Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Group no: 3
PLANT LAYOUT
INTRODUCTION
EFFICIENCY AND
SUITABLE LAYOUT PERFORMANCE
WHAT IS PLANT?
Building Fixtures
MACHINES
WHAT IS PLANT?
TOOLS
SERVICE
MACHINERY
WHAT IS PLANT?
WORK
SHOP
EQUIPMENT
WHAT IS LAYOUT ?
ARRANGEMENT OF
FACILITIES Tools
Equipment
LAYOUT
To raise
To reduce the cost
productive
of production
efficiency
OBJECTIVE
OBJECTIVE
IMPORTANCE OF PLANT LAYOUT
Quick
SAVE execution
HANDLING of
Better
REMOVE Quality
OPTIMUM USE OF AVAILABLE
Control
BOTTLENECKS
AREA orders
COST
IMPORTANCE OF PLANT LAYOUT
Improved
Limited
Improved
production
investment
supervision
control
Improved
Best use
employee
of labour
morale
Factors influencing plant layout.
1. Type of industry:
For example- the layout of chemical factory ill be different as
compared to the layout of an engineering unit. Thus, plant layout
is influenced by the type of industry.
Factors influencing plant layout.
2.Nature of plant
location
6.Space required by
machines
Factors influencing plant layout.
7. Facilities required
by workers
8.Management polices
Factors influencing plant layout.
9.SIZE OF OUTPUT
10.Miscellaneous factors
Various tools
and technique
Two-
METHODOLOGY dimensional
templates
Depends upon
the layout
TYPES OF TOOLS AND
TECHNIQUE
Process charts
Machine data
cards
Visualization of layout
CURRENT SCENARIO
Principle of minimum
movement Flexibility
Full utilization of
Maintain sequence available
of operation space
Safety and
Integration satisfaction
of the customers
ADVANTAGES OF SCIENTIFIC PLANT
LAYOUT.
Reduction in manufacturing
time
2. ADVANTAGES OF SCIENTIFIC
PLANT LAYOUT.
ADVANTAGES OF SCIENTIFIC PLANT
LAYOUT.
3. Superior customer services due to
A competitive price
ADVANTAGES OF SCIENTIFIC PLANT
LAYOUT
4.Satisfaction to workers due to
Limited burden of
supervision
FEATURES OF GOOD PLANT LAYOUT
Effective
Maximum
Production
flexibility
Control
FEATURES OF GOOD PLANT LAYOUT
Convenience in Adequate
storing gangway space
Ineffective Congestion of
Long production
Excessive amount
Production
supervision and material,
cycles and delays
of work
control in
on components &
bottlenecks
inprocess
delivery
employees assemblies
DRAWBACKS OF POOR
LAYOUT
Low production density and under
utilization of plant capacity
Uneconomical materials
handling
Over specialization of
production facilities
PROCESS LAYOUT
Distance between
departments must
be short
Location of
departments
Convenience
for inspection
Convenience
for
supervision
ADVANTAGES
Better
Better & more
Greater scope utilization of
e ff i c i e n t
supervision for expansion men &
machines
ADVANTAGES
Easier to handle
breakdown
Va r i e t y m a k e s
the job
interesting
DISADVANTAGES:
• Difficulty in movement of materials and machine
MEDICAL CLINIC
Neurology Gynecology Laboratory test
Rest room
Patient waiting
Reception
hall X-ray
room
Plastic &
Reconstructive
surgery
pediatrics
pediatrics
Patient entrance
pharmacy clinic
EXAMPLE:
• Labour specialization
• greater incentives
DISADVANTAGES
• Dull and repetitive jobs.
• inflexibility.
• expensive.
• difficulty of supervision.
• Expansion is difficult.
PACKAGING
MACHINE
DRILL
PRESS PAINTING
#1 MACINE
FINISH
PRODUCTION
F I XED LAY OUT
Involves the movement The materials or major
of men & components remains in a fixed
machines location
EXAMPLE:
Manufacturing of bulky & heavy products, such as, construction of
buildings and dams, locomotives, ships, boilers, aircraft & generators.
ADVANTAGES
Investment is very
small
Wide variety of
operations and
products
DISADVANTAGES
Production period is Capital investment is
very long very heavy
Large space is
required for storage
Possibility of
confusion and
conflicts
FIXED POSITION LAYOUT
Raw materials
Floor space
Minimum cost
Improves productivity
Improves productivity
2.DECIDING THE LAYOUT
Nature of product
Production process
Size of building
Human needs
3.PLANT LAYOUT SHOULD