248 1,958.91 1,339.15 68.36 248 1,955.69 1,340.01 68.52
- Roads
LSBs 3 233.14 9.18 3.94 3 233.14 9.18 3.94
1,958.91 1,955.69 Km
248 248
Km roads 1,348.33 roads
Total roads roads 1,349.19*
233.14 m * 233.14 m
3 LSBs 3 LSBs
LSBs LSBs
*MoRD Share : Rs. 809.29 Crores State Share : Rs. 539.90 Crores
Target : 3,285 Km Sanctioned : 935.84 km
5.5 m width road- 3 Nos & Length – 25.30 km - Rs. 132.34 Lakhs/Km
3.75 m width road – 245 Nos & Length- 1,930.39 Km – Rs. 67.68 Lakhs/Km
RQI proposed for 13.28 kms
BT-838.35 kms, WBM-39.16 kms, Gravel – 531.72 kms, Track – 521.20
kms
Average Cost lakhs /Km
140 132.34
120
100
80 69.01 67.68
52.28 55.26
60 48.53
40
20
0
2017-18 (PMGSY) 2018-19 (PMGSY) 2019-20 (PMGSY- 2019-20 (PMGSY- Pre EC (3.75) Pre EC (5.50)
III-3.75) III-5.50)
Length wise proposal details
Length Cost in Average
Sl No Items No of roads
in km Crores cost/Km
1 2 to 3 km 3 7.53 4.89 64.94
Sl Traffic
No of
No details Length Cost Rs. Average No of Length Cost Rs. Average
road
in Km In Lakhs cost/Km roads in Km In Lakhs cost/Km
s
*190 roads of 2,200.65 kms (59%) proposed with 5.50 m carriageway width
**78 roads of 1,161.76 kms (80.44%) proposed with 5.50 m carriageway
width
*** All roads proposed with 5.50 m carriageway width
$3 roads of 25.30 Km proposed with 5.50 carriageway width
Average cost Trends
Current proposal
PMGSY-III
5.50 m carriageway PMGSY-I PMGSY-II RCPLWE
3.75 m carriageway width (Batch I)
Sl width
District
No Avera Avera
Leng
Length Total ge Total ge 3.75 5.50 2017 2018 2013- 2018- 2017 2018 2019
Nos Nos th in
in Kms Cost cost/ Cost cost/K m m -18 -19 14 19 -18 -19 -20
Kms
Km m
Anantapu 69.1
1 10 134.54 58.57 43.53 46.80 52.09 44.61
r 0
2 Chittoor 30 213.37 114.76 53.78 56.89 45.99
East
3 10 61.13 34.93 57.14 51.08 39.47 44.86 50.22 67.18 29.81
Godavari
88.9 10.0 156.0
4 Guntur 28 180.96 160.93 1 15.60 54.07
3 0 0
83.3 15.3 116.8 114.9
5 Krishna 24 176.29 147.01 2 17.88 72.01 58.34
9 0 6 1
6 Kurnool 17 170.47 85.95 50.42 65.35 47.90
7 Nellore 20 163.76 115.11 70.29 70.64 53.75
Srikakula 70.0
9 10 72.77 50.97 62.00 49.51 51.12 69.55 60.83
m 4
Visakhap
10 2 15.49 8.83 57.00 50.78 53.65 45.89 61.55 70.80 72.75 65.01
atnam
Vizianaga
11 5 43.37 29.45 67.90 53.04 54.83 62.35 55.89 81.48 80.36 78.02
ram
West 111. 102.2
12 27 168.61 188.02 54.53
Godavari 51 0
YSR
13 43 357.98 198.99 55.59 41.55 62.67
Kadapa
1930. 1306. 67.6 25.3 132.3 55.2 69.1 52.8 47.9 50.7 93.9 69.5 73.5 62.1
Total 245 3 33.48
34 53 8 0 3 6 0 2 4 7 9 6 2 1
Existing surface wise cost comparison (3.75 m carriageway width roads)
Existing BT surface Existing WBM Existing Gravel Track
Sr. Distric Len Pav Len Pav Len Pav Pav
No t Co Cos Tota Tota Leng Cos Tot Cos
gth eme Total Cost gth eme Cost gth eme Cost Cost eme
. Name Nos st/ Nos t/K l Nos l Nos th in t/K al t/K
in nt cost /KM in nt /KM in nt /Km /KM nt
Km m cost cost Km m cost M
Km cost Km cost Km cost cost
Anantap 112.7 31.7 10.0 46.3
1 8 35.85 48.48 42.99 2 21.77 7.85 36.06
ur 7 9 9 5
25.4 140.5 82.5 58.7
2 Chittoor 3 22.66 5.77 7.44 32.83 7 50.17 17.80 35.48 24.79 49.41 20 60.41 42.98
6 4 3 2
East 46.2
3 10 61.13 28.30 34.93 57.14
Godavari 9
120.9 54.5 118.4 44.1 99.6
4 Guntur 18 66.02 99.54 82.28 1 6.85 3.91 57.08 6.80 99.27 2 8.8 7.75 88.07 10.42 7 44.34 33.55 75.67
7 8 1 8 4
Srikakul 37.5
9 10 72.77 27.35 50.97 70.04
am 8
Visakhap 15.4
10 2 5.31 34.28 8.83 57.00
atnam 9
Vizianag 37.9
11 2 21.69 8.22 13.95 64.32 1 4.55 2.18 47.91 3.10 68.13 2 17.13 5.69 33.22 12.40 72.39
aram 0
Note: Arunachal Pradesh has completely adopted the Model APLM Act, 2017. Uttar
Pradesh and Chhattisgarh have partially adopted the provisions of the Model Act
while Punjab has adopted only selected provisions of the Model Act.
