1 l/min = 0.06 m /h
3
1 USgpm = 0.227 m /h

2
Pressure 1 kgf/cm = 98.1 kPa
1 mmAq = 9.81 Pa
1 mmHg = 133 Pa
1 atm = 101 kPa
1 bar = 100 kPa
1 psi = 6.89 kPa
1 inAq = 249 Pa
1 ftAq = 2.99 kPa

Energy 1 kW = 860 kcal/h

1 Btu/h = 0.25 kcal/h


1 USRt = 3024 kcal/h

o o
Temperature t C = 5(t F-32)
9

Takasago Thermal Engineering Co.,Ltd


Basic Technical Training

Takasago Thermal Engineering Co.,Ltd