Sei sulla pagina 1di 10

 Weekly Reports for EU

Report by Mr .Hnin Maung Maung


(Card number-2160-000440)
1. Membranes inside RO housing changing
2. Desolate flange of RO outlet pipe repairing
3. Ultra filter for EDI system & Guard filter cleaning at EU Chemical Water treatment.
• Chemical Water
Treatment for EU
• Replacement of RO membranes by Third party during EU shutdown
• Date-3,8,2017 (Thursday )
• Shift – first shift

2
e 1&
 Lower three RO housing

stag
2
are secondary stage. e 1&
g
 Upper five RO housing sta

RO
) - RO

(1)-
are primary stage.
RO Housing Unit(2

Unit
Replacement of RO membrane
at chemical water treatment
1) Necessary Tools – 1 ton ,Grip-O-Magic Puller (OTC tool) ,Hummer
,plier ,Monkey wrench , L key set, wrench size 14 & 15.
2) Man power – Third party with ME and Production team(Total-9)
3) Duration time – 15hr
• Replacement of RO membrane
at chemical water treatment

Adjustable key of RO membrane Remove RO membrane with


OTC TOOL
1. Firstly, we must removed adjustable keys.
Remove adjustable key of RO 2. After remove keys, dislodge membrane from RO housing with OTC.
membrane from RO Housing Remark ; We have to count and conserve adjustment keys of RO.
• Replacement of RO membrane
at chemical water treatment

Remove RO membrane elements Replacement new RO membrane Type-CPA3-LD


from RO Housing elements inwards RO housing
• Replacement of RO membrane
at chemical water treatment

Test running is OK.


 Desolate flange of RO outlet pipe
repairing

Initial State Broken flange of RO outlet pipe Final State


 Ultra Filter for EDI system and Guard Filter
Checking & Cleaning at EU Chemical Water
Treatment
 We checked & cleaned block
of filters to flow water very
well.
 We checked & repaired
pressure gauge of all filter.
 We must change new
pressure gauge because
most pressure gauge were
suffer such as air & water
leakage, damage v/v.
Thanks You

By Mr. Hnin Maung Maung