Maintenance
(to be borne by State Government)
Value in % w.r.t
Item Remarks
Lakhs Const. Cost.
PMGSY-III
5 Years Routine
7,440.87 5.55% Can be agreed to.
Maintenance cost
6th Year’s Renewal
27,501.46 20.52% Can be agreed to.
coat
13
R & D Proposals
Technology No of Roads Length in Km
14
R&D Technology
Sl Description Minimum Length Percentage
No length to proposed in of R& D
be Km roads with
proposed respect to
in Km total length
1 to 5 99 40%
5 - 15 105 42%
16 to 50 42 17%
51 to 100 2 0%
Total 248
Too many
proposals in
Chittoor
Aspirations Districts
Visakhapatnam is not
saturated enough
Exceptional Blocks
Blocks with high proposals
District Block % DRRP Length Being
Proposed
Chittoor Ramasamudram 17%
Chittoor Nagalapuram 15%
Anantapur Puttaparthi 15%
Chittoor Kurabalakota 13%
Y S R Kadapa Simhadripuram 13%
Chittoor Mandanpalle 12%
*Aspirational Districts
Exclusions in Priority
Trace Map
Road Name CUCPL Rank Remark
Rank
Excess habitation
(T01)-Rayachoty -T.sundupalli road 2
30 mapping,insufficient
to Mallayagutta palli (Proposed)
habitation maping, .
District Block
Y S R Kadapa Rayachoti
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace Map
Road Name CUCPL Rank Remark
Rank
Excess habitation
2
(MRL01)-Animela to Gangireddipalli 26 mapping,insufficient
(Proposed)
habitation maping. .
District Block
Y S R Kadapa V N Palli
Trace Map
Road Name CUCPL Rank Remark
Rank
Excess habitation
(T02)-N.Palagiri to Gangireddipalli 1 mapping,insufficient
14
via Pochamreddipalli, Sangalapalli (Proposed) habitation
maping,merging issue. .
District Block
Y S R Kadapa V N Palli
Trace Map
Road Name CUCPL Rank Remark
Rank
6
(T05)-Animela to V.N.Palli at Insufficient habitation
(Not 3
Yeramalapalli road via N.Palagiri mapping,
Proposed)
District Block
Krishna Pamarru
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace map
GIS GIS
Trace Map
Road Name CUCPL Rank Remark
Rank
Insufficient habitation
(MRL04) Kathipudi Pamarru NH road 14 (not mapping further only 2
4
at 243 0 to Z golvepalli via Baliparu Proposed) habitation are mapped
having no facility.
District Block
Krishna Unguturu
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace Map
Road Name CUCPL Rank Remark
Rank
14
(T02) TVV road from Telaprolu to Insufficient habitation
(Not 1
Indupalli upto mandal limits mapping,.
Proposed)
District Block
Krishna Bapulapadu
Trace Map
Road Name CUCPL Rank Remark
Rank
(MRL01)-MNK road at
Mirjapuram to Chillaboinapalli 18 Insufficient habitation
24
via Billanapalli, Madicherla (Proposed) mapping.
District Block
Krishna Bapulapadu
Trace Map
Road Name CUCPL Rank Remark
Rank
(T02)
21
Veeravalli to Nuzvid via Insufficient habitation
(Not 5
Rangannagudem, Singannagudem, mapping.
Proposed
Malavalli up to Mandal Limits
Block Redo District Block
Srikakulam Vajrapukothur
u
T shape
T08 Deppuru to Bahadapalli 6 ( Proposed) 81 proposed(Complete
length proposed)
District Block
West Godavari Narasapuram
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace Map
Road Name CUCPL Rank Remark
Rank
Trace Map
Road Name CUCPL Rank Remark
Rank
(T01) 7
Gadivemula to Regadagudur via Insufficient habitation
(Not 1
Korrapolur mapping.
Proposed)
District Block
Chittoor Vijaya Puram
Trace Map
Road Name CUCPL Rank Remark
Rank
State to
verify what
is the
alignment
in DPR
Trace Map
Road Name CUCPL Rank Remark
Rank
1.4 State to
km verify what
is the
alignment
in DPR
Trace Map
Road Name CUCPL Rank Remark
Rank
Chittoor 3 27 30 90%
Prakasam 3 16 19 84%
Krishna 5 21 26 81%
Y S R Kadapa 11 32 43 74%
Kurnool 7 10 17 59%
District TRACE MAP
Block name WORK NAME CUPL RANK Remark
Name RANK
100% Earthen
Roads
Not creating big
shortcuts either
District Block TRACE MAP
WORK NAME CUPL RANK Remark
Name name RANK
T02-NH 71 (Palacentre) to
Mandanp Enumulavaripalle via Complete
Chittoor 2 28
alle Vandadivaripalle,KothaGandlap Earthen Road
alle,Kondamarivaripalle
100% Earthen
Roads
Not MRL/TR or big
short-cuts
District Block TRACE MAP
WORK NAME CUPL RANK Remark
Name name RANK
100% Earthen
Roads
Not MRL/TR or big
short-cuts
District Block TRACE MAP
WORK NAME CUPL RANK Remark
Name name RANK
Proposed
Earthen
Road
Completely Earthen roads need to be re-
considered if they are actually meeting our
guidelines or need to be dropped
Roads Having PCI > 2, Eligible Only for RQI,
But average cost Considered is more than 50 lakhs/km
TOTAL
Minimum TOTAL RIDING AVERA
Length CARRIA COST
District Trace Eligible LENGTH QUALIT GE
Sr.No Block name WORK NAME PACKAGE ID having GE OF
Name Map Length Propose Y COST
PCI>2 WIDTH PROJEC
Rank d LENGTH PER KM
T
T05-Pesaravai to
1 Kurnool Gadivemula 24 AP10PIII06 6.99 6.99 6.99 0.00 3.75 530.00 75.78
Regadagudur
MRL13-
East Rampachod AP05PIII
4 Rampachodavaram to 9 9.30 9.30 9.45 0.00 3.75 503.58 53.29
Godavari avaram RCV 01
Busiguem (via) Rampa
Remark By PIU:
Badly damaged Bt surface
Remark By PIU:
Badly damaged CC surface
Andhra Pradesh
SANCTIONED, COMPLETED, BALANCE AND UNAWARDED WORKS
TYPE OF WORK-ROADS
SANCTIONED COMPLETED
BALANCE ROAD UNAWARDED
S. No SCHEME LENGTH LENGTH BALANCE LENGTH
Nos. LENGTH (Km) Nos.
(Km) (Km) (Km)
352.88 24.60
1 PMGSY I 4,439 13,769.21 4,329 13,005.61 (110 Nos.) (4 Nos.)
40.10 10.85
2. PMGSY-II 174 1,330.95 169 1,252.07 (5 Nos.) (2 Nos.)
935.84 935.84
3. PMGSY-III 129 935.84 - - (129 Nos.) (129 Nos.)
TYPE OF WORK-LSBs
BALANCE
SANCTIONED COMPLETED UNAWARDED
S.No SCHEME (NOs.)
(NOs.) (NOs.) (NOs.)
Apr. May Jun July Aug Sep Oct. Nov Dec Jan Feb. Mar Total Hab.
A 2 13 17 13 11 29 18 50 43 30 32 63
C 2 15 32 45 56 85 103 153 196 226 258
% of Habitations
Habitations
Category Eligible Habitations Habitations Cleared Connected w.r.t
Connected
cleared
In Progress
Preparatory Earthwork Sub-base Base Surface
SCHEME Sanction Misc.
Work Subgrade Preparation Course Course
Length
PMGSY-I 438.095 323.211 281.170 172.562 158.347 109.011 1.330
PMGSY-II - - - - - - -
eMARG STATUS
Admin 1
STATE LEVEL Coordinator 1
Others 1
USER REGISTRATION PIU 20
DISTRICT
Others 441
Total: 464
Total Workable Packages 453
Freezed Packages 447
Pre-EC:-05.03.2020
Andhra Pradesh as on 02.03.2020
Quality Control - 1 ,2 & 3 tier
st nd rd
Pending at NRRDA Pending with state Pending at NRRDA Pending with state
Year Requir
Require Regra Regra
For Required ed For Required
d Initially ded For Not ded For Not
TC/Verific clarificatio Initially TC/Verific clarificatio
approval submitted approval submitted
ation n ation n
> 5 year
44 44 0 0 0 0 45 44 0 0 1 0
(10-15)
>4 year
15 15 0 0 0 0 42 42 0 0 0 0
(15-16)
>3 year
0 0 0 0 0 0 4 4 0 0 0 0
(16-17)
(17-19) 1 1 0 0 0 0 11 10 0 1 0 0
Apr’19- 2 0 0 2 0 0 11 3 0 2 6 0
Till date
0 0 0 0 0 3 7 0
Total 62 60 113 103
0 0 3 7
Andhra Pradesh as on 02.03.2020
30.0% 24.1%
21.1% 20.5%
6.7%
20.0% 12.2%
14.7%
12.2% 13.3%
11.6%
10.5% 10.7%11.1%
10.0% 0.0% 5.4%
4.6% 3.4% 0.0%
0.0% 0.0%
0.0%
2011-14 2012-15 2013-16 2014-17 2015-18 2016-19 2017-February'20
Completed works Ongoing works Maintenance works
Total Ins. ‘U’ (in nos.) ‘U’ (in %) Total Ins. ‘U’ (in nos.) ‘U’ (in %) Total Ins. ‘U’ (in nos.) ‘U’ (in %)
(April’11- February’20)
Completed Re-graded = 0.00% On-Going Re-graded = 1.49% Maintenance Re-graded =17.10%
(Target : To Achieve 95% satisfactory grading in Completed work & 85% Satisfactory grading
in work under Maintenance Period for Financial Year 2019-20).
Andhra Pradesh as on 02.03.2020
(Target : To Achieve 95% satisfactory grading in Completed work & 85% Satisfactory grading
in work under Maintenance Period for Financial Year 2019-20).
Andhra Pradesh as on 02.03.2020
Reasons S/E & E/W not Poor material & Inadequate Thickness of Surface QC record & Quality
proper Workmanship Grain size, WBM & Grain Unevenness & registers not arrangement on
Plasticity & size not Thickness of proper site not proper
compaction proper layer not proper
268 Maintenance work inspections have been conducted during Apr’17 to Feb’2020.
Out of these 44 SRI inspections & 56 Unsatisfactory Inspections
State Level Quality Indicator National Level
Work graded Satisfactory by NQM ( Apr'17 to Feb'20) Work graded Satisfactory by NQM ( Apr'17 to Feb'20)
Completed works Ongoing works Maintenance work Completed works Ongoing works Maintenance work
100.00% 94.56% 79.48% 92.78% 92.21% 74.48%
Contractor wise inspection during (2013-19) Contractor wise inspection during (2013-19)
Contractrors
Total contractors involved In % Total contractors involved Contractrors inspected In %
inspected
206 205 99.5% 12383 10156 82%
Andhra Pradesh
Finance & Account for F.Y 2018-19
(Pre Empowered Committee Meeting : 05-03-2020)
Amount (Rs. in Crore)
Note: Central share pending to be released from State Treasury (as on 02-03-20 ): 243.14 Crore
State share pending to be released from State Treasury (as on 02-03-20 ) : 160.09 Crore
Total share pending to be released from State Treasury (as on 02-03-20 ) : 403.23 Crore
Details of Completed Works Pending Financial Closure-
Andhra Pradesh
(As on 02-03-2020)
Physical Physically Financially Pending Financial
Completion Completed Completed Completion
Year Works Works
2001-09 2809 2809 0
2009-10 629 627 2
2010-16 923 923 0
2016-17 100 99 1
2017-18 52 47 5
2018-19 55 48 7
2019-20 168 53 115
4736 4606 130(2.74%)
• Out of 130 works, 65(50%) are pending for more than 180 days.